Members Workloads

Page 1

TNLS Member Workload Breakdown AIT Waste Water Treatment System


AIT Waste Water Treatment Facility: TNLS Member Workload Breakdown

Document History Version

Description

Date

Author

Checked

Number

1

Original

26/04/13

LM, TS, SP

i

NMcH, LM, TS, SP

NMcH,


AIT Waste Water Treatment Facility: TNLS Member Workload Breakdown

Table of Contents Document History............................................................................................................................... i 1.0

Trevor Smullen (Project Manager) ........................................................................................ 3

2.0

Liam Mahon .......................................................................................................................... 4

3.0

Niall McHale .......................................................................................................................... 5

4.0

Stephen Parker ...................................................................................................................... 6

ii


AIT Waste Water Treatment Facility: TNLS Member Workload Breakdown

1.0

Trevor Smullen (Project Manager) Student No: A00190573 Contact: A00190573@student.ait.ie

Upon commencement of the project I was nominated and subsequently elected as project manager for the project. As such I was responsible for accomplishing the stated project objectives. Throughout the project, as project manager I was also responsible for ensuring that everyone on the project team understood and executed their roles throughout the project. Also regular team meetings were held to monitor and assess project. Throughout the project I was also involved directly in numerous areas including: 

Preparation of a Business Case

Development of a Project Charter

Preparation of a Requirements Management Plan

Identification of Project Requirements

Preparation of a project Scope Statement

Preparation of an Activity List

Identification of Activity Attributes (cost, duration, predecessors, successors)

Preparation of a Risk Management Plan

Development of a comprehensive Risk Register (identification, analyses, response planning)

Completion of SBR System Design

Completion of SBR Tank Design

Maintaining WordPress Website

3


AIT Waste Water Treatment Facility: TNLS Member Workload Breakdown

2.0

Liam Mahon Student No: A00142099 Contact: A00142099@student.ait.ie

Throughout the project I was also involved directly in areas which included: 

Preparation of a Business Case

Preparation of a Project Charter

Development of a Work Breakdown Structure for planning stage

Work Breakdown Structure Dictionary for planning stage

Calculation of costing for the project

Development of a Requirements Management Plan

Preparation of Project Requirements

Preparation of an Activity List

Identification of Activity Attributes

Preparation of Human Resource Plan

Development of the Work Breakdown Structure for the construction stage

Construction of the Google Sketch up Drawings

Preparation of Method Statements

Earned Value Management calculations

Maintenance and upgrade of WordPress Website

Creation of document booklets on the WordPress Website

Putting together and development of the final presentation

4


AIT Waste Water Treatment Facility: TNLS Member Workload Breakdown

3.0

Niall McHale Student No: A00147293 Contact: A00147293@student.ait.ie

Throughout the life cycle of the project I was involved in many different areas such as: 

Preparation of a Business Case

Identification of Stakeholders

Development of a Work Breakdown Structure for planning stage

Work Breakdown Structure Dictionary for planning stage

Identification of Activity Attributes

Identification of Activity Cost

Development of the Project Schedule

Preparation of a Quality Management Plan

Preparation of Milestone Lists

Development of the Work Breakdown Structure for the construction stage

Development of the Scope Statement

Development of the Project Schedule

Construction of the Google Sketch up Drawings

Development of a Site Setup Report

Preparation of Method Statements

Earned Value Management calculations

5


AIT Waste Water Treatment Facility: TNLS Member Workload Breakdown

4.0

Stephen Parker Student No: A00130098 Contact: A00130098@student.ait.ie

Preparation of a Business Case

Development of a Stakeholder Management Strategy

Development of a Stakeholder Register

Preparation of Project Requirements

Preparation of an Activity List

Development of the Communications Management Plan

Hydraulic Design

6