UNDER CONSTRUCTION

Publix store during ongoing operations. Included are updates to the deli kitchen as well as new energy-efficient upgrades, new rooftop air-conditioning units, and overall cosmetic upgrades to the store. The project also includes enclosing the loading dock and concrete slab/ramp modifications.

Rosewood Church Redevelopment 2901 Rosewood Dr. Developer/owner: Cason Development Group Architect(s): Garvin Design Group General contractor: Boyer Commercial Construction Engineer(s): Swygert & Associates (mechanical, plumbing); Belka Engineering Associates, West Columbia (electrical); LandPlan South (civil); Mabry Engineering Associates (structural) Estimated completion date: October 2022 This mixed-use development project adapts an existing church building for new use as apartments and adds new construction for retail, hospitality, and apartments. Distinctive elements such as the steeple and stained glass windows will remain in place. Red Bullet Spec Building 200 Masters Blvd., Anderson Developer/owner: Red Bullet, Anderson Architects: Architectural Design Center–ADC, Easley General contractor: McCrory Construction Engineers: Piedmont Mechanical, Spartanburg (mechanical); Walker & Whiteside, Greenville (electrical); Cam-Ful, Charlotte (plumbing); Site Design, Greenville (civil); Fuller Group, Greenville (structural) Estimated completion date: Fourth quarter 2022 This is an expansion to an existing facility for which McCrory recently completed a large renovation and expansion. The new project adds 150,000 square feet of warehouse and machine/maintenance shop with an area three-hour CMU separation wall. Site work includes an additional seven loading docks and truck apron, 16-foot-high segmented block retaining wall, and extension of the underground fire loop. 58

www.scbizmag.com

St. Paul’s Church 304 E. Camperdown Way, Greenville Architects: McMillan Pazdan Smith, Greenville General contractor: Mavin Construction, Greenville Estimated completion date: June 2022 This project comprises ground-up construction of a 26,500-square-foot two-story church building. Included are 1.2 acres of site work for parking, connection to existing parking, and work associated with renovating the existing church entries as required to accommodate the new grading.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.