Town Comprehensive Plan Draft

Page 245

Town of Little Elm Comprehensive Plan 2017

DRAFT: March 2017

Implementation Item

Implementation Mechanism

237 | Page Chapter 8 Implementation

Lead Department

TimeFrame

Objective 3: Implement streetscape plans for major corridors to improve their appearance and condition. Conduct corridor plans to ensure FM 720, FM 423, and Highway 380 are appropriately landscaped as per their significant influence on the image of the Town.

Town Study

Town Administration

3-years

Develop specific landscaping requirements for land uses along all major corridors (businesses, retails etc.) in order to create a cohesive look and feel of the corridors, such as the Eldorado Streetscape Plan.

Landscape Requirements

Development Services

3-years

Objective 4: Provide additional roadway capacity at the entrance points of neighborhood developments. Utilize the thoroughfare plan during the subdivision and site development review process to ensure provision of street connecting across major arterials between adjacent developments.

Thoroughfare Plan; Site Plan Review

Development Services

On-going

Establish additional left-only and right-only lanes at the entrance of the neighborhoods.

Subdivision Ordinance

Development Services

1-year

For entrances in new subdivisions that will have high traffic volumes or entrances less than 250 feet long, add a subdivision requirement that ensures entrances will have a divided median and one or two lanes of ingress and two lanes of egress (for left and right turns out of the subdivision)

Subdivision Ordinance

Development Services

1-year


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.