is balanced by a simpler fenestration to the north Elevation massing diagram

Citygate church - Beckenham Alan Camp Architects, 2018

- The taller glass volume in entrance to the scheme between the two brick vo

A - Full height brick recess detail

3

B - GRC panels with window detail gives definition to predominant facade

- Large church & community building in south London

C - Slender aluminium mullions bring verticality to glass curtain wall

- Under director supervision I acted as main designer - Produced all drawings, D&A statement

D - Light brown brickwork chosen to blend with surrounding context

Key achievement: Achieved planning permission in August 2018

- We have also incorpora along the northern most f a three storey volume Elevation massing diagram

A

4

C

- GRC panels create visua facing curve of the audit recesses bring order to th

E D

E - Brick parapet helps conceal roof

- By using a light coloured minimised the “monumen

5 B

6 Site location plan - Croydon Road, Beckenham

Aerial perspective - North East

Alan Camp Architects LLP, 88 Union Street, London, SE1 0NW tel: 020 7593 1000. fax 020 7593 1001. mail@alancamp.com job: drawn: Croydon Road drawing: General Arrangement Ground Floor Plan

N AN L P

ING

note: all dimensions to be checked on site before commencement of the work. if this drawing exceeds the quantities in any way the architects are to be informed before the work is commenced. this drawing is copyright.

Grey buff brick with light coloured mortor source: EHSmith Architectural Clay Products

Facade details 28/02/18

scale: 1:100 @ A0 1:200 @ A2

job no: 2674

drawing no. GA-P-L00-1.100

rev. 1

38 Croydon Road, Beckenham BR3 4BJ

revisions rev

date

description

drawn by

checked

1

28.02.18

Planning Submission

ZS

AW

Facade materials pallette

Elev Scale

7

date:

ZS

GRC Panel source: Architonic

8

Grey buff brick with light coloured mortor source: EHSmith Architectural Clay Products

Recessed Brick Detail

Auditorium

KITCHEN 20.0 m²

Due to the length of the Croydon incorporated a number of strateg soften the visual impact:

GRC Panel source: Architonic

- The Croydon Road elevation rea volumes, as indicated in the adja

Recesssed top floor

Tall, seperating entrance volume

- The sculptural form of the audito is balanced by a simpler volume fenestration to the north

38 Croydon Road, Beckenham BR3 4BJ

WC 12.7 m²

LOUNGE 154.3 m²

33.6

- The taller glass volume in the mid entrance to the scheme and pro between the two brick volumes 33.6

33.6

Aerial view looking from the north east - proposed OPENED UP CHAFFINCH BROOK

- We have also incorporated a re along the northern most facade a three storey volume

Site location Plan NTS

COVERED WALKWAY

FIRE ESCAPE

- GRC panels create visual anima facing curve of the auditorium an recesses bring order to this volum

Elevation massing diagram

East elevation massing diagram

RAGE BICYCLE STO STORAGE 71.2 m²

38 Croydon Road, Beckenham BR3 4BJ

WC 35.3 m²

CR

GREEN ROOM 17.0 m²

33

MAIN AUDITORIUM 644.3 m²

- By using a light coloured materia minimised the “monumental” imp

DO OY

WC 4.0 m²

STAGE

1:7 RAMP

33.6 OPEN LOBBY 363.8 m²

GREEN ROOM 16.7 m²

WC 56.1 m²

N AD

RAMP TO B01

RO

465 SEATS

CRECHE 52.2 m²

Alan Camp Architects LLP, 88 Union Street, London, SE1 0NW tel: 020 7593 1000. fax 020 7593 1001. mail@alancamp.com job: drawn:

1:20 RAMP

Croydon Road drawing:

Hall

General Arrangement b St a

Section AA

El

Su

PRE APP FACADE LINE

note: all dimensions to be checked on site before commencement of the work. if this drawing exceeds the quantities in any way the architects are to be informed before the work is commenced. this drawing is copyright.

34.4m

GRC Panel source: Architonic YD

ON

A RO

rev 1

(Ch

AD

28/02/18

scale: 1:100 @ A1 1:200 @ A3

job no: 2674

drawing no. GA-S-01

rev. 1

date 28.02.18

description Planning Submission

drawn by ZS

checked AW

D

.2m 37

O CR

date:

ZS

revisions

RO ARD

Grey buff brick with light coloured mortor source: EHSmith Architectural Clay Products

GODD

33.3

AN L P

G NIN

El Sub Sta

Superstore

Street looking north on Croydon Road - proposed

LAYBY - 2500mm X 12000mm

Ground floor plan - 1:100 @ A1

Alan Camp Architects LLP, 88 Union Street, London, SE1 0NW tel: 020 7593 1000. fax 020 7593 1001. mail@alancamp.com job: drawn: Croydon Road

5

drawing: General Arrangement First Floor Plan

AN L P

G NIN

note: all dimensions to be checked on site before commencement of the work. if this drawing exceeds the quantities in any way the architects are to be informed before the work is commenced. this drawing is copyright.

N

Ground Floor Plan

SCALE BAR 0

GA-P-L00-1.100

Approach along Croydon Road showing massing relationship to context date:

ZS

28/02/18

scale: 1:100 @ A0 1:200 @ A2

job no: 2674

drawing no. GA-P-L01-1.100

rev. 1

revisions rev

date

description

drawn by

checked

11

28.02.18 2

Planning Submission

ZS 10m

AW

5

Site location Plan NTS

KEY PLAN 1 : 2000

38 Croydon Road, Beckenham BR3 4BJ

38 Croydon Road, Beckenham BR3 4BJ

NOT FOR CONSTRUCTION OFFICE 20.0 m²

WC 12.7 m²

OFFICES 154.3 m²

11350

L03 Alan Camp Architects LLP, 88 Union Street, London, SE1 0NW tel: 020 7593 1000. fax 020 7593 1001. mail@alancamp.com job: drawn:

Material Key Material: Description 8200

L02

El

Su

b St

a

Hall

34.4m

BOH GODD

L01

RO ARD

4100

AD

(Ch

WC 40.4 m²

L00

0

EXTERNAL GROUND LEVEL

-3200

CAR PARK LEVEL

-4600

YOUTH HALL LEVEL

STAGE

drawing: General Arrangement South Elevation

N AN L P

note: all dimensions to be checked on site before commencement of the work. if this drawing exceeds the quantities in any way the architects are to be informed before the work is commenced. this drawing is copyright.

LOBBY

28/02/18

scale: 1:100 @ A1 1:200 @ A3

job no: 2674

drawing no. GA-E-06

rev. 1

revisions rev 1

date 28.02.18

description Planning Submission

drawn by ZS

W.C.

VEHICULAR RAMP CARPARK

KEY PLAN 1 : 2000

CR

SCALE BAR 0

DO OY

GA-S-01

1

2

5

10m

NOT FOR CONSTRUCTION

VOID LOBBY 71.4 m²

N RO

AUDITORIUM BELOW

MAT 1

AD

KIDS AREA 406.0 m²

11350

L03

8200

L02

4100

L01

300

L00

0

EXTERNAL GROUND LEVEL

MAT 3

MAT 4

MAT 7

MAT 2

MAT 8

MAT 6

MAT 3

MAT 9

PRE APP FACADE LINE

South elevation - 1:100 @ A1

First floor plan - 1:100 @ A1

SCALE BAR

44

South Elevation GA-E-06

45

date:

ZS

El Sub Sta

Section AA

Storage 10.0 m²

1 2 3 4 5 6 7 8 9

ING

Superstore

Section AA - 1:100 @ A1

BACK OF HOUSE 48.9 m²

Croydon Road

OAD NR .2m

WC 35.4 m²

300

O YD

37

O CR

BOH

Smoked Brown Brick (Flemish Bond) Beige GRC Panel (RAL 9001) Glazing Frosted Glazing PPC Aluminium Mullion Light Grey PPC Aluminium RWP (RAL 9003) PPC Aluminium Door (RAL 9007) Single Ply Membrane Roof System Green Roof System

Material: Mark

0

1

2

5

10m

NOT FOR CONSTRUCTION

checked AW

5


Durham Uni student halls, Durham FaulknerBrowns Architects, 2017

3

- Large student residential scheme with 1000 bedrooms & 3 events “hubs”

4

ity

ers

iv Un

b

Hu

- Modular construction using shipping containers - Designed flat layouts, produced drawings for team meetings & planning application

5

Key achievement: Achieved planning permission in September 2017

6 7

e lleg

e2

g olle

ub

C

1H

b

Hu

Co

8

Scale and Massing Street View

Masterplan NTS

We have responded to this with our choice of materials. The scheme is largely finished in a grey buff brick with GRC detailing in areas to maintain a restrained and subtle colour palette that responds to the surrounding Site location Plan NTS environment.

Street looking north on Croydon Road - proposed

1

2

1

3

= Structure = Loading points

m

roo bed

2925mm

2

Perspective - South East approach

ite n su mm E 45 or rrid m 53 o C m om 1500 o r bed ite u s En 5mm 534

mm

90 121 270 0

mm

38 Croydon Road, Beckenham BR3 4BJ

3

Modular construction

45

4

1 - 10 person dining table

6 - Oak effect vinyl flooring

11 - 4 no. 50 litre waste bins

16 - 1 no. Writeboard/noticeboard

2 - 10 no. dining chairs

7 - Brushed stainless steel handles

17 - 3 no. pinboard

53 -1 no. A1 hung picture

8 - Brushed stainless steel kickplate

12 - Sofa system in cleanable upholstery

4 - Kitchen units in anthracite grey

9 - Diamond white emulsion wall finish

5 - Matt grey tile splashback

10 - Stainless steel inset sink

6 7

17

14 - A+ rated appliances

19 - Walls, ceilings in white skimmed plaster

15 - 1 no. coffee table

20 - 1 no. fire blanket & extinguisher

16

12

8

19

8

Scale and Massing Street View

13 - LED lighting

18 - 1 no. 500mm wall & base units per bedroom

11

4

14

7 2

15

6

13

1

9

1 Street looking south on Croydon Road- proposed

Site location Plan NTS

2

3

5

20

Perspective - North West 120

Perspective - North East approach

10

18

2440

Bedroom to Bedroom Partitions:

+2300

Acoustic Requirement: 43dB Dntw + Ctr

3

38 Croydon Road, Beckenham BR3 4BJ

NOTE: Container Walls Drawn at 130mm wide - Includes 10mm outer air gap. Actual wall build up 120mm as per CMIC Standard Spec.(Upgrade to CIMC standard build possibly required to meet acoustic requirements.)

En Suite 9.5 m²

+2600

4865

4865

41

En Suite 9.5 m²

En Suite 9.5 m²

4

Bedroom to Ensuite Bathroom Partitions: Acoustic Requirement: 43dB Dntw + Ctr

Ensuite Bathroom 2.1 m²

Ensuite Bathroom 2.1 m²

Doors to Ensuite:

200

'zip up' zones - Partitions and Doors to Risers to be constructed on site

300

5

+2300

710mm x 2100mm - Heavy duty plastic laminate faced doorset. Heavy duty solid timber core. Colour: T.B.C Acoustic Requirement: 35 dB Rw

'zip up' zones CFC Floor Sheeting to be finished on site.

6

1800

Bedroom/Bathroom to Corridor Partitions:

200

350

1117

543

Corridor

Fireproof plasterboards and architraves to be finished on site. Corridor walls to be painted on site

1210mm x 2100mm - Pas 24 Compliant Heavy duty paint quality doorset. - Factory sprayed finish Colour: T.B.C Acoustic Requirement: 35 dB Rw

682

+2300 Doors to Bedroom:

Ensuite Bathroom 2.1 m² Ensuite Bathroom 2.1 m²

910mm x 2100mm - Pas 24 Compliant Heavy duty plastic laminate faced doorset. Heavy duty solid timber core. Colour: T.B.C Acoustic Requirement: 35 dB Rw

Ensuite Bathroom 2.1 m²

97

1000

97

1903

97

1100

417

923

4865

8

'zip up' zones Partitions and Doors to Risers to be constructed on site

'zip up' zones Plasterboard Ceilings to be finished on site.

Ceilings in corridor to be painted on site.

1065

7

Floor Finish to be fitted on site

Doors to Risers:

840

+2242

Corridor

Corridor

Acoustic Requirement: 43dB DnTw +Ctr

Corridor

+2367

+2600 En Suite 9.5 m²

En Suite 9.5 m²

2800

En Suite 9.5 m²

+2300

Windows to Bedroom:

120

900mm x 1200mm - Openable to provide natural ventilation requirements - T.B.C by M+E Consultant. Opening lights to ground floor locations to be Pas 24 Compliant.

120

320

900

1220

120

Floor Finish Types

60 Minute Fire Line 30 Minute Fire Line

Ceiling Finish Types

Broadloom Nylon Carpet Tiles

Note: Acoustic Requirements to be confirmed by Balfour Beatty

Non Slip Vinyl : Forbo Surestep Lagunia Non Slip Vinyl Flooring : Forbo Surestep Aqua

0m

0.5m

1m

2m

Entrance Matting Floor Sealer

Street looking east on Tesco’s private road next to the car park - proposed

Site location Plan NTS

Perspective - North West

Washable Matt Emulsion - Dulux Diamond Matt Colour: White

Altro Whiterock Satin Cladding (Welded joints) Colour: Colour T.B.C

Painted Plasterboard Ceiling - Washable Eggshell (Dulux Diamond Eggshell)

Washable Matt Emulsion - Dulux Diamond Matt Colour: Feature Colour T.B.C

Altro Whiterock Satin Cladding (Welded joints) Colour: Feature Colour T.B.C

Painted Plasterboard bulkhead - Washable Matt Emulsion (Dulux Diamond Matt)

Eggshell - Dulux Diamond Eggshell Colour: White

500mm high Altro Whiterock Satin Splashback (Welded joints) Colour: Feature Colour T.B.C

Note: +2242 ceiling height area in corridor for services crossovers

DRAWING FireNUMBER safety and DUMO-FB-A-DR-GEN-FF&E(35)0011 internal finishes plans

46

TITLE

FF&E ENSUITE BEDROOM FINISHES

SCALE

As Indicated

SIZE

A1

DURHAM UNIVERSITY MOUNT OSWALD REVISION Rev 1

47

Wall Finish Types

Painted Plasterboard Ceiling - Washable Matt Emulsion (Dulux Diamond Matt)

Note: [01] 100mm high timber skirtings required generally. [02] 100mm Integral covered skirtings required to all Bathrooms and Accessible WC's

600mm x 500mm Stainless Steel Sheet behind hobs.


NUMBER

Cleaners

Cleaners En Suite En Suite

Corridor

En Suite

Corridor

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

Stair

Stair

Corridor

En Suite

En Suite En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite En Suite

Kitchen

En Suite

Corridor

Kitchen

Kitchen

En Suite

Corridor

Corridor

Kitchen

En Suite

Store Cleaners En Suite

En Suite

1 : 100

Corridor

En Suite

Corridor

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

Cleaners

En Suite Stair

Stair

En Suite

En Suite

Corridor

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

Corridor

En Suite

En Suite

En Suite En Suite

En Suite En Suite

En Suite En Suite

Store

BLOCK 1A+1B LEVEL 01-03

En Suite

En Suite

Kitchen

Kitchen

Corridor

Corridor

En Suite En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite Store

En Suite

En Suite

En Suite

En Suite

En Suite

Kitchen

Store Kitchen

Cleaners

Cleaners En Suite En Suite

BLOCK 1A+1B LEVEL 01-03

En Suite

Corridor

1 : 100

Kitchen

Corridor

Kitchen

Cleaners Corridor

Corridor

En Suite

En Suite

Stair

En Suite

En Suite

Accessible Bathroom

En Suite

Accessible Bathroom En Suite

En Suite

En Suite

Corridor

En Suite

En Suite

En Suite

En Suite

Stair

En Suite

Corridor

En Suite

Circulation Kitchen

En Suite Store

1A

En Suite

En Suite

En Suite

En Suite

1B

Cleaners

Accessible Bedroom En Suite

En Suite

Ancillary Bedroom Ensuite

Accessible Bathroom

Store

En Suite

Corridor

En Suite

Stair

Corridor

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite Stair

En Suite

En Suite

En Suite

Corridor

En Suite

En Suite

En Suite

En Suite

En Suite

1C

En Suite

En Suite

1H

En Suite

En Suite

Kitchen

1G

1D

Kitchen

Ancillary Bedroom Ensuite

En Suite

En Suite

En Suite

Kitchen

Corridor

Kitchen

Corridor

Corridor

En Suite

En Suite

Accessible Bathroom

Store

BLOCK 1A+1B LEVEL 01-03

Cleaners Corridor

En Suite Corridor

En Suite

Stair

En Suite

Accessible Bathroom

Accessible Bathroom

Circulation

0m

Kitchen

En Suite

En Suite

En Suite

En Suite Stair

Corridor

1

2

3

4

5

1A

1B

7.5

10m

1C

En Suite

En Suite

En Suite

Kitchen

N

Cleaners

Accessible Bedroom

1E

En Suite

Store

1 : 100

Kitchen

En Suite

1F

En Suite

1H

En Suite

BLOCK 1A+1B LEVEL 00

1G

1D

1 : 100

DUMO-FB-A-DR-Block1AB-GA(00)1100-ZZ

En Suite

BLOCK 1A + B FLOOR PLANS 1:100

SIZE

En Suite

En Suite En Suite Durham University Mount Oswald En Suite

REVISION Rev 1

A1

En Suite

En Suite

En Suite

En Suite

En Suite

1F

En Suite

0m

Kitchen

1E

Kitchen

1

En Suite

En Suite

En Suite 2

3

4

5

7.5

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

10m

N Ancillary Bedroom Ensuite

En Suite

Kitchen

Corridor

Corridor

Kitchen

Corridor

En Suite

Circulation

BLOCK 1A+1B LEVEL 00

Kitchen

1 : 100

En Suite

DRAWING NUMBER

DUMO-FB-A-DR-Block1AB-GA(00)1100-ZZ

TITLE

BLOCK 1A + B FLOOR PLANS

SCALE

1:100

SIZE

A1

Store

Durham University Mount Oswald REVISION Rev 1

Cleaners Corridor

En Suite Corridor

En Suite

Stair

En Suite

En Suite

Accessible Bathroom Accessible Bathroom

Accessible Bathroom

Store

1A

1B

Cleaners

Accessible Bedroom

En Suite

En Suite

En Suite

En Suite Stair

Corridor En Suite

En Suite

1C

En Suite

1H

En Suite

1G

En Suite En Suite College 1 typical floor plan, section & elevation - 1:100 @ A1

En Suite

1F

En Suite 0m

Kitchen

Kitchen

1D

1

1E 2

3

4

5

7.5

10m

N

BLOCK 1A+1B LEVEL 00 1 : 100

DRAWING NUMBER

DUMO-FB-A-DR-Block1AB-GA(00)1100-ZZ

TITLE

BLOCK 1A + B FLOOR PLANS

SCALE

1:100

SIZE

A1

Durham University Mount Oswald REVISION Rev 1

Perspective - College 1 Hub common room

Perspective - College 1 quad

College 1 typical strip section & elevation - 1:20 @ A1 48

49


RWO

Kitchen

Kitchen

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

Corridor

En Suite

Corridor

RWG

En Suite

RWO RWO

Stair

Stair Plant

Plant

Cleaners

Roof Access Hatch

Cleaners

Key

1 : 1000

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

En Suite

2A

2C 2°

RWG

2D En Suite

En Suite

En Suite

Corridor

En Suite

En Suite

Corridor

En Suite

En Suite

2B 2H

En Suite

2E

65sqm REQUIRED ACTIVE AREA FOR PV TO MEET BREEAM EXCELLENT EPC B En Suite

En Suite

En Suite

En Suite Ancillary Bedroom Ensuite

Kitchen

Kitchen

Circulation Kitchen

RWO 0m

BLOCK 2A LEVEL 00

BLOCK 2A LEVEL 01-03

1 : 100

BLOCK 2A LEVEL 04

1 : 100

1 : 100

1

2

3

4

5

7.5

10m

N

College 2 typical block plans - 1:100 @ A1 DRAWING NUMBER

DUMO-FB-A-DR-Block2A-GA(00)2100-ZZ

TITLE

BLOCK 2A LEVEL 00-04

SCALE

1:100

SIZE

DURHAM UNIVERSITY MOUNT OSWALD A1

REVISION Rev 1

Perspective - College 2 Hub common room

Perspective - College 2 quad

College 2 typical strip section & elevation - 1:20 @ A1 50