Professional Portfolio

Page 1


This Portfolio is a collection of projects worked on professionally within my 4+ years of professional experience.

Professional Works

These are a sample of projects I have been involved in during my two and half years working professionally. Featured Projects.

• Miami Dolphin’s Practice Facility

• Jacksonville Jaguars Training Facility

• Miami Formula 1

• Davidson Residence

Project Narrative:

The design goal for the Miami Dolphins was to create the most efficient and effective training facility to build players into champions. The programming focuses on the connection from the practice field to amenities throughout the building, creating a more efficient and purposeful function. A unique feature of the practice facility is the innovation hub, which embraces new technology, such as virtual reality.

Architecturally, the building reflects a Southern Florida aesthetic, showcasing a modern and clean design. The new training facility will be located adjacent to the team’s home at Hard Rock Stadium. The transparent building will give expansive views, allowing natural light and casual outdoor gathering areas to promote team comradery.

Project details:

Office: ROSSETTI

Project location: Miami Gardens

Project type: New construction

Total Building - 228,491 sf

Project status: Constructed

Architecture team size: 10

Roles

• Construction Documentation

• CA (Punchlisting)

• Virtual Reality Walkthrough Sessions

Project Narrative

The Jacksonville Jaguars Football Performance center will be an efficient tool for winning. Meaningful design strategies will prioritize players’ health and wellness throughout the facility to create a culture of excellence exemplified by a timeless modern aesthetic. The performance center will embody the future of Downtown Jacksonville by being a catalyst in creating a new destination and public realm. With the selection of local materials and building partners, the building will be: “Made-in-Florida.” Blurring the lines of interior and exterior, designing with light, inherent sustainability, will contribute to the value of the building and the overall experience for the team and the city of Jacksonville.

Project details:

Office: ROSSETTI

Project location: Jacksonville, FL

Project type: New construction

Project status: Under construction

Architecture team size: 13

Roles

• Construction Documentation

• Design

Restroom Configuration & Toilet accessories selection

Staircase Configuration

Elevator Selection

• 3d Rendering

Page Intentionally Left Blank

Project Narrative

Planning for the inaugural Formula One Miami Grand Prix within the grounds of the Hard Rock Stadium campus, also the home of the Miami Open, took ingenuity and foresight. ROSSETTI’s proven track record of delivering a vision for success was once again tapped for partnership by the Miami Dolphin’s leadership team to design the hospitality pavilion and activation concepts for the event.

The desired placemaking of enhancing the campus center through new activation and programming was well-received. New temporary and permanent hospitality settings have been tactfully weaved throughout existing sports structures to create a street-scape atmosphere in what otherwise would have been a sprawling parking and tailgate area. The creation of a new activated event has brought in corporate sponsors, community partners, and supportive fans. The expression of Miami’s culture continues to create an atmosphere of excitement and spectacle.

Project details:

Office: ROSSETTI

Project location: Miami Gardens, FL

Project type: New construction

Project status: Completed, 2023

Architecture team size: 10

Roles

• Construction Documentation

• CA Coordination

RFI Responses, ASI issuance, Submittal Reviews

Punchlisting

• 3D Modeling & Rendering

• Design Restroom Configurations

Staircase & Elevator Configuration

Team Hospitality, Paddock Building

Roof Canopy Experience
Renderings by Rockwell

Option 1 ( Two story, 10 team spaces)

Option 2 ( Two story, 12 team spaces)

Rendering by Rockwell

Discovery Synopsis

The project consists of reconfiguring the infield at Darlington raceway to improve fan experience, increase revenue opportunities, maximize operational efficiency. the main focus will be on providing camping opportunities, a fan zone at the NASCAR garages, a new club building and improved media facilities

.

Project details:

Office: ROSSETTI

Project location: Michigan

Project type: Renovation

Architecture team size: 6

Roles

• Life Safety Drawings

• 3d Modelling

• Design Development Documentation

• Enscape renderings

Location

Grosse Pointe Farms, MI

Completion

Completed, 2022

Roles

Construction Documentation

Location Lansing, MI

Completion Under Construction

Roles

Construction Documentation

Location

Lambeau Field, WI

Completion Under Construction

Roles

• Construction Documentation

• QA/QC reviews

Location

Fort Lauderdale, Florida

Completion

2023

Roles

QA/QC reviews

Location

Corktown, MI

Completion

Completed, 2019

Roles

Construction Administration (Punchlisting)

Location

Detroit, MI

Completion Under Construction

Roles

Initial Design Phase for Mikveh

Video Walkthrough

Link to Video Below Night time walkthrough video.

Grosse Point War Memorial
Green Bay Training Facility
MSU Health & Wellness
Florida Panthers War Memorial Training Facility

Academic Works

These are a sample of both individual and group academic projects developed during my bachelor and master’s degrees in college.

Featured Projects.

• Campus Information Center

• Master’s Thesis.

Structure

Diagrid StructuralFraming
A Diagrid Strustural Framing
B Cellular Beam System C Steel Floor Plates D Lift Core
Retaining Wall

For more academic projects see link below https://issuu.com/winfreynyarko/docs/portfolio

Master’s Thesis Design

Background

Kumasi, the capital city of the Ashanti Region in Ghana is the focus of this research. The Garden City as it is popularly known had an abundance of natural vegetation hence its name. During the colonial era, the colonial masters found the potential and necessity in establishing parks to bring

people closer to nature whiles encouraging leisure and recreation. Over the years, these green areas have been taken over by hard structure and surfaces thereby taking a part of our intended nature away.

Project date

September, 2020

Project duration

Project location

Academic W ork AsokwaKumasi

https://youtu.be/6OgUdJe8fLE

For more on the thesis projects see link below

https://issuu.com/winfreynyarko/docs/thesis

Thank you

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.