2023 Portfolio_Jingyao Sylvia Lu

Page 1

SELECTED WORKS OF SYLVIAJINGYAO LU UNIVERSITY OF MELBOURNE

O R T F O L I O
P
T A B L E O F C O N T E N T S 01 00 ABOUT ME 02 PLAYDOCK 03 OMISHIMA CITRUS LAB 04 SHG TOWER 05 CGPC FACTORY & RESEARCH CENTER 06 CGPC FACTORY & RESEARCH CENTER 01 INTERNSHIP 07 THE JACARANDA NIGHTCLUB 08 MODELS MAKING 04-08 09-12 13-15 16-18 19-21 02-03 22 23

JINGYAO LU (SYLVIA)

LOCATION: Melbourne, Australia

LANGUAGE: Mandarin, English

EMAIL: sylvialu0022@gmail.com

TEL: +61 426970415

INSTAGRAM: GULUVEE

PREVIOUS QUALIFICATION

2020-2022 Master of Architecture at University of Melbourne, Melbourne, VIC

2017-2019 Bachelor of Architecture Studies at University of New South Wales, Sydeny, NSW

ACADEMIC ACHIEVEMENTS

2022 Venice Studio with MVRDV - designing a fish market at the southeast end of Venice Island

2021 UNTY Container City Housing Competition - Shortlisted

2019 Design thesis with Glenn Murcutt - an artists-in-gallery at Sofala, New South Wales

2018 The Faculty of Built Environment Dean's Merit List

VOLUNTEER

Open House Melbourne 2023 Hellenic Museum - Information desk

Robin Boyd Foundation Online Exhibition on Japan and Robin Boyd - Worked on researches and collections ofJapanese Architects and Robin Boyd

SKILLS

RHINO REVIT SKETCHUP AUTOCAD PHOTOSHOP ILLUSTRATOR INDESIGN LUMION

V-RAY ENSCAPE MODEL MAKING

INTERNSHIP

DEC 2021 - JAN 2022 // Architectural Intern

East China Architectural Design & Research Institute, Shanghai, China

Huashan Hospital, Shanghai, China:

• Worked on the feasibility study

• Developed design concepts and digital models

Renovation on International Peace Maternity and Child Health Hospital, Shanghai, China:

• Conducted site analysis and concept design

• Developed digital conceptual models

Jindong Hospital, Quanzhou, China:

• Developed digital conceptual models

• Produced design development diagrams and renderings

Guanghua Hospital, Shanghai, China:

• Worked on construction drawings on stairs, windows & door system

Yueyang Hospital, Shanghai, China:

• Developed digital conceptual models

• Produced concept design diagrams and renderings

MAR 2020 - AUG 2020 // Architectural Intern

Architecture Design & Research Institute, Southeast University, Nanjing, China

Lishui Community Centre, Nanjing, China:

• Conducted site analysis and concept design

• Proposed conceptual design model and sketches

• Developed digital models and conceptual renderings

Renovation and replanning of Yingyang Old City, China:

• Worked on feasibility study

• Produced systematic drawings and sketches on urban fabrics

• Developed architectural schematic design renderings

Dujiang Victory Memorial Hall, Nanjing, China:

• Construction drawings on stairs and service spaces

1

01 INTERNSHIP

HOSPITAL&COMMUNITY CENTER&PLANNING

DURING MASTER 2020-2021

RHINO/AUTOCAD/SKETCHUP/ENSCAPE/PHOTOSHOP/ILLUSTATOR

PLAN&ELEVATION&DETAILED DRAWINGS OF SELECTED HOSPITAL PROJECTS YUEYANG HOSPITAL CONCEPT RENDERING
2
JINDONG HOSPITAL ELEVATION RENDERING
RENDERINGS & DIAGRAMS OF LISHUI COMMUNITY CENTER CONSTRUCTION DRAWINGS OF DUJIANG VICTORY MEMORIAL HALL
3
DIAGRAMS OF REPLANNING PROJECT OF YINGYANG OLD CITY

02 PLAYDOCK

COMMUNITY & RESIDENTIAL COMPLEX IN DOCKLAND

MASTER YEAR 2 THESIS 2022, INDIVIDUAL WORK. RHINO/ILLUSTRATOR/PS

In highly urbanised cities, buildings and spaces are planned and constructed based on strict regulations by the government and developers. The people who use these spaces usually do not have the chance to define and modify them. Public ownership and participation are lacking in urbanised cities. Dockland, located in the southwest of the Melbourne CBD, is facing the issue of lacking public ownership and civic spaces. The central pier used to be a community space with restaurants and venues, but was shut down in 2020 and reported to be permanently demolished in the future. The precious harbour area has the potential to be renovated and reactivated. This project explores a new urban paradigm that will return urban spaces to the public realm by encouraging public engagement in Docklands, Melbourne. The PLAYDOCK is a new community space on central pier with residential that its users can periodically remodel. The architecture will strengthen social connection and equality through participatory design. The public community space will be a key component to building up the relationship between people. While the residential buildings can respond to the changing needs of residents, with the capability of future extension or demolition.

4
THE PRECIOUS PUBLIC SPACE playful installation SCULPTURE OF THE PAST removed retain REMEDIATION LANDSCAPE various evergreen shrub PUBLIC PARTICIPATION extensional exhibition space flexible crane
5
the entrance cafe in the shed dock esplanade flexible studio units
1. open public space 2. car park 3. cafe in the shed 4. dock esplanade 5. tennis court 6. basketball court 7. art exhibition space 8. temporary pavilion 9. art studio 10. residential lobby 11. assemble workshop art studio & workshop show room art centre swimming pool cafe in the shed air corridor 6

the changeable facade is a living showcase of the art centre and the PLAYDOCK community, pointing towards Docklands city

the facade is a temporary pavilion for artworks and performances. the open structure allows for flexible configurations, can be developed by artists or local people

the artists and local residents can customize a art studio or worshop with the mini crane inside the building

THE ART STUDIO
THE ART
showroom exhibition space lecture hall temporary
performances corridor to the art studio polycarbonate
flexible crane basic truss structure individual art studio units glass
7
CENTRE
pavilion for arts and
panel
facade

PUZZLE TOWER

The residential tower is built with two types of basic living units. The key concept of Puzzle Tower is that users can consistently modify their living space by adding extension units or recycling unwanted units. Users can also choose the paint and facade material to customize their own homes. There are three sizes of extension units and will be assembled on-site in the workshop inside the building. All material is lightweight and can be recycled.

The puzzle tower gives back ownership of the space to the users by allowing them to modify their own homes. The participatory design idea aims to create a better living community for residents in Dockland and build stronger connections between residents and the community.

transportation of extension units lobby assemble wrokshop extension units sky garden structure core assemble workshop & lobby sky garden 1. kitchen 2. living 3. dining 4. bathroom 5. bedroom 6. residential lift 7. service lift 8. stairs 9. sky garden M UNITS (ONE EXTENSION) BASIC UNITS L UNITS (TWO EXTENSIONS) XL UNITS (THREE EXTENSIONS) TYPICAL FLOOR PLAN A TYPICAL FLOOR PLAN B EXTENDED FLOOR PLAN
8

03 OMISHIMA CITRUS LABORATORY

THE SHIMANAMI KAIDO REVITALIZATION PROGRAM ON OMISHIMA ISLAND

MASTER YEAR 1 STUDIO 2021, GROUP WORK. RHINO/ILLUSTRATOR/PHOTOSHOP

The vision of the project is to revitalize the island focusing on agriculture and the local citrus industry, also to build up connections between local people and tourists. The programs in the citrus laboratory will focus on citrus products making and experimenting, along with farming workshops held by local farmers, offering tutorials for those who are interested in farming. Leisure spaces such as floating restaurants and citrus baths are provided for both local people and tourists, encouraging interactions between those groups. We hope to make use of local resources and existing building structures and farmlands to develop the local economy, creating a new identity for Omishima.

9

OMISHIMA AND CITRUS

Area: 24.92 mi²

Population: 4,006 (2003)

Ethnic groups: Japanese

Omishima, the largest island in the Seto Inland Sea, is a beautiful mountainous island that is artistically and religiously significant. There are museums and galleries designed by famous architect Toyo Ito, and one of Japan’s most important shrines, Oyamazumi Shrine. Agriculture used to be the main industry on Omishima centered on citrus cultivation. However, it has been seriously affected because of the aging population and the lack of contiguous flat land. Many orchards and farms have been abandoned because the owners are too old to take care of the farm. But if we find creative ways to make the citrus products attractive again, the citrus industry may be able to sustain the development of the local community.

SETO INLAND SEA 10

THE GREENHOUSE

The key design idea is to create a greenhouse to enliven the rusty and old factory building, also to echo our idea of revitalizing the rural island focusing on agriculture and citrus. There will be citrus trees and other crops growing in the greenhouse. The laboratory is sitting inside the greenhouse and is divided into three smaller sections - the food producing space, the experience space, and the fragrance producing space - and are connected with glass corridors. The viewing platform on top will provide a tour around the whole lab. Next to the lab will be a cafe with a bakery, an open retail space for flexible markets, farming workshops and a seeds library. Private area including the citrus bath and guest house will sit at the back.

CITRUS LIVING SYSTEM

We aim to create a citrus living system in this proposal. The farming traditions will be inherited and carried forward. Citrus will be cultivated on local farms and later made into various products, including wine, juice, fragrances etc. It can also be directly made into desserts and meals. The citrus peels can be used for aromatherapy products or citrus onsen. Overall, the citrus laboratory project will engage with local farmers and retailers, drive employment and flourish the local economy.

Citrus Lab - Fragrance Producing

Citrus Lab - Experiencing

Greenhouse

Citrus Lab - Food Producing

Sight Viewing Platform

Citrus Bath

Seed Library

Guest House

Polycarbonate Roof

Farming Workshop

Cafe

Flexible Retail

Greenhouse

Citrus Lab - Fragrance Producing Citrus Lab - Experiencing Citrus Lab - Food Producing

Sight Viewing Platform

Floating Restaurant

11

NARRATIVE: A-day-and-life of a tourist KIKI who comes to visit the Omishima Citrus Laboratory.

1. Citrus Laboratory

2. Citrus Cafe

3. Farming Workshop

4. Experimental Farmland

5. Floating Restaurant

6. Viewing Platform

7. Citrus Bath

8. Guest House

1 3 2 4
5 7 6 8 12

04 SHG TOWER

HYBRID HIGHRISE BUILDING IN MELBOURNE CBD

MASTER YEAR 2 2022, GROUP WORK. RHINO/VRAY/ILLUSTRATOR/PHOTOSHOP

The SHG Tower is a hybrid high-rise building with office and hotel at South corner of Lonsdale and Spring Street, Melbourne,VIC 3000.This project explores the floor plate arrangement, façade system, structure and construction, environmental performances and engineering of urban high-rise building.

Located on the south corner of Lonsdale and Spring Street in Melbourne CBD, the SHG Tower is a mixed-use commercial building with an outstanding building height of 240 meters.The building comprises 28 office floors, 14 hotel floors with a sky lobby, 2 levels of podium shops, and 3 mechanical floors which are evenly located along the tower. The building has reached a high floor efficiency of 85.3% by having a total GFA of 73295m² with a net lettable area of 62549m².The irregular shape provides a changing view when observed at different locations. In addition to that, The crown extends with the tapered angle of the tower, which draws people’s visual attention reaching to the apex. The shape of the podium also echoes the volume of the tower. With cut corners, it creates clear entrances for the hotel.

STAINLESS STEEL GLASS ANGLE CARPET BROADLOOM NETCORP 0720 VENEER STAINLESS STEEL MAINTENANCE CATWALK LYSAGHT ROOFTRAK® ARTICULATED BOLT ROTULE RCE10-21 SUNGUARD SOLAR NEUTRAL 67 GLASS PANEL LIGHT BLUE FINISH FIRE-STOPS 50MM SMOKE SEALS ACOUSTIC INSULATION TIGHTLY PACKED 80MM 530 UB 700 EDGE BEAM WITH FLUOROCARBON COATING SUSPENDED CEILING STRIP GALVANIZED STEEL LOUVERS 90MM CONTROLLED BY BMS STRUCTURAL SEALED GLAZING CURTAIN WALL ALUMINIUM MULLION CW 86-SG 90MM SQUARE MULTI DIRECTIONAL AIR VENT 360MM CURTAIN BLIND 80MM PHOTOVOLTAIC PANEL SUNEARTH INC. TRB-40 45° ANGLED SUNGUARD SUPERNEUTRAL SN 40T LIGHT BLUE FINISH C2 800 WC WITH FLUOROCARBON COATING FLOOR ANGLE BRACKET STEEL SUPPORT GLASS PANEL STEEL SUPPORT STEEL STACK JOINT 80MM TATE RAISED FLOOR UFAD CLIP-ON STRINGER SYSTEM FIXING BOLTS FLOOR ANGLE BRACKET CAST-IN INSERT 150MM CONCRETE FLOOR SLAB 70MM BONDEK AIR SUPPLY DUCTS SUNGUARD SPANDREL HT COLOR BACK SPANDREL GLASS PANEL OPAQUE WARM GRAY C1 600 UC WITH FLUOROCARBON COATING STRUCTURAL SEALED GLAZING RL 52.0M RL 48.0M TYPICAL OFFICE NORTH FACADE ELEVATION A4.3 01 TYPICAL OFFICE NORTH FACADE SECTION A4.3 02 A4.3 02 A4.1 03 SPANDRELS PANEL PV PANEL LOUVRES VISION PANEL TYPICAL OFFICE NORTH FACADE ISOMETRIC A4.3 04 1 2M 0.5
13
RL 52.0M ALUMINUIM SILL TRANSOM FIXING BOLTS M12 WITH 5MM FLAT WASHER TO BACK OF MULLION FLOOR ANGLE BRACKET. PAINTED WITH BITUMINOUS PAINT FLOOR ANGLE BRACKET. PAINTED WITH BITUMINOUS PAINT ALUMINIUM SUSPENDED CEILING CLIP ALUMINIUM MULLION CEILING STOP STRUCTURAL SILICONE STRUCTURAL SILICONE SUNGUARD SOLAR NEUTRAL 67 GLASS PANEL 10MM LIGHT BLUE FINISH SUNGUARD SOLAR NEUTRAL 67 GLASS PANEL 12MM LIGHT BLUE FINISH STEEL SUPPORT 80MM THK. 11KG/M ACOUSTIC INSULATION TIGHTLY PACKED SUNGUARD SPANDREL HT COLOR BACK SPANDREL GLASS PANEL OPAQUE WARM GRAY SMOKE FLASHING 1MM FIRE STOP ALUMINIUM SILL COVER ALUMINIUM STACK HEAD CARPET BROADLOOM NETCORP 0720 VENEER ANCHOR BOLTS M16 WITH NUT AND SPRING WASHER AND LOCKED WITH EXTRUDED ALUMINIUM SERATED ASHER REBATE IN CONCRETE SLAB 700 EDGE BEAM WITH FLUOROCARBON COATING STEEL ANGLE BRACKET 530 UB STEEL CHANEL 50MM SQUARE MULTI DIRECTIONAL AIR VENT 360MM GYPROCK SOUNDCHEK™ ACOUSTIC CEILING PLASTERBOARD 10MM CAST-IN INSERT 300MM LONG WITH 3 ANCHORS 800 WC WITH FLUOROCARBON COATING 70MM BONDEK 150MM CONCRETE SLAB TATE THE CONCORE® 1000 RAISED ACCESS FLOOR STRINGERS TATE THE CONCORE® 1000 RAISED ACCESS FLOOR PANELS GALVANIZED STEEL LOUVERS 90MM CONTROLLED BY BMS CURTAIN BLIND 80MM PHOTOVOLTAIC PANEL SUNEARTH INC. TRB-40 45°ANGLED STRUCTURAL SILICONE STAINLESS STEEL GLASS ANGLE ARTICULATED BOLT ROTULE RCE10-21 SUNGUARD SOLAR NEUTRAL 67 GLASS PANEL LIGHT BLUE FINISH STAINLESS STEEL MAINTENANCE CATWALK LYSAGHT ROOFTRAK® CAST-IN INSERT 300MM LONG WITH 3 ANCHORS ANCHOR BOLTS M16 WITH NUT AND SPRING WASHER AND LOCKED WITH EXTRUDED ALUMINIUM SERATED ASHER JACKING BOLT M12 WITH LOCK NUT FOR VERTICAL ADJUSTMENT JACKING BOLT FLOOR ANGLE BRACKET. PAINTED WITH BITUMINOUS PAINT ALUMINIUM SUSPENDED CEILING CLIP ALUMINIUM MULLION CEILING STOP STRUCTURAL SILICONE STRUCTURAL SILICONE SUNGUARD SOLAR NEUTRAL 67 GLASS PANEL 10MM LIGHT BLUE FINISH SUNGUARD SOLAR NEUTRAL 67 GLASS PANEL 12MM LIGHT BLUE FINISH STEEL SUPPORT 80MM THK. 11KG/M ACOUSTIC INSULATION TIGHTLY PACKED SUNGUARD SPANDREL HT COLOR BACK SPANDREL GLASS PANEL OPAQUE WARM GRAY SMOKE FLASHING 1MM FIRE STOP CAST-IN INSERT 300MM LONG WITH 3 ANCHORS 800 WC WITH FLUOROCARBON COATING GALVANIZED STEEL LOUVERS 90MM CONTROLLED BY BMS CURTAIN BLIND 80MM PHOTOVOLTAIC PANEL SUNEARTH INC. TRB-40 45°ANGLED STAINLESS STEEL MAINTENANCE CATWALK LYSAGHT ROOFTRAK® ANCHOR BOLTS M16 WITH NUT AND SPRING WASHER AND LOCKED WITH EXTRUDED ALUMINIUM SERATED ASHER JACKING BOLT M12 WITH LOCK NUT FOR VERTICAL ADJUSTMENT JACKING BOLT ARROWHEAD MALE MULLION MALE MULLION FEMALE MULLION ARROWHEAD FEMALE MULLION SUNGUARD SOLAR NEUTRAL 67 GLASS PANEL 12MM LIGHT BLUE FINISH SUNGUARD SOLAR NEUTRAL 67 GLASS PANEL 10MM LIGHT BLUE FINISH STRUCTURAL SILICONE STAINLESS STEEL GLASS ANGLE ARTICULATED BOLT ROTULE RCE10-21 SUNGUARD SOLAR NEUTRAL 67 GLASS PANEL LIGHT BLUE FINISH FIXING BOLTS M12 WITH 5MM FLAT WASHER TO BACK OF MULLION FLOOR ANGLE BRACKET. PAINTED WITH BITUMINOUS PAINT FLOOR ANGLE BRACKET. PAINTED WITH BITUMINOUS PAINT ALUMINIUM SUSPENDED CEILING CLIP ALUMINIUM MULLION CEILING STOP STRUCTURAL SILICONE STRUCTURAL SILICONE SUNGUARD SOLAR NEUTRAL 67 GLASS PANEL 10MM LIGHT BLUE FINISH SUNGUARD SOLAR NEUTRAL 67 GLASS PANEL 12MM LIGHT BLUE FINISH STEEL SUPPORT 80MM THK. 11KG/M ACOUSTIC INSULATION TIGHTLY PACKED SUNGUARD SPANDREL HT COLOR BACK SPANDREL GLASS PANEL OPAQUE WARM GRAY SMOKE FLASHING 1MM FIRE STOP CAST-IN INSERT 300MM LONG WITH 3 ANCHORS 800 WC WITH FLUOROCARBON COATING GALVANIZED STEEL LOUVERS 90MM CONTROLLED BY BMS CURTAIN BLIND 80MM PHOTOVOLTAIC PANEL SUNEARTH INC. TRB-40 45°ANGLED STAINLESS STEEL MAINTENANCE CATWALK LYSAGHT ROOFTRAK® ANCHOR BOLTS M16 WITH NUT AND SPRING WASHER AND LOCKED WITH EXTRUDED ALUMINIUM SERATED ASHER JACKING BOLT M12 WITH LOCK NUT FOR VERTICAL ADJUSTMENT JACKING BOLT ARROWHEAD MALE MULLION MALE MULLION FEMALE MULLION ARROWHEAD FEMALE MULLION SUNGUARD SOLAR NEUTRAL 67 GLASS PANEL 12MM LIGHT BLUE FINISH SUNGUARD SOLAR NEUTRAL 67 GLASS PANEL 10MM LIGHT BLUE FINISH STRUCTURAL SILICONE STAINLESS STEEL GLASS ANGLE ARTICULATED BOLT ROTULE RCE10-21 SUNGUARD SOLAR NEUTRAL 67 GLASS PANEL LIGHT BLUE FINISH C2 800 WC WITH FLUOROCARBON COATING FLOOR ANGLE BRACKET STRUCTURAL SEALED GLAZING CURTAIN WALL ALUMINIUM MULLION CW 86-SG 90MM STAINLESS STEEL MAINTENANCE CATWALK LYSAGHT ROOFTRAK® ARTICULATED BOLT ROTULE RCE10-21 SUNGUARD SOLAR NEUTRAL 67 GLASS PANEL LIGHT BLUE FINISH STAINLESS STEEL CURTAIN WALL ANGLE CORNER ANCHOR BRACKET CORNER MULLION 80MM PLAN DETAIL NORTH FACADE OUTER SKIN A4.4 03 SECTION DETAIL - NORTH FACADE SPANDRELS PANEL A4.4 01 PLAN DETAIL NORTH FACADE INNER CURTAIN WALL A4.4 02 MATERIAL AND FINISH SCHEDULE PRODUCTS SCHEDULE AL CARPRAL ALUMINIUM AGS COMMERCIAL THERMAL BREAK ALUMINIUM CLEAR ANODIZED GL SUNGUARD SUPERNEUTRAL SN 40T LIGHT BLUE DOUBLE GLAZED, SHGC=0.22 U-VALUE=1.33, VLT=40% AL 2 CARPRAL ALUMINIUM 928328 GREY SATIN GL107A GL 2 SUNGUARD SPANDREL HT COLOR BACK SPANDRELS GLASS PANEL OPAQUE WARM GRAY GL 3 SUNGUARD SOLAR NEUTRAL 67 LIGHT BLUE SINGLE GLAZED, SHGC=0.7 U-VALUE=5.2, VLT=70% ST 1 STAINLESS STEEL MAINTENANCE CATWALK LYSAGHT ROOFTRAK® CL GYPROCK SOUNDCHEK™ ACOUSTIC CEILING PLASTERBOARD 10MM CR 1 NETCORP NEEDLEPOINT GRAPHIC LOOP PILE WOOL CARPET 5MM, 0720 VENEER FETECHNIC POINT FIXING SYSTEM ARTICULATED BOLT ROTULE RCE10-21 SUNEARTH INC. TRB-40 80MM PHOTOVOLTAIC PANEL TATE FLOORING UFAD CLIP-ON STRINGER UNDERSTRUCTURE FOR CONCORE ICSF ACCESS FLOOR PANELS. TYPE 1A PEDESTAL AIR CONDITIONING SQUARE MULTI DIRECTIONAL VENT 360MM WITH 400MM DUCT TYPICAL OFFICE NORTH FACADE PLAN A4.3 03 0.4M 0.1 0.4M 0.1 14

FACTORY & RESEARCH CENTER

INNOVATIVE MATERIAL TECHNOLOGIES & LOW EMBODIED CARBON EMISSIONS

MASTER YEAR 2 STUDIO 2022, INDIVIDUAL WORK. RHINO/VRAY/ILLUSTRATOR/PHOTOSHOP

Coffee grounds-plastic composites are composite materials made of spent coffee grounds and recycled plastics. This project aims to explore the material technology to reduce embodied carbon emissions and raise public awareness of sustainability in construction. It will also function as an educational facility with academic researchers, industry partners and students. The project will create transparency between the researchers’ work, the educational process and the outside world while ensuring the optimal conditions for research and innovation.

Coffee Machine Coffee Grounds Coffee Bean Coffee Roaster Roasted Coffee Bean Waste Crushing & Washing Machine Clean the recycled plastics and cut into flakes Powder Dryer Filtering the coffee grounds powder and dry them off Milling Machine Clean the spent coffee grounds and grind into finer powder CGPCDeckingBoards
CGPCWindowand DoorFrames
CGPC
CGPCCladdingBoards
05
15

COFFEE GROUNDS-PLASTIC COMPOSITE MATERIAL FACTORY & RESEARCH CENTER

It is an assumption, that all projects will target zero carbon operational energy and low embodied emissions in their architectural propositions (The new normal)

16
- GROUND LEVEL PLAN2 4 3 9 5 5 8 10 11 12 8 6 5 3 1 4 3 1 EXHIBITION SPACE 2 RESEARCHER’S OFFICE 3 SEMINAR ROOM 4 THEATRE 5 SELF STUDY SPACE 6 CAFE 7 PREPARATION SPACE 8 TEACHING LAB 9 KITCHEN&RESTAREA 10 GALLERY 11 STAFF MEETING ROOM 12 STAFF OFFICE 1 COFFEE TREE GARDEN 2 TEACHING SPACE 3 KITCHEN&RESTAREA 4 SEMINAR ROOM 5 LIBRARY 6 MEETING ROOM 7 PREPARATION SPACE 8 RESEARCH LAB 9 WRITE UP SPACE 10 GALLERY - FIRST LEVEL PLAN4 8 8 10 8 7 9 6 5 3 3 4 2 2 - SECOND LEVEL PLAN6 3 3 3 2 1 5 4 17

Even though the labs require a controlled and stable environment, one of the design aims is to create a translucency to expose the lab activities to the outside. The facade system of the laboratory building will use a combination of polycarbonate and CGPC panels installed in layers to form different patterns. The interior lighting conditions can be controlled by the layout patterns.

- CGPC&POLYCARBONATE- TRANSLUCENT FACADE -
18

06 HOUSE OF BREATHING

MULTI-UNIT HOUSING IN MASCOT

BACHELOR YEAR 3 STUDIO 2019, INDIVIDUAL WORK SKETCHUP/LUMION/PHOTOSHOP

The project requires the design of three dwellings on a site in the Sydney suburb of Mascot. The assumption is that the dwellings will be built under the National Rental Affordability Scheme (NRAS) and will provide subsidized rental accommodation for low to moderate income earners who otherwise would have difficulty accessing the private rental housing market. The three dwellings comprise:

• Two dwellings, each able to accommodate two types of households (not at the same time) – a couple parent with two children, a single parent with two children (interior floor area 110-120 sq.m.).

• One dwelling, able to accommodate two types of households (not at the same time) – a couple, a single person (interior floor area 55-70 sq.m.).

SECTION B-B SECTION A-A 19

The population in Mascot is growing over time. Multi-unit housing will be a common house type in this area. The idea of this project is to design a multi-unit house that ensures privacy for each dwelling. Besides, Access to outdoor space is another key features that taken into consideration. The Australian outdoor lifestyle should be kept even in a high density residential block. People live a city life but can catch a breath of nature.

The first and third dwelling are designed for the single parent and parents with children. The smaller dwelling in the middle is designed for single person or couple. The idea is that each of the household should have their private garden which has good sun access. Internal garden is introduced to the house, which provides natural light and ventilation to the house. Double height living space allowing interaction between family members.

The use of timber slides creates an organic feeling to the house. It also allows the house to "breath" the interior and exterior are not completely seperate. They are linked by the transparency of the timberslides.

WHITE PLASTER FINISHING ON CONCRETE TIMBER BLINDS OVER GLAZING WALL CONCRETE FLOORING FOR LIVING SPACE TIMBER FLOORING FOR BEDROOMS BLACK BRICK EXPLORED AXO
HOUSE 1 HOUSE 2
HOUSE 3
20
HOUSE 2 LIVING SPACE
HOUSE 3 LIVING SPACE
21
HOUSE 1 DOUBLE HEIGHT LIVING SPACE

07 LA JACARANDA NIGHTCLUB

PARAMETRIC DESIGN: GRASSHOPPER AND MODEL MAKING

BACHELOR YEAR 2 COMPUTATIONAL DESIGN STUDIO 2018, INDIVIDUAL WORK

RHINO/GRASSHOPPER/3D PRINT/LASER CUT

The course ‘Computational Design Studio I’ introduces students to Parametric Design and Digital Fabrication. We used Grasshopper to create parametric models, and we explored different digital fabrication techniques (laser cutting; 3D printing; CNC milling), construction systems and materials though the fabrication of prototypes. This course was taken in my first semester in second year. We chose a work from the famous engineer Felix Candela. My chosen project is La Jacaranda Nightclub in Acapulco, Mexico.

A - RODS AND NODES: 3D PRINTING + BANDSAW CUTTING B - DOUBLE CURVATURE SHELL: LASER CUTTING C - SUBSTRUCTURE AND PLATES: 3D PRINTING + LASER CUTTING 22

08 MODEL MAKING

BACHELOR AND MASTER, INDIVIDUAL WORK

23

EMAIL: SYLVIALU0022@GMAIL.COM

TEL: +61 426970415

INSTAGRAM: GULUVEE

LU
SYLVIA

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
2023 Portfolio_Jingyao Sylvia Lu by Sylvia Lu - Issuu