Implementation Item
Implementation Mechanism
237 | Page Chapter 8 Implementation
Lead Department
TimeFrame
Objective 3: Implement streetscape plans for major corridors to improve their appearance and condition. Conduct corridor plans to ensure FM 720, FM 423, and Highway 380 are appropriately landscaped as per their significant influence on the image of the Town.
Town Study
Town Administration
3-years
Develop specific landscaping requirements for land uses along all major corridors (businesses, retails etc.) in order to create a cohesive look and feel of the corridors, such as the Eldorado Streetscape Plan.
Landscape Requirements
Development Services
3-years
Objective 4: Provide additional roadway capacity at the entrance points of neighborhood developments. Utilize the thoroughfare plan during the subdivision and site development review process to ensure provision of street connecting across major arterials between adjacent developments.
Thoroughfare Plan; Site Plan Review
Development Services
On-going
Establish additional left-only and right-only lanes at the entrance of the neighborhoods.
Subdivision Ordinance
Development Services
1-year
For entrances in new subdivisions that will have high traffic volumes or entrances less than 250 feet long, add a subdivision requirement that ensures entrances will have a divided median and one or two lanes of ingress and two lanes of egress (for left and right turns out of the subdivision)
Subdivision Ordinance
Development Services
1-year