Assessment 3 - Body and Place Sissel Morley - S5288742 Location: Under pavilion Temporary structure was designed to be installed under the aquatic pavilion, between a section of the columns. The sheltered location would o er protection from sun and rain. Maximum sun and wind exposure from west (pool side) due to geographic location. Function: Playing - Climbing Main intention of use to this installation, is to be used as warming up exercise before swimming. Measurements Hight 4m Length 5.5m Width 5m
f
ff
f
Design Development The iscal consequence of the inal structural model, started with the investigation of a single tubular rectangular shape, that have been twisted to create a stronger form. This new shape is mostly made from multiple triangles that supports with other. The uni ication between three of this new shapes, resulted into the inal model.
f
f
TEMPORARY INSTALLATION AT GRIFFITH UNIVERSITY CENTRE AND GYM PAVILION
Model making steps
1.
2.
3.
Yellow
The selection of the bright yellow colour used, was made with the intention to make it to standard out. Reinforcing the temporary aspect and evoke playfulness and interaction.
Fabric material - light and shadow