Building Services Contractors










Update Group is a multidisciplinary building services contractor, with an office network covering Ireland, the UK and the Caribbean. Our firm’s expertise covers the entire range of building services engineering.









Building Services Contractors
Update Group is a multidisciplinary building services contractor, with an office network covering Ireland, the UK and the Caribbean. Our firm’s expertise covers the entire range of building services engineering.
Update Group is armed with technical expertise, uses industry standard project management methodologies, and has experience of unique construction environments. A winning choice combination that has repeatedly delivered successful projects internationally.
We design, install and commission mechanical, electrical and fire sprinkler systems in major building projects. Update Group offer various contracting solutions such as design & build, package management and traditional contracting routes.
For over three decades our reputation has continued to grow, largely attributed to our flexibility and ability to adapt. And with a track record and office network that encompasses Ireland, the UK and the Caribbean we are well placed to make your next project a success, whatever the time zone.
We have demonstrated our ability to deliver internationally by completing projects in a wide range of sectors – from an international airport in Bermuda to a luxury hotel in St Kitts and Nevis; major office developments for Santander in the UK; and retail mall refurbishments in Ireland.
No matter where you need us, we work as one company, with the same commitment to detail and focus on safety in every project location.
Update Group is committed to strong, accountable and transparent corporate governance, which is fundamental to the long-term success of our business and the ambitions of our clients.
The Update Group Board is responsible for leadership and setting the strategic direction of the Group, reviewing management performance, and to ensure compliance with all policies and best practices.
We are focused on the safe and sustainable delivery of all our projects in accordance with our ISO certified standards 45001, 14001 and 9001. Each and every month, external specialist safety auditors visit our sites. We embrace their findings for a fresh view of our safety protocols.
Unity Place is Santander UK’s landmark new workplace in Milton Keynes. Procured by Osborne+Co for Santander and designed by LOM, Unity Place is a centre for digital banking innovation and incorporates a range of community facilities. With a total construction area of 80,000 sq m and over 50,000 sq m of commercial office space, this was one of the largest office developments to be completed in the UK over the past few years outside London.
The scheme will be the focal point for Santander’s UK business and the local community. It includes coworking space for small businesses and start-ups. The public will be encouraged to use its facilities including an ‘urban market’, retail outlets, health facilities including gym, yoga and consultation spaces, community hall and auditorium. There is also a rooftop running track and café/ restaurant with terrace.
Unity Place brings together Santander’s 5,000 employees who are currently spread across four sites in Milton Keynes. The total office space area is equivalent to over eight and a half football pitches.
Designed to achieve a WELL ‘Gold’ certification, this vibrant new workplace will nurture collaboration and support staff health and wellbeing. It has also been conceived to help attract the next generation of talent who will drive the banking sector in the future.
8-storey, mixed-use campus
Low energy building
500 secure cycle spaces
Smart Building for 5,000 people
80,000 sq m of construction
Sustainability is that vital ingredient in building services design. Once carefully considered it provides a real contribution to lower emissions and a greener planet. We fully embrace new technologies providing smarter buildings for the end user. We support the principles of BREEAM and LEED, and work to lower carbon outputs applying Net Zero principles to all our projects.
We support and embrace new technologies providing smarter buildings for the end user
The rooftop batteries will provide a target backup power of 6MW for critical and essential services, delivering 60 minutes of AC power and reducing the need for fossil fuel-powered backup generators.
The choice of glazing intentionally maximises natural light, while three full height atria will allow light to penetrate the deeper plan spaces, thus reducing electricity usage and costs.
From the project outset sustainability was one of the core objectives for Unity Place. The building is on target to achieve a BREEAM ‘Excellent’ rating for its environmental sustainability performance and will exceed Building Regulation requirements by reducing CO2 emissions by a further 20 per cent. It includes solar panels on the roof and uses brise soleil on the building façade to help maximise natural daylight, while reducing solar heat gain.
The solar panels on the roof will reduce energy costs, and will lead to substantial savings over the lifetime of the building
With a plan for no single use plastics, a strategy in place to target a zero waste building, and a focus on green spaces, Unity Place will have a positive impact on sustainability.
Façade fabricated in Poland as offsite component units. This reduced construction waste, improved installation efficiency, speed and safety, and will achieve high thermal performance and air tightness.
Our expertise in multi-disciplinary building services covers three main sectors: Commercial, Hospitality and Industrial, and three project types: Buildings, Fit-Out, and Infrastructure.
Our combined sector experience totals over 9 million sq ft of commercial office space, 7,500 hotel beds, and $300 million+ of industrial and manufacturing facilities.
Over the last decade, we have completed multiple new builds and major renovation projects across three continents, for both public and private sector clients. Our proven track record covers a wide range of sectors and includes hotels, office developments, R&D centres, sports arenas and retail malls.
As we build up knowledge of the project requirements we will guarantee the cost of the MEP works. We manage the coordination of the entire MEP package and bring ISO management processes to local supply chain partners on large scale projects.
Throughout the project we apply a continuous QA/QC process, and provide project reporting at all stages. Where required we actively participate in design development workshops to ensure best value and design suitability.
A properly commissioned building runs efficiently without wasting costly utilities. Prior to handover we prepare a detailed commissioning plan and monitor and validate the results on an ongoing basis.
Update Group is known for its flexible approach and our track record includes projects which range in scale from an 80,000 sq m office campus to the high-quality finishes and attention to detail required for a luxury hotel.
By thoroughly understanding the individual needs of the various stakeholders on each project we develop practical cost-conscious solutions, balancing proactive advice with sound commercial management. We frequently contribute pre-contract and pre-construction advice, equipping our clients with supplementary information and alternative options.
Update Group has experience working in operational buildings, allowing our clients to continue their daily activities, saving them both time and money. Careful planning and programming of complex works and keeping all project stakeholders fully informed ensures a cohesive and safe working environment.
Our service does not end on project completion. We work closely with occupying customers to ensure thorough familiarisation and total satisfaction with their new environment.
Update Group has the experience to provide the entire mechanical, electrical, IT and fire safety systems scope for large scale infrastructure projects.
We are armed with technical expertise, use industry standard project management methodologies, and have experience of unique environments.
A critical factor in the success of any infrastructure project is a trusted supply chain – a network we have been building across all regions where we operate. This capability was demonstrated through our recent delivery of LF Wade International Airport in Bermuda.
We can manage the testing, validation and commissioning process to international standards, and can incorporate LEED or other environmental certifications if required.
A winning choice combination of skills and track record that has repeatedly delivered successful projects, all of which have been ORAT-compliant (Operational Readiness and Testing).
Our firm’s expertise covers the entire range of building services engineering.
CREATIVITY
We work hard to solve problems and overcome challenges through collaboration and creative thinking.
EFFECTIVE
We understand that a business can only be effective if it employs the best people.
TRUSTED
Our clients have trusted our commitment to quality, integrity and exceptional service since 1989.
DELIVERY
We believe the power of partnership and open dialogue delivers the best results. How we are different
500,000 manhours without a lost time injury
250+ workers on site at peak
Client Project Title
Location
Size
Update Scope
Group
Update Group were engaged by Aecon Airport Constructors to provide the entire mechanical, electrical, IT and fire safety systems for the new passenger terminal at Bermuda’s international airport.
In order to facilitate the increasing popularity of Bermuda as a destination, a public private partnership project between the Bermudian Government, Skyport and Aecon Group was initiated to construct this new 280,000 sq ft terminal.
The design brings Bermuda’s airport into line with other major modern airports in terms of passenger comfort, facilities and ease of arrival and departure. Modern lounges and passenger boarding bridges will enhance the passenger experience, while immigration and security have been streamlined.
The whole project is geared towards sustainability and crucially, the new building has been designed to minimise the effect of extreme weather conditions.
The building was designed to be a state-ofthe-art terminal to reflect Bermuda’s growing status as a destination and to transit up to two million passengers per year
Our scope on the project included the entire mechanical, electrical, fire protection, IT and security systems.
Update Group worked closely with Aecon in the development of the design into the detailed and coordinated install which was ORAT-compliant (Operational Readiness and Testing).
Our scope also included the infrastructure packages for the MV network and storm drainage systems, as well as standby generation and full load UPS support.
Within the overall IT systems we had responsibility for the Airport Information Management systems. This included the turnkey install of the flight and gate display systems, automated check-in kiosks, all airline check-in desks, integration with the baggage handling systems, automated entry passport kiosks, fit-out of US Customs and Border Protection areas, and management of the entire access control and analytic CCTV install.
LF Wade International Airport has been voted the Best Airport of its Size in the Latin America and Caribbean region.
The Airport Council International (ACI) World Airport Service Quality (ASQ) Awards, which are held annually, celebrate and showcase the world’s best airports as voted for by travellers, and this year, Bermuda’s airport won the showcase award in the region for airports with two million annual passengers or less.
In addition to the Best Airport by Size and Region award, LF Wade International was also voted as having the Best Hygiene Measures of any airport in Latin America and the Caribbean.
With a recent project win for Hyatt Hotels in Grand Cayman, Update Group is further strengthening its track record in the hospitality sector in the Caribbean region. The Grand Hyatt Grand Cayman Hotel & Residences is a 354-room property, and is located on a premium 7.1-acre site on Seven Mile Beach.
Consisting of 190 hotel guestrooms, 88 condo-hotel guestrooms and 76 condo-hotel suites, the beach front property is expected to open in mid-2025. Residents and guests will have access to six restaurants, three resort-style swimming pools, including an in-ocean saltwater lagoon pool in a protected cove, a 12,000 sq ft destination spa and fitness centre, and a 25,000 sq ft indoor-outdoor conference meeting space.
We will be working with LG-Americaribe as the MEPF specialist vendor, and this is our second project on Grand Cayman, following a project win for Mandarin Oriental earlier this year.
Consisting of 354 guestrooms and suites, the beach front property wil open in mid-2025.
This new hotel by JMK Group and operated by Hampton by Hilton, is a 249room property located on Chancery Street close to the Four Courts complex in Dublin City Centre.
Update Group delivered all the building services for this project on a design and build basis. A busy and bustling location, it presented challenges in terms of logistics and managing the works safely.
Hotel facilities include a spacious lobby with attached bar and café area, adjoining restaurant, fitness centre, and contemporary rooms.
Update Group delivered all the building services for this project on a design and build basis. A busy and bustling location, it presented challenges in terms of logistics and managing the works safely.
Scope included all MEP services
249 rooms
Completed on design and build basis
No 2 Triton Square is the UK headquarters of Spanish banking giant Santander. This facility extends to over 200,000 sq ft over seven levels. Together with Osborne + Co we recently completed the multi-phased refit of the entire building on a Design & Build basis.
Being a live working environment meant there were a number of project complexities. The core challenge was ensuring continuity of the existing MEP systems to allow the executive and trading floor functions with critical systems support to continue to operate. Not forgetting that this building is in one of central London’s busiest districts made the logistical planning and resources management a vital factor.
For Update Group, the project included a change out of the entire Mechanical & Electrical plant infrastructure, and all new sustainable redesigned layouts across Levels 2 - 6 of the building. As we were responsible for the MEP design, our delivery team worked closely with Santander, Osborne + Co and the project architects LOM, to ensure this fast track project meets the future needs of the Bank into the coming decades. Architects:
Total Building Area: 200,000 sq ft
MEP: Update Group
Completion: December 2022
The project scope included a change out of the entire Mechanical & Electrical plant infrastructure, and all new sustainable redesigned layouts across Levels 2 - 6 of the building
Triton Square is Update Group’s second project in the UK for Santander. Our delivery team worked closely with the client, construction managers Osborne + Co and the project architects LOM, to ensure this fast track project meets the future needs of the Bank into the coming decades.
Our mindset is to add value to a project from pre-construction through to project delivery by adopting the following plan of work.
These principles are a culmination of over 30 years in the industry, and are regularly appraised against changing trends and international benchmarks.
The best time to start thinking about the building services requirements of your project, is at the same time as your outline brief is being developed. The MEP scope is usually the largest package after construction, up to 25% of total cost on some projects, so getting this right from the outset should be near the top of your list of critical factors.
Speaking to us at this early stage means we can provide a Strategic Analysis of your initial brief and budget estimate, and advise on potential related risks across the entire plan of work.
Get in touch for a chat. We would really like to hear from you.
Once appointed, we will work closely with the construction consultants and MEP design team to define the Project Brief. This will involve an indepth study of the client objectives and planned demands on the building services.
Our input on the Project Brief will include:
Site Evaluation
Feasibility Studies
Design Drawings & Specification
Order of Magnitude Costs
Procurement Plan
Sustainability
Innovative Technologies
Project Programme
Buildability
Project Execution Plan
Where design responsibility needs to be maintained, we actively participate in workshops and provide input in areas such as technical, sustainability, cost and buildability.
From our extensive experience we have a significant amount of cost data across a wide range of sectors and geographic locations.
Combine this with our resources, knowledge and insights and we can provide a detailed evaluation from an engineering perspective and complete a detailed measurement and cost for the project.
This allows us to prove value for money at an early stage which we can guarantee forms the key to the development of the MEP cost.
Outcome / Benefit
Strategic Analysis
Outcome / Benefit
Definition of Project Brief
Project Programme
Outcome / Benefit
Assurance on Design Direction
Initial Cost Analysis
Detailed Engineering Evaluation
Having established a target cost, the path becomes clearer.
If the system performance and design intent has been sufficiently identified, we have the experience and skill set to take ownership of the design and carry it through to the construction and implementation.
It is important to stress that during this phase cost models are continuously updated to reflect the status of the design. Without these updates it is difficult to gauge on whether value for money is being achieved.
As soon as the design & cost review process is completed our construction team issue a project schedule or programme. Critical path factors and procurement requirements are identified
Our supply chain procurement schedules will be issued simultaneously when final scope is clarified.
At this stage our construction delivery team are fully in place and engaged, working alongside our preconstruction team. This allows us to hit the ground running and ensure meaningful coordination of the MEP works with ongoing QA/QC reviews, all while maintaining the maximum efficiencies of the construction programme.
We issue regular project reports advising on procurement, supply chain performance, design status, financial and critical factors to ensure all stakeholders stay informed.
Always with one eye on the commissioning requirements we will develop a Commissioning Plan from the beginning. This plan starts with the preparation of commissioning scripts per system so we can get the agreed buy in from all project stakeholders.
This follows through with detailed system commissioning work plans.
We also set out the validation and handover processes so everyone knows what to expect.
Following handover, our contract is still active for a further 12 months.
To ensure the building is used, operated and maintained efficiently, during this time we:
Undertake reviews of Building Services Performance
Undertake seasonal Commissioning
Rectify defects
Undertake Post Occupancy Evaluation of building performance in use
Verify Project Outcomes including Sustainability Outcomes 3 4 5 6 7
The benefits from our early engagement flows through the design development stages, and as we gain knowledge of the project requirements we will guarantee the cost of the MEP works from Stage 4 onwards.
Visitors to the Caribbean can experience the work of Update Group from the moment they arrive. Our projects range from the scale of an international airport, to the attention to detail and complex planning required for a luxury hotel.
From our regional hub in St James, Barbados we are currently working on projects in Grand Cayman, Barbados, and St Vincent and the Grenadines.
Port
St Vincent and the
Marriott Hotels
Barbados
Hotel Indigo
Barbados
Update Group Regional Hub/HQ
Barbados
Mandarin
Grand Cayman
Grand Hyatt
Grand Cayman
Aecon has appointed Update Group to offer MEP/FP services for a major port construction project in Saint Vincent and the Grenadines. Located in the capital city of Kingstown, the $170 million contract from the government of Saint Vincent and the Grenadines will be to develop a modernised cargo port and terminal area on a 6.5 hectare site. Port Kingstown handles a wide range of vessel traffic - from deep-sea cargo liner services to inter-island ferries to cruise ships.
Additional project scope includes a container storage yard, break-bulk vehicle storage and maintenance areas, relocating a sewer outfall line, as well as road upgrades and strengthening within the port catchment area.
Terminal buildings will include administration and customs, workshops, warehouses, and a container freight station.
Currently at design stage, construction is expected to commence in the fourth quarter of 2023, with an anticipated duration of two and a half years. MEP/FP (Mechanical, Electrical, Plumbing / Fire Protection) assets, the backbone of any facility, will form a significant component of the overall works.
Update Group have completed a number of infrastructure projects in the Caribbean region, including MEP/FP works for LF Wade International Airport in Bermuda, and Park Hyatt Resort in St Kitts and Nevis.
When completed, the modernised Port Kingstown will handle a wide range of vessel traffic – from deep-sea cargo liner services to inter-island ferries to cruise ships.
Click for video
Update Group will soon be embarking on our second Caribbean airport project with Aecon. Clayton J. Lloyd International Airport is Anguilla’s main travel hub, and is currently going through a major redevelopment to cater to increasing international arrivals. The upgrade includes the construction of a 4,650 sq m passenger terminal, along with airside and landside works.
Appointed to deliver the entire MEP works for the new terminal building, our scope will also include fire protection, IT and security systems, standby generation and full load UPS support, and all systems connected to check-in, baggage handling and immigration.
This is our hird major infrastructure project in the region, following the completion of LF Wade International Airport in Bermuda, and ongoing works on the Kingstown port modernisation project in St. Vincent and the Grenadines.
Jointly funded by the Anguillan and UK governments, the new terminal building will be delivered over a two-year construction programme.
As an international contractor with a track record across three continents it’s a priority for us to work closely with local companies and vendors. Following this ‘first port of call’ policy offers a multitude of benefits, with cost savings and reduced timelines being at the top of the list.
We understand and are proud of supporting local economies through engagement with local businesses. The valuable experience gained, in the delivery of large scale, complex developments by our network of trusted partners, ensures meaningful legacy to our projects.
Choosing local also means reduced risk and less transportation of people and materials is required, resulting in a more sustainable project and a lower carbon footprint.
If you are interested in partnering with Update Group and can add value to the projects we work on, we would like to hear from you.
With a network which spans continents and multiple time zones, Update Group is committed to limiting the risk of modern slavery occurring within its own business, infiltrating its supply chains or through any other business relationship.
Located on a beachfront site in Hastings in the southern district of Christ Church, this 132-room hotel project has a development budget of $100 million. Construction commenced at the end of 2022 and is scheduled to complete in December 2024.
Hotel Indigo is a chain of small, individually owned boutique hotels, which is part of IHG Hotels & Resorts. As of March 2023, there are 158 Hotel Indigo properties worldwide.
Located on a beachfront site in Hastings in the southern district of Christ Church, this 132-room hotel project has a development budget of $100 million
Client
Marriott International
Project Title
Moxy Cork City
Location
Cork, Ireland
Size
194 rooms
Update Scope Full MEP Services
Moxy Hotels has appointed Update Group to deliver the building services for their second hotel in Ireland, in the southern city of Cork. The Moxy Hotel and Residence Inn by Marriott is a 3-star hotel located on Camden Quay at the former McKenzies Circuit Courthouse.
The protected building is part of a €32 million development that will include 153 hotel rooms and 41 long-stay suites.
Client
JMK Group
Project Title
Hampton by Hilton
Location
Ealing, London
Size
153 rooms
Update Scope Full MEP Services
This project is a continuation of our association with JMK Group, with whom we have completed new hotels at Holiday Inn Dublin Airport, Hampton by Hilton Dublin City Centre, and Moxy Hotel Cork City.
Update Group delivered all the building services for this project on a design and build basis. A busy and bustling location, it presented challenges in terms of logistics and managing the works safely.
Safety training is an essential element on all our projects wherever the location, and this extends to safe work practices for our supply chain.
Our approach to safety centres on education, training, and instilling and reinforcing safe behaviours throughout our business, from owners to design teams and our supply chain.
We provide the systems and support for management to make informed decisions through detailed root cause analysis and pre-task planning. The output is a robust, values-based safety program that looks upstream at leading indicators to produce exceptional downstream results.
Each and every month external specialist safety auditors visit all our sites. We embrace their findings for a fresh view of our safety protocols.
Is to the health and wellbeing of all employees and our supply chain.
WE ARE COMMITTED TO PROVIDING A WORKPLACE THAT IS FREE FROM RISK TO EMPLOYEE
SAFETY
Is to uphold health and safety regulations, legislation and international best practice.
Is to provide training for safe work practices for all employees and our supply chain.
Is to encourage mutual respect, consideration and open communication to all.
Update Group were recently awarded the Phase 2 contract for delivering building engineering services at Hilton London Gatwick. Appointed by UK property firm Arora Group, our project scope covers 233 rooms, and follows on from our successful completion of 821 rooms under Phase 1.
Arora Group are a UK group of companies involved in hotel operations, hotel management, property construction, and property portfolio asset management.
Gatwick is the third-busiest airport by total passenger traffic in the UK, after Heathrow and Stansted airports.
Careful planning and programming of any works and keeping the project stakeholders fully informed ensures a cohesive and safe working environment
Client Investec
Project Title
Centre
Location
Dublin
Update Scope
MEP Services
The Frascati Centre in Blackrock, Dublin is a recentlycompleted retail expansion project following a significant addition and refurbishment programme.
The project was completed over six staged handovers, starting with the new multi-storey car park which opened up the necessary space to construct the new retail areas and re-model the concourse within the centre.
Our scope included the installation of a new site-wide electrical infrastructure network, providing additional power requirements for each tenant.
Our works also included a comprehensive upgrade of the life safety systems, standby generation, lighting and security systems.
Client JMK Group
Project Title
Holiday Inn Dublin Airport
Location
Dublin, Ireland
Size
421 rooms
Update Scope Full MEPF Services
The Holiday Inn Dublin Airport is a 4-star hotel with 421 rooms. This project is a continuation of our association with JMK Group, with whom we have completed new hotels at Hampton by Hilton Dublin City Centre and London Ealing, and Moxy Hotel Cork City.
Our scope included all MEPF services on a Design & Build basis.
This project is a continuation of our association with JMK Group, with whom we have completed a number of new hotels in Ireland and the UK
The new Central Plaza development was the former home to the Central Bank of Ireland. This iconic building, designed by Sam Stephenson in the 1970’s, is truly one of the few buildings that identifies itself with Dublin.
This unique redeveloped structure is now home to WeWork as well as new restaurants and retail offerings. The addition of the hospitality rooftop venue with its 360-degree view terrace crowns off this famous building. The overall area of the development is 21,500 sq m, with a mix of commercial, retail and food & beverage space.
Our Scope
We were responsible for all electrical works elements, which included new electrical infrastructure with security and fire safety systems. A new outside lighting installation was constructed, incorporating the latest ideas and features to enhance the structure and open up the new plaza area.
One of Dublin’s most iconic buildings
Total area of 21,500 sq m
Scope included all electrical works
Our scope covers the MEP redesign of the resort core which consists of the arrivals area, event centre, restaurants, and all areas within the hotel other than guest rooms and condos.
The first Caribbean residential offering managed by Mandarin Oriental, this mixed-used development combines hotel rooms and condo’s that share facilities. The resort is located atop one of the highest elevations on the island with cinematic views of the ocean called St. James Point.
Grand Cayman is the largest of the three Cayman Islands and the location of the territory’s capital, George Town. The conveniently located modern international airport offers direct flights to all major cities. Unlike many other Caribbean islands, Grand Cayman is for the most part, flat. This allows for more space to build as the island’s population grows.
There are just under 600 banks and trust companies in Grand Cayman, including 43 of the 50 largest banks in the world. Because of this large financial presence on the island, banking, investments, and insurance drive the economy in Grand Cayman.
Our scope covers the MEP redesign of the resort core which consists of the arrivals area, event centre, restaurants, and all areas within the hotel other than guest rooms and condos
Client
Project Title
A development by Hines Real Estate Ireland.
The works enlarged this 180,000 sq ft property by an additional 30,000 sq ft of commercial space.
The scope saw the construction of additional space to the existing 4th and 5th floors and adding an entire penthouse level.
Client Range Developments
Project Title
Park Hyatt Resort
Location
St. Kitts and Nevis
210,000
The scope saw the construction of additional space to the existing 4th and 5th floors and adding an entire penthouse level
300,000 sq ft
Update Scope
A project by Range Developments this new resort property consists of 78 rooms and 48 suites. The hotel is located on the southern tip of St Kitts and Nevis at Christophe Harbour. The overall development comprises an arrivals area, spa, back of house building and various bar and restaurant facilities totalling 300,000 sq ft.
We completed the two-megawatt MV site-wide electrical infrastructure with N+1 standby power generation, together with the entire guest room mechanical HVAC systems and public lighting.
This state-of-the-art space includes seven full-size dance studios, a studio theatre (seating 193) with a full lighting rig and sound desk to be used for both RAD and community partner performances, two cafes, a specialist dance library and a large welcoming reception space that will be used to host exhibitions and events.
Owing to its end use as a performance theatre, we carefully designed acoustic treatments such as attenuators and silencers for the chillers and AHU’s. There are extensive ELV systems installations which required specific detailed planning during the design and commissioning phases. Update Group were appointed to install the entire building services package on a Design & Build contract.
Client Hines
Project Title
The Campus Cherrywood
Location Dublin, Ireland
Size
150,000 sq ft
Update Scope Full MEP Services
A development by Spear Street Capital located in South Dublin County. This project consists of two new Grade A commercial buildings known as blocks F1 and F2, totalling 150,0000 sq ft of office space.
These two new commercial office buildings are located in the Cherrywood town centre development by Hines, and is Dublin’s largest mixed-use location.
The Campus Cherrywood consists of two new Grade A commercial buildings totalling 150,0000 sq ft of office space
CLIENT
Hines
Hines
Hines
Santander/Osborne+Co
Santander/Osborne+Co
Central Plaza, Dublin
Bishops Square, Dublin
The Campus Cherrywood, Dublin
Unity Place, Milton Keynes
Triton Square, London
CLIENT Investec
CLIENT Kier Construction
Melkonian Capital
Hyatt Hotels
Marriott International
IHG Hotels & Resorts
JMK Group
JMK Group Arora Group
JMK Group
PROJECT
Park Hyatt Resort
Mandarin Oriental
Grand Hyatt Hotel & Residences
MEP systems/7-hotel collection
Hotel Indigo
Holiday Inn Dublin Airport
Hampton by Hilton, Dublin
Moxy Cork City
Holiday Inn Dublin Airport
Hilton London Gatwick
Hilton London Gatwick - Phase 2
CLIENT
Kitts and Nevis
Grand Cayman Grand Cayman
Hampton by Hilton, London Ealing LOCATION
EUROPE
Brighton House
121 Rathmines Road Lwr
Dublin, D06 C5X5
Ireland
CARIBBEAN
1st Floor Building K
Limegrove Centre
Holetown, St James
Barbados BB24016