Update on Building Works
The main amenities have included the following:The Creation of a new male student bathroom block in the heart of the campus accessible via the new Airlock, incorporating toilets (including ambulant), showers and changing areas.
The first term semester of 2022 has been a busy one when it comes to College facilities! Across the Easter Break, work was in full swing to update amenities available to both staff and students and to create additional workspaces.
•
An Upgrade of the female student bathrooms to mirror the new male student block
•
Creation of a new disabled toilet accessible via new DDA Ramp access
•
Refurbishment of toilet facilities at the Brougham St end of the Campus incorporating new change areas in each, catering for both boys and girls
•
The Introduction of new Shade Sails to open up the existing East Courtyards as an open air learning space as well providing additional shade
•
Gymnasium works have included new toilet facilities, shower and wet room, as well as refurbishment of the floors including new court markings.
Student Facilities •
•
16
Health Centre located in the main Student Hub, incorporating »
Two examination rooms
»
Two separate toilets
»
A waiting / Triage area
»
Plus secure storage areas for medicines etc
Seminar Room located in the Design Thinking & Innovation Centre (DTIC) »
Additional learning space
»
ultipurpose, designed for general classwork, club meetings, tutorial M sessions or seminars
»
Location means it can also be used as a study space for VCE students.