Ing. arch. TEREZA BŘEZOVSKÁ
• 16.8.1990 v Praze brezovska@atelierm1.cz tereza.brezovska@gmail.com +420 773 101 029 vzdělání České vysoké učení technické v Praze Fakulta architektury
Kansas State University Collage of Architecture, Planning and Design Gymnázium Jiřího - Ghuta Jarkovského
praxe
M1 Architekti - architekt, 2016 - dodnes Partneship pictures - architekt, koordinátor stavby, 2019-2020
SOA Architekti - junior architekt, 2015-2016 Ateliér Ondřeje Císlera - studentská praxe, 2015-2016
park historie Aš revitalizace parku - studie SOA Architekti 2015
Byt Radhošťská
interiér - studie, realizace SOA Architekti 2016 TOn Berlín interiér - studie, DPS SOA Architekti 2016 RD phov interiér - studie SOA Architekti 2016 ZŠ p sáry DPS, Interiér SOA Architekti 2016
Revitalizace kapličky panny marie v Líbeznicích DPS, AD M1 Architekti 2017
Líbeznice - zázemí hřiště DPS M1 Architekti 2017
Adaptace Jízdárny pro potřeby GASK Studie, DSP M1 Architekti 2017
Tréninková a sportovní hala Borky Soutěžní návrh M1 Architekti 2017
Revitalizace sportovního areálu Sparta KH Studie
M1 Architekti 2017
Revitalizace ulice mělnická Líbeznice Studie M1 Architekti 2018
Rekonstrukce ZÚ ČR - Washington D.c. DPS M1 Architekti 2018 mŠ měšice Studie M1 Architekti 2018
Embassy of the czech Republic in c anberra DPS, tender, Interiér M1 Architekti, Ing. arch. Markéta Cajthamlová 2019
Zelený pás Líbeznice Studie M1 Architekti 2019 novostavba zázemí pro Areál zdraví Studie, DÚR + DSP, DPS M1 Architekti 2020
Úpravy palackého náměstí v Dačicíh Studie M1 Architekti 2020 Základní škola nový Smíchov Studie M1 Architekti, OU Architects, 2021
Filmová studia Jordan Studios Letňany
DSP, DPS, AD, Koordinátor Partnership pictures 2020
Jóga Studio QUIS
Interiér - studie, DPS, realizace Tereza Březovská + Pavel Mahdal 2020
SOUTĚŽní pROJEKTY
p řístavba školy a dostavba Sportovní haly Starý plzenec Soutěž 2017 p řístavba školy a dostavba Sportovní haly Starý plzenec Soutěž 2017 Kampus Albertov - Biocentrum, Globcentrum Soutěž AOC 2016
SEZn
A m pRAcí
pAnnY mARIE LíBEZnIcE
Kulturní památka Dokumentace pro provedení stavby Realizace 2017
Autoři: M1 Architekti - Ing. arch. Jan Hájek, Ing. arch. Tereza Březovská
Hlavním prvkem návrhu je vytvoření zpevněné kruhové plochy okolo kapličky, reflektující její historický význam a odkazující se na dobu jejího vzniku. Ke kapli jsou navráceny lípy, který zde původně byly vysazeny. Úpravy samotného objektu byly navrženy s ohledem na památkou péči v úzké spolupráci s NPÚ. Zvolením mo nochromatické barevnosti a novým prvkem interiérového svítidla byla přidána současná vrstva.
KApLIČKA
součást autorského díla architektonického
ízení
výslovně uvedeno jinak, jsou kótované rozměry modulační.
5. Před zadáním dodávky do výroby je nutno ověřit na místě rozměr skutečného provedení stavby pro každý prvek zvlášť.
6. Tato dokumentace nenahrazuje výrobní dokumentace dodavatele. Dodavatel je povinen zajistit zpracování dodavatelské výrobní okumentace včetně dopracování řešení detailů. Výrobní dokumentaci je dodavatel povinen před vlastní realizací odsouhlasit autory návrhu. Dodavatel je povinen předložit dokumentaci odsouhlasení dostatečným časovým předstihem tak, aby doba nutná pro prostudování doba nutná pro zapracování korektur nekolidovala plánem výroby. Pr účely organizace vzorkování dodavatel před zahájením dodávky zpracuje odsouhlasí autory, časový harmonogram předkládání dodavatelské dokumentace.
7. Tato dokumentace je autorským dílem. Nakládání tímto projektem, provádění změn se řídí zákonem č. 121/2000 Sb., dílech literárních, vědeckých uměleckých (autorský zákon) ve znění pozdějších předpisů.
8. Vzorky, certifikáty, technické listy a prototypy budou předkládány autorům návrhu odsouhlasení. Dodavatel je povinen předložit vzorky prototypy odsouhlasení před zadáním do výroby před objednáním produktu dostatečným časovým předstihem tak, aby doba nutná pro prostudování doba nutná pro zapracování korektur nekolidovala plánem výroby. Pro účely organizace vzorkování dodavatel před zahájením dodávky zpracuje odsouhlasí autory časový harmonogram vzorkování. 9. Požadované stanovené vlastnosti produktů prokáže dodavatel před dodáním formou vzorku, technického listu, atestu, certifikátu, předložením dílenské výrobní dokumentace, to takové míře a podrobnosti, případně množství a velikosti vzorků alternativ až do průkazného dosažení plnění zadaných vlastností odsouhlasení s autory.
10. Nedílnou součástí dodávky stavby jsou pomocné, kotevní spojovací prvky, stavební kování, přípomocné, kompletační začišťovací práce, dokompletování prvků TZB včetně potřebných připojovacích vedení, dokončení detailů návazností uzlových částí stavby.
11. Dodávka bude provedena podle příslušných právních předpisů technických norem doporučujících.
12. Pro dodávku budou zásadně použity výrobky, suroviny polotovar nejvyšší (1.) jakosti 13. Nacenění stavby obsahuje veškeré náklady potřebné pro kompletní dokončení a předání díla (dodávku, montáž, zhotovení prováděcí výrobní dílenské dokumentace, dopravu, odvoz zeminy, suti, odpadu, likvidaci obalů, závěrečný úklid, zařízení, oplocení ostrahu staveniště, náklady spojené s uvedením stavby do provozu.
účely územního
výlučně
Ing. arch. Jan Hájek
INVESTOR:
ČÁST
územního rozhodnutí stavebního povolení. Veškerá autorská práva k tomuto autorskému dílu jsou duševním vlastnictvím těchto autorů: akad. arch. Pavla Joby; ing. arch.Jana Hájka, ing. arch. Jakuba Havlase. Pořizování kopií, popřípadě jiné formy rozmnožování šíře této dokumentace je možné jen výslovným písemným svolením uvedených autorů. Tato dokumentace nenahrazuje výrobní ani dílenskou dokumentaci. Zhotovitel stavb je povinen před realizací ověřit rozměry a stav všech jednotlivých prvků dle skutečnosti. Výrobní a dílenskou dokumentaci je zhotovitel stavby povinen předložit, architektovi investorovi ke schválení před vlastní ealizací. Kótované rozměry jsou pouze modulační. ZHOTOVITEL: STAVBA:
Ing. arch. Tereza Březovská
OBEC LÍBEZNICE, Mělnická 43, 250 65 Líbeznice
ATELIER M1 architekti s.r.o. Revitalizace kapličky Panny Marie v Líbeznicích
D.1 - Architektonicko stavební část
SOD: Č.ZAKÁZKY: POČET PARÉ: STUPEŇ:
DATUM:
AUTOŘI: Ing. arch. Jakub Havlas ZODPOVĚDNÝ Mgr. akad. arch. Pavel Joba Ing. arch. Jan Hájek PROJEKTANT: PARÉ: Č.PŘÍLOHY VÝKRES:
0-6 DPS 12/2017
OKOLÍ D1.1.2.14
info@atelierm1.cz 169 00 Praha 6 Markétská 1/28 MĚŘÍTKO:
min. 2% min. 2% min. 2% min. 2% sloupek nadzemního vedení nn -0,200 -0,180 0,000 0,000 +0,200 +0,010 -0,200 LÍPA +0,100 DLAŽBA DLAŽBA PÍSKOVEC -0,200 +0,060 Ø 125 DRENÁŽ VSAK Ø125DRENÁŽ Ø150odvodnění Ø 125 DRENÁŽ (VNITŘNÍ) VSAK KÁMEN R3780 R3980 1606 1756 300 2000 397 2560 397 2000 300 280 2880 460 377 3564 4182 60 6360 2200 1120 4174 100 240 1880 240 100 1660 160 300 300 300 1930 2600 1730 2530 70 211 300 200 2622 200 298 211 70 162 80 290 205 162 80 290 285 3564 74 211 332 200 1930 200 332 211 74 1900 1760 300 nejnižší bod drenáže min 100 mm nad základovou sparou -0,300 PV2 A PV1 ve stejné úrovni -0,200 bezbariérový přístup +0,090 +0,90 ≈3450 ≈1600 OPĚRNÁ ZÍDKA 150 mm nad povrchem
OPĚRNÁ
5640 1400 ≈5500 ≈5900 VÝŠKOVĚ NAVÁZAT NA PÁSNICI
VÝŠKOVĚ
150 150 100 200 200 150 TYPICKÝ ŘEZ SPECIFICKÉ ZÁSADY 1. Předmětem dodávky je technicky funkční, ucelená bezchybná stavba. 2. Během výstavby budou dodržovány předpisy bezpečnosti a
zdraví při práci, v průběhu stavby bude veden stavební deník. edna
stavebního deníku bude předána autorům návrhu stavby. 3.
zahájením zemních prací dodavatel
4.
A A
chodníku
ZÍDKA 150 mm nad povrchem chodníku = výška obrubníku (doplnit obruník do potřebné návaznosti)
PÁSNICI SEŘÍZNOUT KOLMO
NAVÁZAT NA PÁSNICI PÁSNICI SEŘÍZNOUT KOLMO
ochrany
kopie
Před
zajistí vytýčení sítí technické infrastruktury.
Pokud není
Poznámka: Tato projektová dokumentace jakožto
slouží
pro
stavebního
a zajištění
ÚPRAVA
-0,850 -0,200 300 300 200 150 min20 50 spád min. 2% pískovcová dlažba božanovský pískovec kladený do tmelu beton C8/10 (portlandský cemnet bez příměsu strusky) drcené kamenivo fr. 8-16, 16-32 hutněná pláň beton C20/25 kotevní roxor Ø 24 zabetonováno betonový odvodňovací žlábek spád min 1,5% CHODNÍK zámková dlažna upraveno souvství nová nášlapná vrstva betonová dlažba kladena do maltového lože kotevní konzola přivařený kotevní profil se zařážkou pro usazen kamene cca á 500mm (doměřit na stavbě) odtok vody min 20 mm Poznámka: Realizace
EmBASSY OF THE cZEcH REpUBLIc In cAnBERRA
Dokumentace pro provedení stavby Dokumentace Interiéru Soupis prací a dodávek 2018 2020 zahájení stavby
Autoři: M1 Architekti - Ing. arch. Jan Hájek, Ing. arch. Tereza Březovská Ing. arch. Markéta Cajthamlová
Zpracování projektu pro provedení stavby dle českých standardů v návaznosti na dokumentaci pro stavební povolení, která byla zpra cována australským projektantem.
Návrh ambasády vyšel z architektonické soutěže v roce 1996 a autorkou návrhu je architektka Markéta Cajthamlová. Po dvaceti letech byly zahájeny navazující projektové práce a M1 Architekti byly vybráni do pozice generálního projektanta. Fáze podléhající místním před pisům byly zpracovány australským partnerem GMB v koordinaci s M1 a autorkou. Fáze dokumentace pro provedení stavby byla přepra cována dle českých standardů a použita jako zadávací dokumentace ve výběrovém řízení na veřejnou zakázku. V návaznosti na dokumentaci pro provedení stavby byla zpracována dokumentace interiéru - volných prvků včetně uměleckých prvků ve spolupráci s MgA. Barborou Zachovalovou, která navrhla vizuální styl, orientační systém a unikátní design koberců pro kanceláře velvyslanců.
eW eW eW eW eW eW eW eW eW eW eW eW eW A400 RW-01 RW-02 A400 RW-03 A400 RW-04 A400 RW-06 A400 A400 RW-07 579.0 578.5 578.0 577.0 575.5 576.0 576.5 577.0 577.5 578.0 579.0 579.5 575.5 576.5 575.25 576.25 576.75 577.25 577.75 578.25 578.75 579.25 579.75 578.75 578.25 577.25 576.75 576.75 576.25 575.75 575.25 577.75 E.L P.L. 577,11 E.L P.L. 577,75 P.L. 577,475 E.L P.L. 577,67 FALL 9% FALL 3,70% FALL 3,37% P.L. 577,400 577,315 BATTER 1:4 GD TOP OF THE RAMP 577,450 BASEMENT 575,600 578,300 578,350 578,300 578,350 577,750 P.L.577,750 P.L. 577,550 P.L. 577,610 577,940 578,350 FALL 6,66% 578,350 578,375 P.L. 578,690 P.L.578,900 578,940 P.L. 578,860 578,810 P.L. 578,840 578,750 578,850 579,000 P.L.578,925 578,925 E.L P.L. 579,625 P.L. 579,450 E.L P.L. 578,75 E.L P.L. Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds GFL=578,400 GFL=578,940 CZECH REPUBLIC EMBASSY OFFICE ENTRY VISA ENTRY TERRACE BBQ RAMP TO BASEMENT P.L. 578,500 578,751 5,0% 5,0% 2,5% 5,4% 5,0% 2,5% FALL FALL FALL FALL 2,5% 5,4% 4,45% 3% 578,675 FALL 9% SW SW SW SW SW SW SW Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds FLAGS S S S S S S S S S S S S S S S S E.L.578,71 E.L.576,95 E.L.578,50 E.L.579,25 E.L.576,82 E.L.578,30 E.L.578,50 E.L.578,09 P.L. 576,580 E.L.578,39 E.L P.L. 577,02 E.L P.L. 575,09 P.L. 576,260 E.L.576,00 E.L.578,500 E.L.575,80 P.L. 575,950 E.L.578,01 P.L. 576,930 P.L. =E.L. P.L. 576,250 G G G G G G G P.L.=E.L. 576,200 578,294 W W W W W W W SW Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds Ds HOSE TAP HOSE TAP HOSE TAP HOSE TAP HOSE TAP S IS SW SW SW SW SW SW SW SW S S S S S S S S S S S S S S S S S SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW FH DN WATER METER 32210kPaexistingGAS Ø 40 copper MAIN COLD WATER Ø150existingWATER Ø 100 subsoil DRAINAGE at 1.0% fall min. 100 subsoil DRAINAGE 1.0% fall min. 100Ø catch DRAIN Ø100catchDRAIN 40 copper COLD WATER copper COLD WATER Ø25copperCOLDWATER Ø150UPVC@1.0% 100Ø @UPVC 1.65% SW SW SW SW SW SW SW SW SW SW SW SW Ø150UPVC@1.0% TEL C C C C C C C C C C C C C E E E E E E E E E E E E E E E E P0E E E E E E E E E E E E E E E E E FALL 3% GD PIT PIT KO KO KO KO MULCHED PLANTING BED NON- IRRIGATED GRASSING IRRIGATED LAWN NON- IRRIGATED GRASSING NON- IRRIGATED GRASSING MULCHED PLANTING BED SP2 SP1 10 2xcableinconduit cablein conduit cableinconduit cableinconduit cableinconduit cable in conduit CCTV camera CCTV CCTV CCTV camera NEW FENCE EXACT LENGHT TO BE CONFIRMED SITE FENCE NEIGHBOUR FENCE SL. GATE SL. GATE FENCE SL. GATE FENCE GATE PEDESTRIAN GATE PEDESTRIAN GATE PEDESTRIAN 5500 5000 1000 1000 4960 6150 4 3 2 B D C E F A 1 G TERRACE SO 01 SO 02 SO 02 SO 02 SO 02 SO SO 02 SO SO 01 SO 02 SO 02 SO 02 SO 02 SO 02 SO SO 02 SO SO 02 SO 02 SO 02 SO 02 SO 02 SO02 SO 02 SO 02 SO 02 SO 02 SO 02 SO 02 SO02 SO02 SO 02 16,8 m m SEWER m2,1 STORM SEWER m3,7 ELECTRICAL m49,2 50,0 TEL 6,5 m 17m 23,5 m WATER 38,85 m 43 m 49 m 52,5 m 83° 83° 11695 9830 18380 445 6820 7800 935 5600 13830 10200 3960 1435 2650 5600 17630 11960 9300 2340 2540 2170 4100 4100 R6m 6m R6m R m 4665 7095 FENCE
S S E E C C SW SW S S SW SW project area boundary storm sewer sanitary sewer electrical service LV telestra water service main gas existing storm sewer existing sanitary sewer existing Ds Ds Ds drainage system eW eW existing water water service site area lights cable undeground LEGEND: LINETYPES: SYMBOLS: W6 wall mounted light on facade W3 wall mounted light on facade pole light SL1 B1 floor recessed light U1 floor recessed light recesse extruded LED luminaire topos proposed tree existing tree P.L. 577,610 E.L.578,39 Plan surface Level Existing surface Level Kerb only Grated drain Refer extrernal structures specification Garden adjustmens see part LANSCAPE Setout point KO GD SP2 topos camera CCTV security system 000,00 CONSTRUCTION WORKS NO.: SO 01 Building Czech Republic Embassy SO 02 Exterior 01 Roads and exterior surfaces 02 Landscaping and other 03 Fencing 04 Utilities Network 05 Storm water system 06 Irrigation System S.P.1 S.P.2 52425 9885 22990 90° 25030 29860 6655 3020 3120 3120 3175 6500 25590 3235 7250 1925 15625 15.63 22.99 34390 info@atelierm1.cz 169 00 Praha Markétská 1/28 ATELIER M1 architekti s.r.o. Ing. arch. Markéta Cajthamlová Guida Moseley Brown Architects Ing. arch. Tereza Březovská Ing. arch. Pavel Mahdal MgA. Martin Gabaš, Ing. arch. Jan Tyrpekl Ministerstvo zahraničních věcí České republiky A 010 0-6 CD 1:150 05/2018 Ing. arch. Jan Hájek GFL 578,400 ±0,000 ARCHITECTURAL Ministry of Foreign Affairs of the Czech Republic FOR CONSTRUCTION Czech Republic Embassy Canberra Block Section 80 Deakin SITE PLAN COORDINATION SETOUT POINTS 1:500 SITE PLAN 1:150 TERRITORY LAND
576.750 577.300 1:8 1:5,5 1:8 1:1,5 BATTER 60° 1,7:1 BATTER 60° 1,7:1 BATTER 1:1 575.400 576,200 577,060 575.200 575.200 TRENCH CABLE CONDUIT TRENCH CABLE CONDUIT 1X TRENCH WATER TRENCH CABLE CONDUIT 2X TRENCH CABLE CONDUIT LIGHTING TRENCH CABLE CONDUIT 4X TRENCH CABLE CONDUIT 1X LIGHTING FOOTING LAMP FOOTING LAMP FOOTINGS FLAG COLUMS TRENCH SANITARY WATER TRENCH CABLE CONDUIT TRENCH STORMWATER TRENCH SANITARY TRENCH WATER TRENCH STORMWATER TRENCH EXCAVATION DRAINAGE TRENCH STORM SEWER TRENCH CABLE CONDUITS STRIP FOOTINGS GATE AND FENCING min. depth STRIP FOOTINGS GATE AND FENCING min. depth STRIP FOOTINGS GATE AND FENCING min. depth m STRIP FOOTING RETAINING WALL STRIP FOOTING RETAINING WALL STRIP FOOTING KERB min. depth 0,8 STRIP FOOTING KERB min. depth 0,8 CAMERA COLUMN CAMERA COLUMN CAMERA COLUMN ELECTRICAL POE FOOTING STRORMWATER PIT FOOTING SEE CIVIL CAMERA COLUMN EXISTING FENCE EXISTING FENCE BUILDING PIT SEE 100 TRENTCH EX. WATER WATER SHAFT FOOTING PREPARE FOR STONE TILES BUILD UP 650 mm PREPARE FOR BRICK TILES BUILD UP 700 mm PREPARE FOR ENTRANCE CONCRETE BUILD UP 700mm PREPARE FOR ENTRANCE CONCRETE BUILD UP 700mm MULCHED PLANTING BED 300 mm MULCHED PLANTING BED 300 mm MULCHED PLANTING BED 300 mm MULCHED PLANTING BED 300 mm MULCHED PLANTING BED 300 mm IRRIGATED
TOPSOIL
578.5
577.0 578.75
579.00
TRENCH DRAINAGE SANITARY STORMWATER TRENCH DRAINAGE
SP2
B
PREPARE FOR STONE TILES
BH3
TOPSOIL
TOPSOIL
0
SEWER
STORM SEWER m3,7 ELECTRICAL m49,2 50,0 TEL 6,5 m 17m 23,5 m WATER 38,85 m 43 m 49 m 52,5 m 11600 9930 18280 6720 8000 5400 13730 10300 5400 17530 11860 9540 TOPSOIL CORING 200 600 mm 1600 RETAINING WALL FOOTING for depth see 400 RETAINING WALL FOOTING for depth see 400 RETAINING WALL FOOTING for depth see 400 RETAINING WALL FOOTING for depth see 400 RETAINING WALL FOOTING for depth see 400 45200 26300 500 400 400 400 400 400 400 400 400 400 400 eW eW eW eW eW eW eW EXCAVATION EXCAVATION PIPE RAMMING UNDER THE ROAD REMOVE EXISTING WATER PIPE excavation for mulched planting bed excavation for strip footings fencing and retaining walls trenches for pipes and conduits general width 400 mm for depth see EHM specifications and local codes project area boundary existing site topography geological LOGS see report BH0 T0 set points see A010 T0 LEGEND: S.P.1 S.P.2 52425 9885 22990 90° 25030 29860 6655 3020 3120 3120 3175 6500 25590 3235 7250 1925 15625 15.63 22.99 34390 info@atelierm1.cz 169 00 Praha Markétská 1/28 ATELIER M1 architekti s.r.o. Ing. arch. Markéta Cajthamlová Guida Moseley Brown Architects Ing. arch. Tereza Březovská Ing. arch. Pavel Mahdal MgA. Martin Gabaš, Ing. arch. Jan Tyrpekl Ministerstvo zahraničních věcí České republiky A030 0-6 CD 1:150 05/2018 Ing. arch. Jan Hájek GFL 578,400 ±0,000 A ARCHITECTURAL Ministry of Foreign Affairs of the Czech Republic FOR CONSTRUCTION Czech Republic Embassy Canberra Block 7, Section 80 Deakin EXCAVATION SITE PLAN SETOUT POINTS 1:500 GENERAL NOTE: Remove 300 mm layer of topsoil For depth the trentch excavations see EHM specification GENERAL NOTES: Supply include full completion and handing over functional work delivery, assembly, anchoring and connecting, connection putting into use, testing, and regulation the delivered equipment and facilities. The delivery also includes complete production preparations, i.e., preparation of construction timeline with an indication nodal points, preparation of supplier documentation digital and print form (four rough drafts for discussion and four final copies, the documentation shall be bilingual in Czech and English), discussion and approval of supplier documentation with he project architect and investor, participation in construction site inspections, coordination specialized professions during construction, Staking out of existing utilities networks, and verification of measurements. The supply includes documentation and documents of the delivered work, i.e., documentation of the actually implemented works, initial review, measurements and testing, declaration of conformity, warranties, instructions and anuals, training, health and safety certification, fire resistance certification. The supply includes all transport, materials transfer, unpacking, moving and installation of elements, as well as removal and disposal of rubble and waste, disposal packing, final cleaning, security, and list of equipment per room. Delivery also includes production, testing, and approval of prototype of atypical products, and on-site testing of samples. Samples, prototypes, and testing will be done at the extent, number of versions, and time necessary for their full and official approval. Presentation of samples and production of prototypes will be done prior to the items' production, which will be done after official approval of supplier documentation, prototypes, and samples by the architects and investor. Location performance: Bale Crescent, Block 7, Section 80, Deakin, Canberra, Australia Installation work by specialized professions: The Contractor must anticipate Coordination documentation work undertaken and the possibility that installation work by the various professions will require cooperation during installation. The supply includes structural preparations trenches, conduits, construction processes (heat and moisture insulation layers), structural access, expansion joints, sealants, cable protectors, terminals, installation of pipes including terminals, impregnation with fillers, preparation for connecting electrical wiring and preparation for conduits including installation, access and junction boxes, access doors, access panels, access shafts. The Contractor is obligated determine the extent of all installation work and to ensure supply for all alterations and assistance services associated with system installation. addition, the Contractor shall provide to the Client the following related services: To communicate with the local authorities reviewing the Suppliers Documents and Documentations, and to apply for and obtain th Supplemental Permits as necessary. To communicate with local authorities and entities involved in development projects in the district. To obtain all required Work Permits. To arrange for all required inspections of the completed Work, its parts and building systems. To take part in the progress and final inspections the Work, commissioning the building and its systems, in inspections carried out to determine whether all punch-listed items have been duly completed or corrected, and in any complaints procedures, instituted. To prepare applications for Temporary Certificates of Occupancy necessary), and prepare an application for the Final Certificate of Occupancy after the Work is completed and any objections raised of the relevant authorities resolved. To assist the Client in arranging for any remaining inspections that may be required by authorities. To obtain Temporary Certificates of Occupancy (if necessary), and to obtain the Final Certificate of Occupancy when the process is completed. To conduct inspections determine the date or dates of substantial completion and the date of final completion; NOTES FOR EXCAVATION WORK Topsoil layer thickness differs (see geological report), generally remove 300 mm of topsoil. For the period construction, the sides basement excavation can be left unsupported at slope 1:1, and vertical for less than 1.5 m high. For stability long term, excavation sides should either be formed at slope no steeper than 2:1 or supported by structural retaining walls. Groundwater is not encountered. Groundwater seepages can be present seasonally fractured rock aquifers close to the ground surface. See geological report from February 2007 General trenches width 400 mm for depth see EHM specifications and local codes DPS - Koordinační situace DPS - Situace výkopových prací
W W
579.200 578.900 576.700 575.750 575.200 575.200 575.350
LAWN 300 mm
CORING 200 600 mm
578.0
578.25 576.75 577.25 577.50 577.75
579.25 579.5 575.5 576.0 576.5 577.0 577.5 578.0 578.5 579.0 575.5 576.0 576.5 575.25 575.75 576.25 576.75 577.25 577.75 578.25 578.75 579.25 579.75 579.75 576.75 575.75 575.25 10
576.75
SP1 4
D C E F A 1 G
BUILD UP 650 mm
5T BH1 BH2
CORING 200 600 mm
CORING 200 600 mm 5500 0 m
m
m2,1
R&P MRPB painted G.12 TOILET WOMEN 8.68 stone tiles stone tiles R&P MRPB painted G.13 TOILET MEN 9.32 stone tiles stone tiles R&P MRPB painted G.14 FURNITURE STORAGE 7.80 stone tiles rendered and painted plaster board painted G.15 KITCHEN 14.48 stone tiles rendered and painted plaster board painted S.01 FIRE ISOLATED STAIRCASE 10.06 stone tiles rendered and painted PB painted R&P S.02 CIRCULATION STAIR 10.65 stone tiles cladding brickwork
BD BN CG CP DB DP FH FHR FIP FW GD HT KB MSB RWO VBP AP PB MRPB PUC SP FCU FIX
LEGEND:
SYMBOLS:
finished floor elevation
±0,000 XX X,XXX elevation mark axis symbol room number
ITEM TAGS SEE SPECIFICATIONS OF TECHNICAL AND USER STANDARDS:
DX.00-X WX.00
PATTERN LEGEND: in-situ reinforced concrete fire rated blockwork PIR insulation board basement
doors refer door schedule windows refer window schedule handrail travertine items glass railing glass items
travertine stone LINETYPE LEGEND:
non fire rated blockwork concrete concrete screed insulation for type refer to structure specification rigid thermal insulation board Roof insulated panels gravel different fractions refer to structure specification earth earth existing geotextile fabric waterproof insulation
brick module 240 120
brickwork structure specification refer schedule tiles tiles (height) floor tiling
B.03 detail marking and number balcony drain bin corner guard column protector distribution board downpipe fire hydrant fire hose reel fire indicator panel floor waste cast grated drain hose raised kerb main switch board rain water outlet vehicle barrier protection ceiling access panel plaster board moisture resistant plaster board penetration under the ceiling (EHM) slab penetration above (ceiling) fan coil unit dropp ceiling) for fixtures wet areas refer schedule
metal fittings, flashings..
atypical furniture (millwork)
built-in furniture (millwork) emergency light
HPP CSL FFL WM E.L. P.L. WF WG WB DG
hydraulic pipe penetration above ceiling) concrete slab level finished floor level water meter floor box existing terrain level plan terrain level window first window ground window basement door first door ground door basement
Upper Edge, Bottom Edge elevation lintels see schedule HEA 200 steel profile HEA 100 steel profile main subsoil drainage system see Hydraulics Lightning conductor system temperature sensor
floor dilatation other than around the walls and under door leaf
CEILING FIXTURES: surface mounted LED batten surface mounted LED batten with emergency luminaire wall mounted light track mounted light ceiling mounted light ceiling recessed light motion sensor smoke detector ewis speaker exit sign ceiling diffuser exhaust air grille see part fan coil wall mounted unit
EXIT
LINTELS TABLE no. Desciption pcs. B pcs. GFL pcs. FFL TOTAL L.01 stainless steel lintel, atypical, concealed, lenght 2150 mm, see brickwork spec. L.02 stainless steel lintel, atypical, concealed, lenght 2150 mm, see brickwork spec. L.03 stainless steel lintel, atypical, concealed, lenght 1250 mm, see brickwork spec. L.04 stainless steel lintel, atypical, concealed, lenght 1100 mm, see brickwork spec. L.05 stainless steel lintel, atypical, concealed, lenght 1700 mm, see brickwork spec. L.06 stainless steel lintel, atypical, concealed, lenght 2750 mm, see brickwork spec. L.07 stainless steel lintel, atypical, concealed, lenght 2500 mm, see brickwork spec. L.08 stainless steel lintel, atypical, concealed, lenght 4650 mm, see brickwork spec. L.09 interior steel lintel, 50, lenght 1200 mm 10 25 L.10 interior steel lintel, 50, lenght 1200 mm L.11 interior steel lintel, 50, lenght 1100 mm L.12 interior steel lintel, 50, lenght 1400 mm L.13 interior steel lintel, 50, lenght 1800 mm L.14 interior steel lintel, 50, lenght 1000 mm L.15 interior steel lintel, 50, lenght 2400 mm L.16 interior steel lintel, 50, lenght 1340 mm L.17 stainless steel lintel, atypical, concealed, lenght 3600 mm, see brickwork spec. L.18 stainless steel lintel, atypical, concealed, lenght 2500 mm, see brickwork spec. L.19 stainless steel lintel, atypical, concealed, lenght 4250 mm, see brickwork spec. L.20 stainless steel lintel, atypical, concealed, lenght 2150 mm, see brickwork spec. L.21 stainless steel lintel, atypical, concealed, lenght 2500 mm, see brickwork spec. L.22 stainless steel lintel, atypical, concealed, lenght 1200 mm, see brickwork spec. L.23 interior steel lintel, 50, lenght 2500 mm L.24 interior steel lintel, 50, lenght 1700 mm
samples. Samples, prototypes, and testing shall provided the necessary extent, number versions, and for time required for their full and recorded approval. Presentation samples and production prototypes must done prior the production of these items. Production of these items can launched only after recorded approval supplier documentation, prototypes and samples, by architects and the investor. Location the job: Bale Crescent, Block Section 80, Deakin, Canberra, Australia nstallation work done by specialized professionals: The Contractor must anticipate coordination of work done by specialized professionals and must provide cooperation during installation work done by specialized professionals. The contract includes construction preparations trenches, conduits, construction processes (heat and moisture insulation layers), access through constructions, expansion joints, sealants, cable protectors, terminals, installation pipes including terminals, impregnation ith fillers, preparation connecting electrical wiring and preparation for conduits including installation, access and junction boxes, access doors, access panels, access shafts. The Contractor must determine the extent all installation work and required alterations and supplemental labor associated with system installation done specialized professionals.
addition, Contractor shall provide the Client the following related services: The Contractor shall communicate with local authorities reviewing the Suppliers Documents and Documentations, and shall app and obtain Supplemental Permits as required. The Contractor shall communicate with local authorities and entities involved development projects the district. The Contractor shall obtain all required Work Permits. The Contractor shall manage required inspections the completed Work, its parts and building systems. The Contractor shall take part all handovers/takovers finished parts the Work, inspections the Work, initiation the building operation, initiation operation all technical equipment, all inspections carried out determine whether punch-listed items have been duly completed corrected, and any complaints/warrant procedures, instituted. The Contractor shall provide application for Temporary Certificates Occupancy necessary),
900 2450 900 2450 900 2450 900 2450 900 2450 900 2450 900 2450 900 2450 800 2340 900 2450 900 800 2450 1700 900 2450 stone tiles 1200 stone tiles 1200 stone tiles 1200 h=2100 open to below 1000 2450 15 184.4 250 16 181.3 260 180 300 13 180 300 182.5 260 PB 3,500 PB 2,500 MRPB3,500 PB3,500 PB3,500 PB2,700 PB2,700 MRPB 2,500 Tiling on axis Tiling axis Tiling on axis First tile start tiling from column line 1040 920 920 2,500 2,500 EXIT EXIT EXIT EXIT EXIT EXIT 1700 3000 1700 3000 3000 880 2920 920 2440 1850 920 2440 700 2050 7500 1920 1200 1920 1200 1920 1200 1920 7500 1440 1080 540 900 3600 900 2700 1080 960 7080 2520 840 2280 840 2280 840 4440 900 2440 1700 2920 150 300 424 A 450 ±0,000 +0,540 MAIN DOOR DETAILS A 429 A 448 A 449 461 Floor dilatation under the movable door 1600 457 1700 1700 2920 ACOUSTICCEILINGPLASTERFINISH ACOUSTICCEILINGPLASTERFINISH +0,500 +0,150 AMBULANT TOILET CLOAK HALL G.02 FOYER RECEPTION G.01 VISA APPLICANTS G.04 VISA INTERVIEW G.05 CORRIDOR G.09 CORRIDOR G.10 STAIR 01 S.01 ACCESS TOILET G.11 TOILET WOMEN G.12 TOILET MEN G.13 FURNITURE STORE G.14 KITCHEN G.15 PORCH G.16 CIRCULATION STAIR S.02 INTERNAL STAIR S.03 TOILET CHILDREN G.07a CIRCULATION STAIR S.04 TERRACE G.18 VISA OFFICE G.06 TERRACE G.19 STAIR 05 S.05 CONCRETE BEDROOM CHILDREN G.07 AMBULANT TOILET ACCESS TERACCE G.20 DP DP DP Groove conrete wall and beam 100 80 mm Groove conrete wall 100 80 mm Groove in conrete wall door jamb 50 mm Groove conrete wall door jamb 50 mm Groove conrete wall door jamb 50 50 mm Groove conrete wall door jamb 50 50 mm Reversed beam floor 200 mm see detail Penetration above the door 1000 200 B.E.= 3600 concrete wall penetration for FIP PUC 700 x150 PUC 350 PUC 350 PUC 350 PUC 700 x250 PUC
150 PUC 150 PUC 350 300 PUC 400 200 PUC 400 200 PUC 300 200 PUC 400 150 PUC 350 350 PUC 150 Opening concrete 900 2460 opening slab (ceiling) shaft above 1630 285 Beam under Staircase wall support Data projector Under the ceiling see E414 (cast in conduit in concrete slab) HPP see part HPP see part HPP see part partition U.E. end with dropped ceiling DS.01-D DS.01-B
WG.07 WG.06 DG.02-G DG.02-H DG.02-E DG.02-L FDG.07-A FIP DB DP's RWO RWO DP WC2 WC2 WC2 WC2 TRH1 TRH1 TRH1 TRH1 B1 T1 CH1 CH1 CH1 CH1 B1 T1 U1 WC3 TRH1 GR TR3 TH B3 T3 CH1 WC2 CH1 CH1 B4 T1 TRH1 DG.04-C FALL 1.5% FALL 1,5% FALL 1,5% FALL 1.5% FALL 1.5% AP AP AP AP AP DP DW1 DW1 KS1 KS1 CK1 CK1 F3 F2 TRANSITION ZONE FALL 12,5% RAMP TO BASEMENT FALL 18,6% TRANSITION ZONE FALL 12,5% WOODEN LANDING FCU FCU FCU DG.02-F WG.07 WG.06 +0,540 +0,500 4 B D C E F A 1 G Side Acces panel PB2,700 3000 3000 3000 3000 2520 2520 2520 2520 1680 (840) 1680 (840) 3660 3660 3660 3660 1100 210 1104 150 1000 1652 1000 825 1000 2500 2500 2500 150 80 1000 1230 2500 300 1000 300 2500 150 1760 300 1000 300 2500 150 4830 445 1100 210 1100 2414 1340 3640 1600 770 570 1710 600 1145 615 2360 1005 1541 390 1541 1000 150 370 6020 345 345 6655 3020 3120 3120 3175 6500 345 26280 1925 7250 3235 445 345 200 2675 2675 200 3600 200 5155 1836 150 885 150 1810 2500 2500 2071 150 1835 150 1920 925 150 2845 600 1445 350 7000 200 3006 600 255 345 350 600 344 1040 79 80 127 3000 126 77 200 16722 1020 201 123 150 535 1700 710 710 1700 710 710 1700 710 710 1700 230 600 1080 200 3760 150 1245 193 900 75 150 100 1000 330 2390 3000 3000 3000 3000 265 76 5414 1300 5499 3000 3000 150 1170 150 138,3° 2055 345 1788 150 150 5940 250 6021 70 150 2476 710 150 1975 1000 115 2500 131,7° 1160 2379 150 2260 150 3000 3090 1594 1615 331 1500 900 780 2500 5015 155 1375 1630 200 910 200 555 485 2750 4906 83 3400 2400 900 225 100 5900 1025 4500 11 170 300 10 170 300 170 300 390 10122 225 6827 3019 225 2019 1733 2640 2450 530 1200 530 150 350 1200 350 1000 100 2500 1200 (1100) 1200 (1100) 300 225 675 3200 650 167 149 358 8256 13200 groove concrete for AV see E414 459 concealed lightning conductor conduit grounding concealed lightning conductor conduit grounding concealed lightning conductor conduit grounding concealed lightning conductor conduit grounding GROUND LEVEL Room schedule no. Room name AREA floor walls ceiling G.01 FOYER/RECEPTION 38.09 stone tiles R&P brickwork rendered and painted G.02 HALL 87.74 stone tiles R&P wall cladding acoustic plaster R&P G.03 CLOAK 5.51 stone tiles rendered and painted rendered and painted G.04 VISA APPLICANTS 9.27 stone tiles rendered and painted plaster board painted G.05 VISA INTERVIEW
S.03
G.18 TERRACE 79.51
tiles G.19 TERRACE 28.46 timber G.20 ACCESS TERRACE 31.68 concrete S.04
STAIR concrete S.05 STAIR
Ø
DG.12-A WG.02 WG.01 DG.15-A DG.15-B DG.09-A DG.14-A DG.13-A DG.02-K DG.11-A DG.02-J WG.03 DG.02-A DG.02-B DG.02-C DG.02-D WG.03 WG.03 FDG.01-C WG.08 DG.04-B DG.04-A WG.04 WG.08 WG.04 GRATED DRAIN FD.S01-C
6.98 stone tiles rendered and painted plaster board painted G.06 VISA OFFICE 17.23 stone tiles rendered and painted plaster board painted G.07 CHILDREN BERDROOM 13.08 timber rendered and painted rendered and painted G.07a CHILDREN TOILET 2.10 timber ceramic mosaic MRPB painted G.08 G.09 CORRIDOR 3.70 stone tiles rendered and painted plaster board painted G.10 CORRIDOR 14.62 stone tiles rendered and painted plaster board painted G.11 ACCESS TOILET 5.89 stone tiles stone tiles
rendered and painted
INTERNAL STAIR timber rendered and painted rendered and painted FLOOR AREA 265.2158 G.16 PORCH 26.53 stone tiles
stone
CIRCULATION
10.06 concrete
info@atelierm1.cz 169 00 Praha Markétská 1/28 ATELIER M1 architekti s.r.o. Ing. arch. Markéta Cajthamlová Guida Moseley Brown Architects Ing. arch. Tereza Březovská Ing. arch. Pavel Mahdal MgA. Martin Gabaš, Ing. arch. Jan Tyrpekl Ministerstvo zahraničních věcí České republiky A 103 0-6 CD 1:50 05/2018 Ing. arch. Jan Hájek GFL 578,400 ±0,000 A ARCHITECTURAL Ministry of Foreign Affairs of the Czech Republic FOR CONSTRUCTION Czech Republic Embassy Canberra Block 7, Section 80 Deakin GROUND LAVEL PLAN GENERAL NOTES: The contract includes full completion scope work and handover functional work supply, installation, anchoring and connecting elements, plugging putting into operation, testing, regulation the supplied equipment and facilities. The contract also includes complete production preparations, i.e., preparation construction schedule with indication key nodes, elaboration supplier documentation digital and printed form (four rough drafts for consultation and four final copies, the documentation shall bilingual Czech and English), consultation and approval supplier documentation the project architect and the investor, participation during construction site inspections, coordination specialized professionals during construction, tting out the existing technical infrastructure, and verification measurements. The contract includes documentation and documents executed work, i.e., documentation the actually implemented work, initial reviews, measurements and testing, declaration conformity, warranties, instructions and manuals, training personell, health and safety certification, fire resistance certification. The contract includes transport, material transfers, unpacking, moving and installation elements, as well emoval and disposal rubble and waste, disposal packing, final cleaning, construction site security, and equipment per room. The contract also includes production, testing, submission and approval of prototypes all atypical products, and on-site testing
and shall provide application
Final Certificate Occupancy after
Work has been completed
objections eventually raised relevant uthorities have been resolved. The Contractor shall provide assistance the Client with management any remaining inspections that may required the authorities. The Contractor shall obtain Temporary Certificates of Occupancy necessary), and shall obtain the Final Certificate Occupancy when the process has been completed. The Contractor shall conduct inspections determine the date dates substantial completion and handover and the date final completion; The subject the contract technically functional, sound and flawless building. safety and health protection rules shall be followed during the construction works and construction job diary shall One copy the construction diary shall be submitted the authors design the building. Contractor must provide geodetic setout points all technical infrastructure prior intiation earth works. provided dimensions are used modulation only not stated otherwise. dimensions installation all items must verified on-site and every item separately prior to initiation manufacturing This documentation must substitute any shop drawings the contractor. The contractor must ensure elaboration shop drawings and any additional manufacturing documentation, including final detailing. The contractor must submit all shop drawings the authors design written approval. The contractor must submit the shop drawings approval sufficient vance allow enough time the Architect study the drawings and incorporate any required corrections and avoid any collisions with the manufacturing plan. The contractor must elaborate and request approval Architect for sampling chedule for the purposes sampling organization prior the initiation the job. This documentation work protected copyright. Every use this project and implementing of revisions governed the regulation "Zákon 121/2000 Sb., dílech literárních, vědeckých uměleckých (autorský zákon)" in most upda The contractor must submit samples, certifications, technical factsheets and prototypes the Architect written approv The contractor must submit the samples and prototypes for approval prior to initiation manufacturing, prior ordering, and sufficient advance allow enough time for the Architect study drawings and incorporate any required corrections and avoid any collisions with the manufacturing plan.The contractor must elaborate and request approval Architect for sampling schedule the purposes sampling organization prior initiation the job. The contractor must prove all required and prescribed features and characteristics products submitting samples, technical factsheets, test records, certifications, shop drawings, the Architect prior supplying and such extent, detail, dimensions the sample, options, until the compliance with prescribed characteristics has been proved and approval Architect has been gained. 10. The job includes auxiliary elements, anchors, connections, fixtures, supplemental and finishing labor, completion of MEP equipment with all required connections, finishing details transitions nodal points the building, without any exception. The job must executed compliance with relevant codes, regulations, technical norms and recommendations. 12. the items, raw materials, semi-finished products, used job must be 1st quality grade only and with fire ting prescribed the Fire Protection part the project and Building Permit. Especially case materials with requiremen regarding their reaction to fire class, flame spread index and coordination with electrical items and fixtures. The contract includes all groove cutting and finishing, penetrations for MEP installations and distributions, access doors ount, dimensions and way installation compliance with MEPL requirements. 14. The contract includes all completion, connection, operational testing and final revisions all operational and technological complexes MEPL; these must performed an authorized professional commissioned Contractor. 15. installation job diary shall kept during MEP installations. control report, eventually detailed report, shall issued after execution operational tests. 16. supplied constructions and products that shall be installed as hidden must be taken over and accepted Resident Engineer record prior their covering. The Resident Engineer shall be invited for the takeover sufficient advance and provable way. 17. supplied MEP installations that shall installed hidden must taken over and accepted by the relevant responsible ofessional record. 18. The pricing the construction includes costs necessary for complete finishing and handover of the work (supply, installation, elaboration shop drawings and other manufacturing documentation, transportation costs, transportation and disposal soil, rubble, waste, final cleaning, all facilities, fencing, site security, costs related with the intitiation operation building, and final inspection and approval the building. DPS - Půdorys 1 NP
for the
the
and
BALCONY 18.84 timber rendered and painted rendered and painted S.01 STAIR 01 7.54 stone tiles rendered and painted plaster board painted S.02 CIRCULATION STAIR 7.10 stone tiles R&P /cladding rendered and painted FLOOR AREA 242.7944 m
BD BN CG CP DB DP FH FHR FIP FW GD HT KB MSB RWO VBP AP PB MRPB PUC SP FCU FIX
LEGEND:
SYMBOLS:
finished floor elevation
±0,000 X,XXX elevation mark axis symbol room number
B.03 detail marking and number
PATTERN LEGEND: in-situ reinforced concrete fire rated blockwork
travertine stone
DX.00-X WX.00
ITEM TAGS SEE SPECIFICATIONS OF TECHNICAL AND USER STANDARDS: doors refer door schedule windows refer window schedule handrail travertine items glass railing glass items
Upper Edge, Bottom Edge elevation lintels see schedule
PIR insulation board basement
brick module 240 120 60
LINETYPE LEGEND:
non fire rated blockwork concrete concrete screed insulation type refer structure specification rigid thermal insulation board Roof insulated panels gravel different fractions refer structure specification earth earth existing geotextile fabric waterproof insulation
brickwork structure specification refer schedule tiles tiles (height) floor tiling
metal fittings, flashings..
atypical furniture (millwork)
built-in furniture (millwork) emergency light
floor dilatation other than around the walls and under the door leaf
balcony drain bin corner guard column protector distribution board downpipe fire hydrant fire hose reel fire indicator panel floor waste cast grated drain hose tap raised kerb main switch board rain water outlet vehicle barrier protection ceiling access panel plaster board moisture resistant plaster board penetration under the ceiling (EHM) slab penetration above (ceiling) fan coil unit (in dropp ceiling) fixtures wet areas refer schedule
HPP CSL FFL WM FB E.L. P.L. WF WG WB DF DG DB
hydraulic pipe penetration above (in ceiling) concrete slab level finished floor level water meter floor box existing terrain level plan terrain level window first window ground window basement door first door ground door basement
HEA 200 steel profile HEA 100 steel profile main subsoil drainage system see Hydraulics Lightning conductor system temperature sensor
EXIT
CEILING FIXTURES: surface mounted LED batten surface mounted LED batten with emergency luminaire wall mounted light track mounted light ceiling mounted light ceiling recessed light motion sensor smoke detector ewis speaker exit sign ceiling diffuser exhaust grille see part fan coil wall mounted unit
LINTELS TABLE no. Desciption pcs. pcs. GFL pcs. FFL TOTAL L.01 stainless steel lintel, atypical, concealed, lenght 2150 mm, see brickwork spec. L.02 stainless steel lintel, atypical, concealed, lenght 2150 mm, see brickwork spec. L.03 stainless steel lintel, atypical, concealed, lenght 1250 mm, see brickwork spec. L.04 stainless steel lintel, atypical, concealed, lenght 1100 mm, see brickwork spec. L.05 stainless steel lintel, atypical, concealed, lenght 1700 mm, see brickwork spec. L.06 stainless steel lintel, atypical, concealed, lenght 2750 mm, see brickwork spec. L.07 stainless steel lintel, atypical, concealed, lenght 2500 mm, see brickwork spec. L.08 stainless steel lintel, atypical, concealed, lenght 4650 mm, see brickwork spec. L.09 interior steel lintel, 50, lenght = 1200 mm 10 25 L.10 interior steel lintel, 50, lenght = 1200 mm L.11 interior steel lintel, 50, lenght = 1100 mm L.12 interior steel lintel, 50, lenght = 1400 mm L.13 interior steel lintel, 50, lenght = 1800 mm L.14 interior steel lintel, 50, lenght = 1000 mm L.15 interior steel lintel, 50, lenght = 2400 mm L.16 interior steel lintel, 50, lenght = 1340 mm L.17 stainless steel lintel, atypical, concealed, lenght 3600 mm, see brickwork spec. L.18 stainless steel lintel, atypical, concealed, lenght 2500 mm, see brickwork spec. L.19 stainless steel lintel, atypical, concealed, lenght 4250 mm, see brickwork spec. L.20 stainless steel lintel, atypical, concealed, lenght 2150 mm, see brickwork spec. L.21 stainless steel lintel, atypical, concealed, lenght 2500 mm, see brickwork spec. L.22 stainless steel lintel, atypical, concealed, lenght 1200 mm, see brickwork spec. L.23 interior steel lintel, 50, lenght = 2500 mm L.24 interior steel lintel, 50, lenght = 1700 mm
testing shall be provided the necessary extent, number versions, and time required their full and recorded approval. Presentation samples and production prototypes must be done prior to the production these items. Production these items can be launched only after recorded approval of supplier documentation, prototypes and samples, architects and the investor. Location job: Bale Crescent, Block Section 80, Deakin, Canberra, Australia nstallation work be done specialized professionals: The Contractor must anticipate coordination work done specialized professionals and must provide cooperation during installation work done specialized professionals. The contract includes construction preparations trenches, conduits, construction processes (heat and moisture insulation layers), access through nstructions, expansion joints, sealants, cable protectors, terminals, installation pipes including terminals, impregnation fillers, preparation for connecting electrical wiring and preparation conduits including installation, access and junction boxes, cess doors, access panels, access shafts. The Contractor must determine the extent installation work and required alterations and supplemental labor associated with system installation done specialized professionals.
addition, the Contractor shall provide Client the following related services: The Contractor shall communicate with the local authorities reviewing the Suppliers Documents and Documentations, and shall app for and obtain the Supplemental Permits required. The Contractor shall communicate with local authorities and entities involved development projects the district.
4 3 B D C E F A 1 G 900 2470 900 2470 800 2470 900 2470 900 2450 900 2450 900 2450 900 2450 900 2470 stone tiles 1200 stone tiles 1200 mosaic 2520 MV 187.5 300 182.5 260 PB2,520 MRPB2,520 MRPB2,520 PB2,520 PB2,500 1040 1040 880 2920 1100 2450 PB2,500 2890 900 2920 880 7320 2280 840 2280 840 2280 840 2280 6360 600 4860 1500 4380 1500 960 7080 3360 840 2280 840 3960 840 1920 5160 26280 13200 6655 3020 3120 3120 3175 6500 A 430 430 A 441 444 +2,880 +4,380 +0,540 ±0,000 A 451 456 458 13 180 300 15 182.5 260 1050 1170 1040 452 OPEN TO FOYER BELOW 1.01 GALLERY 1.02 VICE AMBASSADOR'S OFFICE 1.03 SECRETARY 1.04 AMBASSADOR'S OFFICE 1.05 LANDING 1.06 KITCHENETTE 1.07 OFFICE 1.08 OFFICE 1.09 CORRIDOR 1.10 CORRIDOR 1.11 UNISEX TOILET SHOWER 1.12 STORAGE 1.13 OFFICE 1.14 BALCONY 1.15 STAIR 01 S.01 CIRCULATION STAIR S.02 SHOWER AMBULANT TOILET DB door in the wall accesible from corridor PUC 150 Penetration above 1000 200 Penetration above 1000 200 PUC 300 300 PUC 650 250 PUC 300 300 PUC 1000 250 PUC 1000 250 SP see 550 300 SP see 650 250 SP see M 600 600 SP see 600 600 SP see 600 600 SP see 600 600 SP see 600 600 SP see 600 600 SP see M 350 350 SP see 300 300 SP see 350 350 SP 150 150 see SP 80 80 PUC 700 200 DP WF.01 WF.01 D1.12-A
345
1395
concealed
conduit to
concealed
concealed
concealed
D.S.01-D FD1.13-A D1.14-B WF.02 WF.02 WF.02 WF.02 WF.03 D1.06.A WF.01 WF.01 WF.01 D1.08.A D1.09.A D1.04-D D1.04-C WF.07 WF.08 WF.09 WF.04 WF.05 WF.06 D1.03.B D1.05.B D1.04.B DB DP's RWO RWO RWO DP WC2 TRH1 CH1 WC2 TRH1 CH1 WC2 CH1 TRH1 B5 T1 B5 T5 SHW CH1 CH1 CH1 AP AP D1.04.A D1.05.A AP FCU FCU FCU FCU WF.05 WF.06 WF.06 WF.04 WF.04 WF.04 WF.09 WF.09 WF.08 WF.07 WF.07 WF.07 3000 3000 3000 3000 4500 (-1500) 1680 (840) 1680 (840) 1680 (840) 1680 (840) 1680 (840)
6655 3020 3120 3120 3175 6500 345 345 345 FB FB FB FB 26280
2100 1610 250 405 3090 75 150 150 2500 75 1400 49 1000 735 2500 150 1170 1300 775 1200 776 600 600 5040 150 2970 150 3910 150 1660 390 1850 600 345 255 1450 90 130 2975 1000 1750 45 55 2500 1275 150 R125 R125 R125 75 R125 55 R125 150 1000 1750 2500 5910 155 100 2830 75 225 2570 450 2670 450 2670 450 2670 450 975 1300 100 710 2520 2520 2520 2520 150 1000 150 2520 614 3460 150 2720 150 1590 150 1630 150 1100 210 1100 1430 190 6390 1400 5130 900 1060 2775 395 150 2520 600 300 1040 110 1925 1130 75 1705 4720 138,3° 3960
lightning conductor in
grounding
lightning conductor conduit grounding
lightning conductor in conduit to grounding
lightning conductor conduit grounding
ceiling 1.01 OPEN TO FOYER BELOW 1.02 GALLERY 20.71 stone tiles rendered and painted rendered and painted 1.03 VICE AMBASSADOR´S OFFICE 23.05 timber rendered and painted rendered and painted 1.04 SECRETARY 17.32 timber rendered and painted rendered and painted 1.05 AMBASSADOR´S OFFICE 29.47 timber R&P /cladding rendered and painted 1.06 LANDING 5.62 stone tiles R&P /cladding rendered and painted 1.07 KITCHENETTE 4.77 stone tiles rendered and painted plaster board painted 1.08 OFFICE 16.72 timber rendered and painted rendered and painted 1.09 OFFICE 20.44 timber rendered and painted rendered and painted 1.10 CORRIDOR 7.36 stone tiles rendered and painted PB painted R&P 1.11 CORRIDOR 11.25 stone tiles R&P brickwork rendered and painted 1.12 UNISEX TOILET SHOWER 16.00 stone tiles stone tiles MRPB painted 1.13 STORAGE 13.95 concrete rendered and painted plaster board painted 1.14 OFFICE 22.67 timber rendered and painted rendered and painted 1.15
FIRST LEVEL Room schedule no. Room name AREA floor walls
info@atelierm1.cz 169 Praha Markétská 1/28 ATELIER M1 architekti s.r.o. Ing. arch. Markéta Cajthamlová Guida Moseley Brown Architects Ing. arch. Tereza Březovská Ing. arch. Pavel Mahdal MgA. Martin Gabaš, Ing. arch. Jan Tyrpekl Ministerstvo zahraničních věcí České republiky 104 0-6 CD 1:50 05/2018 Ing. arch. Jan Hájek GFL 578,400 ±0,000 A ARCHITECTURAL Ministry of Foreign Affairs of the Czech Republic FOR CONSTRUCTION Czech Republic Embassy Canberra Block 7, Section 80 Deakin FIRST LEVEL PLAN GENERAL NOTES: The contract includes full completion the scope work and handover functional work supply, installation, anchoring and connecting elements, plugging in, putting into operation, testing, regulation of the supplied equipment and facilities. The contract also includes complete production preparations, i.e., preparation construction schedule with an indication key nodes, elaboration supplier documentation digital and printed form (four rough drafts for consultation and four final copies, the documentation shall be bilingual Czech and English), consultation and approval supplier documentation the project architect and by the investor, participation during construction site inspections, coordination specialized professionals during construction, setting out the existing technical infrastructure, and verification measurements. The contract includes documentation and documents he executed work, i.e., documentation of the actually implemented work, initial reviews, measurements and testing, declaration of conformity, warranties, instructions and manuals, training personell, health and safety certification, fire resistance certification. The contract includes transport, material transfers, unpacking, moving and installation elements, well as emoval and disposal rubble and waste, disposal packing, final cleaning, construction site security, and list equipment per room. The contract also includes production, testing, submission and approval prototypes atypical products, and on-site testing samples. Samples, prototypes, and
The
date dates substantial
The subject the contract technically functional, sound and flawless building. safety and health protection rules shall be followed during the construction works and construction job diary shall One copy the construction diary shall be submitted the authors design building. Contractor must provide geodetic setout points all technical infrastructure prior intiation earth works. provided dimensions are used modulation only not stated otherwise. dimensions installation all items must verified on-site and every item separately prior to initiation manufacturing This documentation must substitute any shop drawings the contractor. The contractor must ensure elaboration shop drawings and any additional manufacturing documentation, including final detailing. The contractor must submit all shop drawings the authors design written approval. The contractor must submit the shop drawings approval sufficient vance allow enough time the Architect study the drawings and incorporate any required corrections and avoid any collisions with the manufacturing plan. The contractor must elaborate and request approval Architect for sampling chedule for the purposes sampling organization prior the initiation the job. This documentation work protected copyright. Every use this project and implementing of revisions governed the regulation "Zákon 121/2000 Sb., dílech literárních, vědeckých uměleckých (autorský zákon)" most upda The contractor must submit samples, certifications, technical factsheets and prototypes the Architect written approv The contractor must submit the samples and prototypes for approval prior to initiation manufacturing, prior ordering, and sufficient advance allow enough time for the Architect study drawings and incorporate any required corrections and avoid any collisions with the manufacturing plan.The contractor must elaborate and request approval Architect for sampling schedule the purposes sampling organization prior initiation the job. The contractor must prove all required and prescribed features and characteristics products submitting samples, technical factsheets, test records, certifications, shop drawings, the Architect prior supplying and such extent, detail, mount, dimensions the sample, options, until the compliance with the prescribed characteristics has been proved and approval Architect has been gained. 10. The job includes auxiliary elements, anchors, connections, fixtures, supplemental and finishing labor, completion of MEP equipment with all required connections, finishing details of transitions nodal points the building, without any exception. The job must executed compliance with relevant codes, regulations, technical norms and recommendations. 12. the items, raw materials, semi-finished products, used job must be 1st quality grade only and with fire ting prescribed the Fire Protection part the project and Building Permit. Especially case materials with requiremen regarding their reaction to fire class, flame spread index and coordination with electrical items and fixtures. The contract includes all groove cutting and finishing, penetrations for MEP installations and distributions, access doors ount, dimensions and way installation compliance with all MEPL requirements. The contract includes all completion, connection, operational testing and final revisions all operational and technological complexes MEPL; of these must performed an authorized professional commissioned Contractor. 15. installation job diary shall kept during all MEP installations. control report, eventually detailed report, shall issued after execution operational tests. 16. supplied constructions and products that shall be installed as hidden must be taken over and accepted Resident Engineer record prior their covering. The Resident Engineer shall be invited for the takeover sufficient advance and provable way. 17. supplied MEP installations that shall installed hidden must taken over and accepted by the relevant responsible ofessional record. 18. The pricing the construction includes costs necessary complete finishing and handover the work (supply, installation, elaboration shop drawings and other manufacturing documentation, transportation costs, transportation and disposal soil, rubble, waste, final cleaning, all facilities, fencing, site security, costs related with the intitiation operation building, and final inspection and approval the building. DPS - Půdorys 2 NP
The Contractor shall obtain required Work Permits.
Contractor shall manage required inspections the completed Work, parts and building systems. The Contractor shall take part in handovers/takovers finished parts the Work, inspections the Work, initiation the building operation, initiation operation technical equipment, inspections carried out to determine whether punch-listed items have been duly completed or corrected, and any complaints/warrant procedures, instituted. The Contractor shall provide application for Temporary Certificates Occupancy necessary), and shall provide application Final Certificate Occupancy after the Work has been completed and all objections eventually raised by the relevant uthorities have been resolved. The Contractor shall provide assistance to the Client with management any remaining inspections that may be required the authorities. The Contractor shall obtain Temporary Certificates Occupancy necessary), and shall obtain the Final Certificate of Occupancy when the process has been completed. The Contractor shall conduct inspections determine the
completion and handover and the date of final completion;
B D C E F A G +1,000 -0,100 16x175x260 16 15 15x182.5x260 3x180x300 578,690 +0,290 578,840 +0,440 FCU -1 +0,000 +0,540 16 +2,880 13x180x300 +0,000 +2,737.5 +4,380 -2,450 -2,800 -0,100 +7,380 +7,630 +8,940 -0,600 -0,400 -0,550 -0,350 -2,800 +0,150 +0,400 A 458 +3,500 575,600 BASEMENT 578,400 GROUND 582,780 FIRST 586,160 ROOF 587,340 BRICK ATTIC DG.02-A DG.02-B DG.02-C DG.02-D DG.10-A DG.10-A FDS.01-A DB.05-C DB.14-A DB.01-B BTH 2xCH1 2800 4380 3380 1180 2200 500 2250 450 150 150 100 2400 50 250 100 7380 250 130 150 150 150 150 2350 250 250 140 6840 3000 150 2600 +2,640 2240 4990 240 4500 250 2500 2880 2650 3500 500 250 3000 130 2837 4942 100 2650 150 2488 200 50 1000 1190 210 2400 350 Existing terrain Tuffa stone bedrock WOOD CLADDING -0,120 Groundwater not encountered. Groundwater seepages can be present seasonally fractured rock aquifers close to the ground surface. -1,600 4162 480 +6,900 +7,380 280 D4 D4 D4 D4 D4 D4 D4 D3 D3 W1 W1 W1 W1 D2 D2 W1 D1 D1 A1E A1E A1 A1 A1 A1 ±0,000 XX X,XXX elevation mark axis symbol room number finished floor elevation PATTERN LEGEND: in-situ reinforced concrete fire rated blockwork PIR insulation board basement travertine stone LINETYPE LEGEND: SYMBOLS:
ITEM TAGS SEE SPECIFICATIONS OF TECHNICAL AND USER STANDARDS: doors refer door schedule windows refer to window schedule handrail travertine items glass railing glass items non fire rated blockwork concrete concrete screed insulation for type refer structure specification rigid thermal insulation board Roof insulated panels gravel different fractions refer to structure specification earth earth existing geotextile fabric waterproof insulation brick module 240 120 60 B.03 435 detail marking and number brickwork structure specification refer schedule tiles tiles (height) floor tiling built-in furniture (millwork) floor dilatation other than around the walls and under the door leaf DX.00-X WX.00 metal fittings, flashings.. Upper Edge, Bottom Edge elevation lintels see schedule HEA 200 steel profile HEA 100 steel profile main subsoil drainage system see Hydraulics Lightning conductor system atypical furniture (millwork) VISIBLE PROFILE COVERED MM COVER STRIP HIGH-GRADE WATERTIGHT MORTAR AND DILATATION INSERTION AND SHORT AAS FOIL MIGUA) VYNECHANÁ KAPSA PRO OSAZENÍ PROFILU MUSÍ 150 1/2 1/2 BENTONITE STRIP REINFORCED CONCRETE WALL PROTECTION GEOMEMBRANE 800 g/m2 PIPE SEALING POWER WATER RESISTANT SYSTEM CASING POWER WATER RESISTANT PIPE BITUMEN STRIP CLAMPING RING XPS BASEMENT INSULATION ELECRICAL FIXTURES AND FITTINGS see part electrical E GPO (different types) PANIC BUTTON DATA TV (different types) SWITCHES DIMMERS THERMOSTAT CARD READERS Notes: Standard GPOs 280 mm on axis above the floor switches and dimmers 1220 mm on axis above the floor when possible group fixtures and fittings into wall plates info@atelierm1.cz 169 00 Praha 6 Markétská 1/28 ATELIER M1 architekti s.r.o. Ing. arch. Markéta Cajthamlová Guida Moseley Brown Architects Ing. arch. Tereza Březovská Ing. arch. Pavel Mahdal MgA. Martin Gabaš, Ing. arch. Jan Tyrpekl Ministerstvo zahraničních věcí České republiky A 301 0-6 CD 1:50 05/2018 Ing. arch. Jan Hájek GFL = 578,400 ±0,000 A - ARCHITECTURAL Ministry of Foreign Affairs of the Czech Republic FOR CONSTRUCTION Czech Republic Embassy Canberra Block 7, Section 80 Deakin SECTION B-B GENERAL NOTES: The contract includes full completion of the scope of work and handover functional work supply, installation, anchoring and connecting elements, plugging in, putting into operation, testing, regulation the supplied equipment and facilities. The contract also includes complete production preparations, i.e., preparation of construction schedule with an indication key nodes, elaboration supplier documentation digital and printed form (four rough drafts for consultation and four final copies, the documentation shall be bilingual in Czech and English), consultation and approval supplier documentation by the project architect and by the investor, participation during construction site inspections, coordination specialized professionals during construction, setting out the existing technical infrastructure, and verification of all measurements. The contract includes documentation and documents of he executed work, i.e., documentation the actually implemented work, initial reviews, measurements and testing, declaration conformity, warranties, instructions and manuals, training of personell, health and safety certification, fire resistance certification. The contract includes all transport, material transfers, unpacking, moving and installation of elements, as well as emoval and disposal of rubble and waste, disposal of packing, final cleaning, construction site security, and list equipment per room. The contract also includes production, testing, submission and approval of prototypes of all atypical products, and on-site testing samples. Samples, prototypes, and testing shall be provided the necessary extent, number of versions, and for time required for their full and recorded approval. Presentation samples and production of prototypes must be done prior to the production of these items. Production these items can be launched only after recorded approval of supplier documentation, prototypes and samples, by architects and the investor. Location the job: Bale Crescent, Block Section 80, Deakin, Canberra, Australia nstallation work be done by specialized professionals: The Contractor must anticipate coordination of all work done by specialized professionals and must provide cooperation during installation work done by specialized professionals. The contract includes construction preparations trenches, conduits, construction processes (heat and moisture insulation layers), access through constructions, expansion joints, sealants, cable protectors, terminals, installation of pipes including terminals, impregnation with fillers, preparation for connecting electrical wiring and preparation for conduits including installation, access and junction boxes, access doors, access panels, access shafts. The Contractor must determine the extent all installation work and required alterations and supplemental labor associated with system installation done by specialized professionals. addition, the Contractor shall provide to the Client the following related services: The Contractor shall communicate with the local authorities reviewing the Suppliers Documents and Documentations, and shall app for and obtain the Supplemental Permits as required. The Contractor shall communicate with local authorities and entities involved development projects in the district. The Contractor shall obtain all required Work Permits. The Contractor shall manage all required inspections the completed Work, its parts and building systems. The Contractor shall take part handovers/takovers of finished parts the Work, inspections the Work, initiation the building operation, in initiation operation of all technical equipment, inspections carried out determine whether all punch-listed items have been duly completed or corrected, and any complaints/warrant procedures, instituted. The Contractor shall provide application for Temporary Certificates of Occupancy (if necessary), and shall provide application for the Final Certificate of Occupancy after the Work has been completed and all objections eventually raised by the relevant uthorities have been resolved. The Contractor shall provide assistance the Client with management of any remaining inspections that may be required by the authorities. The Contractor shall obtain Temporary Certificates of Occupancy (if necessary), and shall obtain the Final Certificate of Occupancy when the process has been completed. The Contractor shall conduct inspections determine the date or dates substantial completion and handover and the date of final completion; BASEMENT WALL PIPE PENETRATION BASEMENT CONCRETE FLOOR DILATATION SPECIFIC PRINCIPLES The subject of the contract is technically functional, sound and flawless building. 2. All safety and health protection rules shall be followed during the construction works and construction job diary shall be kept. One copy the construction job diary shall be submitted the authors of the design of the building. 3. Contractor must provide geodetic setout points technical infrastructure prior intiation of earth works. 4. All provided dimensions are to be used as modulation only not stated otherwise. 5. All dimensions for installation of all items must be verified on-site and for every item separately prior to initiation of manufacturing 6. This documentation must not substitute any shop drawings of the contractor. The contractor must ensure elaboration shop drawings and any additional manufacturing documentation, including final detailing. The contractor must submit all shop drawings the authors of the design for written approval. The contractor must submit the shop drawings for approval sufficient advance to allow enough time for the Architect study the drawings nd incorporate any required corrections and avoid any collisions with the manufacturing plan. The contractor must elaborate and request an approval of the Architect for sampling schedule for the purposes of sampling
7. This
8.
9.
been gained. 10. The job includes all auxiliary elements, anchors, connections, fixtures, supplemental and finishing labor, completion MEP equipment with all required connections, finishing details of transitions at nodal points the building, without any exception. 11. The job must be executed compliance with all relevant codes, regulations, technical norms and recommendations. 12. All of the items, raw materials, semi-finished products, to be used for the job must be 1st quality grade only and with fire rating prescribed in the Fire Protection part of the project and Building Permit. Especially case of materials with requirements regarding their reaction to fire class, flam spread index and coordination with electrical items and fixtures. 13. The contract includes all groove cutting and finishing, penetrations for MEP installations and distributions, access doors ount, dimensions and way of installation in compliance with all MEPL requirements. 14. The contract includes all completion, connection, operational testing and final revisions all operational and technological complexes of MEPL; all these must be performed by an authorized professional commissioned by the Contractor. 15. An installation job diary shall be kept during all MEP installations. control report, eventually detailed report, shall be issued after the execution operational tests. 16. All supplied constructions and products that shall be installed as hidden must be taken over and accepted by the Resident Engineer by record prior to their covering. The Resident Engineer shall be invited for the takeover in sufficient advance and provable way. 17. All supplied MEP installations that shall be installed as hidden must be taken over and accepted by the relevant responsible professional by record. 18. The pricing for the construction includes all costs necessary for complete finishing and handover of the work (supply, installation, elaboration shop drawings and other manufacturing documentation, transportation costs, transportation and disposal of soil, rubble, waste, final cleaning, facilities, fencing, site security, costs related with the intitiation operation of the building, and final inspection and approval of the building. DPS - Řez
LEGEND:
organization prior the initiation the job.
documentation work protected by copyright. Every use of this project and implementing of revisions governed by the regulation "Zákon 121/2000 Sb., dílech literárních, vědeckých uměleckých (autorský zákon)" in its most updated form.
The contractor must submit all samples, certifications, technical factsheets and prototypes to the Architect for written approval. The contractor must submit the samples and prototypes for approval prior to initiation of the manufacturing, prior to ordering, and in sufficient advance to allow enough time for the Architect study the drawings and incorporate any required corrections and avoid any collisions with the manufacturing plan.The contractor must laborate and request an approval the Architect for sampling schedule for the purposes of sampling organization prior the initiation of the job.
The contractor must prove all required and prescribed features and characteristics of all products by submitting samples, technical factsheets, test records, certifications, shop drawings, to the Architect prior to supplying and such extent, detail, amount, dimensions of the sample options, until the compliance with the prescribed characteristics has been proved and the approval the Architect has
The
The
The
B D C E F A G +1,000 +1,000 575,600 BASEMENT 578,400 GROUND 582,780 FIRST 586,160 ROOF 587,340 BRICK ATTIC 576,200 -2,200 W6 W6 W6 W6 576,650 -1,750 0,000 187 x 60 = 11220 219 120 = 26280 CONTINUOS VENTILATED GAP SEE ATTIC DETAILS 1st ROW ABOVE GROUND EVERY 4th HEAD JOINT OPEN FOR VENTILATION 61 60 3660 12 60 720 50 60 3000 149 x 60 = 8940 59 120 7080 28 120 3360 120 840 19 120 2280 120 840 33 120 3960 120 = 840 16 120 1920 43 120 5160 21 120 2520 7x120 840 19 120 2280 120 840 19 120 2280 120 840 37 120 4440 WOOD CLADDING WOOD CLADDING CCTV Security cameras supplied by others CCTV Security cameras supplied by others +1,000 +0,900 ±0,000 XX X,XXX elevation mark axis symbol room number finished floor elevation PATTERN LEGEND: in-situ reinforced concrete fire rated blockwork PIR insulation board basement travertine stone LINETYPE LEGEND: SYMBOLS: LEGEND: ITEM TAGS SEE SPECIFICATIONS OF TECHNICAL AND USER STANDARDS: doors refer to door schedule windows refer window schedule handrail travertine items glass railing glass items non fire rated blockwork concrete concrete screed insulation for type refer to structure specification rigid thermal insulation board Roof insulated panels gravel different fractions refer structure specification earth earth existing geotextile fabric waterproof insulation brick module 240 120 60 B.03 435 detail marking and number brickwork structure specification refer to schedule tiles tiles (height) floor tiling build-in furniture (millwork) floor dilatation other than around the walls and under the door leaf DX.00-X WX.00 metal fittings, flashings.. Upper Edge, Bottom Edge elevation lintels see schedule HEA 200 steel profile HEA 100 steel profile main subsoil drainage system see Hydraulics Lightning conductor system info@atelierm1.cz 169 00 Praha 6 Markétská 1/28 ATELIER M1 architekti s.r.o. Ing. arch. Markéta Cajthamlová Guida Moseley Brown Architects Ing. arch. Tereza Březovská Ing. arch. Pavel Mahdal MgA. Martin Gabaš, Ing. arch. Jan Tyrpekl Ministerstvo zahraničních věcí České republiky A 202 0-6 CD 1:50 05/2018 Ing. arch. Jan Hájek GFL = 578,400 ±0,000 A - ARCHITECTURAL Ministry of Foreign Affairs of the Czech Republic FOR CONSTRUCTION Czech Republic Embassy Canberra Block 7, Section 80 Deakin ELEVATION SOUTH GENERAL NOTES: The contract includes full completion of the scope of work and handover functional work supply, installation, anchoring and connecting elements, plugging in, putting into operation, testing, regulation the supplied equipment and facilities. The contract also includes complete production preparations, i.e., preparation of construction schedule with an indication key nodes, elaboration supplier documentation digital and printed form (four rough drafts for consultation and four final copies, the documentation shall be bilingual Czech and English), consultation and approval supplier documentation by the project architect and by the investor, participation during construction site inspections, coordination specialized professionals during construction, setting out the existing technical infrastructure, and verification of all measurements. The contract includes documentation and documents of he executed work, i.e., documentation of the actually implemented work, initial reviews, measurements and testing, declaration conformity, warranties, instructions and manuals, training of personell, health and safety certification, fire resistance certification. The contract includes all transport, material transfers, unpacking, moving and installation of elements, as well as emoval and disposal of rubble and waste, disposal of packing, final cleaning, construction site security, and list equipment per room. The contract also includes production, testing, submission and approval of prototypes all atypical products, and on-site testing samples. Samples, prototypes, and testing shall be provided the necessary extent, number of versions, and for time required for their full and recorded approval. Presentation samples and production of prototypes must be done prior to the production these items. Production of these items can be launched only after recorded approval of supplier documentation, prototypes and samples, by architects and the investor. Location the job: Bale Crescent, Block Section 80, Deakin, Canberra, Australia nstallation work to be done by specialized professionals: The Contractor must anticipate coordination all work done by specialized professionals and must provide cooperation during installation work done by specialized professionals. The contract includes construction preparations trenches, conduits, construction processes (heat and moisture insulation layers), access through constructions, expansion joints, sealants, cable protectors, terminals, installation of pipes including terminals, impregnation with fillers, preparation for connecting electrical wiring and preparation for conduits including installation, access and junction boxes, access doors, access panels, access shafts. The Contractor must determine the extent all installation work and required alterations and supplemental labor associated with system installation done by specialized professionals. addition, the Contractor shall provide to the Client the following related services: The Contractor shall communicate with the local authorities reviewing the Suppliers Documents and Documentations, and shall app for and obtain the Supplemental Permits as required. The Contractor shall communicate with local authorities and entities involved development projects in the district. The Contractor shall obtain all required Work Permits. The Contractor shall manage all required inspections the completed Work, its parts and building systems. The Contractor shall take part in all handovers/takovers of finished parts the Work, inspections the Work, initiation the building operation, in initiation operation of all technical equipment, inspections carried out to determine whether all punch-listed items have been duly completed or corrected, and any complaints/warrant procedures, instituted. The Contractor shall provide application for Temporary Certificates of Occupancy (if necessary), and shall provide application for the Final Certificate Occupancy after the Work has been completed and all objections eventually raised by the relevant
uthorities have been resolved.
Contractor shall provide assistance the Client with management any remaining inspections that may be required by the authorities.
Contractor shall obtain Temporary Certificates of Occupancy (if necessary), and shall obtain the Final Certificate of Occupancy when the process has been completed.
SPECIFIC PRINCIPLES 1. The subject the contract technically functional, sound and flawless building. All safety and health protection rules shall be followed during the construction works and construction job diary shall be pt. One copy of the construction job diary shall be submitted to the authors the design the building. Contractor must provide geodetic setout points of all technical infrastructure prior to intiation earth works. All provided dimensions are be used as modulation only not stated otherwise. All dimensions for installation of all items must be verified on-site and for every item separately prior initiation manufacturing This documentation must not substitute any shop drawings the contractor. The contractor must ensure elaboration of shop drawings and any additional manufacturing documentation, including final detailing. The contractor must submit shop drawings to the authors the design for written approval. The contractor must submit the shop drawings for approval sufficient advance allow enough time for the Architect to study the drawings and incorporate any required corrections and avoid any collisions with the manufacturing plan. The contractor must elaborate and request an approval the Architect for sampling schedule for the purposes sampling organization prior to the initiation the job. This documentation is work protected by copyright. Every use this project and implementing revisions governed by the regulation "Zákon 121/2000 Sb., dílech literárních, vědeckých uměleckých (autorský zákon)" its most updated form. The contractor must submit samples, certifications, technical factsheets and prototypes the Architect for written approval. The contractor must submit the samples and prototypes for approval prior initiation the manufacturing, prior ordering, and sufficient advance to allow enough time for the Architect study the drawings and incorporate any required corrections and to avoid any collisions with the manufacturing plan.The contractor must elaborate and request an approval of the Architect for sampling hedule for the purposes of sampling organization prior to the initiation the job. The contractor must prove all required and prescribed features and characteristics products by submitting samples, technical factsheets, test records, certifications, shop drawings, the Architect prior supplying and in such extent, detail, mount, dimensions the sample, options, until the compliance with the prescribed characteristics has been proved and the approval of the Architect has been gained. 10. The job includes all auxiliary elements, anchors, connections, fixtures, supplemental and finishing labor, completion of MEP equipment with all required connections, finishing details transitions at nodal points the building, without any excepti 11. The job must be executed in compliance with all relevant codes, regulations, technical norms and recommendations. 12. All the items, raw materials, semi-finished products, to be used for the job must be 1st quality grade only and with fire ting prescribed the Fire Protection part the project and Building Permit. Especially in case of materials with requirements regarding their reaction to fire class, flame spread index and coordination with electrical items and fixtures. 13. The contract includes all groove cutting and finishing, penetrations for MEP installations and distributions, access doors in ount, dimensions and way installation compliance with all MEPL requirements. 14. The contract includes all completion, connection, operational testing and final revisions of all operational and technological complexes MEPL; all of these must be performed by an authorized professional commissioned by the Contractor. 15. An installation job diary shall be kept during MEP installations. control report, eventually detailed report, shall be issued after the execution of operational tests. 16. All supplied constructions and products that shall be installed as hidden must be taken over and accepted by the Resident Engineer by record prior their covering. The Resident Engineer shall be invited for the takeover in sufficient advance and rovable way. 17. All supplied MEP installations that shall be installed as hidden must be taken over and accepted by the relevant responsible ofessional by record. 18. The pricing for the construction includes costs necessary for complete finishing and handover the work (supply, installation, elaboration of shop drawings and all other manufacturing documentation, transportation costs, transportation and disposal of soil, rubble, waste, final cleaning, facilities, fencing, site security, costs related with the intitiation of operation of the building, and nal inspection and approval the building. DPS - Pohled
Contractor shall conduct inspections determine the date or dates substantial completion and handover and the date of final completion;
fillings of the openings hot dip galvanized steel Anchor masonry elements stainless steel • Anchoring elements of the front wall of the masonry stainless steel Fasteners stainless steel
• Visible fasteners Recessed Hexagon Heads Mounting frames for fillings of the openings - Hot dip galvanized steel Surface treatment of metal facade visible elements - in uniform with window frames Frame system of opening parts of fillings of the openings design meeting the requirements: Hidden Vent width max 105mm
• Fixed glazing system hidden frame Sills brick treads, impregnation to a depth of 3mm, laying in two-component painting waterproofing, frost-proof water-resistant coating, frost-resistant waterproofing
Free openings of the ventilation system of the facade fitted with an insect screen black metal net Connection of the fillings of openings to the construction outer perimeter of the frame asphalt strip melted through mineral wool wedge
Filling of holes to the construction outer perimeter of the frame vapor-proof foil, gasket sealant butyl Anchoring the filling of openings to the construction expansion joints
Glass bonding one component or two-component silicone sealant certified for structural bonding of glass, including enamelled and plated glass, painted, anodised aluminum, lacquered or stainless steel, UV resistant.
Execution of bonded joints two-sided joint designation by spacer compression PE belts.
• Connection and anchoring elements - type, dimension and number are determined by the contractor
Statics of glass determined by the contractor of the building Dimensions of glued joints Dimensions and related type of adhesive are specified by the contractor in accordance with ASTM C 1184 or EOTA ETAG No. 002.
The flatness of the assemblies the surfaces of the glass fixtures and the openings will be aligned
• Laying of the glasses through the settling PVC blocks
Sealing of glass contact detail frame, glass glass sealed with weatherproof coating Correction of front-to-back comparisons of glasses with spacer strips Glued glazing joints Primary and secondary sealant UV resistant, black
arch. SPECIFICKÉ ZÁSADY SPECIFIC PRINCIPLES Pokud není výslovně uvedeno jinak, jsou kótované rozměry
modula provided dimensions are to used modulation only not stated otherwise. Před zadáním dodávky výroby je nutno ověřit místě rozměry skutečného provedení stavby pro každý prvek zvlášť. dimensions installation items must be verified on-site and every item separately prior to initiation manufacturing Tato dokumentace nenahrazuje výrobní dokumentace dodavatele. Dodavatel povinen zajistit zpracování dodavatelské výrobní okumentace včetně dopracování řešení detailů. Výrobní dokumentaci dodavatel povinen před vlastní realizací odsouhlasit s autory návrhu. Dodavatel je povinen předložit dokumentaci k odsouhlasení s dostatečným časovým předstihem tak, aby doba nutná pro prostudování doba nutn pro zapracování korektur nekolidovala s plánem výroby. Pro účely organizace vzorkování dodavatel před zahájením dodávky zpracuje odsouhlasí s autory časový harmonogram předkládání dodavatelské dokumentac This documentation must not substitute any shop drawings the contractor. The contractor must ensure elaboration of shop awings and any additional manufacturing documentation, including final detailing. The contractor must submit shop drawings the authors the design written approval. The contractor must submit the shop drawings approval sufficient advance allow enough time for the Architect study the drawings and incorporate any required corrections and to avoid any collisions with the manufacturing plan. The contractor must elaborate and request an approval the Architect sampling schedule for the purposes sampling organization prior initiation the job. Tato dokumentace autorským dílem. Nakládání s tímto projekte provádění změn se řídí zákonem č. 121/2000 Sb., dílech erárních, vědeckých uměleckých (autorský zákon) znění pozdějších předpisů. This documentation work protected by copyright. Every use this project and implementing of revisions governed regulation "Zákon 121/2000 Sb., dílech literárních, vědeckých uměleckých (autorský zákon)" most upda Vzorky, certifikáty, technické listy prototypy budou předkládány autorům návrhu k odsouhlasení. Dodavatel povinen předlož vzorky prototypy k odsouhlasení před zadáním do výroby pře objednáním produktu s dostatečným časovým předstihem tak, aby doba nutná pro prostudování doba nutná pro zapracování korektur nekolidovala s plánem výroby. Pro účely organizace vzorkování dodavatel pře zahájením dodávky zpracuje odsouhlasí s autory časový harmonogram vzorkování. The contractor must submit all samples, certifications, technical factsheets and prototypes the Architect for written approval. The contractor must submit the samples and prototypes for approval prior to initiation the manufacturing, prior ering, and sufficient advance allow enough time Architect study drawings and incorporate any required corrections and avoid any collisions with the manufacturing plan.The contractor must elaborate and request an approval the Architect for sampling schedule for the purposes sampling rganization prior the initiation the job. Požadované stanovené vlastnosti produktů prokáže dodavatel ed dodáním formou vzorku, technického listu, atestu, certifikát předložením dílenské výrobní dokumentace, v takové mí podrobnosti, případně množství velikosti vzorků alternativ do průkazného dosažení splnění zadaných vlastností odsouhlasení s autory. The contractor must prove required and prescribed features and characteristics products submitting samples, hnical factsheets, test records, certifications, shop drawings, Architect prior supplying and such extent, detail, amount, dimensions of the sample, options, until the compliance with the prescribed characteristics has been proved and the approval the Architect has been gained. Nedílnou součástí dodávky stavby jsou pomocné, kotevní spojovací prvky, stavební kování, přípomocné, kompletační začišťova práce, dokompletování prvků TZB včetně potřebných připojovacích vedení, dokončení detailů návazností uzlových částí stavby.
The job includes auxiliary elements, anchors, connections, fixtures, supplemental and finishing labor, completion MEP equipment with required connections, finishing details transitions nodal points building, without any exception. Dodávka bude provedena podle příslušných právních předpisů chnických norem doporučujících. The job must executed compliance with relevant codes, regulations, technical norms and recommendations. Pro dodávku budou zásadně použity výrobky, suroviny polotovar nejvyšší (1.) jakosti s požární odolností podle požadavku projektu Požárně bezpečnostního řešení stavební části, stavebního povolení. Zejména jedná řešení materiality požadované ídě reakce oheň, index šíření plamene koordinaci kompletačními prvky elektroinstalací. the items, raw materials, semi-finished products, be used for the job must quality grade only and with fire rating prescribed the Fire Protection part the project and Building Permit. Especially case materials with requirements regarding their reaction fire class, flame spread index and coordination with electrical items and fixtures. 10. Nacenění výrobku obsahuje veškeré náklady potřebné pro kompletn dokončení předání díla (dodávku, montáž, zhotovení prováděc výrobní dílenské dokumentace, dopravu, odvoz odpadu likvidaci obalů, závěrečný úklid) The pricing construction includes costs necessary for complete finishing and handover of the work (supply, installation, elaboration shop drawings and all other manufacturing documentation, transportation costs, transportation and dispos waste, final cleaning.
earth geotextile fabric insulation fleece Ing.
glazing Jan
Hájek
DPS - Detaily a specifikace
Ministry of Foreign Affairs of the Czech Republic FOR CONSTRUCTION
Czech Republic Embassy Canberra Block 7, Section 80 Deakin AMBASSADOR´S BOOKCASE
České republiky GFL 578,400 ±0,000 S-SPECIFICATION
This documentation documentation of the Before you enter into dimensions site Prior to entering the supplier is required mentation and to discuss, writing with the interested Anchor elements for galvanized steel Anchor masonry elements Anchoring elements stainless steel Fasteners stainless Visible fasteners Mounting frames for galvanized steel Surface treatment in uniform with window Frame system of opening openings design Vent width max 105mm Fixed glazing system Sills brick treads, laying in two-component frost-proof water-resistant waterproofing Free openings the fitted with insect Connection of the struction outer perimeter melted through mineral Filling of holes the of the frame vapor-proof Anchoring the filling expansion joints Glass bonding one silicone sealant certified glass, including enamelled anodised aluminum, UV resistant. Execution of bonded tion by spacer compression Connection and anchoring sion and number are Statics of glass determined the building Dimensions of glued type of adhesive are accordance with ASTM 002. The flatness the glass fixtures and Laying of the glasses blocks Sealing of glass contact sealed with weatherproof Correction of front-to-back with spacer strips Glued glazing joints UV resistant, black
SECTION PLAN
PROJECT
PROJECT
DOOR ATYPICAL
FOR
REFERENCE TYPICAL DOOR DRAWING PLAN Ing. arch. Jan Hájek ATELIER M1 architekti s.r.o. Markétská 1/28 169 00 Praha Czech Republic Embassy Canberra Block 7 Section 80 Deakin Ing. arch. Markéta Cajthamlová Ing. arch. Tereza Březovská CD construction documentation Ministerstvo zahraničních věcí České republiky Ministry of Foreign Affairs of the Czech Republic 5/2018 A ARCHITECTURAL 1:10 INTERIOR TYPICAL DOOR A 460 GENERAL NOTES AND LEGEND: This documentation does not replace the production documentation of the contractor • Before you enter into production, verify the actual dimensions in site Prior to entering the factory for production, the supplier is equired to prepare the production docu mentation and to discuss, to agree and to confirm in writing with the interested parties the construction Anchor elements for
ELEVATION
D.NO.: PARÉ: SCALE: NO. PARÉ: FORMAT: DATE: DRAWING:
NAME: INVESTOR: Olomouc, tř.17. Listopadu - lokalita ENVELOPA PROJECT PHASE:
NO: 1 : 1 0 2/2018 CZECH EMBASSY CANBERRA DOOR DETAILS
DOOR
CONSTRUCTION
S S
WF 08 1.02 gallery 1.03 - 1,05 offices +4,380 +4,380 gallery floor offices floors gasket Mirelon setting block galvanized steel profile10/80 base profiles, steel anchoring to the structure structure
WF 07 WF 09 galvanized steel
profile cone profile,
Mirelon finishing optic filling finishing
filling Ing. arch. Jan Hájek ATELIER M1 architekti s.r.o. Markétská 1/28 169 00 Praha Czech Republic Embassy Canberra Block 7 Section 80 Deakin Ing. arch. Markéta Cajthamlová Ing. arch. Tereza Březovská CD construction documentation Ministerstvo zahraničních věcí České republiky Ministry of Foreign Affairs of the Czech Republic
4B
outline slab + 4,250
L
screwing through the gasket
optic
1:1 5/2018 GENERAL NOTES AND
INT. GALLERY GLASS
PATTERN LEGEND: in-situ reinforced concrete gravel wood section NOTES: MATERIALS MDF 18 mm VENEER: sliced veneer European oak top quality sliced veneer without defects, strip width 200 mm tangential section, veneer edges 0,9mm thick veneer direction see drawings matte lacquer finish Lacquer finish with polyester transparent varnish for interior use, matte, application method: spraying sprayer Technological process painting: 1. filling paste wood filler, grinding, pore filling, grinding, multipurpose finishing with multi-layer sanding HARDWARE: Reference quality hardware BLUM Hinges with shock absorbers and rectification Handles: push open (tip-on) info@atelierm1.cz 169 00 Praha Markétská 1/28 ATELIER M1 architekti s.r.o. Ing. arch. Markéta Cajthamlová Guida Moseley Brown Architects Ing. arch. Tereza Březovská Ing. arch. Pavel Mahdal MgA. Martin Gabaš, Ing. arch. Jan Tyrpekl Ministerstvo zahraničních věcí
plaster A3 1:20
concrete rigid thermal insulation waterproof membrane stone travertine steel 05/2018
REKOnSTRUKcE ZÚ ČR WASHInGTOn D.c.
Dokumentace pro provedení stavby Návrh a dokumentace interiéru a vybavení Stavební povolení získáno 2017 Výběrové řízení dosud nezahájeno
Autoři: M1 Architekti - Ing. arch. Jakub Havlas, Ing. arch. Jan Hájek. MgA. Pavel Joba, Ing. arch. Tereza Březovská. MgA. Martin Gabaš
Budova velvyslanectví z roku 1969 ve Washingtonu dnes již nevyhovuje současným potřebám ZÚ a bylo rozhodnuto o její kompletní rekonstrukci. Dokumentace pro stavební povolení byla zpracována v součinnosti s místními projektanty dle místních náležitostí a povolení bylo získáno v roce 2017. V návaznosti na DSP byla zpra cována podrobná DPS a návrh interiéru. Navrženy jsou dispoziční úpravy včetně půdní vestavby, která je nutná pro rozšíření kapacity ZÚ. Dále byl navržen výtah, který zajišťující bezbariérový přístup. Všeobecná koncepce modernizace areálu ZÚ ČR ve Washingtonu bude zahrnovat výměnu všech výplní otvorů, střešní krytiny a opravu stávající fasády, dále výměnu vybraných a silně vyžilých domovních rozvodů ZTI, ÚT, VZT, chlazení i elektro, jejichž nezbytnou součástí je také celková rekonstrukce kotelny ÚT a návrh nových strojoven VZT.
V rámci úprav bude provedena také realizace návrhu nové venkovní zpevněné plochy při jižní fasádě ZÚ. Tato plocha umožní rozšíření vnitřních reprezentačních prostor vně budovy. Součástí návrhu je také komplexní řešení venkovních ploch a sadových a krajinářských úprav.
ADAp TAcE JíZDÁRnY pRO pOTŘEBY GASK
Městská památková rezervace Kutná Hora Studie proveditelnosti DSP Stavební povolení 2018 Realizace probíhá
Autoři: M1 Architekti - Ing. arch. Jan Hájek, Ing. arch. Tereza Březovská. Ing. arch. Zuzana Dušek Hanušková
Adaptace Jízdárny spočívala v přeměně nevhodného stávající využití - parkoviště na multifunkční prostor, který rozšíří prostory GASK. Bylo využito potenciálu rekonstrukce, která již proběhla a do objektu byly vloženy interiérové vestavby s nutným provozním a technickým zázemím. Jízdárna bude využíván zejména jako kongresové centrum, nový výstavní prostor a prostor pro konání větších společenských akcí.
Dále byla navržena úprava stávajících povrchů fasád a výplní otvorů, tak aby reflektovali památkovou ochranu a hodnotu území památkové rezervace.
Nový ocelový světlík s trojitým zasklením a elektricky ovladatelnými větracími klapkami
Nová zateplená skladba střechy položená na stávající konstrukci krovu
LEGENDA
Dopasování dlažby až k patě zídky, provázání se stávající dlažbou
Dopasování dlažby až k budově jízdárny, provázání se stávající dlažbou
Vedení VZT zavěšené pod konstrukci krovu
2890
280
280
Cihelný překlad provázaný s nosným zdivem ocelovými sponami
1650 200
S.2akusticky pohltivá S.2akusticky odrazivá
S.2a - Návrhová skladba zateplené stěny, akusticky pohltivá: Stávající vyvázané zdivo, betonové cihly, lazura v barvě okolní omítky Doplnění vyvázaného zdiva, betonové pásky (dlouhé půlky), lazura v barvě okolní omítky Nové minerální tepelně irolační desky tl. 60 mm
Nový svislý rošt z trámků 95 x 60 mm á 625 mm
Nová minerální vata 50 mm (baleno do tenkého igelitu) vložená do roštu Nová netkaná vysoce průzvučná textilie
Nové vyvázané zdivo, betonové cihly, lazura v barvě okolní omítky
S.2b - Návrhová skladba zateplené stěny, akusticky odrazivá: Stávající vápená omítka, vyspravená, lazura světlá teplá šedá Stávající cihlové zdivo CP 290 x 140 x 65 mm
Nové minerální tepelně irolační desky tl. 60 mm
Nový svislý rošt z trámků 95 x 60 mm á 625 mm
Nová minerální vata 50 mm (baleno do tenkého igelitu) vložená do roštu
Nová podkladní odrazivá deska, překližka tl. 5 mm
Nová netkaná vysoce průzvučná textilie
Nové vyvázané zdivo, betonové cihly, lazura v barvě okolní omítky
vnitřní omítka stávající kamenná podezdívka
Stávající konstrukce krovu: krokev 120 x 160 vaznice 160 x 230 horní pásnice 2 75 140 sloupek 150 x 120 příčník 100 x 100 spodní pásnice 2 x 75 x 135
stávající zdivo stávající kostrukce, cihelné zdivo stávající kostrukce, kamenný sokl návrh, prolévané betonové tvárnice
návrh, betonový strop nesený ocelovými profily
OBJEDNATEL:
ZODPOVĚDNÝ AUTOŘI: Ing. arch. Jakub Havlas Mgr. akad. arch. Pavel Joba
autorizovaný architekt ČKA 03283
Ing. arch. Jan Hájek PROJEKTANT: Č.ZAKÁZKY: PROJEKTANT PROFESE: Ing. arch. Jan Hájek PARÉ: ADAPTACE OBJEKTU JÍZDÁRNY PRO POTŘEBY GASK, KUTNÁ HORA DUR, DSP, DPS
Markétská 1 ATELIER M1 architekti GENERÁLNÍ
návrh, skladba vestavěných modulů návrh, lehký ocelový strop info@atelierm1.cz www.atelierm1.cz
169 01 Praha 6 STUPEŇ:
S.1 - Návrhová skladba střechy: vláknocementové šablony záklop, tl. 25 mm, impregnovaný vzduchová mezera pojistná hydroizolace difuzně otevřená svislé kontralatě 120 x 250 mm + příložky 100 40 mm minerální vata mezi kontralatěmi tl. 250 mm parozábrana, samolepicí asfaltový pás z oxidovaného asflatu s nosnou vložkou z Al folie stávající záklop, tl. 25 mm, impregnovaný stávající konstrukce krovu (uvedeno koordinačně)
příčník 100 x 100
- Nové minerální tepelně irolační
DATUM NÁZEV VÝKRESU Č.V. M 1:20 STUPEŇ: NÁVRH, DETAILY ŘEŠENÍ VÝPLŇOVÝCH POLÍ AKCE: ZADAVATEL: Galerie Středočeského kraje PROJEKTANT: 169 01 PRAHA MARKÉTSKÁ ATELIER M1 ARCHITEKTI S.R.O. ZODPOVĚDNÝ PROJEKTANT: ING. ARCH. JAN HÁJEK AUTOŘI: 12. Barborská 51 53 284 01 Kutná Hora KUTNÁ HORA ADAPTACE OBJEKTU JÍZDÁRNY PRO POTŘEBY GASK Ing. arch. Jakub Havlas Mgr. akad. arch. Pavel Joba Ing. arch. Jan Hájek Ing. arch. Zuzana Dušek Hanušková Ing. arch. Tereza Březovská SPOLUPRÁCE: DUR, DSP, DPS
PROJEKTANT: Architektonické a stavebně technické řešení Galerie Středočeského kraje Barborská 51 - 53, 284 01, Kutná Hora Ing. arch. Zuzana Dušek Hanušková M124102017 Ing. arch. Zuzana Dušek Hanušková Ing. arch. Tereza Březovská SPOLUPRÁCE:
Č.V. 1:20 NÁVRH, DETAILY SKLADBA STŘECHY
+1,920 +1,850 +0,000 +4,740 +3,520 +7,820 +6,500 +0,000 +2,300 +0,000 +6,135 +10,890 +1,850 +4,775 +2,300 +3,000 +3,650 +1,430 +10,730 www.atelierm1.cz Markétská 1 ATELIER M1 architekti GENERÁLNÍ 169 01 Praha 6 ZODPOVĚDNÝ AUTOŘI: Ing. arch. Jakub Havlas Mgr. akad. arch. Pavel Joba Ing. arch. Jan Hájek PROJEKTANT: Č.ZAKÁZKY: PROJEKTANT PROFESE: Ing. arch. Jan Hájek autorizovaný architekt PROJEKTANT: Ing. arch. Tereza Březovská SPOLUPRÁCE: DSP - Další výkresy, detaily
desky - Vodorovný okapní svod - Nasávání vzduchové mezery - Mřížka proti hmyzu
ATELIéRY „JORDAn STUDIOS“ LETňAnY
Vestavba filmových ateliérů do průmyslové haly v areálu bývalé Avie Letňany Dokumentace pro ohlášení stavby Zajištění souhlasu SÚ s ohlášeným záměrem Výběr dodavatele Koordinace stavby a autorský dozor Realizace 2020 Probíhá realizace fáze 2
Autor: Ing. arch. Tereza Březovská, Ing. arch. Petr Kořený
Filmové ateliéry JS byly navrženy a postaveny pro mezinárodní filmový projekt „Wheel of Time“ produkce Sony Pictures a Amazon Prime video. Jedná se o dočasnou stavbu s trváním na 4 roky. Celková úprava areálu spočívala v dispozičních úpravách pro potřeby filmové výroby a vestavbě 4 ateliérů do budovy průmyslové haly. V první fázi byly kromě vestavby upraveny další prostory a prostory přilehlého administrativního objektu pro jednotlivá oddělení výroby. Ateliery A-D byly povoleny v režimu Ohlášení stavebního záměru SÚ. Během realizace byl dostavěn další atelier E a dodatečně povolen v režimu změny stavby před dokončením. V roce 2021 byly navrženy další Stavební úpravy a vestavba ateliéru F, která byla opět povolena Souhlasem s provedením ohlášeného stavebního záměru, konkrétně Stavební úpravy pro změnu užívání v části stavby. V současné době probíhá fáze autorského dozoru při výstavbě.
FILmOVé
G F E D C B A 10 9 8 7 6 5 4 3 2 1 H500 COSTUME CRAFT SET STORAGE AREA A COSTUME MAKING B MAKE UP C PROPS CROWD HOLDING D PRODUCTION LIGHTING RIGGING GRIPS CAMERA SET DEC SET DEC WS SET DEC PROPS BASE CAMP PARK SFX CREW PARKING JANITORS STUNTS BASIN OTHER TENANT OTHER TENANT CS booth F H106 Stage 1190 m BACKING STORAGE construction WORKSHOP STORAGE UNUSABLE SPACE GATE ENLARGED STORAGE -LEVEL THE FLOOR OTHER TENANT PROPS MUFX SET DEC EXISTING GATE NEW GATE SFX container OTHER TENANT 1070 20250 25270 300 47730 300 300 47730 300 2270 2270 -0,150 -0,150 -0,450 -3,500 DET D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13 D15 D14 D16 D17 D18 A H101 A Stage B H102 B Stage C H103 C Stage D H104 D Stage E H105 Stage T31 T21 LOCATION DRAWING DRAWN BY DRW nr. SCALE PHASE DATE REV nr. Půdorys návrh - celek 02 Jordan Studios, Letňany Tereza Březovská 1:1000 @ A3 12/2020 01 ZADÁVACÍ DOKUMENTACE dwg 05 dwg 04 dwg 06
SKLADBA S 01 - STĚNA ATELIERU
SDK deska MAI (DF) 12 ,5 mm Nosné systémové CW profily Vyplněno tepelnou minerální izolací tloušťka dle systémového certifikovaného řešení SDK deska MAI (DF) 12 ,5 mm Akustický obklad Skelná vlna nakašírovanou geotextilií 0,034, desky 1200 600 mm, tl. 100 mm, nehořlavý třída reakce na oheň A1, kotveno talířovými kotvami
SKLADBA S 02 - PŘEDSTĚNA
Nosné systémové CW profily Vyplněno tepelnou minerální izolací Tlouštka dle systémového certifikovaného řešení SDK deska MAI (DF) 12 ,5 mm Akustický obklad Skelná vlna nakašírovanou geotextilií 0,034, desky 1200 600 mm, tl. 100 mm, nehořlavý třída reakce na oheň A1, kotveno talířovými kotvami
SKLADBA S 03 - STĚNA ATELIERU OBOUSTRANNĚ OPLÁŠTĚNÁ
Akustický obklad Skelná vlna nakašírovanou geotextilií 0,034, desky 1200 600 mm, tl. 100 mm, nehořlavý třída reakce na oheň A1, kotveno talířovými kotvami Stávající skladba stěny Akustický obklad Skelná vlna nakašírovanou geotextilií 0,034, desky 1200 600 mm, tl. 100 mm, nehořlavý třída reakce na oheň A1, kotveno talířovými kotvami
SKLADBA S 04 - STĚNA PŘEDSÍNĚ
x SDK deska MAI (DF) tl. 12 mm Nosné systémové CW profily Vyplněno tepelnou minerální izolací x SDK deska MAI (DF) tl. 12 mm Akustický obklad Skelná vlna nakašírovanou geotextilií = 0,034, desky 1200 600 mm, 100 mm, nehořlavý třída reakce na oheň A1, kotveno talířovými kotvami
POŽADOVANÉ PODMÍNKY POŽÁRNÍ ODOLNOSTI.
· PŘI REALIZACI MUSÍ BÝT RESPEKTOVÁNA A ZOHLEDNĚNA VÝŠKOVÁ A
PROSTOROVÁ NEROVNOST A KŘIVOST STÁVAJÍCÍHO REKONSTRUOVANÉHO
OBJEKTU, · REALIZACE NOVÝCH KONSTRUKCÍ MUSÍ RESPEKTOVAT TVAR STÁVAJÍCÍCH
OBJEKTŮ A ŘEŠENÍ JEJICH STAVEBNÍCH ČÁSTÍ
PŘI JAKÝCHKOLI NEJASNOSTECH NEBO OKOLNOSTECH, KTERÉ SE BUDOU LIŠIT OD
PROJEKTOVÉ DOKUMENTACE JE NUTNÉ KONTAKTOVAT PROJEKTANTA.
· NEODMĚŘOVAT Z VÝKRESU, V PŘÍPADĚ NEJASNOSTÍ SE DOTÁZAT PROJEKTANTA;
· PŘI REALIZACI STAVBY JE NUTNÉ ZOHLEDNIT POŽADAVKY NA STAVEBNÍ ČÁST OD
JEDNOTLIVÝCH PROFESÍ (VZT, ELEKTRO...);
NÁVRH NOVÉHO VZT SYSTÉMU PODLÉHÁ SCHVÁLENÍM PROJEKTANTEM VZT · NÁVRH NOVÝCH ROZVODŮ ZTI PODLÉHÁ SCHVÁLENÍM PROJEKTANTEM ZTI · STATICKÝ NÁVRH NOVÝCH OCELOVÝCH VESTAVEB PODLÉHÁ SCHVÁLENÍM PROJEKTANTEM STATIKY
· VEŠKERÉ ROZMĚRY KONTROLOVAT NA STAVBĚ, KÓTOVÁNO MODULAČNĚ
S 01
Stávající konstrukce Existing structures Nové konstrukce Proposed structures Akustické obložení stěn Additional acoustical wall treatment
Označení skladeb a detailů Details and specifications
V2-N 5/4,2
Označení dveří a výplní Doors see specifications
Stávající pevné oplocení Existing fence Nové pevné oplocení New fences Mobilní oplocení Mobile fences
Vyznačení NÚC Fire escapes corridors D18 Číslování vjezdových vrat Existing gates coding
Bourané konstrukce Structures to Remove
1100 2100 D2-N
zadělat
zadělat
předstěna additional
wall akustické
od výšky 1200
additional
treatment
ceiling S 01 S 01 S 04 S
S 04 S 03 vyznačený únikový pruh šíře 1200 mm painted fire lane 1,2 m zadělat
vyznačený únikový pruh šíře 1200 mm painted fire lane 1,2 m akustické obložení od výšky 1200 mm additional acoustical treatment from 1,2 m to ceiling akustická předsíň čistá výška 4,5 m New acoustical lobby clear height + 4,5 m servisní dveře service acces door 1000 2150 100 4 x ochranný rohový profil do výšky 2,5 m viz spec. Z prvků 4 x corner protection h=2,5 m see Z specification 2x ochranný rohový profil do výšky 2,5 m viz spec. Z prvků 2x corner protection h=2,5 m see Z specification 800 150 29601500 160 1000 2150 3370 150 1200 2150 2950 4000 4000 660 16300 300 1200 300 250 150 3350 1200 2050 100 1200 2150 1800 1650 300 1650 150 2070 1200 2150 150 150 1040 4000 4000 3270 ≈47730 630 1150 2150 dle stáv.
4000 4000 1100 2100
Přesunuté dveře Přesunuté dveře 2780 Prostup pro kabely u země 500x500 mm - akusticky ošetřit Prostup pro kabely u země 500x500 mm - akusticky ošetřit Prostup u podlahy Ø 2x 500 mm pro napojení externí A/C jednotky můžeme využít stávající dveře 500 500 200 400 VZT potrubí Mecchanical duct 8450 5890 11300 VZT potrubí Mecchanical duct VZT potrubí Mecchanical duct kabelový žlab cable tray akustický obklad soundproof insulation akustický obklad 1200 150 7100 2780 70
světlík
SDK
akustická izolace zadělat světlík izolace parozábrana SDK záklop akustická izolace
900 2100 900 2100 D1-S D1-N L V2-S 5/4,2 V1-N 4/4 700 2000 4000 4000 5000 4200 D3-N 1100 2100 D2-N 1100 2100 D2-N P 4000 4000 V1 N 4/4 V1 4/4 4000 4000
D2-N 1000 2100 D4-N L 900 2100 D2-S 900 2100 D2-N L
otvor po dveřích dveře přesunout fill in existing door opening move door to new position
otvor po vratech vrata přesunout fill in the roller shutter opening move roller shutter to new position
acoustical
obložení
mm
acoustical
from 1,2 m to
01
otvor po dveřích dveře přesunout fill in existing door opening move door to new position
vrat
dle stávající pozice vrat 300 1200 ≈25270
zadělat
izolace parozábrana
záklop
akustická izolace
zadělat světlík izolace parozábrana SDK záklop
80 200 80 80 150 S 01
PLASTERBOARD MAI (DF) tl. 12 ,5 mm Structural CW profiles Filled with mineral insulation width according to certified structural solution PLASTERBOARD MAI (DF) tl. 12 ,5 mm Mineral wool slabs made of glass fibers one-sidedly covered with reinforced black glass veil 100 mm, fire-resistant S 02 ADDITIONAL STAGE WALL Structural CW profiles Filled with mineral insulation width according to certified structural solution PLASTERBOARD MAI (DF) tl. 12 ,5 mm Mineral wool slabs made of glass fibers one-sidedly covered with reinforced black glass veil 100 mm, fire-resistant S 03 EXISTING WALL ADDITIONAL TREATMENT Mineral wool slabs made of glass fibers one-sidedly covered with reinforced black glass veil 100 mm, fire-resistant Existing wall Mineral wool slabs made of glass fibers one-sidedly covered with reinforced black glass veil 100 mm, fire-resistant S 04 ACOUSTICAL LOBBY WALL PLASTERBOARD MAI (DF) 12 ,5 mm CW structural profiles Filled with mineral insulation PLASTERBOARD MAI (DF) 12 ,5 mm Mineral wool slabs made of glass fibers one-sidedly covered with reinforced black glass veil 100 mm, fire-resistant ŘEZ 2-2 Section 2-2 M 1:100 PŮDORYS VESTAVBA "F" LAYOUT M 1:100 2 2 S D A B C E F S LEGENDA SPECIFIKACE SKLADEB 1:15 WALL BUILD-UPS 1:15 · TATO DOKUMENTACE NENAHRAZUJE DODAVATELSKOU ANI VÝROBNÍ DÍLENSKOU DOKUMENTACI PRO REALIZACI STAVBY. · DODAVATELSKÁ A VÝROBNÍ DÍLENSKÁ DOKUMENTACE MUSÍ BÝT PŘED ZAPOČETÍM KONKRÉTNÍCH STAVEBNÍCH PRACÍ ODSOUHLASENA GPS A INVESTOREM! VEŠKERÉ DIMENZE STÁVAJÍCÍCH A NAVAZUJÍCÍCH KONSTRUKCÍ BUDOU PŘED ZAPOČETÍM VÝROBY
NEW STAGE WALL
OVĚŘENY V MÍSTĚ OSAZENÍ NA STAVBĚ. · ±0,000 PRO TUTO DOKUMENTACI ODPOVÍDÁ ÚROVNI PŘÍZEMÍ HLAVNÍHO OBJEKTU HALY REALIZACE NAVRŽENÝCH ÚPRAV, ZASAHUJÍCÍ PROSTOROVĚ NEBO FUNKČNĚ DO STÁVAJÍCÍCH ČÁSTÍ OBJEKTU MUSÍ PROBÍHAT V SOUČINNOSTI S PROVOZOVATELEM · VEŠKERÁ ODPOJENÍ TECHNOLOGIÍ A ROZVODŮ LZE PROVÉST TEPRVE PO SCHVÁLENÍ KOMPETENTNÍCH OSOB (URČÍ PROVOZOVATEL). · PROTIPOŽÁRNÍ ÚPRAVY BUDOU PROVEDENY TAK, ABY SPLŇOVALY
POZNÁMKY: LOCATION DRAWING DRAWN BY DRW nr. SCALE PHASE DATE REV nr. Půdorys STAGE F 05 Jordan Studios, Letňany Tereza Březovská 1:100 @ A1 12/2020 01 ZADÁVACÍ DOKUMENTACE
nOVOSTAVBA ZÁZEmí pRO AREÁL ZDRAVí
Studie
DÚR + DPS (územní souhlas, ohlášení)
2019
Autoři: M1 Architekti - Ing. arch. Jan Hájek, Ing. arch. Tereza Březovská
Novostavba hygienického zázemí pro obecní volnočasový areál v Líbeznicích. Kromě vytvoření zázemí pro návštevníky areálu bylo hlavní myšlenkou vymezit prostor pro umísťování dalších funkcí - kavárna, sauna, stage, terasa.
SKLAD SAUNA TOALETY MUŽI TOALETY ŽENY TECHNICKÉ ZÁZEMÍ OCHLAZOVNA ŠATNA WC ZIMNÍ TERASA STÁVAJÍCÍ OBJEKT KAVÁRNY PODIUM LETNÍ TERASA SPRCHA BEZBARIÉROVÝ VSTUP VSTUP WC SAUNA KAVÁRNA
pro účely územního a stavebního řízení a zajištění územního rozhodnutí a stavebního povolení. Veškerá autorská práva k tomuto autorskému dílu jsou duševním vlastnictvím těchto autorů: akad. arch. Pavla Joby; ing. arch.Jana Hájka, ing. arch. Jakuba Havlase. Pořizování kopií, popřípadě jiné formy rozmnožování a šíření této dokumentace je možné jen s výslovným písemným svolením uvedených autorů. Tato dokumentace nenahrazuje výrobní ani dílenskou dokumentaci. Zhotovitel stavby je povinen před realizací ověřit rozměry a stav vŠech jednotlivých prvků dle skutečnosti. Výrobn a dílenskou dokumentaci je zhotovitel stavby povinen předložit, architektovi a investorovi ke schválení před vlastní realizací.
Ing. arch. Jan Hájek Ing. arch. Jakub Havlas Mgr. akad. arch. Pavel Joba
Ing. arch. Tereza Březovská
0,00
+3,300
-1,250 +3,400 +3,150 +2,700 2700 700 3400 A B C D E F -1,000 900 200 150 2830 120 200 80 170 3100 2700 250 250 05 02 01 04 boty zrcadlo fén 1 2 3 5 6 7 8 9 10 sprcha káď 03 TUV 200 15 x pivní set INSTALAČNÍ KANÁL POD DESKOU TEPELNĚ IZOLOVANÝ INSTALAČNÍ KANÁL POD DESKOU TEPELNĚ IZOLOVANÝ 4800 4500 4500 4500 4500 23200 10400 600 9200 600 600 4300 300 4600 600 DEŠŤOVÝ SVOD dn 100 rozvaděč kovová skříň skrytá dřevěném obkladu INSTALAČNÍ HNÍZDO V KAŽDÉM MODULU INSTALAČNÍ HNÍZDO V KAŽDÉM MODULU R200 R200 600 9200 600 400 A A 400 06 07 08 B B 5200 06.1 06.2 A B C D E F 3 2 1 WC1 U1 WC2 U2 P1 V1 WC2 WC2 U3 U3 S1 PV1 PV1 PV1 PV1 PV1 ohřev TV DEŠŤOVÝ SVOD dn 100 4900 4900 0,00 1,250 + 2,700 +2,830 +2,950 +3,150 +3,400 900 200 150 2830 120 200 80 170 3100 3550 1100 LEGENDA MATERIÁLŮ: železobeton vnitřní kontaktní tepelná izolace spádové střešní klíny EPS zděné příčky tl. 150 mm lehká dřevěná konstrukce stěny s dřevěným obkladem vyplněná tepelnou izolací, sloupky 50 x 110 á 625 mm
číslo
01
02
03
04
05
06
06.1 WC
06.2 WC
07
08
betonová podlaha s kartáčovaným povrchem hydroizolace modifikované asfaltové pásy prostý beton B20 drcené kamenivo hutněné rostlý terén
ATELIER M1 architekti
Markétská 1/28 169 00 Praha 6
PŮDORYS 1.NP, ŘEZ A-A´ B-B´ D.1.1.4 Obec Líbeznice, Mělnická 43, 250 65 Líbeznice, IČ: 00240427 DUR
DSP
Poznámka: Tato projektová dokumentace jakožto součást autorského díla architektonického slouží výlučně
Novostavba zázemí pro Areál zdraví
-0,02 +3,200
+3,400 +4,000 0,00 -0,465
TABULKA MÍSTNOSTÍ
název plocha [m2
PŘEDSÍŇ 7.07
WC ŽENY INVALIDÉ 5.02
WC MUŽI 3.50
PŘEZOUVÁRNA 3.84
ŠATNA 6.94
SRCHA 7.77
ŽENY 1.32
MUŽI 1.32
TECHNICKÁ MÍSTNOST 1.25
SKLAD 1.91 celkem 39.9475
Ing. arch. Jan Hájek
s.r.o.
+
Ing. arch. Jan Hájek Ing. arch. Jakub Havlas Mgr. akad. arch. Pavel Joba
zděné příčky tl. 150 mm
lehká dřevěná konstrukce stěny s dřevěným obkladem vyplněná tepelnou izolací, sloupky 50 x 110 á 625 mm
spádové střešní klíny EPS
hydroizolace modifikované asfaltové pásy prostý beton B20
železobeton vnitřní kontaktní tepelná izolace betonová podlaha s kartáčovaným povrchem
drcené kamenivo hutněné rostlý terén
skladby konstrukcí výplně otvorů dveře TABULKA MÍSTNOSTÍ
název plocha [m2
díla architektonického slouží výlučně pro účely územního a stavebního řízení a zajištění územního rozhodnutí a stavebního povolení. Veškerá autorská práva k tomuto autorskému dílu jsou duševním vlastnictvím těchto autorů: akad. arch. Pavla Joby; ing. arch.Jana Hájka, ing. arch. Jakuba Havlase. Pořizování kopií, popřípadě jiné formy rozmnožování a šíření této dokumentace je možné jen s výslovným písemným svolením uvedených autorů. Tato dokumentace nenahrazuje výrobní ani dílenskou dokumentaci. Zhotovitel stavby je povinen před realizací ověřit rozměry a stav vŠech jednotlivých prvků dle skutečnosti. Výrobn a dílenskou dokumentaci je zhotovitel stavby povinen předložit, architektovi a investorovi ke schválení před vlastní realizací.
05 02 01 04 boty zrcadlo fén 1 2 3 4 5 6 7 8 9 10 sprcha káď 03 TUV 200 l 15 x pivní set 4800 10400 600 9200 600 600 4300 300 4600 600 rozvaděč kovová skříň skrytá v dřevěném obkladu 06 07 08 B 5200 06.1 06.2 A B WC1 U1 WC2 U2 P1 V1 WC2 WC2 U3 U3 S1 PV1 PV1 PV1 PV1 PV1 ohřev TV 350 1900 200 2150 150 3000 150 2500 350 240 2250 200 1950 240 1700 150 200 1350 150 2500 350 2300 150 900 150 900 240 1200 3050 240 150 600 1300 2700 2250 900 2700 2501 900 2700 1350 600 600 1300 2700 5650 900 2700 450 900 2700 600 800 2050 800 2650 900 2650 900 2650 800 2650 1000 2100 2400 1000 2100 900 2050 900 2050 800 2050 700 2050 700 2050 650 1100 800 2650 800 2650 450 1550 1050 0,00 -
+ 2,700 +2,830 +2,950 +3,150 +3,400 900 200 150 2830 120 200 80 170 3100 3550 1100 LEGENDA MATERIÁLŮ:
1,250
číslo
01
02
03 WC
PŮDORYS 1.NP, ŘEZ B-B´ D.1.1.5 Obec Líbeznice, Mělnická 43, 250 65 Líbeznice, IČ: 00240427 DUR
PŘEDSÍŇ 7.07
WC ŽENY INVALIDÉ 5.02
MUŽI 3.50 04 PŘEZOUVÁRNA 3.84 05 ŠATNA 6.94 06 SRCHA 7.77 06.1 WC ŽENY 1.32 06.2 WC MUŽI 1.32 07 TECHNICKÁ MÍSTNOST 1.25 08 SKLAD 1.91 celkem 39.9475 Ing. arch. Jan Hájek ATELIER M1 architekti s.r.o. Markétská 1/28 169 00 Praha 6 Ing. arch. Tereza Březovská
+ DSP
Tato projektová dokumentace
Novostavba zázemí pro Areál zdraví
5300
A B C D E F 3 2 1
A
B
PT = UT PT = UT
Ing. arch. Jan Hájek ATELIER M1 architekti s.r.o. Markétská 1/28 169 00 Praha 6 Ing. arch. Tereza Březovská Obec Líbeznice, Mělnická 43, 250 65 Líbeznice, IČ: 00240427 DUR + DSP Ing. arch. Jan Hájek Ing. arch. Jakub Havlas Mgr. akad. arch. Pavel Joba Poznámka: Tato stavebního jsou kopií, autorů. rozměry předložit, Novostavba zázemí pro Areál zdraví 0,200 -1,000
-1,000 -
-1,000 -
-1,000 - 0,650 -1,250 600 5300 10400 600 17900 600 1200 1200 1200 1200 1200 1200 4900 4900 4800 4500 4500 4500 4500 A B C D E F 3 2 1 A A B B 1200 1200 INSTALAČNÍ KANÁL INSTALAČNÍ KANÁL DPS - Půdorys 1.NP, Výkopy, Základy
Poznámka:
jakožto součást autorského
-1,000 -1,000 -1,000 -1,000 -1,250 600
10755 600 17900 600 1200 1200 1200 1200 1200 1200 4900 4900 4800 4500 4500 4500 4500
A
B
pláň = -0,400 pláň = -0,500 PT = UT 0,000 217,300 217,200
23562 x=735817 y=1032113 -0,600 -0,600
0,200
0,200
0,350
ZELEnÝ pÁS LíBEZnIcE
Řešení koncepce zeleného pásů okolo obce Líbeznice Studie
Záborový elaborát 2019 Probíhá zpracování DÚR postupně pro jednotlivé části
Autoři: M1 Architekti - Ing. arch. Jan Hájek, Ing. arch. Tereza Březovská, Ing. arch. Pavel Mahdal Dendrologie: Ing. Jan Halík
Zpracování Studie území „Zeleného pásu kolem Líbeznic“. Cílem studie je na podkladu katastrální mapy, platného územního plánu, rešerší a dostupných mapových podkladů technické infrastruktury vytvořit koncept celku okružního parku s rozpracováním lokálních uzlů a vzorových příčných řezů. Studie zpracovává plán výsadby - druhovou skladbu rostlin v jednotlivých úsecích zeleného pásu s ohledem na místní podmínky a dále zásady sadových a terénních úprav, řešení prvků mobiliáře a formuje zásady návazností na sousedící různorodá území obce. Součástí studie je záborový elaborát na podkladě katastrální mapy. Celková urbanistická a prostorová koncepce Okružního parku vychází z Územního plánu, kde je Okružní park stanoven plochou ZP - veřejná zeleň, parky. Hlavním sjednocujícím prvkem je centrální alej s nezpevněnou cestou procházející celým územím. Na tuto základní páteř jsou „navěšovány“ jednotlivé aktivity a zájmová území oživující Okružní park. Centrální alej drží svůj sjednocující ráz, ale zároveň proměnami druhové skladby a typu hlavní funkce aleje (stín, vě trolam, izolační zeleň) reaguje na různorodá území, kterými prochází. Hlavní okružní cesta měří celkem 3,5 km a je doplněna novými radiálami dle platného územního plánu obce. Celkový okruh s navazujícím propojením „biokoridorem“ v katastru obce Bořanovice bude 5km.
Souřadnicový systém S-JTSK, Bpv Ing. arch. Jakub Havlas Ing. arch. Jan Hájek Mgr. akad. arch. Pavel Joba AUTOŘI: SPOLUPRÁCE: PROJEKTANT ČÁSTI: GENERÁLNÍ PROJEKTANT: Markéta 1/28 169 01 Praha info@atelierm1.cz ZODPOVĚDNÝ PROJEKTANT: INVESTOR: STAVBA: ČÁST: VÝKRES: SOD: ZAKÁZKY: POČET PARÉ: STUPEŇ: DATUM: MĚŘÍTKO: PARÉ: PŘÍLOHA ČÍSLO: SOD ZAK 0-6 STUDIE 2/2019 C-SITUACE Studie Zeleného pásu Líbeznice Okružní park Líbeznice Obec Líbeznice, Mělnická 43, 25065, Líbeznice Ing. arch. Tereza Březovská, arch. Pavel Mahdal Ing. arch. Jan Hájek Ing. arch. Jan Hájek ZELENÝ PÁS CELKOVÝ PLÁN B.1 Mělnická nádražní Měšická líbeznickýpotok Mratínka Východní hoVorčoVická ucihelny Mělnická Valejíčkách zdibská i/9praha-Mělník ÚSEK I. - SEVEROZÁPADNÍ Na Mořím dole družsteVní ŘEZ1 ŘEZ 2 ŘEZ 4 ŘEZ ŘEZ ŘEZ 7 ŘEZ3 ÚSEK III. SEVERNÍ Na Libovníku ÚSEK IV. SEVERNÍ Líbeznický sad ÚSEK V. - VÝCHODNÍ Pod školou ÚSEK VI. VÝCHODNÍ Na zvonici ÚSEK VII. VÝCHODNÍ U potoka ÚSEK VIII. VÝCHODNÍ Mratínka ÚSEK IX. VÝCHODNÍ Humna ÚSEK X. VÝCHODNÍ Humna ÚSEK II. SEVEROZÁPADNÍ ŘEZ 5 bašť Měšice Měšice Měšice hovorčovice bořanovice bořanovice zdiby
VEGETAČNÍHRACÍRVKY VEGETAČNÍHRACÍRVKY
VVN VN podzemní Ing. arch. Jan Hájek ATELIER M1 architekti s.r.o. Markétská 1/28 169 00 Praha Ing. arch. Tereza Březovská Ing. arch. Pavel Mahdal STUDIE Obec Líbeznice Mělnická 43 25065, Líbeznice ZELENÝ PÁS 2/2019 STUDIE B.5 1:1000 DETAIL ÚSEK IV LÍBEZNICKÝ SAD řEZ 4 řEZ 5 Úsek v. výChoDní Pod školou PŘÍRODNÍ HRIŠTĚ SOCHA učebna přírodovědy SOCHA lampa STÁVAJÍCÍ FOTO ChArAkter komunitní, dětské hřiště, vyhlídka Charakter vychází z přímé návaznosti na zahradu školního areálu. V rozšířeném místě pásu je využito depo nované zeminy k vytvoření umělého kopce a landartového přírodního hřiště s přírodními hracími prvky z vrb a travin. Sochařsky zpracované stoly a lavice jsou uspořádány do půdorysu učebny a nabízí tak využití pro venkovní výuku. V návaznosti na vývoj plánované stavby rychlodráhy je možné zemní val protáhnout směrem k novým rodinným domům, jako protihlukovou bariéru. AktivitY Turistická stezka, cyklostezka, běžecký okruh dětské hřiště, vyhlídka, posezení, venkovní třída. prvkY Učebna, hrací prvky z vrbového proutí a travin, lavičky, stoly, lampa UČEBNA, LAMPA VVNnadzemní VNnadzemní DL DL Ing. arch. Jan Hájek ATELIER M1 architekti s.r.o. Markétská 1/28 169 00 Praha Ing. arch. Tereza Březovská Ing. arch. Pavel Mahdal STUDIE Obec Líbeznice Mělnická 43 25065, Líbeznice ZELENÝ PÁS 2/2019 STUDIE C.5 DRUHOVÁ SKLADBA ÚSEK Ing. Jan Halík Úsek v. výChoDní Pod školou HLAVNÍ ALEJ 87 JB- javor babyka -acer campreste hlavní JO jeřáb oskeruše sorbus domestica 5 JB jeřáb břek sorbus torminalis 12 JH jilm habrolistý ulnus minor 10 VNĚJŠÍ PŘERUŠOVANÁ ALEJ 12 dub šípák jilm habrolistý hloh KEŘOVÝ LEM ptačí zob lingustrum vullare 80 meruzalka alpská ribes alpinum 50 zimolez tatarský lohicera tatarica 25 dřín cornus mas jednotlivě 4 SOLITÉRY 7 borovice bříza SCHÉMAT CKÝ řEZ 4 - ÚSEK V
HLAVNÍALEJ HLAVNÍALEJ VNĚJŠÍLEM CESTA Rondel záplet–Jilm drobnolistý Vysokétrsnatétraviny skrýšemezitrsy javorbabyka
jeřábbřek
Pod školou 50 15 0 1 3
Javor babyka- hlavní Acer campestre hlavní alej Dub pýřitý (šípák) Quercus pubescens vnější přerušovaná alej Jeřáb oskeruše Sorbus domestica hlavní alej Hloh obecný jednotlivě Crataegus laevigata vnější přerušovaná alej bříza bělokorá Betula alba solitéry Jeřáb břek Sorbus torminalis hlavní alej 10-20 m 20 m 10-20 m 2-10 m 20 m 10-20 m Jilm habrolistý Ulmus minor hlevní alej a vnější alej 30m borovice lesní Pinus sylvestris solitéry 10-20 m Ing. arch. Jan Hájek ATELIER M1 architekti s.r.o. Markétská 1/28 169 00 Praha Ing. arch. Tereza Březovská Ing. arch. Pavel Mahdal STUDIE Obec Líbeznice Mělnická 43 25065, Líbeznice ZELENÝ PÁS 2/2019 STUDIE C.5.1 DRUHOVÁ SKLADBA ÚSEK Ing. Jan Halík
jeřáboskeruše
jilmhabrolistý javorbabykajeřáboskeruše jeřábbřekjilmhabrolistý přerušovanýlem keřovou podsadoudubšípákjilmhabrolistý hlohptačízobmeruzalkaalpská zimoleztatarský dřín cornusmas mlatovácestapěšíacyklisté
B.5.2
BŘEHOVÉPOROSTY
ostřicelatnatá,kosatec žllutý,ostřicepobřežní, puškvorec,sítinyVODNÍROSTLINYleknín,kotviceplovoucí,vachta,šípatky,skřípinec jezerní
STROMYNABŘEHU MALÝSAD REGULAČNÍOBJEKT
stávajícíremízs cestou topolčerný topolbílýhlavovéproutkovévrby podélbřehůvodníchploch apotoka -jabloně-třešně -regulačníobjekt maláhráz pronapájenítůněk,stavidlo +zachycovačsplavenin -revitalizacestávajících břehovýchporostů průtočnétůněnapájené zpotokapřivaděčemv zatravněnémprůlehunapotoceregulační objekt,1unapojenízpětz tůnídopotokaregulační objekt2
Ing. arch. Jan Hájek ATELIER M1 architekti s.r.o. Markétská 1/28 169 00 Praha Ing. arch. Tereza Březovská Ing. arch. Pavel Mahdal STUDIE Obec Líbeznice Mělnická 43 25065, Líbeznice ZELENÝ PÁS 2/2019 STUDIE B.7 1:1000 DETAIL ÚSEK VII U POTOKA ř EZ 7 Úsek vii. - výChoDní U potoka STÁVAJÍCÍ FOTO SOCHA křeslo PRVKY V LOKALITĚ LÁVKA ChArAkter romantický, komunitní Charakter úseku navazuje na přítomnost vodního toku. Revitalizací a úpravou vodního toku vznikne ekosystém mokřadu s navazující pobytovou loukou. Vhodné přehrazení potoka umožní vytvořit průtočné tůňky s typickými mokřadními rostlinami a dřevinami, kompozice bude doplněna dřevěnými stezkami. Na potoce navrhujeme regulační objekt se atavidlem a zachy covačem splavenin, který bude zároveň sloužit jako lávka na hlavní mlatové cestě. Nad tímto regulačním ob jektem bude vytvořena nová větev přivaděč v zatravněném průlehu, který napájí jednotlivé tůně. Před vtokem do potoka bude umístěn další menší regulační objekt AktivitY Cyklostezka, běžecká stezka, pěší stezka, pikniková louka prvkY molo, křeslo, lávka KŘESLO JO JO JO JO KR KR KR DL DL DZ DZ Ing. arch. Jan Hájek ATELIER M1 architekti s.r.o. Markétská 1/28 169 00 Praha Ing. arch. Tereza Březovská Ing. arch. Pavel Mahdal STUDIE Obec Líbeznice Mělnická 43 25065, Líbeznice ZELENÝ PÁS 2/2019 STUDIE C.6 DRUHOVÁ SKLADBA ÚSEKY 6,7,8 Ing. Jan Halík Úsek vi - výChoDní Na zvonici Úsek vii. - výChoDní U potoka Úsek viii - výChoDní Mratínka HLAVNÍ ALEJ + SOLITÉRY 46 DŘ- dřín -cornus mas 20 HL hloh kuří noha 6 JO jeřáb oskeruše 4 MU muchovník amelancnier 5 HR -hrušeň pyrifolia KR korkovník amurský- 3 KEŘOVÝ LEM ptačí zob lingustrum vullare 80 meruzalka alpská ribes alpinum 50 zimolez tatarský lohicera tatarica 25 dřín lornus mas jednotlivě 4 MALÝ OVOCNÝ SAD jabloň, třešeň HLAVNÍ ALEJ + SOLITÉRY 23 LM- lípa malolistá 25 JM- javor mléč 4 DL dub letní 2 TB- topol bílý 2 SCHÉMAT CKÝ řEZ 7 - ÚSEK Vii LOUKA MRATÍNKA
TŮNĚ
pobytovárekreačnílouka
U Líbeznického potoka 50 15 0 1 3 B.7.2 Lekníny Nymphaea tůňka mokřad Skřípinec jezerní Schoenoplectus lacustris tůňka mokřad Kotvice plovoucí Trapa natans tůňka a mokřad Ostřice latnatá Carex paniculata břehové rostliny Vachta trojlistá Menyanthes trifoliata tůňka mokřad Ostřice pobřežní Carex riparia břehové rostliny Kosatec žlutý, Puškvorec, Sítiny Iris pseudacorus, Acorus, Juncus břehové rostliny Šípatka Sagittaria tůňka a mokřad Ing. arch. Jan Hájek ATELIER M1 architekti s.r.o. Markétská 1/28 169 00 Praha Ing. arch. Tereza Březovská Ing. arch. Pavel Mahdal STUDIE Obec Líbeznice Mělnická 43 25065, Líbeznice ZELENÝ PÁS 2/2019 STUDIE C.6.3 DRUHOVÁ SKLADBA ÚSEK 7,8 Ing. Jan Halík
ÚpRAVY pALAcKéHO nÁmĚSTí V DAČIcícH
Studie proveditelnosti 2020
Autoři: M1 Architekti - Ing. arch. Jan Hájek, Ing. arch. Tereza Březovská, Ing. arch. Martin Čtverák
Studie byla zpracována pro petiční výbor „Zastavte výstavbu kruhového objezdu na Palackého náměstí“, který se snaží zabránit výstavbě okružní křižovatky na hlavním náměstí v historickém centru města Dačice. Studie je rozpracována do vysoké podrobnosti včetně dopravního řešení odpovídající rozsahem spíše navazujícímu stupni projektové dokumentace.
Zcela cizorodý a z kulturně - historického pohledu nevhodný prvek okružní křižovatky je prosazován současnou politickou reprezentací a zejména DO DI Policie ČR, který svými stanovisky doposud blokuje jakékoliv jiné řešení. Proto byl zpracován dopravní průzkum Dopravní fakultou ČVUT a dále Bezpečnostní inspekce stávající stavu a bezpečnostní audit navrhovaného řešení. V současné době probíhá úprava návrhu na základě auditu. Návrh byl prezentován památkové komisi NPÚ v Českých Budějovicích.
Studie nabízí nový pohled na řešení veřejného prostoru dačického centra - Palackého náměstí a jeho nejbližšího okolí. Ukazuje způsob, jakým lze skloubit požadavky na bezpečný a komfortní pohyb pěších, dostatek parkovacích míst a zá roveň vytvořit reprezentativní veřejný prostor, vhodný i pro pořádání kulturních akcí.
Studie reaguje na současný stav náměstí, který je poznamenán nekoncepčními úpravami minulých desetiletí. Hlavním negativním faktorem, který ovlivňuje kvalitu veřejného prostoru, je nadměrná tranzitní doprava vedená centrem města. Průzkum z roku 2011 uvádí, že centrem projede 12.900 vozidel denně, z toho 2.200 nákladních. Důsledkem je nejen hluk, exhalace a nebezpečný provoz, ale i absence pěších tras a pobytových prostor v centru města. Vzhledem k předpokládané výstavbě obchvatu je řešení zpracováno ve variantách před a po obchvatu. Kdy ve finální variantě po výstavbě obchvatu města může dojít k úplnému zklidnění dopravy na náměstí a úpravě profilů komunikací.
Stávající pomník přesunutý do původní polohy na ose náměstí
Nové stromořadí javor babyka cílová výška stromů
Řešené území a stávající stav Úpravy Palackého náměstí v Dačicích - Studie proveditelnosti 1.1. Situace - vymezení řešeného území Zhotovitel: Atelier M1 architekti s.r.o. Autoři: Ing. arch. Jan Hájek, Ing. arch. Tereza Březovská Spolupráce: Ing. arch. Johana Netrvalová, Ing. Jan Halík Autor původní studie: Ing. arch. Martin Čtverák Dopravní řešení: Ing. Petr Peštál Datum: 08/2020 Göthova Zhotovitel: Atelier M1 architekti s.r.o. Autoři: Ing. arch. Jan Hájek, Ing. arch. Tereza Březovská Spolupráce: Ing. arch. Johana Netrvalová, Ing. Jan Halík Autor původní studie: Ing. arch. Martin Čtverák Dopravní řešení: Ing. Petr Peštál Datum: 08/2020 3.5. Celková situace před realizací obchvatu 2m 5m 10m 20m 2 1 3 4 5 6 8 9 10 6 Historická osa císařské silnice Centrální plocha “agora”, místo pro veřejný život Úprava tvaru průsečné křižovatky zvýšení bezpečnosti, zpřehlednění Zvýšená plocha do jedné úrovně pohodlné přecházení chodců Obslužná komunikace pro kolmá parkovací místa smíšený pohyb aut a chodců Stávající pomník přesunutý do E E A B C Palackého náměstí Krajířova Antonínská Göthova Masarykova Zhotovitel: Atelier M1 architekti s.r.o. Autoři: Ing. arch. Jan Hájek, Ing. arch. Tereza Březovská Spolupráce: Ing. arch. Johana Netrvalová, Ing. Jan Halík Autor původní studie: Ing. arch. Martin Čtverák Dopravní řešení: Ing. Petr Peštál Datum: 08/2020 4.2. Celková situace po realizaci obchvatu 2m 5m 10m 20m 1 2 2 1 3 4 5 6 7 9 8 10 3 4 5 7 8 9 10 6 Zúžení komunikací na šířku jízdního pruhu 2,75 m celková šířka 5,5 m Centrální plocha “agora”, místo pro veřejný život Úprava tvaru průsečné křižovatky zrušení srpovitých krajnic Celá plocha náměstí v jedné úrovni - zapuštění obrubníků, komunikace, chodníky a parkovací místa vyznačeny rozdílným
typem dláždění Kolmá stání podél ulice Krajířova s vynecháním průjezdů pro zajíždění do vnitrobloku
8m Kancnýřův sad - návrh obnovy a údržby sadu Piazzetta u radnice významný prvek
Stávající
E A E A B C C B D D Řešené území a stávající stav 6 Úpravy Palackého náměstí v Dačicích - Studie proveditelnosti ZAMĚŘENÍ STÁVAJÍCÍSTAV 1:250A0 1.2. Situace - zaměření stávajícího stavu 2m 5m 10m 20m Zhotovitel: Atelier M1 architekti s.r.o. Autoři: Ing. arch. Jan Hájek, Ing. arch. Tereza Březovská Spolupráce: Ing. arch. Johana Netrvalová, Ing. Jan Halík Autor původní studie: Ing. arch. Martin Čtverák Dopravní řešení: Ing. Petr Peštál Datum: 08/2020
- strom solitér.
vzrostlé stromy ponechány v návaznosti na dendrologický posudek stavu, zdraví a perspektivy jednotlivých stromů
Změna režimu parkování „obrácení“ parkovacích míst- zrušení obslužné komunikace, zajíždění do kolmých parkovacích míst je možné přímo z ulice Krajířova
Zvednutí komunikací a srovnání do jedné úrovně v celém prostoru náměstí sjednocení plochy, bezbariérovost
Zavedení zóny 30, zrušení přechodů pro chodce pouze místa pro přecházení
Návrh urbanistické a architektonické řešení 58 Úpravy Palackého náměstí v Dačicích Studie proveditelnosti 0,3 5,5 0,3 1,2 5,5 1,2 0,3 5,5 2,2 0,3 Zhotovitel: Atelier M1 architekti s.r.o. Autoři: Ing. arch. Jan Hájek, Ing. arch. Tereza Březovská Spolupráce: Ing. arch. Johana Netrvalová, Ing. Jan Halík Autor původní studie: Ing. arch. Martin Čtverák Dopravní řešení: Ing. Petr Peštál Datum: 08/2020 D -Profil Masarykova ulice E Profil Göthova ulice 4.4. Uliční profily D-E 1,2 m (0,3) chodník 2,2 (0,3) chodník 1,3 m (0,3) chodník 1,6 m (0,3) chodník 5,5 m 2 x jízdní pruh 5,5 m 2 x jízdní pruh Návrh - urbanistické a architektonické řešení 53 Úpravy Palackého náměstí v Dačicích - Studie proveditelnosti Zhotovitel: Atelier M1 architekti s.r.o. Autoři: Ing. arch. Jan Hájek, Ing. arch. Tereza Březovská Spolupráce: Ing. arch. Johana Netrvalová, Ing. Jan Halík Autor původní studie: Ing. arch. Martin Čtverák Dopravní řešení: Ing. Petr Peštál Datum: 08/2020 3.9. Schéma transformace 1 1 2 2 3 4 5 5 1 2 1 3 4 5 Zrušení srpovitých krajnicrozšíření chodníků
postupná
profilů komunikací na šířku pruhu 2,75 m
Zklidnění dopravy
úprava
Návrh urbanistické a architektonické řešení 57 Úpravy Palackého náměstí v Dačicích Studie proveditelnosti Zhotovitel: Atelier M1 architekti s.r.o. Autoři: Ing. arch. Jan Hájek, Ing. arch. Tereza Březovská Spolupráce: Ing. arch. Johana Netrvalová, Ing. Jan Halík Autor původní studie: Ing. arch. Martin Čtverák Dopravní řešení: Ing. Petr Peštál Datum: 08/2020 Poloha křižovatky sklon 4,4% (max 5,5%) Uliční profil pod radnicí Kancnýřův sad Pomník „Agora“ kašna Kraj. Chodník Kolmé P Chodník Ulice Krajířova P P P Stoupání Sklon až 12% 4.3. Schématické řezy A-C A - Podélní profil Masarykova Göthova B- Schématický řez středem náměstí B- Schématický řez SV frontou a ulicí Krajířova Návrh - urbanistické a architektonické řešení 54 Úpravy Palackého náměstí v Dačicích - Studie proveditelnosti Zhotovitel: Atelier M1 architekti s.r.o. Autoři: Ing. arch. Jan Hájek, Ing. arch. Tereza Březovská Spolupráce: Ing. arch. Johana Netrvalová, Ing. Jan Halík Autor původní studie: Ing. arch. Martin Čtverák Dopravní řešení: Ing. Petr Peštál Datum: 08/2020 3.10. Schéma cílového stavu
Revitalizace sportovního areálu Studie
Autoři: M1 Architekti - Ing. arch. Jan Hájek, Ing. arch. Tereza Březovská
Předmětem zadání je zpracování studie pro nalezení optimálního postupu pro revitalizaci sportovního areálu Sparta Kutná Hora, a to zejména z hlediska provozních vazeb uvnitř areálu, urbanistických souvislostí místa, stavebně technického stavu stávajících objektů a ekonomických možností. Cílem studie je vyhodnocení kapacitní možnosti území pro umístění požadovaného stavebního programu v investičním limitu akce.
SpARTA KUTnÁ HORA
DOMÁCÍ 40m 5.1 HYGIENA DOMÁCÍ 15m 5.2 SAlONEK DOMÁCÍ 15m 6 ZAHRADNÍ TRAKTOR / DÍlNA 32m
7 SCHODIŠTĚ VýCHOD 20m
8 SKlAD BRANEK 40m
9 PŘÍPRAVNA OBčERSTVENÍ 16m2
10 SKlAD OBčERSTVENÍ 13m2
11 VSTUP ZAMĚSTNANCI 8m
12 HYGIENA + ŠATNA ZAMĚSTNANCI M 3m 13 POKlADNA 3m
14 wC MUžI + IMOBIlNÍ 20m 15 wC žENY + IMOBIlNÍ 20m2 16 KRYTý VSTUP 18m2 17 TERASA 45m2
AKCE: KUTNÁ HORA REVITALIZACE SPORTOVNÍHO AREÁLU SPARTA ZADAVATEL: Město Kutná Hora PROJEKTANT: 169 01 PRAHA 6 MARKÉTSKÁ 1 ATELIER M1 ARCHITEKTI S.R.O. ZODPOVĚDNÝ PROJEKTANT: ING. ARCH. JAN HÁJEK AUTOŘI: SPOLUPRÁCE: ING. ARCH. TEREZA BŘEZOVSKÁ ING. ARCH. JAKUB HAVLAS ING. ARCH. JAN HÁJEK MGR. AKAD. ARCH. PAVEL JOBA Havlíčkovo náměstí 522/1 284 01 Kutná Hora DATUM NÁZEV VÝKRESU Č.V. M 1:150 D.2.1 PŮDORYS 1.NP 12. 2 0 1 7 STUPEŇ: ARCHITEKTONICKÁ STUDIE STÁVAJÍCÍ KONSTRUKCE NOVÉ KONSTRUKCE Klubovna, občerstvení, bar Hlavní šatny Hygienické zázemí Technické a provozní zázemí Komunikace 0 1 3 5 D2.2 OBJEKT A + B
1 SCHODIŠTĚ ZÁPAD 20m 2 ŠATNA HOSTé 30m 2.1 HYGIENA HOSTé 15m 3 CHODBA 12m 4 OBčERSVENÍ / KlUBOVNA 120m2 4.1 BAR 30m 5 ŠATNA
1 A A B C B
2 3 14 15 4 5 7 6 8 9 16 17 10 11 12 13 5.1 5.2 4.1 2.1 1 SCHODIŠTĚ ZÁPAD 20m 4.7 SKlAD DRESŮ 12m2 8.1 HYGIENA 10m2 lEGENDA
STÁVAJÍCÍ KONSTRUKCE NOVÉ KONSTRUKCE Galerie Šatny sportovců Hygienické zázemí Technické a provozní zázemí Provozní úsek administrativa 0 1 3 5 Komunikace 1 2 3 4.1 4.2 4.3 4.6 5 11 6 7 8 9 10 4.7 4.8 4.9 4.4 4.5 5.1 6.1 7.1 8.1 9.1 10.1 A A B C B C
lEGENDA MÍSTNOSTÍ
C
MÍSTNOSTÍ
AKCE: KUTNÁ HORA REVITALIZACE SPORTOVNÍHO AREÁLU SPARTA ZADAVATEL: Město Kutná Hora PROJEKTANT: 169 01 PRAHA 6 MARKÉTSKÁ 1 ATELIER M1 ARCHITEKTI S.R.O. ZODPOVĚDNÝ PROJEKTANT: ING. ARCH. JAN HÁJEK AUTOŘI: SPOLUPRÁCE: ING. ARCH. TEREZA BŘEZOVSKÁ ING. ARCH. JAKUB HAVLAS ING. ARCH. JAN HÁJEK MGR. AKAD. ARCH. PAVEL JOBA Havlíčkovo náměstí 522/1 284 01 Kutná Hora DATUM NÁZEV VÝKRESU Č.V. M 1:150 D.2.3 PŮDORYS STŘECHY 12. 2 0 1 7 STUPEŇ: ARCHITEKTONICKÁ STUDIE +0,000 +3,280 +6,350 +7,400 +0,000 +3,150 +6,200 +7,400 +0,000 +3,280 +6,350 +7,400 +0,000 +3,150 +6,200 +7,400 +2,300 +0,000 +4,300 +5,750 +7,400 +2,300 +0,000 +2,300 +7,400 +3,150 D2.5 OBJEKT A + B ŘEZY STÁVAJÍCÍ KONSTRUKCE NOVÉ KONSTRUKCE Galerie Šatny sportovců Hygienické zázemí Technické a provozní zázemí Provozní úsek - administrativa 0 1 3 5 Komunikace ŘEZ B ŘEZ A ŘEZ C
Soutěžní
2017
projekt
Sportovní hala Kolín Borky
DŘEVĚNÁ KONSTRUKCE
CELKOVÉ SCHÉMA
Líbeznice Studie 2018
Revitalizace ulice mělnická
DRUŽSTEVNÍ MĚLNICKÁ NAMÝTĚ POTOČNÍ MĚLNICKÁ kontejnery ŘEZ ŘEZ ŘEZ MÝTĚ BUS BUS BUS BUS BUS BUS ŘEZ BUS BUS Líbeznickýpotok Líbeznickýpotok Narybníčku Kovárny HUP kontejnery 2 3 7 8 10 11 12 13 14 oú oú m cyklo VO lampa nástěnná VO lampa na sloupu lavička strom navrhovaný strom stávající Dlažba komunikace Dlažba chodník Dlažba cyklopruh Asfaltový povrch komunikace Zatravňovací dlažba Zeleň Ing. arch. Jan Hájek ATELIER M1 architekti s.r.o. Markétská 1/28 169 00 Praha Revitalizace ulice Mělnická Ing. arch. Tereza Březovská ARCHITEKTONICKÁ STUDIE Obec Líbeznice Mělnická 43, 250 65 Líbeznice ATELIER M1 architekti s.r.o. Markétská 1/28 169 00 Praha 6 CELKOVÁ SITUACE Legenda C.2 sdílený chodník 4,21 chodník 2,75 zeleň jízdní pruh 3,88 jízdní pruh 1,5m zelený pás odvodnění Markétská 1/28 169 Praha Obec Líbeznice Mělnická 43, 250 65 Líbeznice Markétská 1/28 169 00 Praha ŘEZ A DETAIL MĚLNICKÁ 1 A.1 Revitalizace ulice Mělnická 3,25 jízdní pruh 3,25 jízdní pruh chodník předprostor nové Zbrojice chodník 1,5 cyklopruh zeleň plácek Markétská 1/28 169 00 Praha Markétská 1/28 169 Praha 1:100 11/2018 STUDIE STUDIE Obec Líbeznice Mělnická Líbeznice Ulice Mělnická B.1 MĚLNICKÁ 2- POVRCHY A A B B C C D D E A CHODNÍK mozaika 4/6 štípaná, řádková vazba, šedožlutá (melír), žula jemnoz rnná, ref. lom Sumrakov (tříděný) B CYKLOPRUH mozaika 4/6 štípaná, řádková vazba,červená žula, ref. lom Šluknov Eagel red C VOZOVKA kostka drobná 8/10 štípaná,kroužková vazba, tmavě šedá, žula jemnozrnná, ref. Skutečská, lom Ctětín D VODOROVNÉ DOPRAVNÍ ZNAČENÍ kostka drobná 10/10 řezaná po obvodu, řádková vazba, mramor, se zvýšenou odolností vůči mrazovým cyklům, bílý/velmi světle šedý ref. lom Jeseník – Supíkovice E- ZAPUŠTĚNÉ OBRUBNÍKY A PŘECHODOVÉ PÁSKY deska (obrubník) š.15cm, řezaný, povrch tryskaný, světle šedý, žula jemnozrnná Markétská 1/28 169 Praha Markétská 1/28 169 Praha 1:100 11/2018 STUDIE STUDIE Obec Líbeznice Mělnická Líbeznice Ulice Mělnická B.2 MĚLNICKÁ POVRCHY A A B B G D C D C E A CHODNÍK mozaika 4/6 štípaná, řádková vazba, šedožlutá (melír), žula jemnozrnná, ref. lom Sumrakov (tříděný) B CYKLOPRUH mozaika 4/6 štípaná, řádková vazba,červená žula, ref. lom Šluknov Eagel red C VJEZDY kostka drobná 8/10 štípaná,kroužková vazba, tmavě šedá, žula jemnozrnná, ref. Skutečská, lom Ctětín D VODOROVNÉ DOPRAVNÍ ZNAČENÍ kostka drobná 10/10 řezaná po obvodu, řádková vazba, mramor, se zvýšenou odolností vůči mrazovým cyklům, bílý/velmi světle šedý, ref. lom Jeseník Supíkovice E PARKOVACÍ STÁNÍ kostka drobná 8/10 štípaná, řádková vazba, tmavě šedá, žula jemnozrnná, ref. Skutečská, lom Ctětín F- OBRUBNÍKY A PŘECHODOVÉ PÁSKY deska (obrubník) š.15cm, řezaný, povrch tryskaný, světle šedý, žula jemnozrnná
ASFALTOVÁ VOZOVKA
G