Portfolio Spring 2024

Page 1

Aaron Wagnitz

Oklahoma State University

2021-2023

creating places

where people go

TABLE OF CONTENTS CONTENTS CONTENTS CONTENTS

CONTENTS CONTENTS
Glenn Partners Honorable Merit Award 1 2 3 4 5 6 7 8 BESTON-BOSTON INTRODUCTION
Prize Winner Spring 2021 Fall 2023 Fall 2022 Milan Stadium WORK & PLAY SOCCER PLANET Spring 2023 Integrative Design Winner ESPEN MULTIMODAL Spring 2021 Skin & Structure AMAZING CHAINZ Fall 2021 Research USER ERROR Summer 2023 Study Travel SKETCHES
Baumiller

BESTON-BOSTON

Year: Fall 2023

Software: Rhino, Illustrator , Photoshop, InDesign, After Effects, Photoshop, MadMapper, 3D Printing, Laser Cutting, CNC, UV Printing

Team: Hulen Howard, Isaac McCalip, Adam Romero, Hank Traxel & Aaron Wagnitz

Award: Baumiller Prize Winner

Located in a period of contextual transformation, our project aims to navigate intersecting trajectories of space. Viewed as a bridge between two significant parts of Boston, it strives to connect the existing fabric of the city with the future developments happening in Seaport and beyond. Our strategy is to create a place that announces this new district as culturally significant and relevant

to the greater history of Boston and its citizens. Located directly above I-90, the highway is utilized as a dramatic component of our structural composition and development strategy. I-90 is acknowledged as an unavoidable and influential presence of the city fabric and serves as a catalyst for energizing engagement. Transportation then is a key element of our proposal, providing new ways for

citizens to interact with the built environment and for introducing new ideas about public space. This area has a rich history of cultural and artistic significance, and we believe it is crucial that this space service the continuation of that presence. Our proposal acts as a spectacular backdrop for the community, fostering creativity and collaboration to continue the cosmopolitan atmosphere of Boston.

SITE Site Bridge Activate Massing Scatter Clump Maximize Subtract Divide
Form Transformation
Hospitality Residential Housing
Commercial/Cultural Research & O ce
Diagram Views
Convention Center Gateway Entrance I-90 MASS Turnpike
Bike Path
Circulation
Diagram
Flood
Intertidal Subtidal Backshore High Tide Splash Zone Interior Residential Axonometric
Diagrams
Commercial/Cultural
New City Park
Residential Units Public Rooftop Floodable Parking I-90 Access Vehicular Drop-o Box Theater Hotel Amenities Private Res. Terrace Public Realm Deck Intertidal Subtidal Backshore High Tide Splash Zone Ground Floor Plan Section

WhAT’S ThE MISsIoN?

SavinG tHe desigN sTudenTs of ThE BIG city fRom beInG sTresSed oUt by desigNinG a desigN lab tHroUgH worK anD pLaY

PlaYSpace gives sTudenTs a cHanCe to take a bReAk fRom vigoroUs worK, anD pRomotes curiOsity, exerCise, anD resT!!

ArChitecTure influEnCes culTure witHin tHe sPaces it cReAtes. IronicalLy, tHe culTure cReAted by tHe desigN of many sTudiOs is negative becaUse it emPhasizes efficiEnCy anD pRoducTivity. But wHat if yOu coUlD inTegRate worK witH pLaY? If yOu inCorPorate pLaYful elemenTs inTo a worK enVironMenT, it coUlD imProve sTudenT heAlTh, tHinKinG, desigN, anD enVironMenT. These pLaYful elemenTs sucH as sLides, pLaY sPaces anD sCreAm roOmS enHanCe tHe pSycHological welL-beInG of sTudenTs. This pRoposal for tHe DesigN lab pRomotes tHe ideA of worK anD pLaY, wHicH are usuAlLy seEn as opPosites, anD cReAtes an enVironMenT tHat leAdS towarD a colLaborative anD resTorative sPace to be in.

Why exit tHroUgH monotonoUs doOrS wHen yOu can go dowN a sLide??

MotiOn sTeEl fRame winDowS alLow an inDoOr/oUtDoOr exPeriEnCe…

conF. cLasS.

= 1’

carToOniverSe
ChAPtER 4: fiRsT fLOoR sCale: 1/16”
StUDIo OFfICES MAKER SpACE PlAy SpACE
HERES ThE PlAN… LetSgo figHt! worK pLaY GRID DIAGONAL PLAY PROGRAM + + = forM anD orGanizatiOn = WORK PLAY WORK & PLAY + pRogRam reseArChinG neEdS for sTudenTs… worKinG 9-5 PLAN SECTION ELEVATION WALL SECTION Moisture Barrier Concrete Slab 0’ 0” 24’ 0” F3 37’ 0” Max 12’ 0” F2 Steel Beams Steel Beams MEP Space Drop Ceiling Pier Steel Column Steel W Column Metal Decking Concrete Slab on Insulation Insulation Brick Detail Metal Cladding Metal Decking Concrete Lintel Horizontal Mullion Vertical Mullion System System Metal Decking rise anD sHine walL secTiOn lunCh bReAk

(Skin & Structure)

community food playground plaza shopping study
structure is revealed structure is extruded eat, drink and everything else. turf ground surface southwest axonometric mesh surface taco truck tubular steel structure skeleton spiral slide community zone roof/site plan circulation zone gathering space chainlink skin
El Arenal in its basic form
west elevation 3 6 0 12ft taco time skin elevation 1.5 3 0 6ft
perspective yikes... ♫ <3 exterior perspective tweet zz z TGIF
interior

eat, drink and everything

To create open forms and spaces by exposing the structural skeleton. These spaces turn exible through the rearrangement of elements as the community and people adjust their environment as needed. The bottom level is only left with a grass surface to make way for a wide variety of community uses and interactions. Circulation devices such as stairs, ramps, and a slide allow guests to easily circulate through the structure. The east facade allows vertical and horizontal movement, taking advantage of views above and below cimarron plaza, o ering a take of cimarron.

the parking lot is not a parking lot anymore.

move up, down, left, and right.

community food playground plaza shopping study
zoning diagram roof/site plan skin elevation west elevation concept diagram no. 1 exterior perspective explodometric axonometric interior perspective detailed explodometric yikes... ♫ <3 tweet zz TGIF turf ground surface southwest axonometric mesh surface taco truck tubular steel structure skeleton chainlink skin chainlink roof
else.

Multimodal Station

Year: Spring 2023

Software: Revit, Rhino, Cove Tool, Illustrator, Indesign, Photoshop, Premiere Pro Team: Aaron Wagnitz (& Hulen Howard in SD phase)

Award: First Place Overall Design, First Place Lowest Carbon Footprint, Honorable Mention in Closest to Net Zero, & Honorable Mention in Lighting Design

ES PEN

EHS PEHN

a. an opportunity to create a new center for Edmond, one that promotes sustainable urban design and highlights the new train station as a grounding icon for the city.

b. Edmond + Aspen = Espen (get it?)

E s p e n pl a c e
Bay Module
Site Plan axonometric illustrates it all together.
1. Inspiring feats of Railroad Engineering
The
to create an icon
2. Drawings referencing railroad bridges
3.
form is translated
4.
Trend of making industrial infrastructure into a backdrop sets the stage for community.

Program Diagram

PUBLIC PARKING RESTAURANT PARK/POND PICKLE
Elevations 1 2 3 Storage Restrooms Restrooms Area Reception Office Dispatch Headquarters 17. General Offices 18. Manager’s Office 19. Locker Room 20. Shower/bathroom 21. File/work room 22. Skyline First Level Second Level Third Level 4 5 6 7 8 9 10 11 12 13 14 18 19 20 22 23 17 15 16 Edmond Multi-Modal Transit Station Proposal Wagnitz Design Documentation Presentation TEAM 03 EMMTH 1. Platform 2. Mechanical Room 3. Electrical Room 4. Hard Rock Cafe 5. Outdoor Seating 6. Mechanical Room 7. Lobby 8. Ticket Office 1 9. Cafe 10. Cafe Storage 11. Restrooms 12. Restrooms 13. Vending Area 14. Reception 15. Security Office 16. Dispatch Headquarters 17. General Offices 18. Manager’s Office 19. Locker Room 20. Shower/bathroom 21. File/work room 22. Skyline N First Level Legend Second Level 7 9 10 11 12 13 14 18 19 20 22 17 15 16 30 15 45 Transit Station Proposal Wagnitz Design Documentation Presentation transit is on this level. the main level, visitors have to make where to go. can access all of the top of the providing a tourist amazing views of Room Room Cafe Seating Room 1 2 3 9. Cafe 10. Cafe Storage 11. Restrooms 12. Restrooms 13. Vending Area 14. Reception 15. Security Office 16. Dispatch Headquarters 17. General Offices 18. Manager’s Office 19. Locker Room 20. Shower/bathroom 21. File/work room 22. Skyline First Level Second Level Third Level 4 5 6 7 8 9 10 11 12 13 14 18 19 20 22 23 17 15 16 45 DD Level 1 NEW DD Level 2 NEW 1 2 3 Storage Area Office Headquarters 17. General Offices 18. Manager’s Office 19. Locker Room 20. Shower/bathroom 21. File/work room 22. Skyline First Level Second Level Third Level 4 5 6 7 8 9 10 11 12 13 14 18 19 20 22 23 17 15 16 OFFICE PUBLIC VERTICAL CIRCULATION VERTICAL CIRCULATION RESTAURANT The iconic form is divided into 3 massings based on program. Circulation bridges them together.
Exterior
Programmatic Elevation Diagram

The plywood paneling imitates the structure on the outside & ceiling proportions. The ceiling materiality finds its way crawling down the ceiling for a more “forward- thinking” look.

Wagnitz
Vertical Proportions Study
Window Steel
Dimensional Lumber 6”
Shou Sugi Ban
Horizontal Proportions Study
7.5’ x 3.5’
Casing
Glulam Column
from Shou Sugi Ban, a enhance the facade in a
Glulam Beam
22 Edmond Multi-Modal Transit Station Proposal Wagnitz Design Documentation Presentation A137 Interior Elevations TEAM 03 EMMTH 04/10/23 3/32" = 1'-0" 1 Elevation 1 - a 3/32" = 1'-0" 2 Elevation 1 - b 3/32" = 1'-0" 3 Elevation 1 - d 3/32" = 1'-0" 4 Elevation 1 - c A138 Interior Elevations Copy 1 04/10/23 Elevation 1 - closup
Facade Study
A study using precise and accurate dimensions to scale, created a matrix to enhance the facade even at the smallest detail. The station’s materiality is intentionally meant to be common, while also providing sustainable solutions to the city 13 Edmond Multi-Modal Transit Station Proposal Wagnitz Design Documentation Presentation Shou Sugi Ban
CLT Plywood Paneling
Earth-toned terrazo Interior Palette Exterior Palette Corrugated Metal Material Palette
Interior Elevations
Concrete
Barrisol
Edmond Multi-Modal Transit Station Proposal Wagnitz Design Documentation Presentation MEP & Structural Axonometric The lobby has potential to become anything you want for visitors to create an immersive space Integrative MEP & Structural Axonometric Wall Section with Callout Details 23 Wagnitz Design Documentation Presentation become visitors. Maybe while

Soccer Planet

Year: Fall 2022

Software: Rhino, Grasshopper, Illustrator, Indesign, Photoshop

Team: Aaron Wagnitz

Milan is seen as a capital of the world and a true centerpiece for Italy. In the same way, this stadium is an impression on Italy’s Seria A and the sport of soccer around the world. Galileo, a famous Italian scientist, studied space and discovered that the galaxy is made up of a collection of stars, seen imperfectly put together to create a system beyound our atmosphere throught further discovery of

crater’s on the moon. Galileo’s discoveries changed human’s perception of space into the future. The stadium is organized based off the structure and layering of a soccer ball, similarly to planets in our Solar System. Structure, seating, program, and the pitch play an important role in the atmosphere and spirit of the sport. This stadium is a symbol of Italy’s innovation, bringing together past

discoveries and connecting them to the future. Through design, fans will enter an experiential space reflecting a night sky, reminding them of Galileo’s fundamental discovery that kept Italy moving forward throughout time. This stadium will stand as a landmark to the world, reflecting Italy’s impact on innovation and science on humankind.

Concept Diagram
Site Plan
Milan Expo Aerial Perspective
Entry Level Plan Arrival Diagram
Urban Context
Longitudinal Section
Transverse
Section
Interior Perspective
Field Tier 1 Tier 2 Suites Tier 3 Stadium Seating Diagram Exploded Axonometric
3 Steel Connections Skin Connections Roof Studies Bay Axonometric Skin System a 1 b 2 c 3 a b c 1 2

Printers are the nemesis of architecture students. We all have firsthand interactions with printers through the paper jams, misprints, and making “peace” with the error messages. Yet, we simply ignore the benefits or successes we have with the printers. We don’t consider the performance, but instead lean towards the experience. I want to explore the patterns of use and emotional responses towards the printers.

USER ERROR

Firsthand encounters and Ephemeral Conditions of a printer

<No matter where I am, if someone asks me to use a printer I’m going to be upset about it> (tapping USB while waiting=> same guy walked past the printer 4 times before printing) ’is your degree 4 or 5 years=> 5. “Oh cool mine is 4”. <F&$% this isnt what I wanted.I need to cancel it. ughhhh how> (plays with hair while standing waiting for a print) ’*Loud cheers when printer works* <Damn it I chose the wrong file!!,> (stays silent and looks at phone while waiting the entire time) ’referee! foul... sorry I’m acting like a referee today.(laughter) “ummm okay.”,’ <since when did they charge for printing?=>I already pay enough here as it is:(> (only at the school of architec<No matter where I am, if someone asks me to use a printer I’m going to be upset about it> (tapping USB while waiting=> same guy walked past the printer

4 times before printing) ’is your degree 4 or 5 years=> 5. “Oh cool mine is 4”. <F&$% this isnt what I wanted.I need to cancel it. ughhhh how> (plays with hair while standing waiting for a print) ’*Loud cheers when printer works* <Damn it I chose the wrong file!!,> (stays silent and looks at phone while waiting the entire time) ’referee! foul... sorry I’m acting like a referee today.(laughter) “ummm okay.”,’ <since when did they charge for printing?=>I already pay enough here as it is:(> (only at the school of architecture will i find someonce tap dancing at the printer) ’saturday we are doing <No matter where I am, if someone asks me to use a printer I’m going to be upset about it> (tapping USB while waiting=> same guy walked past the printer 4 times before printing) ’is your degree 4 or 5 years=> 5. “Oh cool mine is 4”. <F&$% this isnt what I wanted.I need to cancel it. ughhhh how> (plays with hair while standing waiting for a print) ’*Loud cheers when printer works* <Damn it I chose the wrong file!!,> (stays silent and looks at phone while waiting the entire time) ’referee! foul... sorry I’m acting like a referee today.(laughter) “ummm okay.”,’ <since when did they charge for print<No matter where I am, if someone asks me to use a printer I’m going to be upset about it> (tapping USB while waiting=> same guy walked past the printer 4 times before printing) ’is your degree 4 or 5 years=> 5. “Oh cool mine is 4”. <F&$% this isnt what I wanted.I need to cancel it. ughhhh how> (plays with hair while standing waiting for a print) ’*Loud cheers when printer works* <Damn it I chose the wrong file!!,> (stays silent and looks at phone

(printer talk)

08/24/2021 13:22:00

08/24/2021 13:21:30

(movement study)

08/24/2021 13:21:00

08/24/2021 13:20:30

08/24/2021 13:20:00

1 7 2 3 4 5 6 1 7 8 8 8 2 3 4 5 6 1 7 8 2 3 5 6 2 5 6 8 9 9 5 6 3 3--

USER ERROR

08/24/2021 13:21:30

08/24/2021 13:20:30 08/24/2021 13:21:00

<No matter where I am, if someone asks me to use a printer

5. “Oh cool mine is 4”. <F&$% this isnt what I wanted.I

file!!,> (stays silent and looks at phone while waiting pay enough here as it is:(> (only at the school of architecture will do really bad’ <These printers are pieces of SH*T> year student tries to figure out how to use a printer *six tates conversation/memories to 4th years’ <Go <No matter where I am, if someone asks me to use a printer

5. “Oh cool mine is 4”. <F&$% this isnt what I wanted.I

file!!,> (stays silent and looks at phone while waiting pay enough here as it is:(> (only at the school of architecture will do really bad’ <These printers are pieces of SH*T> year student tries to figure out how to use a printer *six tates conversation/memories to 4th years’ <Go <No matter where I am, if someone asks me to use a printer 5. “Oh cool mine is 4”. <F&$% this isnt what I wanted.I file!!,> (stays silent and looks at phone while waiting pay enough here as it is:(> (only at the school of architecture will do really bad’ <These printers are pieces of SH*T> year student tries to figure out how to use a printer *six <No matter where I am, if someone asks me to use a printer 5. “Oh cool mine is 4”. <F&$% this isnt what I wanted.I file!!,> (stays silent and looks at phone while waiting pay enough here as it is:(> (only at the school of architecture

<negative response> ‘positive response’ (gesticulation)

1 7 2 3 4 5 6 1 7 8 8 8 2 3 4 5 6 1 7 8 2 3 5 6 2 5 6 8 9 9 5 6 3 3 #
1:00 8/18 8/19 8/20 8/21 8/22 8/23 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00
08/24/2021
successful copy error message human printer start up button beeping
13:20:00 08/24/2021 13:22:00

printer I’m going to be upset about it> (tapping USB while waiting=> same guy walked past the printer 4 times before printing) ’is your degree 4 or 5 years=> wanted.I need to cancel it. ughhhh how> (plays with hair while standing waiting for a print) ’*Loud cheers when printer works* <Damn it I chose the wrong the entire time) ’referee! foul... sorry I’m acting like a referee today.(laughter) “ummm okay.”,’ <since when did they charge for printing?=>I already architecture will i find someonce tap dancing at the printer) ’saturday we are doing a scrimmage where we will be evaluated=>who do u play==>hutchinson, they (swings arms back and forth and plays a rhythmic whistle) ’Did you see the episode where the guy shoves the coach? *unneccessary laughter*’ <A second *six minutes later* => still staring at the printer> (Lots of looking & turning around,, why not say hi?) ’*intentionally misprinted identify sheet*=> inihome printer youre drunk.> (8 people quietly waiting in line) ‘gives lesson about USB drives as they continue to print’ printer I’m going to be upset about it> (tapping USB while waiting=> same guy walked past the printer 4 times before printing) ’is your degree 4 or 5 years=> wanted.I need to cancel it. ughhhh how> (plays with hair while standing waiting for a print) ’*Loud cheers when printer works* <Damn it I chose the wrong the entire time) ’referee! foul... sorry I’m acting like a referee today.(laughter) “ummm okay.”,’ <since when did they charge for printing?=>I already architecture will i find someonce tap dancing at the printer) ’saturday we are doing a scrimmage where we will be evaluated=>who do u play==>hutchinson, they (swings arms back and forth and plays a rhythmic whistle) ’Did you see the episode where the guy shoves the coach? *unneccessary laughter*’ <A second *six minutes later* => still staring at the printer> (Lots of looking & turning around,, why not say hi?) ’*intentionally misprinted identify sheet*=> inihome printer youre drunk.> (8 people quietly waiting in line) ‘gives lesson about USB drives as they continue to print’ printer I’m going to be upset about it> (tapping USB while waiting=> same guy walked past the printer 4 times before printing) ’is your degree 4 or 5 years=> wanted.I need to cancel it. ughhhh how> (plays with hair while standing waiting for a print) ’*Loud cheers when printer works* <Damn it I chose the wrong the entire time) ’referee! foul... sorry I’m acting like a referee today.(laughter) “ummm okay.”,’ <since when did they charge for printing?=>I already architecture will i find someonce tap dancing at the printer) ’saturday we are doing a scrimmage where we will be evaluated=>who do u play==>hutchinson, they (swings arms back and forth and plays a rhythmic whistle) ’Did you see the episode where the guy shoves the coach? *unneccessary laughter*’ <A second *six minutes later* => still staring at the printer> (Lots of looking & turning around,, why not say hi?) ’*intentionally misprinted identify sheet*=> ini printer I’m going to be upset about it> (tapping USB while waiting=> same guy walked past the printer 4 times before printing) ’is your degree 4 or 5 years=> wanted.I need to cancel it. ughhhh how> (plays with hair while standing waiting for a print) ’*Loud cheers when printer works* <Damn it I chose the wrong the entire time) ’referee! foul... sorry I’m acting like a referee today.(laughter) “ummm okay.”,’ <since when did they charge for printing?=>I already architecture will i find someonce tap dancing at the printer) ’saturday we are doing a scrimmage where we will be evaluated=>who do u play==>hutchinson, they

1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 Paper Feeding errors walked

Sketching

Study Travel Summer 2023

you. Thank

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Portfolio Spring 2024 by Aaron Wagnitz - Issuu