THE BUILDERS CHOICE Kmart Distribution

1 in 100-year storm was allowed for. The final cladding design and material was selected for its free-air versus solid properties as well as glare properties to low-flying aircraft! The Arbon/Rite-Hite dock-leveller installation included a Master Control Unit (MCU) that allowed for a combination of dock and roller doors to be operated in a set sequence which eliminated the potential for hazards associated with open edges and interaction with moving vehicles. The installation also included additional warning and operational lights internally, again focusing on the health and safety of operations/operators. One of the most significant features of the project was the overall size of the site, being in excess of 96,000 sqm. This allowed for construction and fitting off activities to be carried out in tandem

whereas they would normally be performed one after the other on a tighter site. Early access was required to enable client fit-out; this had to be fully coordinated and programmed with the base-build works. The Kmart Distribution Centre is also the first facility within the Jandakot City precinct to have solar power installed. This proved to be quite testing due to the influences and restrictions placed on the project by Western Power to ensure the facility provided no backsurge of power into their network. Negative Voltage Displacement protection was required to be installed throughout the Jandakot embedded network to ensure the Western Power grid was protected. The successful delivery of the facility by CIP was a direct result of team work by both on-site and off-site management from the company. The team was led by project manager (Tristan Howard) Commercial Plumbing were proud to complete all plumbing requirements at the Kmart Distribution Centre Jandakot.

Pullella Earthmoving completes earthworks and associated works for small to large scale commercial and residential projects throughout the Perth metropolitan area and outer suburbs of Western Australia.

Earthmoving • Excavating • Bitumen Car Parks • Kerbing Our main contact at Pullella Earthmoving is Leo Pullella on 0419 446 659 EC8744

Commercial Plumbing specialise in the design, installation and maintenance of industrial, commercial and mining projects all across Western Australia.

www.complumb.com.au

P: 08 9434 1204 Unit 2, 52 Cocos Drive Bibra Lake WA 6163 E: contact@complumb.com.au

FPA Reg No. F0716194

Fire Detection Specialists E: sales@afes.com.au

Ph: 0488 010 003 PO Box 1112, Joondalup DC WA 6919

www.afes.com.au 60 The Builders Choice Magazine – December 2016

Shop drawings and fittings for fabrication. Detailed marking plans including 3D. H.D Bolt plans and details. Material lists/Bolt reports. Shop drawings and report data for cold rolled sections.

CNC and DXF data. 3D models for review / approval. Custom reports to suit fabrication and erection requirements. 3D fully rendered data rich models to aid on site.

T +61 (0) 439 312 781 E draftelement@bigpond.com W www.draftelement.com.au


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.