Kerbs: Installation and Specification

The installation of kerbs is specified by SANS 1200MK. In principle, the following is prescribed: •

Trenches on which kerbs are to be installed should be excavated and well compacted. If the engineer finds that the in-situ subsoil is not good, an imported sub-base material should be used.

A bedding material of at least 50mm thickness should be used that consists of crushed stone, cement and sand, with a maximum particle size of 13,2mm.

There should be close joints no larger than 10mm between kerbs and they should be filled with 3:1 sand/cement. The joints must be pointed. Ends of kerbs should be well moistened before jointing and filled joints must be covered and kept moist for 48 hours. When joints have cured, an appropriate sealant must be used, where necessary.

Allow for expansion joints of at least 12mm at intervals of at least 20m.

After jointing, the kerbs must be backed with concrete “haunching” of at least 15Mpa and the space behind kerbs must be back-filled and well compacted in layers.

108


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

Permeable paving design and installation guidelines

7min
pages 166-170

Product specifications

4min
pages 182-184

Complementary Products

5min
pages 176-180

Guarantee

2min
page 175

Building Information Modelling (BIM

1min
page 181

Common paving installation problems

1min
page 171

Maintenance

6min
pages 172-174

Installation guidelines

11min
pages 161-165

Efflorescence

3min
pages 148-149

Installation guidelines

5min
pages 136-139

Things you should know about paving prior to installation

1min
page 145

Versoblock

1min
pages 132-135

Vertical fixed connection (VFC) wall block

4min
pages 118-123

Products

3min
pages 112-115

Design concepts

7min
pages 140-143

Paving material comparison

2min
pages 146-147

Installation and specification

1min
pages 110-111

Products

12min
pages 74-101

Permeable paving

1min
pages 68-69

Modern residential designs

6min
pages 12-31

Roads

1min
pages 66-67

Introduction

6min
pages 7-11

Sidewalks

1min
pages 64-65

Critical considerations when paving

3min
page 71

Innovation

1min
pages 106-107
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.