Silver Comet Industrial Park

Page 1

SILVER COMET INDUSTRIAL PARK Hiram, GA 30141 Under Construction // Now Pre-Leasing // 30,000 - 300,000 SF // Manufacturing / Distribution Jeb Gordon // 404.456.6368 // jgordon@skcr.com Chris Little // 770.380.8270 // clittle@skcr.com UNDER CONSTRUCTION

OVERVIEW

SK Commercial Realty and Goldenrod Companies are proud to present Silver Comet Industrial Park – a 128 AC master-planned industrial park with build-to-suit opportunities for warehousing, manufacturing, and distribution users with requirements ranging from 30,000 – 300,000 SF.

Located in Paulding County, Silver Comet Industrial Park has excellent access to major transportation arteries and is surrounded by a highly-skilled workforce.

Silver Comet Industrial Park is located in the I-20 W / Douglasville Industrial Submarket, which is considered one of the most dynamic industrial submarkets in Atlanta, from both a construction and a leasing standpoint. The submarket boasts an excellent transportation network, solid rent growth, a robust leasing environment, and a strong labor pool.

Other notable cities in the I-20 W / Douglasville Industrial Submarket are Douglasville, Powder Springs, Austell, Lithia Springs, Villa Rica, and parts of Temple and Carrollton.

2 Jeb Gordon // 404.456.6368 // jgordon@skcr.com Chris Little // 770.380.8270 // clittle@skcr.com
3 Jeb Gordon // 404.456.6368 // jgordon@skcr.com Chris Little // 770.380.8270 // clittle@skcr.com SITE PLAN Concept A // Buildings B & C Concept B // Building B-Alternate LEASED LEASED BILLCARRUTHPKY BILLCARRUTHPKY

AVAILABLE BUILDING SPECS

Concept A // Building B

Total Building SF: 171,000 SF

Total Available SF: 171,000 SF

Office SF: Build To Suit

Building Dimensions: 180’ x 950’

Configuration: Rear Load

Construction: Tilt Wall

Clear Height: 32’

Fire Protection: ESFR

Electrical: 400 AMP with Additional Capacity

Dock Doors: 45

Drive-In Doors: 2 // 14’ x 16’

4 Jeb Gordon // 404.456.6368 // jgordon@skcr.com Chris Little // 770.380.8270 // clittle@skcr.com
BILLCARRUTHPKY LEASED

AVAILABLE BUILDING SPECS

Concept A // Building C

Total Building SF: 131,040 SF

Total Available SF: 131,040 SF

Office SF: Build To Suit

Building Dimensions: 182’ x 720’

Configuration: Rear Load

Construction: Tilt Wall

Clear Height: 32’

Fire Protection: ESFR

Electrical: 400 AMP with Additional Capacity

Dock Doors: 32

Drive-In Doors: 2 // 14’ x 16’

5 Jeb Gordon // 404.456.6368 // jgordon@skcr.com Chris Little // 770.380.8270 // clittle@skcr.com
BILLCARRUTHPKY LEASED

AVAILABLE BUILDING SPECS

Concept B // Building B-Alternate

Total Building SF: 300,000 SF

Total Available SF: 300,000 SF

Office SF: Build To Suit

Building Dimensions: 428’ x 700’

Configuration: Cross-Dock

Construction: Tilt Wall

Clear Height: 32’

Fire Protection: ESFR

Electrical: 400 AMP with Additional Capacity

Dock Doors: 66

Drive-In Doors: 4 // 14’ x 16’

6 Jeb Gordon // 404.456.6368 // jgordon@skcr.com Chris Little // 770.380.8270 // clittle@skcr.com
BILLCARRUTHPKY LEASED

AVAILABLE BUILDING SPECS

Building D

Total Building SF: 149,760 SF

Total Available SF: 149,760 SF

Office SF: Build To Suit

Building Dimensions: 320’ x 468’

Configuration: Rear Load

Construction: Tilt Wall

Clear Height: 32’

Fire Protection: ESFR

Electrical: 400 AMP with Additional Capacity

Dock Doors: 26

Drive-In Doors: 2 // 14’ x 16’

7 Jeb Gordon // 404.456.6368 // jgordon@skcr.com Chris Little // 770.380.8270 // clittle@skcr.com
BILLCARRUTHPKY LEASED
8 Jeb Gordon // 404.456.6368 // jgordon@skcr.com Chris Little // 770.380.8270 // clittle@skcr.com
Norfolk Southern // Austell Yard 9 miles I-20 // via Hwy 92 10 miles I-20 // via Thornton Road 12 miles I-285 // via I-20 19 miles I-75 // via Hwy 92 20 miles Hartsfield-Jackson International Airport 31 miles 2 DAYS 3 DAYS 4 DAYS 5 DAYS 1 DAY TRUCK TRANSIT TIMES FROM GEORGIA ATLANTA BUCKHEAD POWDER SPRINGS SANDY SPRINGS SMYRNA MARIETTA KENNESAW ACWORTH WOODSTOCK ROSWELL ALPHARETTA COLLEGE PARK TUCKER DECATUR STOCKBRIDGE RIVERDALE FAIRBURN FAYETTEVILLE ST MOUNT LITHIA SPRINGS 575 575 400 19 19 19 75 75 75 75 75 75 285 285 285 285 285 85 85 85 85 20 20 SILVER COMET INDUSTRIAL PARK
KEY DISTANCES

OVERVIEW

SK Commercial Realty and Goldenrod Companies are proud to present Silver Comet Industrial Park – a 128 AC master-planned industrial park with build-to-suit opportunities for warehousing, manufacturing, and distribution users with requirements ranging from 50,000 – 300,000 SF.

Located in Paulding County, Silver Comet Industrial Park has excellent access to major transportation arteries and is surrounded by a highly-skilled workforce.

Silver Comet Industrial Park is located in the I-20 W / Douglasville Industrial Submarket, which is considered one of the most dynamic industrial submarkets in Atlanta, from both a construction and a leasing standpoint. The submarket boasts an excellent transportation network, solid rent growth, a robust leasing environment, and a strong labor pool.

Other notable cities in the I-20 W / Douglasville Industrial Submarket are Douglasville, Powder Springs, Austell, Lithia Springs, Villa Rica, and parts of Temple and Carrollton.

Proposed Property Tax Abatement Schedule

The Paulding County Industrial Building Authority (IBA) has proposed a 10year Payment in Lieu of Taxes (PILOT) Program that will greatly reduce enduser’s totally occupancy cost, as seen in the adjacent graphic.

*Please note that all tax incentives are subject to approval by the Paulding County Industrial Building Authority and Board of Commissioners.

9 Jeb Gordon // 404.456.6368 // jgordon@skcr.com Chris Little // 770.380.8270 // clittle@skcr.com
$1.02/SF $0.94/SF $0.86/SF $0.78/SF $0.69/SF $0.59/SF $0.49/SF $0.37/SF $0.26/SF $0.13/SF 100% 0% 50% Year 1 Year 5 Year 10

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.