Measurement & Verification Plan

Greater Latrobe School District

Investment Grade Audit

Measurement & Verification Plan

Section 5 Measurement & Verification

Greater Latrobe School District Investment Grade Audit Report

This section of the report provides information for the measurement and verification (M&V) of the savings associated with each of the energy conservation measures (ECMs) recommended for implementation.

Facility energy or water savings are determined by comparing the energy use before and after the installation of the facility improvement measures. The “before” case is called the baseline. The “after” case is referred to as the post-installation or performance period. Proper determination of savings includes adjusting for changes that affect energy use but that are not caused by the facility improvement measures. Such adjustments may account for differences in weather and occupancy conditions between the baseline and performance periods.

In general,

Savings = Baseline Energy Use – Post Installation Energy Use ± Baseline Adjustments

a. Approaches to Measurement & Verification

The International Measurement and Verification Protocols (IPMVP) outlines four approaches to provide suitable techniques to verify the savings associated with implementation of a FIM. An additional approach is Calculated Savings. The five M&V approaches are:

Option A – Measured Capacity

Option B – Measured Consumption

Option C – Whole Facility

Option D – Calibrated Simulation

Option E – Calculated (Stipulated)

Option

A- Measured Capacity

This approach is intended for Facility Improvement Measures where, with a one-time measurement for specific equipment or system’s instantaneous Baseline energy use, and a onetime measurement for specific equipment or system’s instantaneous post-implementation, (Post) energy use can be measured. Baseline and Post energy consumption is calculated by multiplying the measured end use instantaneous capacity (i.e., kW, Gal/hr, BTU/hr) by stipulated hours of operation for each mode of operation (i.e., hours, week, month). The calculations for energy consumption have been defined in the FIM Description Section (IV).

Industry, Inc.
2022 Smart Infrastructure Page 69
Siemens
September 9,

Option B- Measured Consumption

Greater Latrobe School District

Investment Grade Audit Report

This approach is intended for Facility Improvement Measures where continuous periodic measurements for specific equipment or systems baseline energy use, and continuous periodic measurements for that equipment or systems post-implementation, (Post) energy use can be measured. The calculations for energy consumption will be defined in this Measurement and Verification Section. Periodic inspections and consumption measurements of the equipment or systems will be necessary to verify the on-going efficient operation of the equipment and savings attainment. The predetermined schedule for data collection, evaluation, and reporting will also be defined.

Option C- Whole Facility

Savings are determined by measuring energy use at the whole facility or sub-facility level. Continuous measurements of the entire facility’s energy use are taken throughout the reporting period. Baseline and reporting period energy use will be determined by analyzing the whole facility’s utility data. Routine and non-routine adjustments will be made as required using techniques such as simple comparison or regression analysis.

Option D- Calibrated Simulation

This approach is intended for Facility Improvement Measures where the savings are determined through simulation of the energy use of components or the whole facility. The energy use simulation is calibrated with hourly or monthly utility billing data and/or end-use metering.

Option E- Calculated (Stipulated)

This approach is intended for Facility Improvement Measures where the end use capacity or operational efficiency; demand, energy consumption or power level; or manufacturer’s measurements, industry standard efficiencies or operating hours are known in advance, and used in a calculation or analysis method that will determine the outcome. Both CLIENT and CONTRACTOR agree to the inputs and outcome(s) of the analysis methodology. Based on the established analytical methodology the calculated savings will be achieved upon completion of the Facility Improvement Measures Work and that no further measurements or calculations will need to be performed.

b. M&V Option Selected for Each Energy Conservation Measure

As the master plan is finalized and scope of work for this project is finalized, Siemens will work with Greater Latrobe School District to determine which retrofit option best fits each ECM. Table 5.1 shows which option is recommended at this time for each energy conservation measure.

Siemens
September
2022 Smart Infrastructure Page 70
Industry, Inc.
9,
Greater Latrobe School District Investment Grade Audit Report Siemens Industry, Inc. September 9, 2022 Smart Infrastructure Page 71 Table 5.1: M&V Option Recommended for Each ECM ECM ECM Description Measurement and Verification Types A B C D E Partially Measured Retrofit Isolation Retrofit Isolation Whole Facility Calibrated Simulation Calculated (Stipulated) 1 Lighting Retrofits X 2 Building Envelope Improvements X 3 Chilled Water System Optimization X 4 Walk-in Cooler/Freezer Fan Control X 5 HVAC & Controls Replacement X 6 Dynamic VAV Optimization 7 Kitchen Hood Fan Control X

Greater Latrobe School District

Investment Grade Audit

Appendices
Appendices

APPENDIX A Lighting Retrofits – Scope of Work and Savings Calculations

APPENDIX B

Building Envelope Improvements – Scope of Work

CalculationMethod Facility Name RTS Map ID# Existing Description Upgraded Code Description Quantity (Existing) Total Air Leakage Area (in2) Total Energy Loss (kWh) Total Energy Loss (Therms) Total Upgraded Energy Loss (kWh) Total Upgraded Energy Loss (Therms) Total Energy Savings (kWh) Total Energy Savings (Therms) AthleticComplex LockerRoom PenetrationVentCaulk Ductwork-Wall 15.00 11.53 32.11 0.58 1.61 10.96 30.51 AthleticComplex EN AP1 DoorPenetrationCaulkDoor-Frame 13.77 8.68 24.18 0.43 1.21 8.25 22.98 AthleticComplex EN AP1 DoorPenetrationReplaceVerticalSweep-DoorSweep 14.84 11.17 31.11 0.89 2.49 10.28 28.62 AthleticComplex EN AP1 DoorPenetrationCaulkDoor 11.71 3.95 10.99 0.20 0.55 3.75 10.44 AthleticComplex EN AP12 DoorPenetrationReplace-DoorSweep 10.56 1.30 3.61 0.10 0.29 1.19 3.32 AthleticComplex EN AP11 DoorPenetrationReplace-DoorSweep 10.56 1.30 3.61 0.10 0.29 1.19 3.32 AthleticComplex EN AP2 DoorPenetrationReplace-DoorSweep 10.56 1.30 3.61 0.10 0.29 1.19 3.32 AthleticComplex EN AP3 DoorPenetrationReplace-DoorSweep 10.56 1.30 3.61 0.10 0.29 1.19 3.32 AthleticComplex EN AP4 DoorPenetrationReplace-DoorSweep 10.56 1.30 3.61 0.10 0.29 1.19 3.32 AthleticComplex EN AP5 DoorPenetrationReplace-DoorSweep 10.56 1.30 3.61 0.10 0.29 1.19 3.32 AthleticComplex EN AP6 DoorPenetrationReplace-DoorSweep 10.56 1.30 3.61 0.10 0.29 1.19 3.32 AthleticComplex EN AP7 DoorPenetrationReplaceAstragal-DoorSweep 19.70 22.38 62.32 1.79 4.99 20.59 57.33 AthleticComplex EN AP8 DoorPenetrationCaulkDoor 11.71 3.95 10.99 0.20 0.55 3.75 10.44 AthleticComplex EN AP8 DoorPenetrationCaulkDoor-Frame 13.77 8.68 24.18 0.43 1.21 8.25 22.98 AthleticComplex EN AP8 DoorPenetrationReplaceVerticalSweep-DoorSweep 14.84 11.17 31.11 0.89 2.49 10.28 28.62 AthleticComplex EN AP9 DoorPenetrationReplace-DoorSweep 10.56 1.30 3.61 0.10 0.29 1.19 3.32 AthleticComplex EN AP10 DoorPenetrationReplace-DoorSweep 10.56 1.30 3.61 0.10 0.29 1.19 3.32 AthleticComplex LockerRoom PenetrationVentCaulk Ductwork-Wall 15.00 11.53 32.11 0.58 1.61 10.96 30.51 AthleticComplex LockerRoom PenetrationVentCaulk Ductwork-Wall 15.00 11.53 32.11 0.58 1.61 10.96 30.51 AthleticComplex LockerRoom PenetrationVentCaulk Ductwork-Wall 15.00 11.53 32.11 0.58 1.61 10.96 30.51 AthleticComplex Mechanical Room PenetrationVentCaulkDuctwork-Wall 15.00 11.53 32.11 0.58 1.61 10.96 30.51 AthleticComplex Mechanical Room PenetrationVentCaulkDuctwork-Wall 15.00 11.53 32.11 0.58 1.61 10.96 30.51 AthleticComplex Mechanical Room PenetrationWindowCaulkBlack-Window-Frame-Wall 11.50 3.46 9.63 0.17 0.48 3.29 9.15 AthleticComplex Mechanical Room PenetrationWindowCaulkBlack-Window-Frame-Wall 13.88 8.94 24.89 0.45 1.24 8.49 23.64 AthleticComplex Mechanical Room PenetrationWindowCaulkBlack-Window-Frame-Wall 11.50 3.46 9.63 0.17 0.48 3.29 9.15 AthleticComplex Mechanical Room PenetrationWindowCaulkBlack-Window-Frame-Wall 13.88 8.94 24.89 0.45 1.24 8.49 23.64 AthleticComplex Mechanical Room PenetrationWindowCaulkBlack-Window-Frame-Wall 11.50 3.46 9.63 0.17 0.48 3.29 9.15 AthleticComplex Mechanical Room PenetrationWindowCaulkBlack-Window-Frame-Wall 13.88 8.94 24.89 0.45 1.24 8.49 23.64 SeniorHigh Hallway Wall toCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 263.68 146.86 408.95 7.34 20.45 139.52 388.50 SeniorHigh PV20 WalltoCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 121.94 50.60 140.89 2.53 7.04 48.07 133.85 SeniorHigh PF24 WalltoCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 13.66 8.43 23.48 0.42 1.17 8.01 22.31 SeniorHigh TKTS Wall toCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 13.66 8.43 23.48 0.42 1.17 8.01 22.31 SeniorHigh P204andP205 Wall toCeiling AddFiberglassInsulation-Spray Foam-Wall-Ceiling 165.81 151.79 422.67 7.59 21.13 144.20 401.54 SeniorHigh PPA Wall toCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 274.81 172.55 480.47 8.63 24.02 163.92 456.45 SeniorHigh Mechanical Room PenetrationPipe Don'tDo 20.38 0.86 2.41 0.86 2.41 -SeniorHigh Mechanical Room PenetrationPipe Don'tDo 10.88 2.02 5.62 2.02 5.62 -SeniorHigh Mechanical Room PenetrationPipe Don'tDo 12.75 6.34 17.66 6.34 17.66 -SeniorHigh Mechanical Room PenetrationVentInsulateSprayfoam-Ductwork-Wall 14.50 10.38 28.90 0.52 1.45 9.86 27.46 SeniorHigh Mechanical Room PenetrationPipe Don'tDo 11.38 3.17 8.83 3.17 8.83 -SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.19 5.05 14.05 0.25 0.70 4.79 13.35 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.19 5.05 14.05 0.25 0.70 4.79 13.35 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.19 5.05 14.05 0.25 0.70 4.79 13.35 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.19 5.05 14.05 0.25 0.70 4.79 13.35 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.19 5.05 14.05 0.25 0.70 4.79 13.35 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 24.38 10.09 28.10 0.50 1.40 9.59 26.69 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 48.75 20.18 56.20 1.01 2.81 19.17 53.39 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 18.84 20.40 56.80 1.02 2.84 19.38 53.96 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 15.91 13.62 37.93 0.68 1.90 12.94 36.04 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 18.84 20.40 56.80 1.02 2.84 19.38 53.96 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 18.84 20.40 56.80 1.02 2.84 19.38 53.96 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 111.91 27.46 76.47 1.37 3.82 26.09 72.64 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 48.75 20.18 56.20 1.01 2.81 19.17 53.39 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 36.56 15.14 42.15 0.76 2.11 14.38 40.04 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 111.91 27.46 76.47 1.37 3.82 26.09 72.64 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 18.84 20.40 56.80 1.02 2.84 19.38 53.96 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 18.84 20.40 56.80 1.02 2.84 19.38 53.96 All information is proprietary and confidential and may only be shared or used with the written consent of ENVOCORE,Inc © 2011-2021 RTS Building Envelope, LLC BE LxL.xlsx1
SeniorHigh Hallway Wall toCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 131.84 73.43 204.47 3.67 10.22 69.76 194.25 SeniorHigh Hallway Wall toCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 124.75 57.08 158.95 2.85 7.95 54.23 151.01 SeniorHigh AD2 Wall toBeam-BeamCeilingInsulateSprayfoam-Wall-Beam-Ceiling 167.50 155.68 433.51 7.78 21.68 147.90 411.84 SeniorHigh AD2 Wall toBeam-BeamCeilingAddFiberglassInsulation-SprayFoam-Wall-Beam-Ceiling 159.63 137.52 382.93 6.88 19.15 130.64 363.79 SeniorHigh F201 Wall toPenetrationMetal PanRoofInsulateSprayfoam-Wall-PenetrationMetalPanRoof 15.63 12.97 36.13 0.65 1.81 12.32 34.32 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 11.94 4.47 12.44 0.22 0.62 4.25 11.82 SeniorHigh F201 Wall toPenetrationMetal PanRoofInsulateSprayfoam-Wall-PenetrationMetalPanRoof 120.25 46.70 130.05 2.34 6.50 44.37 123.55 SeniorHigh F206andF207 EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 163.28 145.95 406.42 7.30 20.32 138.65 386.10 SeniorHigh F207thruF208 WalltoCeiling InsulateSprayfoam-Wall-Ceiling 190.00 207.57 578.01 10.38 28.90 197.19 549.11 SeniorHigh F202thruF207 WalltoCeiling InsulateSprayfoam-Wall-Ceiling 1113.63 262.06 729.74 13.10 36.49 248.96 693.26 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 120.97 48.36 134.67 2.42 6.73 45.94 127.94 SeniorHigh D203 Wall toCeiling InsulateSprayfoam-Wall-Ceiling 133.75 77.84 216.76 3.89 10.84 73.95 205.92 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 24.38 10.09 28.10 0.50 1.40 9.59 26.69 SeniorHigh Hallway Wall toCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 131.84 73.43 204.47 3.67 10.22 69.76 194.25 SeniorHigh Hallway Wall toCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 124.75 57.08 158.95 2.85 7.95 54.23 151.01 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh Hallway Wall toCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 166.38 153.09 426.29 7.65 21.31 145.43 404.97 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 513.44 30.99 86.30 1.55 4.32 29.44 81.99 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 513.44 30.99 86.30 1.55 4.32 29.44 81.99 SeniorHigh Hallway Wall toCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 166.38 153.09 426.29 7.65 21.31 145.43 404.97 SeniorHigh Hallway Wall toCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 118.56 42.81 119.22 2.14 5.96 40.67 113.25 SeniorHigh S207thruS209 WalltoCeiling InsulateSprayfoam-Wall-Ceiling 178.75 181.63 505.76 9.08 25.29 172.55 480.47 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 120.97 48.36 134.67 2.42 6.73 45.94 127.94 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 120.97 48.36 134.67 2.42 6.73 45.94 127.94 SeniorHigh S202thruS204 WalltoCeiling InsulateSprayfoam-Wall-Ceiling 156.25 129.73 361.26 6.49 18.06 123.25 343.20 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 510.94 25.23 70.24 1.26 3.51 23.96 66.73 SeniorHigh Classrooms Wall toCeiling InsulateSprayfoam-Wall-Ceiling 170.31 162.17 451.57 8.11 22.58 154.06 429.00 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 120.97 48.36 134.67 2.42 6.73 45.94 127.94 SeniorHigh Classrooms Wall toCeiling InsulateSprayfoam-Wall-Ceiling 180.44 185.52 516.60 9.28 25.83 176.24 490.77 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 120.97 48.36 134.67 2.42 6.73 45.94 127.94 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh Hallway Wall toCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 131.50 72.65 202.31 3.63 10.12 69.02 192.19 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 36.56 15.14 42.15 0.76 2.11 14.38 40.04 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 48.75 20.18 56.20 1.01 2.81 19.17 53.39 SeniorHigh C3 Wall toBeam-BeamCeilingInsulateSprayfoam-Wall-Beam-Ceiling 125.88 59.68 166.18 2.98 8.31 56.69 157.87 SeniorHigh H206thruH209 WalltoCeiling InsulateSprayfoam-Wall-Ceiling 157.38 132.33 368.48 6.62 18.42 125.71 350.06 SeniorHigh H201thruH203 WalltoCeiling InsulateSprayfoam-Wall-Ceiling 157.38 132.33 368.48 6.62 18.42 125.71 350.06 SeniorHigh A202thruA209A WalltoCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 166.38 153.09 426.29 7.65 21.31 145.43 404.97 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 33.94 9.08 25.29 0.45 1.26 8.63 24.02 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 22.63 6.05 16.86 0.30 0.84 5.75 16.02 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 22.63 6.05 16.86 0.30 0.84 5.75 16.02 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 22.63 6.05 16.86 0.30 0.84 5.75 16.02 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 45.25 12.11 33.72 0.61 1.69 11.50 32.03 SeniorHigh L200 Wall toCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 158.50 134.92 375.71 6.75 18.79 128.18 356.92 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.91 6.70 18.67 0.34 0.93 6.37 17.73 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 19.00 20.76 57.80 1.04 2.89 19.72 54.91 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 19.13 21.05 58.60 1.05 2.93 19.99 55.67 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 24.38 10.09 28.10 0.50 1.40 9.59 26.69 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 24.38 10.09 28.10 0.50 1.40 9.59 26.69 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 24.38 10.09 28.10 0.50 1.40 9.59 26.69 SeniorHigh WN INT PenetrationWindowClearCaulk-Window-Sill 28.75 20.18 56.20 1.01 2.81 19.17 53.39 SeniorHigh WN INT PenetrationWindowClearCaulk-Window-Sill 28.75 20.18 56.20 1.01 2.81 19.17 53.39 SeniorHigh WN INT PenetrationWindowClearCaulk-Window-Sill 236.50 84.18 234.42 4.21 11.72 79.97 222.70 SeniorHigh WN INT PenetrationWindowClearCaulk-Window-Sill 236.00 83.03 231.21 4.15 11.56 78.88 219.65 SeniorHigh WN INT PenetrationWindowClearCaulk-Window-Sill 211.63 26.81 74.66 1.34 3.73 25.47 70.93 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh Hallway Penetration Don'tDo 13.00 6.92 19.27 6.92 19.27 -SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 18.75 20.18 56.20 1.01 2.81 19.17 53.39 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 18.75 20.18 56.20 1.01 2.81 19.17 53.39 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 18.75 20.18 56.20 1.01 2.81 19.17 53.39 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 18.75 20.18 56.20 1.01 2.81 19.17 53.39 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 18.75 20.18 56.20 1.01 2.81 19.17 53.39 All information is proprietary and confidential and may only be shared or used with the written consent of ENVOCORE,Inc © 2011-2021 RTS Building Envelope, LLC BE LxL.xlsx2
SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 18.75 20.18 56.20 1.01 2.81 19.17 53.39 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 18.75 20.18 56.20 1.01 2.81 19.17 53.39 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN Hallway PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.69 6.20 17.26 0.31 0.86 5.89 16.40 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 48.75 20.18 56.20 1.01 2.81 19.17 53.39 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 36.56 15.14 42.15 0.76 2.11 14.38 40.04 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 48.75 20.18 56.20 1.01 2.81 19.17 53.39 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 114.84 34.24 95.33 1.71 4.77 32.52 90.57 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 114.84 34.24 95.33 1.71 4.77 32.52 90.57 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 114.53 33.51 93.33 1.68 4.67 31.84 88.66 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 114.84 34.24 95.33 1.71 4.77 32.52 90.57 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.81 6.49 18.06 0.32 0.90 6.16 17.16 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 114.84 34.24 95.33 1.71 4.77 32.52 90.57 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.81 6.49 18.06 0.32 0.90 6.16 17.16 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 114.84 34.24 95.33 1.71 4.77 32.52 90.57 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 114.84 34.24 95.33 1.71 4.77 32.52 90.57 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.81 6.49 18.06 0.32 0.90 6.16 17.16 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 114.84 34.24 95.33 1.71 4.77 32.52 90.57 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 114.84 34.24 95.33 1.71 4.77 32.52 90.57 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 115.16 34.96 97.34 1.75 4.87 33.21 92.47 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 114.84 34.24 95.33 1.71 4.77 32.52 90.57 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 115.16 34.96 97.34 1.75 4.87 33.21 92.47 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 12.81 6.49 18.06 0.32 0.90 6.16 17.16 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 114.84 34.24 95.33 1.71 4.77 32.52 90.57 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 613.13 30.27 84.29 1.51 4.21 28.76 80.08 SeniorHigh Hallway Wall toBeam-BeamCeilingInsulateSprayfoam-Wall-Beam-Ceiling 1197.44 455.36 1,268.02 22.77 63.40 432.60 1,204.62 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 36.56 15.14 42.15 0.76 2.11 14.38 40.04 SeniorHigh ENReceivingRoom InteriorDoor Don'tDo 11.84 4.25 11.83 4.25 11.83 -SeniorHigh ENReceivingRoom InteriorDoor Don'tDo 11.84 - 11.83 - 11.83 -SeniorHigh ENMechanical Room InteriorDoor Don'tDo 11.42 3.27 9.10 3.27 9.10 -SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 120.97 48.36 134.67 2.42 6.73 45.94 127.94 SeniorHigh D201 Wall toCeiling InsulateSprayfoam-Wall-Ceiling 156.25 129.73 361.26 6.49 18.06 123.25 343.20 SeniorHigh WN INT PenetrationWindowInsulateSprayfoam-Window -Frame-Wall 410.75 24.79 69.04 1.24 3.45 23.55 65.59 SeniorHigh Hallway Wall toCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 263.68 146.86 408.95 7.34 20.45 139.52 388.50 JuniorHigh StorageRoom Wall toPenetrationMetal PanRoofInsulateSprayfoam-Wall-PenetrationMetalPanRoof 116.50 38.06 105.97 1.90 5.30 36.15 100.67 JuniorHigh ConferenceRoom Wall toBeam-BeamCeilingInsulateSprayfoam-Wall-Beam-Ceiling 118.00 41.51 115.60 2.08 5.78 39.44 109.82 JuniorHigh ConferenceRoom PenetrationWall InsulateSprayfoam-Soffit 119.50 44.97 125.24 2.25 6.26 42.73 118.97 JuniorHigh ConferenceRoom MissingInsulationNoCost 1- 8.39 13.68 3.05 4.97 5.34 8.70 JuniorHigh Classrooms EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 149.50 114.17 317.91 5.71 15.90 108.46 302.01 JuniorHigh Classrooms EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 149.50 114.17 317.91 5.71 15.90 108.46 302.01 JuniorHigh Shop EnergyWall AddRigidInsulation-SprayFoam-Wall-Ceiling 149.50 114.17 317.91 5.71 15.90 108.46 302.01 JuniorHigh EN37 EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 14.73 10.90 30.35 0.54 1.52 10.35 28.83 JuniorHigh EN35 EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 17.88 18.16 50.58 0.91 2.53 17.25 48.05 JuniorHigh Break Room EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 19.00 20.76 57.80 1.04 2.89 19.72 54.91 JuniorHigh EN34 EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 14.73 10.90 30.35 0.54 1.52 10.35 28.83 JuniorHigh Classrooms EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 149.50 114.17 317.91 5.71 15.90 108.46 302.01 JuniorHigh EN32 EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 14.73 10.90 30.35 0.54 1.52 10.35 28.83 JuniorHigh Classrooms EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 118.75 43.24 120.42 2.16 6.02 41.08 114.40 JuniorHigh Classrooms EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 156.25 129.73 361.26 6.49 18.06 123.25 343.20 JuniorHigh EN29 EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 17.88 18.16 50.58 0.91 2.53 17.25 48.05 JuniorHigh StorageRoom Wall toPenetrationMetal PanRoofInsulateSprayfoam-Wall-PenetrationMetalPanRoof 116.50 38.06 105.97 1.90 5.30 36.15 100.67 JuniorHigh Hallway EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 188.50 204.11 568.38 10.21 28.42 193.91 539.96 JuniorHigh StorageRoom Wall toPenetrationMetal PanRoofInsulateSprayfoam-Wall-PenetrationMetalPanRoof 116.50 38.06 105.97 1.90 5.30 36.15 100.67 JuniorHigh JanitorCloset EnergyWall AddRigidInsulation-SprayFoam-Wall-Ceiling 17.50 17.30 48.17 0.86 2.41 16.43 45.76 JuniorHigh Stairwell EnergyWall AddRigidgInsulation-Wall-Ceiling 124.00 55.35 154.14 2.77 7.71 52.59 146.43 JuniorHigh Stairwell EnergyWall AddRigidgInsulation-Wall-Ceiling 124.00 55.35 154.14 2.77 7.71 52.59 146.43 JuniorHigh LockerRoom EnergyWall AddRigidgInsulation-Wall-Ceiling 184.00 193.73 539.48 9.69 26.97 184.05 512.51 JuniorHigh LockerRoom EnergyWall AddRigidgInsulation-Wall-Ceiling 184.00 193.73 539.48 9.69 26.97 184.05 512.51 JuniorHigh LockerRoom EnergyWall AddRigidgInsulation-Wall-Ceiling 184.00 193.73 539.48 9.69 26.97 184.05 512.51 SeniorHigh EN1 DoorPenetrationReplaceVerticalSweep-DoorSweep 216.22 37.41 104.16 2.99 8.33 34.41 95.83 SeniorHigh EN67 DoorPenetrationReplaceVerticalSweep-DoorSweep 216.22 37.41 104.16 2.99 8.33 34.41 95.83 SeniorHigh EN57 DoorPenetrationReplaceVerticalSweep-DoorSweep 217.34 40.00 111.39 3.20 8.91 36.80 102.48 SeniorHigh EN2 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.62 45.24 125.99 3.62 10.08 41.62 115.91 SeniorHigh ENCourtyard4 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.62 45.24 125.99 3.62 10.08 41.62 115.91 SeniorHigh Hallway Wall toCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 130.94 71.35 198.69 3.57 9.93 67.79 188.76 SeniorHigh Hallway Wall toCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 130.94 71.35 198.69 3.57 9.93 67.79 188.76 SeniorHigh EN3 DoorPenetrationReplaceVerticalSweep-DoorSweep 321.94 50.60 140.89 4.05 11.27 46.55 129.62 SeniorHigh EN4 DoorPenetrationReplaceVerticalSweep-DoorSweep 643.88 101.19 281.78 8.10 22.54 93.10 259.24 SeniorHigh EN5 DoorPenetrationReplaceVerticalSweep-DoorSweep 214.63 33.73 93.93 2.70 7.51 31.03 86.41 SeniorHigh ENPool InteriorDoor Don'tDo 11.84 4.25 11.83 4.25 11.83 -SeniorHigh ENPool InteriorDoor Don'tDo 11.42 3.27 9.10 3.27 9.10 -SeniorHigh ENPool InteriorDoor Don'tDo 11.42 3.27 9.10 3.27 9.10 -SeniorHigh ENPool InteriorDoor Don'tDo 11.42 3.27 9.10 3.27 9.10 -All information is proprietary and confidential and may only be shared or used with the written consent of ENVOCORE,Inc © 2011-2021 RTS Building Envelope, LLC BE LxL.xlsx3
SeniorHigh ENPool InteriorDoor Don'tDo 11.42 3.27 9.10 3.27 9.10 -SeniorHigh ENPool InteriorDoor Don'tDo 11.42 3.27 9.10 3.27 9.10 -SeniorHigh EN14 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.28 42.16 117.41 3.37 9.39 38.79 108.02 SeniorHigh EN15 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.69 45.41 126.44 3.63 10.12 41.77 116.33 SeniorHigh EN16 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.69 45.41 126.44 3.63 10.12 41.77 116.33 SeniorHigh EN13 DoorPenetrationReplaceWeatherstripping-DoorSweep 111.25 25.95 72.25 2.08 5.78 23.87 66.47 SeniorHigh ENMechanical Room InteriorDoor Don'tDo 11.84 4.25 11.83 4.25 11.83 -SeniorHigh EN12 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.97 46.06 128.25 3.68 10.26 42.37 117.99 SeniorHigh EN11 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.97 46.06 128.25 3.68 10.26 42.37 117.99 SeniorHigh EN10 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.97 46.06 128.25 3.68 10.26 42.37 117.99 SeniorHigh EN9 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.97 46.06 128.25 3.68 10.26 42.37 117.99 SeniorHigh OGD1 ExistingGarageDoorReplaceWeatherstripping-OverheadGarageDoor 126.72 61.62 171.60 4.93 13.73 56.69 157.87 SeniorHigh OGD1 ExistingGarageDoorCaulk-Door-Trim-Wall-Exterior 113.64 31.46 87.61 1.57 4.38 29.89 83.23 SeniorHigh EN7 DoorPenetrationReplaceWeatherstripping-Vertical Sweep-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 SeniorHigh EN8 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 SeniorHigh EN6 DoorPenetrationReplaceVerticalSweep-DoorSweep 17.31 16.87 46.96 1.35 3.76 15.52 43.21 SeniorHigh ENCourtyard3 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.62 45.24 125.99 3.62 10.08 41.62 115.91 SeniorHigh ENCourtyard2 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.62 45.24 125.99 3.62 10.08 41.62 115.91 SeniorHigh ENCourtyard1 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 SeniorHigh EN53 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 SeniorHigh EN54 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 SeniorHigh EN56 DoorPenetrationReplaceVerticalSweep-DoorSweep 17.88 18.16 50.58 1.45 4.05 16.71 46.53 SeniorHigh EN58 DoorPenetrationReplaceVerticalSweep-DoorSweep 17.88 18.16 50.58 1.45 4.05 16.71 46.53 SeniorHigh EN66 DoorPenetrationReplaceVerticalSweep-DoorSweep 643.88 101.19 281.78 8.10 22.54 93.10 259.24 SeniorHigh EN65 DoorPenetrationReplaceVerticalSweep-DoorSweep 214.63 33.73 93.93 2.70 7.51 31.03 86.41 SeniorHigh EN64 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 SeniorHigh EN61 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.69 45.41 126.44 3.63 10.12 41.77 116.33 SeniorHigh EN63 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 130.16 69.57 193.73 5.57 15.50 64.00 178.23 SeniorHigh EN62 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 SeniorHigh OGD1 ExistingGarageDoorReplaceWeatherstripping-OverheadGarageDoor 132.96 76.02 211.70 6.08 16.94 69.94 194.76 SeniorHigh EN60 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.69 45.41 126.44 3.63 10.12 41.77 116.33 SeniorHigh EN59 DoorPenetrationReplaceVerticalSweep-DoorSweep 17.88 18.16 50.58 1.45 4.05 16.71 46.53 SeniorHigh EN56 DoorPenetrationReplaceWeatherstripping-DoorSweep 111.25 25.95 72.25 2.08 5.78 23.87 66.47 SeniorHigh EN55 DoorPenetrationReplaceWeatherstripping-DoorSweep 112.38 28.54 79.48 2.28 6.36 26.26 73.12 SeniorHigh OGD2 ExistingGarageDoorReplaceWeatherstripping-OverheadGarageDoor 147.25 108.98 303.46 8.72 24.28 100.26 279.18 SeniorHigh EN52 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.69 - 126.44 - 10.12 - 116.33 SeniorHigh EN51 DoorPenetrationReplaceWeatherstripping-DoorSweep 111.25 - 72.25 - 5.78 - 66.47 SeniorHigh EN50 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.69 - 126.44 - 10.12 - 116.33 SeniorHigh EN49 DoorPenetrationReplaceWeatherstripping-DoorSweep 111.25 - 72.25 - 5.78 - 66.47 SeniorHigh OGD3 ExistingGarageDoorReplaceWeatherstripping-Astragal-DoorSweep 127.25 - 174.99 - 14.00 - 160.99 SeniorHigh EN48 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.69 - 126.44 - 10.12 - 116.33 SeniorHigh EN47 InteriorDoor Don'tDo 11.42 3.27 9.10 3.27 9.10 -SeniorHigh EN46 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.69 45.41 126.44 3.63 10.12 41.77 116.33 SeniorHigh EN45 DoorPenetrationReplaceWeatherstripping-DoorSweep 111.25 25.95 72.25 2.08 5.78 23.87 66.47 SeniorHigh EN44 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 JuniorHigh EN43 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.31 44.54 124.03 3.56 9.92 40.98 114.11 JuniorHigh EN42 DoorPenetrationReplaceWeatherstripping-DoorSweep 111.81 27.24 75.86 2.18 6.07 25.06 69.80 JuniorHigh EN41 DoorPenetrationReplaceWeatherstripping-DoorSweep 111.81 27.24 75.86 2.18 6.07 25.06 69.80 JuniorHigh EN40 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 JuniorHigh EN39 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 478.19 180.33 502.15 14.43 40.17 165.90 461.98 JuniorHigh EN38 DoorPenetrationReplaceWeatherstripping-DoorSweep 111.25 25.95 72.25 2.08 5.78 23.87 66.47 JuniorHigh EN37 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 JuniorHigh EN36 DoorPenetrationReplaceWeatherstripping-DoorSweep 111.25 25.95 72.25 2.08 5.78 23.87 66.47 JuniorHigh EN35 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 JuniorHigh EN34 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 JuniorHigh EN33 DoorPenetrationReplaceWeatherstripping-DoorSweep 111.25 25.95 72.25 2.08 5.78 23.87 66.47 JuniorHigh EN32 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 JuniorHigh EN30 DoorPenetrationReplaceWeatherstripping-DoorSweep 111.25 25.95 72.25 2.08 5.78 23.87 66.47 JuniorHigh EN29 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 JuniorHigh EN28 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 JuniorHigh EN27 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 JuniorHigh EN26 DoorPenetrationReplaceWeatherstripping-DoorSweep 111.25 25.95 72.25 2.08 5.78 23.87 66.47 JuniorHigh OGD1 ExistingGarageDoorReplaceWeatherstripping-OverheadGarageDoor 136.00 83.03 231.21 6.64 18.50 76.39 212.71 JuniorHigh OGD2 ExistingGarageDoorReplaceWeatherstripping-OverheadGarageDoor 136.00 83.03 231.21 6.64 18.50 76.39 212.71 JuniorHigh OGD3 ExistingGarageDoorReplaceWeatherstripping-OverheadGarageDoor 136.00 83.03 231.21 6.64 18.50 76.39 212.71 JuniorHigh OGD4 ExistingGarageDoorReplaceWeatherstripping-OverheadGarageDoor 136.00 83.03 231.21 6.64 18.50 76.39 212.71 JuniorHigh OGD5 ExistingGarageDoorReplaceWeatherstripping-OverheadGarageDoor 136.00 83.03 231.21 6.64 18.50 76.39 212.71 JuniorHigh EN25 DoorPenetrationReplaceWeatherstripping-DoorSweep 111.25 25.95 72.25 2.08 5.78 23.87 66.47 JuniorHigh EN24 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 JuniorHigh EN23 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 SeniorHigh EN17 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.69 45.41 126.44 3.63 10.12 41.77 116.33 SeniorHigh EN18 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.69 45.41 126.44 3.63 10.12 41.77 116.33 AdministrationBuilding EN 1 DoorPenetrationDon'tDo 12.44 5.62 15.65 5.62 15.65 -All information is proprietary and confidential and may only be shared or used with the written consent of ENVOCORE,Inc © 2011-2021 RTS Building Envelope, LLC BE LxL.xlsx4
AdministrationBuilding EN 1 DoorPenetrationDon'tDo 21.81 4.18 11.64 4.18 11.64 -AdministrationBuilding EN 3 DoorPenetrationDon'tDo 15.79 13.35 37.18 13.35 37.18 -AdministrationBuilding EN 3 DoorPenetrationDon'tDo 11.77 4.09 11.39 4.09 11.39 -AdministrationBuilding EN 3 DoorPenetrationDon'tDo 10.90 2.07 5.77 2.07 5.77 -AdministrationBuilding EN 3 DoorPenetrationDon'tDo 10.80 1.86 5.17 1.86 5.17 -AdministrationBuilding EN 2 DoorPenetrationDon'tDo 13.75 8.65 24.08 8.65 24.08 -AdministrationBuilding EN 2 SingleDoor Don'tDo 14.19 9.65 26.88 9.65 26.88 -JuniorHigh ENAD3 InteriorDoor Don'tDo 11.41 3.24 9.03 3.24 9.03 -JuniorHigh Mechanical Room PenetrationPipe Don'tDo 32.63 6.05 16.86 6.05 16.86 -JuniorHigh Mechanical Room PenetrationPipe Don'tDo 20.38 0.86 2.41 0.86 2.41 -JuniorHigh Mechanical Room PenetrationPipe Don'tDo 24.00 9.23 25.69 9.23 25.69 -JuniorHigh Mechanical Room PenetrationPipe Don'tDo 33.00 6.92 19.27 6.92 19.27 -JuniorHigh Mechanical Room PenetrationPipe Don'tDo 10.31 0.72 2.01 0.72 2.01 -JuniorHigh Mechanical Room PenetrationPipe Don'tDo 10.31 0.72 2.01 0.72 2.01 -JuniorHigh Mechanical Room PenetrationPipe Don'tDo 10.19 0.43 1.20 0.43 1.20 -JuniorHigh Mechanical Room PenetrationPipe Don'tDo 10.19 0.43 1.20 0.43 1.20 -JuniorHigh Mechanical Room PenetrationPipe Don'tDo 20.88 2.02 5.62 2.02 5.62 -JuniorHigh Mechanical Room PenetrationPipe Don'tDo 224.13 9.51 26.49 9.51 26.49 -JuniorHigh Mechanical Room PenetrationPipe Don'tDo 21.38 3.17 8.83 3.17 8.83 -JuniorHigh Mechanical Room PenetrationPipe Don'tDo 10.31 0.72 2.01 0.72 2.01 -JuniorHigh Mechanical Room PenetrationPipe Don'tDo 20.88 2.02 5.62 2.02 5.62 -JuniorHigh Mechanical Room PenetrationPipe Don'tDo 30.94 2.16 6.02 2.16 6.02 -JuniorHigh Mechanical Room PenetrationPipe Don'tDo 10.19 0.43 1.20 0.43 1.20 -JuniorHigh Mechanical Room PenetrationPipe Don'tDo 18.00 18.45 51.38 18.45 51.38 -MountainView ElementarySchoolEN 2 DoorPenetrationReplace-DoorSweep 11.69 3.89 10.84 0.31 0.87 3.58 9.97 MountainView ElementarySchoolEN RoofAccess DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 MountainView ElementarySchoolEN RoofAccess DoorPenetrationReplaceWeatherstripping-DoorSweep 111.25 25.95 72.25 2.08 5.78 23.87 66.47 MountainView ElementarySchoolEN M102 InteriorDoor ReplaceWeatherstripping-DoorSweep 11.37 3.16 8.80 0.25 0.70 2.91 8.10 MountainView ElementarySchoolEN 1 DoorPenetrationReplaceAstragal-DoorSweep 321.94 50.60 140.89 4.05 11.27 46.55 129.62 MountainView ElementarySchoolEN 3 DoorPenetrationReplaceAstragal-DoorSweep 321.94 50.60 140.89 4.05 11.27 46.55 129.62 MountainView ElementarySchoolOffice Wall toPenetrationMetal PanRoofAddFiberglassInsulation-SprayFoam-Wall-PenetrationMetal PanRoof 126.25 60.54 168.59 3.03 8.43 57.52 160.16 MountainView ElementarySchoolClassrooms Wall toBeam-BeamCeilingInsulateSprayfoam-Wall-Beam-Ceiling 15.68 13.10 36.48 0.65 1.82 12.44 34.65 MountainView ElementarySchoolStorageRoom Wall toPenetrationMetal PanRoofAddFiberglassInsulation-SprayFoam-Wall-PenetrationMetal PanRoof 115.11 34.85 97.06 1.74 4.85 33.11 92.21 MountainView ElementarySchoolClassrooms Wall toBeam-BeamCeilingInsulateSprayfoam-Wall-Beam-Ceiling 121.00 48.43 134.87 2.42 6.74 46.01 128.13 MountainView ElementarySchoolClassrooms Wall toBeam-BeamCeilingInsulateSprayfoam-Wall-Beam-Ceiling 14.88 11.24 31.31 0.56 1.57 10.68 29.74 MountainView ElementarySchoolStorageRoom Wall toPenetrationMetal PanRoofAddFiberglassInsulation-SprayFoam-Wall-PenetrationMetal PanRoof 115.11 34.85 97.06 1.74 4.85 33.11 92.21 MountainView ElementarySchoolClassrooms Wall toBeam-BeamCeilingAddFiberglassInsulation-SprayFoam-Wall-Beam-Ceiling 16.47 14.92 41.54 0.75 2.08 14.17 39.47 MountainView ElementarySchoolEN 5 DoorPenetrationReplaceAstragal-DoorSweep 16.75 15.57 43.35 1.25 3.47 14.32 39.88 MountainView ElementarySchoolClassrooms Wall toCeiling AddRigidInsulation-Spray Foam-Wall-Ceiling 118.75 43.24 120.42 2.16 6.02 41.08 114.40 MountainView ElementarySchoolClassrooms Wall toBeam-BeamCeilingAddFiberglassInsulation-SprayFoam-Wall-Beam-Ceiling 16.28 14.49 40.34 0.72 2.02 13.76 38.32 MountainView ElementarySchoolClassrooms Wall toBeam-BeamCeilingInsulateSprayfoam-Wall-Beam-Ceiling 135.63 82.16 228.80 4.11 11.44 78.06 217.36 MountainView ElementarySchoolClassrooms Wall toBeam-BeamCeilingInsulateSprayfoam-Wall-Beam-Ceiling 128.31 65.30 181.83 3.26 9.09 62.03 172.74 MountainView ElementarySchoolStorageRoom Wall toPenetrationMetal PanRoofAddFiberglassInsulation-SprayFoam-Wall-PenetrationMetal PanRoof 115.11 34.85 97.06 1.74 4.85 33.11 92.21 MountainView ElementarySchoolStorageRoom Wall toPenetrationMetal PanRoofAddFiberglassInsulation-SprayFoam-Wall-PenetrationMetal PanRoof 115.11 34.85 97.06 1.74 4.85 33.11 92.21 MountainView ElementarySchoolClassrooms Wall toCeiling InsulateSprayfoam-Wall-Ceiling 118.75 43.24 120.42 2.16 6.02 41.08 114.40 MountainView ElementarySchoolEN 4 DoorPenetrationReplaceAstragal-DoorSweep 321.94 50.60 140.89 4.05 11.27 46.55 129.62 MountainView ElementarySchoolStorageRoom PenetrationVentDon'tDo 120.63 47.57 132.46 47.57 132.46 -MountainView ElementarySchoolStorageRoom PenetrationVentDon'tDo 120.63 47.57 132.46 47.57 132.46 -MountainView ElementarySchoolStorageRoom PenetrationVentDon'tDo 120.63 47.57 132.46 47.57 132.46 -MountainView ElementarySchoolStorageRoom PenetrationVentDon'tDo 120.63 47.57 132.46 47.57 132.46 -MountainView ElementarySchoolStorageRoom PenetrationVentDon'tDo 120.63 47.57 132.46 47.57 132.46 -MountainView ElementarySchoolStorageRoom PenetrationVentDon'tDo 120.63 47.57 132.46 47.57 132.46 -MountainView ElementarySchoolEN 1 Wall toBeam-BeamCeilingInsulateSprayfoam-Wall-Beam-Ceiling 111.25 25.95 72.25 1.30 3.61 24.65 68.64 MountainView ElementarySchoolEN 12 DoorPenetrationReplaceWeatherstripping-DoorSweep 112.00 27.68 77.07 2.21 6.17 25.46 70.90 MountainView ElementarySchoolEN 11 DoorPenetrationReplaceAstragal-DoorSweep 214.63 33.73 93.93 2.70 7.51 31.03 86.41 MountainView ElementarySchoolHallway Wall toPenetrationMetal PanRoofAddFiberglassInsulation-SprayFoam-Wall-PenetrationMetal PanRoof 11.88 4.32 12.04 0.22 0.60 4.11 11.44 MountainView ElementarySchoolHallway Wall toCeiling InsulateSprayFoam-Wall-Ceiling 13.00 6.92 19.27 0.35 0.96 6.57 18.30 MountainView ElementarySchoolClassrooms Wall toBeam-BeamCeilingAddFiberglassInsulation-SprayFoam-Wall-Beam-PenetrationMetal PanRoof 116.13 37.19 103.56 1.86 5.18 35.33 98.38 MountainView ElementarySchoolStorageRoom BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 33.38 7.78 21.68 0.39 1.08 7.39 20.59 MountainView ElementarySchoolRestroom BeamPocket AddFiberglassInsulation-Spray Foam-Beam-Pocket 33.38 7.78 21.68 0.39 1.08 7.39 20.59 MountainView ElementarySchoolRestroom BeamPocket AddFiberglassInsulation-Spray Foam-Beam-Pocket 33.38 7.78 21.68 0.39 1.08 7.39 20.59 MountainView ElementarySchoolStorageRoom BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 33.38 7.78 21.68 0.39 1.08 7.39 20.59 MountainView ElementarySchoolEN 10 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 MountainView ElementarySchoolEN 10 Wall toBeam-BeamCeilingInsulateSprayfoam-Wall-Drywall-Ceiling 14.13 9.51 26.49 0.48 1.32 9.04 25.17 MountainView ElementarySchoolEN 9 Wall toBeam-BeamCeilingInsulateSprayfoam-Wall-Drywall-Ceiling 14.13 9.51 26.49 0.48 1.32 9.04 25.17 MountainView ElementarySchoolEN 9 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 MountainView ElementarySchoolClassrooms Wall toBeam-BeamCeilingAddFiberglassInsulation-SprayFoam-Wall-Beam-PenetrationMetal PanRoof 122.50 51.89 144.50 2.59 7.23 49.30 137.28 MountainView ElementarySchoolStorageRoom BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 33.38 7.78 21.68 0.39 1.08 7.39 20.59 MountainView ElementarySchoolStorageRoom BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 33.38 7.78 21.68 0.39 1.08 7.39 20.59 MountainView ElementarySchoolEN 8 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 MountainView ElementarySchoolEN 8 Wall toBeam-BeamCeilingInsulateSprayfoam-Wall-Drywall-Ceiling 14.13 9.51 26.49 0.48 1.32 9.04 25.17 MountainView ElementarySchoolRestroom BeamPocket AddFiberglassInsulation-Spray Foam-Beam-Pocket 33.38 7.78 21.68 0.39 1.08 7.39 20.59 MountainView ElementarySchoolRestroom BeamPocket AddFiberglassInsulation-Spray Foam-Beam-Pocket 33.38 7.78 21.68 0.39 1.08 7.39 20.59 All information is proprietary and confidential and may only be shared or used with the written consent of ENVOCORE,Inc © 2011-2021 RTS Building Envelope, LLC BE LxL.xlsx5
MountainView ElementarySchoolClassrooms Wall toBeam-BeamCeilingAddFiberglassInsulation-SprayFoam-Wall-Beam-PenetrationMetal PanRoof 122.50 51.89 144.50 2.59 7.23 49.30 137.28 MountainView ElementarySchoolClassrooms Wall toBeam-BeamCeilingAddFiberglassInsulation-SprayFoam-Wall-Beam-PenetrationMetal PanRoof 129.06 67.03 186.65 3.35 9.33 63.68 177.32 MountainView ElementarySchoolEN 7 Wall toBeam-BeamCeilingInsulateSprayfoam-Wall-Drywall-Ceiling 14.13 9.51 26.49 0.48 1.32 9.04 25.17 MountainView ElementarySchoolEN 7 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 MountainView ElementarySchoolStorageRoom BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 33.38 7.78 21.68 0.39 1.08 7.39 20.59 MountainView ElementarySchoolStorageRoom BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 33.38 7.78 21.68 0.39 1.08 7.39 20.59 MountainView ElementarySchoolRestroom BeamPocket AddFiberglassInsulation-Spray Foam-Beam-Pocket 33.38 7.78 21.68 0.39 1.08 7.39 20.59 MountainView ElementarySchoolRestroom BeamPocket AddFiberglassInsulation-Spray Foam-Beam-Pocket 33.38 7.78 21.68 0.39 1.08 7.39 20.59 MountainView ElementarySchoolEN 6 Wall toBeam-BeamCeilingAddFiberglassInsulation-SprayFoam-Wall-Beam-PenetrationMetal PanRoof 13.19 7.35 20.47 0.37 1.02 6.98 19.45 MountainView ElementarySchoolEN 6 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 MountainView ElementarySchoolStorageRoom PenetrationVentDon'tDo 120.63 47.57 132.46 47.57 132.46 -MountainView ElementarySchoolStorageRoom PenetrationVentDon'tDo 120.63 47.57 132.46 47.57 132.46 -AdministrationBuilding ExteriorWall Office WalltoCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 12.34 5.41 15.05 0.27 0.75 5.14 14.30 AdministrationBuilding ExteriorWall Office WalltoCeiling InsulateSprayfoam-Wall-Ceiling 18.81 20.32 56.60 1.02 2.83 19.31 53.77 AdministrationBuilding ExteriorWall Office BeamPocket InsulateSprayfoam-Beam-Penetration 7016.41 37.84 105.37 1.89 5.27 35.95 100.10 AdministrationBuilding ExteriorWall Office Wall toBeam-BeamCeilingInsulateSprayfoam-Wall-Beam-Ceiling 11.19 2.74 7.62 0.14 0.38 2.60 7.24 AdministrationBuilding ExteriorWall Office WalltoCeiling AddFiberglassInsulation-SprayFoam-Wall-Ceiling 16.09 14.05 39.14 0.70 1.96 13.35 37.18 AdministrationBuilding WLINT PenetrationWall InsulateSprayfoam-Box-Sill-Perimeter 112.00 27.68 77.07 1.38 3.85 26.29 73.22 AdministrationBuilding WLINT MissingInsulationNoCost 1- 45.46 74.11 16.53 26.95 28.93 47.16 AdministrationBuilding ExteriorWall Office PenetrationWall CaulkPenetrationWall 10.14 0.32 0.90 0.02 0.05 0.31 0.86 AdministrationBuilding ExteriorWall Office PenetrationVentDon'tDo 22.25 5.19 14.45 5.19 14.45 -AdministrationBuilding ExteriorWall Office PenetrationVentDon'tDo 22.25 5.19 14.45 5.19 14.45 -AdministrationBuilding ExteriorWall Office PenetrationVentDon'tDo 22.25 5.19 14.45 5.19 14.45 -AdministrationBuilding ExteriorWall Office PenetrationVentDon'tDo 22.25 5.19 14.45 5.19 14.45 -AdministrationBuilding ExteriorWall Office PenetrationVentDon'tDo 22.25 5.19 14.45 5.19 14.45 -JuniorHigh Classrooms EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 156.25 129.73 361.26 6.49 18.06 123.25 343.20 JuniorHigh Mechanical Room Wall toPenetrationMetal PanRoofInsulateSprayfoam-Wall-PenetrationMetalPanRoof 116.73 38.57 107.41 1.93 5.37 36.65 102.04 JuniorHigh Cafeteria EnergyWall AddRigidgInsulation-Wall-Ceiling 184.00 193.73 539.48 9.69 26.97 184.05 512.51 JuniorHigh ENRoofAccess DoorPenetrationReplaceWeatherstripping-DoorSweep 111.25 25.95 72.25 2.08 5.78 23.87 66.47 JuniorHigh ENRoofAccess DoorPenetrationReplaceWeatherstripping-DoorSweep 111.25 25.95 72.25 2.08 5.78 23.87 66.47 JuniorHigh ENRoofAccess DoorPenetrationReplaceWeatherstripping-DoorSweep 111.25 25.95 72.25 2.08 5.78 23.87 66.47 Baggaley Elementary SchoolEN 1 DoorPenetrationReplace-DoorSweep 10.56 1.30 3.61 0.10 0.29 1.19 3.32 Baggaley Elementary SchoolEN 2 DoorPenetrationReplaceVerticalSweep-DoorSweep 12.42 5.59 15.55 0.45 1.24 5.14 14.31 Baggaley Elementary SchoolEN 3 DoorPenetrationReplaceVerticalSweep-DoorSweep 12.42 5.59 15.55 0.45 1.24 5.14 14.31 Baggaley Elementary SchoolEN 4 DoorPenetrationReplaceVerticalSweep-DoorSweep 12.42 5.59 15.55 0.45 1.24 5.14 14.31 Baggaley Elementary SchoolEN 5 DoorPenetrationReplaceVerticalSweep-DoorSweep 12.42 5.59 15.55 0.45 1.24 5.14 14.31 Baggaley Elementary SchoolEN 6 DoorPenetrationReplaceWeatherstripping-DoorSweep 13.94 9.08 25.29 0.73 2.02 8.35 23.27 Baggaley Elementary SchoolEN 7 DoorPenetrationReplaceVerticalSweep-DoorSweep 12.42 5.59 15.55 0.45 1.24 5.14 14.31 Baggaley Elementary SchoolEN 7 DoorPenetrationReplaceVerticalSweep-DoorSweep 12.42 5.59 15.55 0.45 1.24 5.14 14.31 Baggaley Elementary SchoolEN 8 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 16.19 14.27 39.74 1.14 3.18 13.13 36.56 Baggaley Elementary SchoolEN 9 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 16.19 14.27 39.74 1.14 3.18 13.13 36.56 Baggaley Elementary SchoolEN 10 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 16.19 14.27 39.74 1.14 3.18 13.13 36.56 Baggaley Elementary SchoolEN 11 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 16.19 14.27 39.74 1.14 3.18 13.13 36.56 Baggaley Elementary SchoolEN 12 DoorPenetrationReplaceWeatherstripping-DoorSweep 13.75 8.65 24.08 0.69 1.93 7.96 22.16 Baggaley Elementary SchoolEN 13 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 16.19 14.27 39.74 1.14 3.18 13.13 36.56 Baggaley Elementary SchoolEN 14 DoorPenetrationReplaceWeatherstripping-DoorSweep 13.75 8.65 24.08 0.69 1.93 7.96 22.16 Baggaley Elementary SchoolEN 15 DoorPenetrationReplaceWeatherstripping-DoorSweep 13.75 8.65 24.08 0.69 1.93 7.96 22.16 Baggaley Elementary SchoolEN 16 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 16.19 14.27 39.74 1.14 3.18 13.13 36.56 Baggaley Elementary SchoolEN 17 DoorPenetrationReplaceVerticalSweep-DoorSweep 12.42 5.59 15.55 0.45 1.24 5.14 14.31 Baggaley Elementary SchoolEN BoilerRoom DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 15.69 - 36.53 - 2.92 - 33.61 Baggaley Elementary SchoolEN 18 DoorPenetrationReplaceVerticalSweep-DoorSweep 12.42 5.59 15.55 0.45 1.24 5.14 14.31 Baggaley Elementary SchoolA28thruA31 EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 118.75 43.24 120.42 2.16 6.02 41.08 114.40 Baggaley Elementary SchoolA33 PenetrationVentDon'tDo 13.38 7.78 21.68 7.78 21.68 -Baggaley Elementary SchoolA33 PenetrationVentDon'tDo 13.38 7.78 21.68 7.78 21.68 -Baggaley Elementary SchoolA34 PenetrationVentDon'tDo 13.38 7.78 21.68 7.78 21.68 -Baggaley Elementary SchoolA34 PenetrationVentDon'tDo 13.38 7.78 21.68 7.78 21.68 -Baggaley Elementary SchoolA05 PenetrationVentDon'tDo 13.38 7.78 21.68 7.78 21.68 -Baggaley Elementary SchoolA05 PenetrationVentDon'tDo 13.38 7.78 21.68 7.78 21.68 -Baggaley Elementary SchoolA04 PenetrationVentDon'tDo 13.38 7.78 21.68 7.78 21.68 -Baggaley Elementary SchoolA04 PenetrationVentDon'tDo 13.38 7.78 21.68 7.78 21.68 -Baggaley Elementary SchoolA35thruA49 EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 117.81 41.08 114.40 2.05 5.72 39.03 108.68 Baggaley Elementary SchoolA36thruA39 EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 118.38 42.38 118.01 2.12 5.90 40.26 112.11 Baggaley Elementary SchoolA18thruA32 EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 18.44 19.46 54.19 0.97 2.71 18.49 51.48 Baggaley Elementary SchoolA06thruA08 EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 111.81 27.24 75.86 1.36 3.79 25.88 72.07 Baggaley Elementary SchoolA02 EnergyWall AddRigidInsulation-SprayFoam-Wall-Ceiling 15.63 12.97 36.13 0.65 1.81 12.32 34.32 Baggaley Elementary SchoolA03 EnergyWall AddRigidInsulation-SprayFoam-Wall-Ceiling 15.63 12.97 36.13 0.65 1.81 12.32 34.32 Baggaley Elementary SchoolA07thruA09 EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 120.25 46.70 130.05 2.34 6.50 44.37 123.55 Baggaley Elementary SchoolEN 17 Wall toCeiling InsulateSprayfoam-Wall-Ceiling 11.69 3.89 10.84 0.19 0.54 3.70 10.30 Baggaley Elementary SchoolEN 17 PenetrationWall InsulateSprayfoam-SoffitPerimeter 18.25 19.03 52.98 0.95 2.65 18.08 50.34 Baggaley Elementary SchoolEN 17 PenetrationWall InsulateSprayfoam-SoffitPerimeter 16.75 15.57 43.35 0.78 2.17 14.79 41.18 Baggaley Elementary SchoolEN 17 MissingInsulationAddFiberglassInsulation-Soffit 1- 5.48 8.93 0.95 1.55 4.53 7.38 Baggaley Elementary SchoolA03 Wall toCeiling InsulateSprayfoam-Wall-Ceiling 15.63 12.97 36.13 0.65 1.81 12.32 34.32 Baggaley Elementary SchoolA02 Wall toCeiling InsulateSprayfoam-Wall-Ceiling 15.63 12.97 36.13 0.65 1.81 12.32 34.32 All information is proprietary and confidential and may only be shared or used with the written consent of ENVOCORE,Inc © 2011-2021 RTS Building Envelope, LLC BE LxL.xlsx6
Baggaley Elementary SchoolEN BoilerRoom InteriorDoor Don'tDo 11.42 3.27 9.10 3.27 9.10 -Baggaley Elementary SchoolBoilerRoom Penetration Don'tDo 10.34 0.79 2.21 0.79 2.21 -Baggaley Elementary SchoolB18 Wall toBeam-BeamCeilingAddFiberglassInsulation-SprayFoam-Wall-Beam-Ceiling 19.56 22.05 61.41 1.10 3.07 20.95 58.34 Baggaley Elementary SchoolC16 BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 26.00 13.84 38.53 0.69 1.93 13.15 36.61 Baggaley Elementary SchoolC12 BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 26.00 13.84 38.53 0.69 1.93 13.15 36.61 Baggaley Elementary SchoolC10 BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 26.00 13.84 38.53 0.69 1.93 13.15 36.61 Baggaley Elementary SchoolC08 BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 26.00 13.84 38.53 0.69 1.93 13.15 36.61 Baggaley Elementary SchoolEN 11 EnergyWall AddRigidgInsulation-Spray Foam-Wall-PenetrationMetal PanRoof 11.50 3.46 9.63 0.17 0.48 3.29 9.15 Baggaley Elementary SchoolC03thruC07 Wall toBeam-BeamCeilingAddFiberglassInsulation-SprayFoam-Wall-Beam-Ceiling 132.63 75.25 209.53 3.76 10.48 71.48 199.05 Baggaley Elementary SchoolEN 10 Wall toCeiling InsulateSprayfoam-Wall-Ceiling 13.47 8.00 22.28 0.40 1.11 7.60 21.16 Baggaley Elementary SchoolC23 BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 26.00 13.84 38.53 0.69 1.93 13.15 36.61 Baggaley Elementary SchoolC25 BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 26.00 13.84 38.53 0.69 1.93 13.15 36.61 Baggaley Elementary SchoolC26 BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 26.00 13.84 38.53 0.69 1.93 13.15 36.61 Baggaley Elementary SchoolD01 BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 26.00 13.84 38.53 0.69 1.93 13.15 36.61 Baggaley Elementary SchoolC19thrC22 Wall toBeam-BeamCeilingAddFiberglassInsulation-SprayFoam-Wall-Beam-Ceiling 128.50 65.73 183.04 3.29 9.15 62.44 173.89 Baggaley Elementary SchoolD02thruD08 Wall toBeam-BeamCeilingAddFiberglassInsulation-SprayFoam-Wall-Beam-Ceiling 128.50 65.73 183.04 3.29 9.15 62.44 173.89 Baggaley Elementary SchoolD15 BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 26.00 13.84 38.53 0.69 1.93 13.15 36.61 Baggaley Elementary SchoolD17 BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 26.00 13.84 38.53 0.69 1.93 13.15 36.61 Baggaley Elementary SchoolD18 BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 26.00 13.84 38.53 0.69 1.93 13.15 36.61 Baggaley Elementary SchoolD19 BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 26.00 13.84 38.53 0.69 1.93 13.15 36.61 Baggaley Elementary SchoolD19 BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 26.00 13.84 38.53 0.69 1.93 13.15 36.61 Baggaley Elementary SchoolD24andD25 Wall toBeam-BeamCeilingAddFiberglassInsulation-SprayFoam-Wall-Beam-Ceiling 121.38 49.30 137.28 2.46 6.86 46.83 130.41 Baggaley Elementary SchoolEN 9 Wall toCeiling InsulateSprayfoam-Wall-Ceiling 13.47 8.00 22.28 0.40 1.11 7.60 21.16 Baggaley Elementary SchoolEN 8 Wall toCeiling InsulateSprayfoam-Wall-Ceiling 13.47 8.00 22.28 0.40 1.11 7.60 21.16 Baggaley Elementary SchoolB25 BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 26.00 13.84 38.53 0.69 1.93 13.15 36.61 Baggaley Elementary SchoolB25B BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 26.00 13.84 38.53 0.69 1.93 13.15 36.61 Baggaley Elementary SchoolB28 BeamPocket AddFiberglassInsulation-SprayFoam-Beam-Pocket 26.00 13.84 38.53 0.69 1.93 13.15 36.61 Baggaley Elementary SchoolB31 Wall toBeam-BeamCeilingAddFiberglassInsulation-SprayFoam-Wall-Beam-Ceiling 11.50 3.46 9.63 0.17 0.48 3.29 9.15 Baggaley Elementary SchoolEN 7 EnergyWall AddRigidInsulation-SprayFoam-Wall-Ceiling 17.26 16.74 46.60 0.84 2.33 15.90 44.27 Baggaley Elementary SchoolB31 WalltoCeiling InsulateSprayfoam-Wall-Ceiling 11.13 2.59 7.23 0.13 0.36 2.46 6.86 Baggaley Elementary SchoolEN 6 Wall toPenetrationMetal PanRoofAddFiberglassInsulation-SprayFoam-Wall-PenetrationMetal PanRoof 14.88 11.24 31.31 0.56 1.57 10.68 29.74 MountainView ElementarySchoolEN 4 EnergyWall AddRigidInsulation-Spray Foam-Wall-Ceiling 13.19 7.35 20.47 0.37 1.02 6.98 19.45 MountainView ElementarySchoolEN 11 Wall toBeam-BeamCeilingInsulateSprayfoam-Wall-Drywall-Ceiling 15.25 12.11 33.72 0.61 1.69 11.50 32.03 SeniorHigh EN21 DoorPenetrationReplaceWeatherstripping-DoorSweep 111.25 25.95 72.25 2.08 5.78 23.87 66.47 SeniorHigh EN22 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.56 42.81 119.22 3.42 9.54 39.39 109.68 SeniorHigh EN20 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 119.69 45.41 126.44 3.63 10.12 41.77 116.33 SeniorHigh EN19 DoorPenetrationReplaceWeatherstripping-Astragal-DoorSweep 118.28 42.16 117.41 3.37 9.39 38.79 108.02 All information is proprietary and confidential and may only be shared or used with the written consent of ENVOCORE,Inc © 2011-2021 RTS Building Envelope, LLC BE LxL.xlsx7
APPENDIX C Chilled Water System Optimization – Savings Calculation Methodology

Energy Calculation Methodology

In every Demand Flow® project, rigorous engineering analysis is performed on each subsystem in a chilled water system. These subsystems include the chillers, the chilled water pumps, the condenser water pumps, the cooling tower fans, and the air handling units (or other loads). This section will detail the calculation methodology of the current power usage of each component in the chiller plant Additionally, it will include the calculation methodology of the expected power usage of each component in the chiller plant. Lastly, it will illustrate how these numbers will be annualized to create an annual savings model for the entire system at Error! Reference source not found.

SUBSYSTEM ANALYSIS

Chillers

Current Chiller Performance

When the chiller power (kW) is not being trended by a BAS or in a chiller log, then we look for other ways to calculate the chiller power for each data point Specifically, we use trended or recorded %RLA or RLA to calculate this chiller power. This is calculated by the typical analysis of a three-phase circuit shown in the equation below:

where voltage is the calculated average voltage of all three phases of the machine, current is the calculated average amperage of all three phases, and PF is the calculated/measured power factor of the machine.

Expected Demand Flow® Chiller Performance

Due to the proprietary nature of our Demand Flow calculations, the equations used to calculate the ideal Demand Flow chiller performance cannot be shown here; however, it may be stated that the Demand Flow calculation takes into consideration the following values: the lift of the machine, the flow rates of the condenser and evaporator, the heat of compression, the refrigeration effect, the temperatures of the water entering and leaving the chiller in the condenser and evaporator, and other pertinent values. Based on the time of year, the expected Demand Flow performance can be 5 to 60% lower than the current calculated chiller power.

Chilled Water Pumps

Current Chilled Water Pump Performance

000,1 3 PF Current Voltage kWchiller  = ,

When the pumping power is not trended directly, the pumping power may be calculated in different ways depending on if the pump is currently equipped with a variable speed drive (VFD) or not. When a pump is not currently equipped with a variable speed drive, the pumping power will be calculated from a pump test performed at the pump’s typical flow. If the pump does currently have a variable speed drive and the impeller size is held constant, the pump power will be calculated with the following equation:

where 0.7457 is the conversion factor between horsepower and kilowatts, LF is the load factor of the pump, HPfull flow is the measured full flow horsepower calculated after a pump test, GPMcurrent is the measured flow at which one is calculating for power, and GPMfull flow is the flow rate at full flow corresponding to the HPfull flow Note that tests will be done to verify the integrity of the affinity law Many peer-reviewed studies have shown that the exponent may be between 2.2 and 3.0.

Expected Demand Flow® Chilled Water Pump Performance

The Siemens Demand Flow savings calculator will identify the most ideal flow rate for each pump in Demand Flow mode. The way this ideal flow rate calculation works is proprietary, but the way the power is calculated from that flow is not. Since Demand Flow will require a VFD on every chilled water pump in the system; the equation used above for the VFD case will still be used to calculate the power in Demand Flow mode. That is the following equation (restated):

where 0.7457 is the conversion factor between horsepower and kilowatts, LF is the load factor of the pump, HPfull flow is the measured full flow horsepower calculated after a pump test, GPMcurrent is the measured flow at which one is calculating for power, and GPMfull flow is the flow rate at full flow corresponding to the HPfull flow. Note that tests will be done to verify the integrity of the affinity law. Many peer-reviewed studies have shown that the exponent may be between 2.2 and 3.0.

Condenser Water Pumps

Current Condenser Water Pump Performance

3 7457.0          = flowfull current flowfull calc GPM GPM HP LF kW ,
3 7457.0          = flowfull current flowfull calc GPM GPM HP LF kW ,

When the pumping power is not trended directly, the pumping power may be calculated in different ways depending on if the pump is currently equipped with a variable speed drive (VFD) or not. When a pump is not currently equipped with a variable speed drive, the pumping power will be calculated from a pump test performed at the pump’s typical flow.

If the pump does currently have a variable speed drive and the impeller size is held constant, the pump power will be calculated with the following equation:

where 0.7457 is the conversion factor between horsepower and kilowatts, LF is the load factor of the pump, HPfull flow is the measured full flow horsepower calculated after a pump test, GPMcurrent is the measured flow at which one is calculating for power, and GPMfull flow is the flow rate at full flow corresponding to the HPfull flow. Note that tests will be done to verify the integrity of the affinity law. Many peer-reviewed studies have shown that the exponent may be between 2.2 and 3.0.

Expected Demand Flow® Condenser Water Pump Performance

The Siemens Demand Flow savings calculator will identify the most ideal flow rate for each pump in Demand Flow mode The way this ideal flow rate calculation works is proprietary, but the way the power is calculated from that flow is not. Since Demand Flow will require a VFD on every condenser water pump in the system; the equation used above for the VFD case will still be used to calculate the power in Demand Flow mode. That is the following equation (restated):

where 0.7457 is the conversion factor between horsepower and kilowatts, LF is the load factor of the pump, HPfull flow is the measured full flow horsepower calculated after a pump test, GPMcurrent is the measured flow at which one is calculating for power, and GPMfull flow is the flow rate at full flow corresponding to the HPfull flow Note that tests will be done to verify the integrity of the affinity law Many peer-reviewed studies have shown that the exponent may be between 2.2 and 3.0.

3 7457.0          = flowfull current flowfull calc GPM GPM HP LF kW ,
3 7457.0          = flowfull current flowfull calc GPM GPM HP LF kW ,
Cooling Tower Fans

Current Cooling Tower Fan Performance

For cooling tower fans that currently operate at full speed, the power of each fan will be tested prior to the development of a finalized savings analysis to ensure accurate accountability of the energy used by the fans prior to Demand Flow.

Cooling tower fans that operate in a “two-speed” configuration and for fans that operate with a variable speed drive (VFD), the following equation will be used to calculate the power usage of the fan motor:

where kWcurrent is the instantaneous power of the cooling tower fan at the current frequency, fcurrent, LF is the load factor of the cooling tower motor, BHP@60Hz, is the calculated full speed brake horsepower of the fan, and f60 is the full speed frequency of the motor, or 60 Hz.

Expected Demand Flow® Cooling Tower Fan Performance

The expected cooling tower fan speed is calculated using Siemens Demand Flow Savings Calculator where all components of the plant are considered to identify this ideal speed. The way the speed is selected is proprietary, but the method of relating that speed to power is not In Demand Flow all cooling tower fans will be operating with a VFD (Variable Frequency Drive) Fans that operate with a VFD, the following equation will be used to calculate the power usage of the fan motor:

where kWcurrent is the instantaneous power of the cooling tower fan at the current frequency, fcurrent, LF is the load factor of the cooling tower motor, BHP@60Hz, is the calculated full speed brake horsepower of the fan, and f60 is the full speed frequency of the motor, or 60 Hz.

3 60 @60 7457           = f f BHP LF kW current Hz current ,
3 60 @60 7457           = f f BHP LF kW current Hz current ,
thomas.ulmer@siemens.com

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.