Redmond CentRal ConneCtoR masteR Plan | the desIgn evolutIon
CReeksIde
170th ave ne
2025 highlights The creekside alignment and character will be significantly altered with the construction of Sound Transit’s light rail that will include a bridge over Bear Creek. The details of this alignment cannot be determined at this time; however, there are several identified factors about how this section of the trail will ultimately take form.
2 1
2025
sound tRansit Light RaiL
ne 76th st.
4
2012
3
76
2 2
1 2