PORTFOLIO20 - V

Page 1

Architecture Portfolio 2020

Federico Salvalaio Architect

IV.2020 - COVID19 EN

federico salvalaio portfolio„



Personal data and informations

Education

Work Experience

Federico Salvalaio 13.11.1990 Venice, Italy

Architect M.Arch + M.aS License VE4172 SLVFRC90S13L407W VAT. IT04382370270

+39 348 80 02 92 9 fsalvalaio@pm.me

2020

LEED Green Associate

Attending GBCI exam a.s.a.p. -

2016

Eidgenössische Technische Hochschule ETHz - NCCR DFAB GRAMAZIOKOHLER Research Group Zürich (CH)

M.aS - Master of Advanced Studies Architecture and Digital Fabrication Robotic Architecture -

2015

University of Architecture of Venice IUAV Venice (IT)

M.Arch - Master Degree in Architecture Architecture and Construction -

2011

Liceo G. Galilei Venice (IT)

Mathematical and Scientific Diploma -

2017 - 2020

L2F_____ARCHITETTURA 30024 Venice (IT) www.l2farch.it

Senior Architect BIM Manager- full-time Entire design process: competitions, sketch proposal to design development phases Architect BIM Specialist- full-time Entire design process: competitions, conceptual, final proposal to construction phase. Educational, residential (large scale housing) Architect BIM Modeller- apprenticeship Conceptual design: drawing, visualisation and physical model / commercial, interior fit-out -

2015 - 2017

Language - IT Skills Miscellaneous

Architecture Portfolio 2020

KGA kellergerardier architekten 80024 Zürich (CH) www.kellergirardier.ch

linkedin.com/in/federicosalvalaio issuu.com/salvalaiofederico

2014

Bezdikian Architects 30017 Cavallino (IT) www.bezdikian.com

Italian (native) English (advanced) Spanish (novice) German (novice) Latin

BIM: REVIT (advanced) VECTORWORKS (advanced) 3DSMAX (advanced) RHINO + VRAY/CORONA PARAMETRIC: Dynamo (intermediate) Grasshopper (advanced) + PY SUSTAINABILITY (add-ons): Ladybug/Honeybee (intermediate) OpenStudio + EnergyPlus DIVA+ClimateStudio ENGINEERING: KARAMBA (intermediate) RHINOVAULT (advanced) Adobe Suite (advanced) MS Office

Eager to know Problem Solver Precise and organized Tech addicted Astrology Analogue Photographer (36mm)

Federico Salvalaio Architect

Personal data and Informations Page 3


- Analyze the world, left to right: 1. search for a B 2. if True, has a O right after? 1. Yes, has a B right after? 2. Yes, countBob += 1 4. if False, skip to next letter 5. Start a for loop!

“ Finding Bob”


Contents

1-3 5 7 12 16 20 24 26 28 34 36 40 44 48 50 54 58 62 66 70 72 74 76

Architecture Portfolio 2020

Personal data and informations Contents / Diagram of the Informations TRAM32 4178 SUST THIRIO FKT W20 KAN NEU EDG WAT WER LIV ITM DE-POT MMM REUSE EX-CA BBZ GPT P.MAR MISC

Social Housing Installations Residential

Educational Public Spaces

Public Spaces

Retail Sport Centre Hospitality Museum Co-working School

NC NC NC CP R R NC NC NC CP R CP R CP R CP R - CP - CP R CP R NC - CP

Landscape CG Visualisation

Federico Salvalaio Architect

SD SD+DD+CD SD+DD SD+DD+CD SD DD+CD SD SD+DD SD SD+DD SD+DD+CD SD SD SD SD+DD SD SD+DD SD SD -

NC R CP

= New Construction = Refurbishment

SD DD CD

= Schematic Design = Development Design = Construction Documents

Contents Page 5

= Competition


The ‘presence of absence’, absence in the presence.


TRAM32

Architecture Portfolio 2020

Residential 20138 Rogeredo Milan IT 2020

Social Housing sqm. 15’000.0 €. 1’945’000.00 NC/CP SD

Since the origins of the development of the rail lines, in Milan as in other European cities, the inseparable relationship between city and railway has led to changes in the urban and territorial form. The railway lines have integrated and shaped the urban fabric but have also created new limits and boundaries within the city. The railway infrastructure has called for the creation of spaces for its operation, spaces that have gone to make up the current airports. The provision of services to the residence, the distribution and articulation of human activities, the typological solutions and the related conformation of the aggregates starting from the relationships between public spaces, collective spaces and private spaces are factors that contribute to defining the quality urban of the places, where the intervention fits.

Federico Salvalaio Architect

TRAM32 Page 7


via Toffetti

SPAZIO EVENTI OASI URBANA

Ro

g

gia

Ge

re

nz

an

a

P.TO OSSERVAZIONE

Una grande tettoia urbana protegge la nuova PIAZZA,

GALLERIA APERTA una PROMENADE URBANA, riparata dal caos della città, all’ombra degli alberi.

PARCO BOTANICO

FILTRO ECOLOGICO FILTRO ECOLOGICO

le WATERSQUARE, accumulano le acque piovane raccolte dai tetti circostanti. il TAPPETO VERDE, piazza filtrante e versatile per ospitare attività spontanee.

PAESAGGIO DELLA MACCHINA


Architecture Portfolio 2020

Urbanity is the most effective and civil guarantee of security and, in this context, the re-qualification of the habitat under the banner of re-humanization must be pursued: cities of civil coexistence must be armed, giving utmost importance to the infrastructures of sociality, such as hinges of the civil estate of the social and settlement fabric. Being in a lower position than the historic centre of Milan, the rivers and canals have lapped this neighbourhood for centuries even though many of them are now underground. The design idea also takes strength from this duality between the presence-absence (physical) of the channels by creating water collection points that serve both as an accumulation for rainwater.

It is clear how the residential fronts stretch along the direction of this street, inclined by 55 ° N, until it crosses the railway, thus creating a real graft where the fronts intersect with each other; the older residential fronts follow the Via Emilia while the more recent industrial fronts unfold perpendicularly to it, standing orthogonally with respect to the railway line. The project originated from this intersection, a grid that recalls the existing intersection bringing it inside the airport through a connection between private and public spaces such as to guarantee a permeability that allows the success of the project. The name of the project takes its cue from this story to reconnect past, present and future in order to allow the railway yard to be a point of new beginning that allows the regeneration of the urban fabric through residential construction with shared spaces.

Federico Salvalaio Architect

TRAM32 Page 9


TOWER bldg.

LINEAR bldg.

T.E.

T.B. S.D. S.B.

T.A.

S.A.


Dimensioning: Social residential building (co-housing): sqm. 9000 Social residential ed. (For rent): sqm. 4500 Percentage distribution plans: Tower Building (T.): T.A.- T.C. 35% T.B. - T.E. 35% T.D. 30% Line Building (S): S.A. 30% S.B./C./D. 70%

Social housing is characterized by innovation policies that seek an answer to housing needs by creating places for the community that guarantee a close relationship between public and private spaces. This is thought of as a remedy for housing inequality and the creation of a social mix. In particular, the project pays particular attention to urban redevelopment and energy saving. The accommodations are designed to comply with the high energy efficiency building standards and the permeability of the spaces allows for participatory co-planning of the community. The residences are designed to have a mix between co-housing and premises to be rented at an agreed fee, in particular university students were thought of as possible users given the great attractiveness of the Milanese universities.

T.A. 120 m2 T.D. 50 m2

T.B. 135 m2

T.C. 110 m2

Architecture Portfolio 2020

Federico Salvalaio Architect

TRAM32 Page 11

S.C.45 m2


Assembling structure - view from outside

Finished structure - view from outside


constrains. In specific, slab line starts at 2.80 meters from the ground level, and this line cannot be move more down due to ‘key-stone’ arch, a singular cuboid component that has to kept bigger than 70 cm. Installation 4178 Assembly constrains plays a relevant role because the type of connection chosen for linking together different belts. It’s clear that is necessary a face-to-face 8049connection between planar elements forces design system to double up all elements at Campus starting ETHz and ending points of each belt, only in this way is possible to Honggerberg screw together Zürich CH elements, and in strategical points to place aluminium plates for stiffening. ign system: kink Slab component, described by two different kink’s curves, has a height 55 cm 2015 -of2016 romand the isparaboloid, obtained thanks levelwalls). controllers, is easier possible to add process, placed on the top of first beltfirst (ground For an assembly e and more details towards final house kinks,- openings, slab in andposition, after completion and placement of alldefinition: ground chunks slab is placed components. pre-assembled at ground and then lift into position. eystone for acomponent parametricafter design logic is “kink-lines”: are projected to ring mainthrough First slab, is the balustrade. they It’s linked to lower ace,double-face creating in connections, order slab, akink -n numbers of different elements (calleda ‘belt’) curve is inclined in order to create lower profile lastbalustrade of it, the roof. this logic, athe first main and the second for curve represent the inner (55 Using cm) permitting wider opening enjoy sight from nning andInclination the endingisofalso thestrategic slab, into control space. to GH creatededicated an usablesliders heightpermit at thetoend of building, kness and stair z-positioning, in and orderinside to accommodate fabrication andspace assembly where is coming up house, it allows a sufficient to enter-exit trains. In specific, slab line starts at 2.80 meters from the ground level, and at dwellers. line cannot be move more down due to ‘key-stone’ arch, a singular cuboid After the 70 second ponent thatbalustrade has to kept belt, biggerit’sthan cm. belt. Settled between inclined kink curve and last curve, planar, from that roof is starting, and shape coming smaller until sembly constrains relevant role because the type of connection for logic enclosure. Thisplays kinkacan be moved (asx others) freely thanks to chosen parametric ingbehind togetherthis different It’s cleartothat is necessary face-to-face system:belts. it’s possible adjust height ofainner space, toconnection reach as desired weenmore planar elements forces design system to double up all elements at starting intime feeling. ending points of each belt, only in this way is possible to screw together ments, and in strategical points to place aluminium plates for stiffening. ntrollers, is possible to add ab component, described by two different kink’s curves, has a height of 55 cm kinks, openings, slab and is placed on the top of first belt (ground walls). For an easier assembly process, r completion and placement of all ground chunks - slab is placed in position, they are projected to and mainthen lift into position. assembled at ground ent elements (called ‘belt’) rst component after slab, second curve represent theis the balustrade. It’s linked to lower ring through ble-face kink curve is inclined in order to create a lower profile ed sliders connections, permit to control strade (55 cm) fabrication andpermitting assembly a wider main opening for enjoy sight from inner e. Inclination is also rom the ground level,strategic and to create an usable height at the end of building, re and inside house, it allows a sufficient space to enter-exit e’ stair arch, isa coming singularupcuboid wellers. ter ofbalustrade it’s for the second belt. Settled between inclined kink curve ype connectionbelt, chosen curve, planar, from that roof is starting, and shape coming smaller until ylast a face-to-face connection osure. kinkatcan be moved (asx others) freely thanks to parametric logic up all This elements starting nd this system: it’stogether possible to adjust height of inner space, to reach as desired possible to screw elates intime feeling. for stiffening.

ves, has a height of 55 cm an easier assembly process, slab is placed in position,

Minimal House Unit sqm. 60.0 + 50.0 Fr. 800’000.00 NC SD+DD+CD NCCR DFAB: National Centres of Competence in Research GKR: Gramazio Kohler Research Group Master Thesis Project

The structure consists of 4178 geometrical unique members which are divided into 46 chunks, that are prefabricated in the robotic fabrication lab. The overall design is based on a double-curvature surface, parabolic shape which connects all parametric inputs. The system design is based on a double levels process: in the first, 3 simple curves are used in order to describe final overall shaping surface. The second one permits to increase details downsizing scale by increasing number of curves until final design configuration is reached.

© DFAB + gramaziokohler

18

19

ked to lower ring through er to create a lower profile for enjoy sight from inner ght at the end of building, ufficient space to enter-exit

tween inclined kink curve shape coming smaller until thanks to parametric logic r space, to reach as desired

18

Architecture Portfolio 2020

19

19

Federico Salvalaio Architect

4178 Page 13


Finished structure - view from interior

Robotic assembling process - wood structure


Design

Structure Fabrication work-flow Computational Design: Wall Modules highest priority, the horizontal ones follow and the diagonal ones occupy the last The development and implementation of a novel The design of the structure emerged as a position. For assembly purposes, indeed, the work-flow was vital to the success of our project. trade-off between desired resolution, structurdiagonal elements do not land on the vertical It required us to innovate the organization in both al capacity and fabrication parameters: i.e., elements, but span between two horizontal Wallallowed Modules computational data and teamwork. the tapering thickness of the walls towards Computational ones: this Design: disposition for a considBy the time we began final production, the the top implied the over-dimensioning of the erable decrease in the number of elements The design of the structure emerged as a trade-off between process to exchange information and to troublecross section of the ground floor modules, in converging to the same node. An interesting shoot fabrication issues had been streamlined order to allow most of the components of the of thestructural built structure is the desireddetail resolution, capacity andface-to-face fabrication parameters: into an efficient operation. higher modules to remain inside the admitted connection between adjacent modules: the i.e., thedoubling taperingup thickness of the walls towards the top implied This unique work-flow is specific to the design length-range (250 – 2500 mm). A special fabthe interfacing elements reflects fabrication constraints of this project, howrication process has been implemented to cut the dimensions of themselves. the over-dimensioning ofthe themodules cross section of the groundand floor ever it is possible to imagine how the underlying smaller elements without negatively affecting modules, in order to allow most of the components of the logic highercan be adapted and applied as new archithe robustness of the whole process. The hierarchical layout of the components modules to remain inside the admitted length-range (250 tectural – 2500 expressions are investigated. is divided in three classes, each defining the “trimming-priority” of the beam in respect mm). A special fabrication process has been implemented to cut to the neighbours. The vertical beams havesmaller elements without negatively affecting the robustness of

Rhino

the whole process.

Rhino Grasshopper (C# Script)

Python Script DFAB

File

Program

Curves

Creating Structure (Curves) Optimization

Calculating Structural Performance (Karamba)

ABB RobotStudio (RAPID Code)

Axis Angles or Target Planes Robot + Tool Data classes, each defining the “trimming-priority” Module Orientation Procedure Loop of the beam Saw Cut Angles Shingle Placement Procedure in respect to the neighbors. The vertical beams have highest Cut Planes PROFINET device priority, the horizontal ones follow and the diagonal ones occupy Singularity + Collision Check communication the last position. For assembly purposes, indeed, the diagonal Offline Simulation + Workspace Shingle Placement Plane do not land on the vertical elements, Collision Checkbetween elements but span Shingle Plane Feedback Adjustment

Element of Structure

Shingle

two horizontal ones: this disposition allowed for a considerable

b

decrease c in the number of elements converging to the same A4

a

A3

node. AnA5 interesting detail of the built structure is the face-toA2

A6

face connection between adjacent modules: the doubling up A1 E1 the interfacing elements reflects the dimensions of the modules

B DUAL GRIPPER B DUAL GRIPPER

themselves.

Axo View

Axo View Axo View

Front View

Front View

Side View

Side View

Front View

Gripper Width 400mm

Gripper Width 400mm Gripper Width 400mm

Architecture Portfolio 2020

ABB 4600 Robots

The hierarchical layout of the components is divided in three

Side View

Gripper Depth 215mm

Wall Modules

Gripper Depth 215mm Gripper Depth 215mm

Federico Salvalaio Architect 22 / MAS Digital Fabrication

4178 Page 15

Profinet



Sustainability

Architecture Portfolio 2020

Parametric Tools

As high performance design is becoming more desirable in the field of architecture, the need for supporting architects with environmental analysis tools is also growing. Rhino/Grasshopper is one of the most widely used platforms that are used by designers today. There are already a number of environmental plugins developed for Rhino/ Grasshopper.

Embodied Energy / Carbon Calculator Because of their complexity and due to convention, embodied energy calculations are never really part of a structural engineer’s range of services during the initial design phase. If considered at all, they will only be calculated for building evaluation, once the design has been more or less set. But wouldn’t it be great if these calculations can be embedded into the concept design phase, so that the architects, engineers, and owners can really understand the impact that their design might have on the environment, and use this understanding to design a better and more environmentally responsible building? After all, embodied energy is an important contributor to the lifetime energy consumption of highly efficient buildings, and of those that have life spans of a century or less.

Federico Salvalaio Architect

Sustainability Page 17


Interior Glare - analysed viewing position and relative glare intensities


- Carbon Calculator: Conduct highly integrated analysis to understand the embodied and operational carbon footprint of your project. - Renewable Energy: Simulate the performance of photovoltaic to offset energy demands or demonstrate net-zero feasibility. Include battery storage and variable electricity pricing in your analysis. - Sun path and Shadow Analysis: Visualize sun angles and shadows to highlight passive design opportunities and site impact. - Multizone Energy Modelling: With a fullyfledged UI, automatic adjacency detection, and interactive results. - Dynamic Shading: Apply real-world shades and dynamic glazing product.

Driven Selection System The building and construction industries determine, by and large, how residents interpret their surroundings and built environment. As such, it is vital to re-engineer our cities and towns to correspond more directly to the natural landscapes they inhabit. By reconfiguring how we think of such spaces, architects, engineers, planners, and contractors can create buildings that generate their own energy, and wean buildings off the fossil fuel economy. Create buildings that generate more energy than they use, capture and treat all water on site, and are made using healthy materials.

- Annual Glare: Assess glare from hundreds of viewing positions, for every hour of the year, all in a matter of seconds. - Spatial Thermal Comfort: Compute highly resolved annual spatial comfort maps to reveal local thermal comfort issues early in the design process. - Electric Lighting: Easily place and edit luminaries, calculate illuminance levels, create visualizations, and determine lighting power loads. - Advanced Natural Ventilation: simulation and visualization detailed energy and mass flow through a multi-zone model. Pressure Coefficients can be auto-calculated or provided as an envelope mesh from CFD simulations.

Parametric Design Method The scheme design is not only the first step of the architectural design, but also a crucial decision-making phase that contains all the design requirements and mobilizes all the design elements. In this phase, it will basically determine the building shape, space, skin and other parameters which are expressive and concerned by the designers on the one hand, and essential factors for the building energy consumption on the other hand. The research shows that 57% of the energy-saving technical measures should be considered in the scheme phase. With the constant development in the design progress, the potential of energy saving becomes smaller and smaller, while the costs become higher. Spatial Thermal Comfort Urban climate is determined by a city’s spatial structure, block texture, building form, open space layout, and so on. Urban climate influences building cooling and heating loads, and outdoor thermal comfort, then influences the building performance, and it is therefore one of the most significant factors considered in urban design. Sustainable urban design plays an important role in the improvement of the urban climate, pointing to the need for more climate-responsive environments. In particular, urban morphology can influence the urban climate with different morphological parameters and exhibit more intense heat islands and lower permeability of urban air ventilation. Therefore, urban morphology in the design phase has become an important ecological factor in high-density and high-intensity urban development, gradually becoming the focus of architects and planners. Local decision makers and researchers are also focusing on implementing engineering methods to optimize the thermal performance of urban blocks.

Architecture Portfolio 2020

Federico Salvalaio Architect

Sustainability Page 19


1102112311041105124667067011611 35065664013087386511106974855995883 10741101610111272 61883983777577169976 3924103890988583488792286686395810558 898 669528469048979048901063964892987 1100116888284211417377789499261115796 9976956907327297108127637357701108834 806110811137951168803 1107926768837688 95276386769711078451414742137177686811031 00697510829789271020112911741103640797743 8598298721107118081111041175 1102968756 70489174895871112439651270955851791828477 81784787846788829 110784514147421371776868 11031006975108297892710201129117411036407 97743859829872110711808111104117511029687 567048917489587111243965127095585179 8288 477817847878467888291102770962934105163 06316328858038695801102754918700752747750 83088883972473373784077911971102110411851 183114511056041066627110174586995589963 26326327571057776775832888120110801108661 1048107875211061104746959878868630630 106911711453141998910179777068205446 93833 72754174077612421 958711124396512711078451 955851791828847781784787846788829 41474213717768681103100697510829789271020 11291141103640797743859829872110711808111 10411751102968756704891748958711124396512 7095585179 8288 47781784787846788829110277096293410516306 316328858038;)5801102754918700752747750830 88883972473373784077911971102110411851183 11451105604106662711017458699558996326326 32757105777677583288812011080110866110481 07875211061104746959878868630630106911711 45314199891017977706820544693833727541740 77612421;) Numerical sequence of cumulative linear elements length (expressed in centimetres)


THIRIO

Architecture Portfolio 2020

Installation ETHz Zürich 8049 Honggerberg Campus Zürich CH 2016

Spatial Timber Truss Multifunction Structure sqm. 40.0 Fr. NC SD+DD

“beast” - noun, form Greek - an animal, especially a large of dangerous four-footed one: a wild beast; - an animal as opposed to a human. The gift of reason differentiates humanity from the beasts. - [with adj.] informal a thing possessing a specified quality. 2.40m height - 4.20m width - 5.30m length 8m3 bounding volume of structure 50x50 / 30x30mm profiles used 178m total length of beams 260kg weight of wood used 370 total n. of connecting elements (screws) 227 wooden elements 2300 total numbers of cuts on the robot

Federico Salvalaio Architect

Thirio Page 21



FKT

Architecture Portfolio 2020

Residential 31100 Quinto di Treviso Treviso IT 2020 - ...

Interior Design sqm. 170.0 ₏. 35’000.00 R SD+DD+CD

At the time of the purchase, the space still presented the typical twentieth-century subdivision with many rooms served by a distribution corridor. The strategy of the project was to adapt the house to the contemporary lifestyle of the young owners through large and fluid spaces while retaining some elements that recall the original character. Restrained colours, elegant simplicity of shapes, materials, and nuances compose a space that offers freedom, comfort, and purity. Columns in the central social area is supplemented by the comfy modular sofa arrangement attached to this specific architectural feature. The prevailing white, wood and blue entwine in the colour palette and the shining polished concrete floors that go throughout the main areas, give the space enhanced light feel.

Federico Salvalaio Architect

FKT Page 25


5 4 0 1 2

01 411.64

408.74

3 3

2 4 5

1 10

dipl. architekten eth/sia 8005 zürich www.kellergirardier.ch

Bauleiter

dat

gr

mst

8835 feusisberg www.rueegg-bm.ch

8835 feusisberg www.rueegg-bm.ch

rüegg baumanagement gmbh dorfstrasse 2b, t 055 420 38 84

t 055 420 38 84

Bauleiter rüegg baumanagement gmbh Längsschnitt 1-1 dorfstrasse 2b,

418.19

kellergirardier hardturmstrasse 169, t 044 448 30 68

417.44

Neubau Mehrfamilienhaus Kantonsstrasse 29

418.44

Architekt

414.54

Südfassade 743_KAN

dat

gr

mst

EL

A rev

rev

gez

4.12.15

BP_921

A4

1:100

rev

rev A

gez

PA_931 5.1.15

4.12.15

A4

1:200

423.34

Architekt Bauherr kellergirardier dipl. architekten eth/sia Karl Keller Erben c/o Andreas Keller hardturmstrasse 169, 6 8005 zürich Mattenrain t 044 448 30 68 Steinhausen www.kellergirardier.ch 6312

04

Karl KellerKantonsstrasse Erben c/o Andreas 29 Keller Objekt Mattenrain8807 6 Freienbach 6312 Steinhausen

06

Neubau Mehrfamilienhaus Kantonsstrasse 29

45°

2

743_KAN

02

8

6

5

3

Kantonsstrasse 29 8807 Freienbach

08

8

07

6

03

5

05

4

Bauherr

6

5

Objekt

7 6 9

7

10

7

9

7

45°

8 10

8 1

421.34

420.34

EL


KAN

Residential 8807 Kantonsstrasse 29 Freienbach CH 2014 - 2017

Housing sqm. 690.0 Fr. 2’400’000.00 NC SD+DD+CD

The nine apartments in the condominium offer a direct view of Lake Zurich, with its shore just 50m away. A tailored architecture based on the viewing, the sun-path from rise until dawn, gives generous window fronts and outside areas, plus some two-storey apartments with partial ceiling height s of almost six meters. Apartments are designed according to the Minergie-Standar®. The comfort ventilation, with additional humidification of the air, ensures a comfortable climate in all rooms. Three geothermal probes heat the floor using a heat pump. This reduce the ancillary costs and ensure independence from oil and gas. © kga architekten © roger frei - images

Architecture Portfolio 2020

Federico Salvalaio Architect

KAN Page 29


9.62

23

5 9.64

16 Aussenputz Putzträgerplatte Sichtbeton

20mm 30mm 160mm

Zementplatten 30mm Splittbett 30mm Trittschallschutz Ethafoam 5mm Dachhaut Polymerbitumen 2-lag 16mm PS B swisspor PUR Alu 80mm Dampfsperre 8mm Stahlbeton im Gefälle 235mm-280mm Weissputz 10mm 8.64

8.46

5

8.245 8.185

8.175

98mm

8.145

7.96 Rafflamellen Lamisol III 90 fix Führungsschiene Lamisol III fix

Rafflamellen Lamisol III 90 fix

Objekt

Kantonsstrasse 29 8807 Freienbach

Bauherr

Karl Keller Erben c/o Andreas Keller Mattenrain 6 6312 Steinhausen

Architekt

743_KAN

kellergirardier hardturmstrasse 169, t 044 448 30 68

Neubau Mehrfamilienhaus Kantonsstrasse 29

Führungsschiene Lamisol fix Detail III25.A4

mst

6.53

provisorische Ausführung

dipl. architekten eth/sia 8005 zürich www.kellergirardier.ch

22

A4

dat

rüegg baumanagement gmbh dorfstrasse 2b, t 055 420 38 84

11.1.16

8835 feusisberg www.rueegg-bm.ch

Aussenputz swisspor Lamda White 031 Sichtbeton 2

1:10

gr

6.49

Bauleiter

gez

el

rev rev C

11.1.16

25.A4

C

20mm 220mm 200mm

20

Parkett Unterlagsboden mit Bodenheizung Polystyrol TS gopor T/SE 2xMineralwolle Isover PS81 20/17 Stahlbeton Weissputz

15mm 70mm 20mm 40mm 310mm 10mm

5 5.61

3 1

31

4 2 7

15

5.76

5.265

5.305

5.295

Massiv geschlitzt

Fassadenmarkisen Solozip II Box 130 Führungsschiene Standard

Fassadenmarkisen 130

Objekt

Kantonsstrasse Solozip II29Box 8807 Freienbach

Bauherr

Karl Standard Keller Erben c/o Andreas Keller Mattenrain 6 6312 Steinhausen

743_KAN

kellergirardier hardturmstrasse 169, t 044 448 30 68

mst gr

0.91 provisorische Ausführung

dat

0.87

dipl. architekten eth/sia 8005 zürich www.kellergirardier.ch

Bauleiter

rüegg baumanagement gmbh dorfstrasse 2b, t 055 420 38 84

8835 feusisberg www.rueegg-bm.ch

1:10 A4 11.1.16

gez rev

B

19.6.15

rev C

11.1.16

25.A3

C

20mm 220mm 250mm

2

22

25

0.00 22

8

12

Parkett 15mm Unterlagsboden mit Bodenheizung 70mm PE Folie Polystyrol TS gopor T/SE 20mm 2xMineralwolle Isover PS81 20/17 40mm Stahlbeton 310mm Unitex SW KD light-2 190mm

31

5 -0.14

15

Aussenputz swisspor Lamda White 031 Sichtbeton

Neubau Mehrfamilienhaus Kantonsstrasse 29

Detail 25.A3

4 2 7

Architekt

60-WSS30

Führungsschiene

19

-0.455

5 -0.64

2 6

35

6 2 XPS Putz

60mm 20mm

Details from principal structural nodes -1.145

Objekt

Kantonsstrasse 29 8807 Freienbach

Bauherr

Karl Keller Erben c/o Andreas Keller Mattenrain 6 6312 Steinhausen

Architekt

kellergirardier hardturmstrasse 169, t 044 448 30 68

743_KAN

Neubau Mehrfamilienhaus Kantonsstrasse 29 mst

Detail 25.A1

gr

provisorische Ausführung

dipl. architekten eth/sia 8005 zürich www.kellergirardier.ch

Bauleiter

dat rüegg baumanagement gmbh dorfstrasse 2b, t 055 420 38 84

8835 feusisberg www.rueegg-bm.ch

1:10 A3 11.1.16

gez rev rev C

11.1.16

25.A1

C


The five-story structure with an adjoining one-story annex occupies the maximum area of the narrow plot. The area facing the street in front has trees and greened parking spaces. The ground floor accommodates flexible commercial uses and is oriented toward public space. A shared garden at the back can be accessed via staircases from the flats above and from the terrace of the annex. Each of the three stories above contains a 2.5 and 3.5 room unit. The spacious accommodation on the top floor is setback and consists of 3.5 rooms front to back. In addition to a central stairwell, a lift provides direct access to the flats. The below ground level contains storage areas for both residents and commercial tenants as well as a common laundry room and a small flat for

B

C

Architecture Portfolio 2020

E

D

F

G

H

F

G

H

3

2

1 A

D

3

C

2

B

1

A

guests. In addition to suitability for seniors and a view of the lake of Zurich, important factors for the clients included shared spaces, outdoor areas for the flats and direct access to the garden. The distinctive shape of the rectangular building is defined by the arrangement of the annex on one side and balconies jutting out to the south and west – somewhat like a windmill. To ensure spaciousness the ground plans are open in design. Full height sliding doors connect the rooms along the façade, each of which provide different outlooks. The central kitchen unit and wall closets resemble room dividers and structure the floor plan. Oak flooring and exposed concrete ceilings throughout emphasize the loft like atmosphere. The balconies, stairs and wings of the floor-to-ceiling, oak-framed windows are fitted with perforated railings.

E

Federico Salvalaio Architect

KAN Page 31



In all living areas can be enjoyed the warm atmosphere of the natural oak parquet and bathrooms are equipped with aesthetics tiles. A kitchen-related reduit, built-in cloakrooms, electric slatted blinds, electric awnings in the attic apartments, as well as washing machine and dryer offer a high quality of living.

All bedrooms face the quiet park side and are connected by a projecting balcony. The living rooms extend through the apartment, facing both east and west and giving onto the park-side balconies. Within the smaller Brunnenhofstrasse building, the living rooms are positioned along the façade and look onto the park to the south and southeast via adjoining balcony areas. In the four-story north- and south-facing part of the building, the eat-in kitchens are connected to the living rooms on the south side, while in the angled part of the building the kitchens enjoy the evening sun. A circuit-like layout grants all apartment types spaciousness, freedom of movement for both children and adults, and enhanced flexibility of use.

R.St 11,09 R.Br 8,63

R.St 11,09 R.Br 8,63

R.Br 9.62

R.Br 9.62

Dachterrasse 06 BF F: RH: B: W: D:

305 FB +8.64 7.4m2 RB +8.495 0m2 2.70m Bodenbelag Wandoberfläche Deckenoberfläche

10

7

9

5

6

8

N

R.Br 9.62

Dachterrasse 08 BF F: RH: B: W: D:

+8.42

Dachterrasse

316 FB +8.64 12.3m2 RB +8.495 0m2 m Bodenbelag Wandoberfläche Deckenoberfläche

09 BF F: RH: B: W: D:

+8.42

327 FB +8.64 12.2m2 RB +8.495 0m2 m Bodenbelag Wandoberfläche Deckenoberfläche +8.42

R.St 11,11 R.Sw 8,48

R.St 11,11 R.Sw 8,48

313 FB +8.64 15.9m2 RB +8.495 6.3m2 2.425m Parkett Sichtbeton, Abrieb gestr. Weissputz gestrichen

WM/TU

326 FB +8.64 9.6m2 RB +8.495 6.2m2 2.425m Parkett Sichtbeton, Abrieb gestr. Weissputz gestrichen

Treppenh. BF F: RH: B: W: D:

T_302 T_313

300 FB +8.66 14.8m2 RB +8.56 2m2 2.405m Kunststein Sichtbeon abgehängte Decke

R.St 11,11 R.Sw 8,48

2

Verteilerschrank EPS 550

2

Entree

R.Br 9.62

Verteilerschrank EPS 680

325 FB +8.64 3.9m2 RB +8.495 0.9m2 2.425m Keramikplatten Keramikplatten, Abrieb gestr. Weissputz gestrichen

Kaldewei Duschwanne SUPERPLAN 120x80x2.5

RSt 10.85

T_321

312 FB +8.64 5.8m2 RB +8.495 RSt 10.79

WC / DU

0m2 2.425m Keramikplatten Sichtbeton, Abrieb gestr. Weissputz gestrichen

0m2 m Bodenoberfläche Wandoberfläche Deckenoberfläche

R.St 11,11 R.Sw 8,48

T_325

RSt 10.79

09 BF F: RH: B: W: D:

RSt 10.85

08 BF

F: RH: B: W: D:

LaufenLiving City 100x46

R.St +10.53 R.Br +9.2 Durchbruch Wartungstableau Brandschutz

F: RH: B: W: D:

333 FB +8.62 8.0m2 RB +8.495

WC / DU

LaufenLiving City 100x46

T_312

Kaldewei Duschwanne SUPERPLAN 120x80x2.5

Laufen PROUP rimeless

09 BF

Laufen PROUP rimeless

Laufen PROUP rimeless

LaufenLiving City 100x46

3

+8.43

Dach extensiv begrünt

09 BF

321 FB +8.64 7.2m2 RB +8.495

F: RH: B: W: D:

0m2 2.425m Parkett Sichtbeton, Abrieb gestr. Weissputz gestrichen

3

T_324

OK Beton R.Br. +9.37

304 FB +8.64 5.4m2 RB +8.495

1.2m2 2.425m Keramikplatten Keramikplatten Weissputz gestrichen

T_304

06 BF

F: RH: B: W: D:

RSt 10.79

Verteilerschrank EPS 880

Bad

09 BF F: RH: B: W: D:

Verteiler S offen/verkleidet

R.St 11,11 R.Sw 8,48

2

Kochen, Essen

Zimmer 09 BF

324 FB +8.64 9.6m2 RB +8.495

F: 1.4m RH: 2.425m B: Parkett W: Abrieb gestrichen D: Weissputz gestrichen 2

Kantonsstrasse 29 8807 Freienbach

08 BF F: RH: B: W: D:

328 FB +8.64 3.2m2 RB +8.495 0m2 2.425m Keramikplatten Wandoberfläche Deckenoberfläche

GS

Bodenoberfläche Wandoberfläche Deckenoberfläche

09 BF F: RH: B: W: D:

Neubau Mehrfamilienhaus Kantonsstrasse 29

Zimmer

T_322

R.St 11,11 R.Sw 8,48

+8.445

4

Zimmer

Wohnen

F: RH: B: W: D:

F: RH: B: W: D:

06 302 FB +8.64 BF 15.8m2 RB +8.495

331 FB +8.64 9.3m2 RB +8.495 0m2 m ext.begrünt Wandoberfläche Deckenoberfläche

09 BF F: RH: B: W: D:

10.1m2 2.425m Parkett Sichtbeton, Abrieb gestr. Weissputz gestrichen

R.St 11,11 R.Sw 8,48

R.St 11,11 R.Sw 8,48 R.Br 9.62

Wohnen

08 311 FB +8.64 BF 28.9m2 RB +8.495

4.8m2 2.425m Parkett Sichtbeton, Abrieb gestr. Weissputz gestrichen

R.St 11,11 R.Br 8,58

+8.42

09 BF

332 FB +8.64 5.7m2 RB +8.495

F: RH: B: W: D:

0m2 m ext.begrünt Wandoberfläche Deckenoberfläche

R.St 11,11 R.Sw 8,48

+8.42

Dachterrasse

303 FB +8.64 12.5m2 RB +8.495 0m2 m Bodenbelag Wandoberfläche Deckenoberfläche

08 BF F: RH: B: W: D:

R.Br 9.62

Dachterrasse

314 FB +8.64 13.9m2 RB +8.495 0m2 m Bodenbelag Wandoberfläche Deckenoberfläche

09 BF F: RH: B: W: D:

R.Br 9.62

R.Br 9.62

R.St 11,11 R.Br 9,37

7

9

5

6

8

R.St 11,11 R.Br 9,37

Architecture Portfolio 2020

Dach extensiv begrünt

+8.42

Dachterrasse 06 BF F: RH: B: W: D:

+8.44

322 FB +8.64 14.5m2 RB +8.495 3.8m2 2.425m Parkett Sichtbeton, Abrieb gestr. Weissputz gestrichen

10

06 BF F: RH: B: W: D:

Federico Salvalaio Architect

KAN Page 33

4

R.Br 9.62

Dach extensiv begrünt

Abstand 1cm leer lassen

Objekt

Abstand 1cm leer lassen

743_KAN

Reduit

1.8m2 2.425m Parkett Sichtbeton, Abrieb gestr. Weissputz gestrichen

UK Betonsturz +10.79

334 FB +8.64 5.8m2 RB +8.495 0m2 +8.435 m

UK Betonsturz +10.79

06 BF F: RH: B: W: D:

OK Beton R.Br. +9.37

F: RH: B: W: D:

Dach extensiv begrünt

R.Br 9.62

06 301 FB +8.64 BF 10.6m2 RB +8.495

V-ZugGK45TEGF 571x501

1

Korridor, Arbeiten

KS

R.St 11,11 R.Sw 8,48

1

T_328

R.Br 9.62

R.St 11,11 R.Sw 8,48

323 FB +8.64 7.4m2 RB +8.495 0m2 m Bodenbelag Wandoberfläche Deckenoberfläche


rschiedliche Konturierung von Strassen- und Gartenseite unterstützt das Konzept der „öffentlichen“ Zugangs- resp. der „wohnlichen“ Gartenseite, die von der Ausrichtung der privaten Terrassen bestimmt wir

hnte Abwicklungen annehmen und nicht mehr auf einen Blick erfassbar sind, sondern sich erst in der Bewegung des wahrnehmenden Menschen erschliessen.

äuser sind vergleichbar als 3-Spänner organisiert, ein Typ, der trotz seiner Kompaktheit eine hohe Wohnqualität bietet und jeder Wohnung mindestens drei Expositionen gewährt.

ck aller Wohnungen bildet die funktionale Zuordnung der Raumgruppe Eingang-Küche-Wohnraum-Balkon. Als Übergangsraum ist der Balkon windgeschützt ins Volumen eingebunden und gleichzeitig an de

m gelegen.

uck und Materialität orientiert sich die Überbauung an zeitgenössischen Genossenschaftsbauten. Einfache, stehende Holzfenster als Lücke zwischen den Wandscheiben, weder die Vertikale noch die Horizon

it; Faltläden und die senkrecht strukturierte, farblich verfremdete, Holzverkleidung unterstützen diesen Eindruck.

r konstruktive Aufbau folgt den Gesetzen der Direktheit, vertikale Lastabtragung, kleine Spannweiten, innere Tragwände konventionell in Beton oder Backstein. Die Fassaden werden in Holzelementen ausgef

olz. Die Steigzonen sind von Erdgeschoss bis Attika durchgehend und genügend gross dimensioniert.

andsfähige Materialien und eine einfache Detailierung bestimmen den Innenausbau.

View from exterior, entrance


Kochen / Essen 20qm

41 3

Pa

rt

rkp

ge

de

lätz

e

Tro

t

Co

ir Ne

ufe

nta

lds

tra

ss

e

ine

r

W

as

Ha

rtb

se

rbe

ck

en

ela

g

öffe ntlic her Fuss weg

410

La

nd

str

as

se

Terrasse

15qm

24qm

17qm

The plot is located on the south-eastern edge of the elongated settlement area along Neufeldstrasse and has an unobstructed 270 degree view at the transition to the agricultural zone into the distance. The buildings refer to this preferred location, the 0 :20 ,1 chamber-like green spaces and the expanse. ss ho sc ge a Thanks to their position on Neufeldstrasse, they tik At form a common identity-creating foundation: entrance area and open the room diagonally to the garden, on the south corner of which is protected under trees, a place to play and stay for the residents.

tto

ck

Wohnen

A

B

fah

A

Ein

n. ? Apartments sqm. Fr. NC SD 411

Residential 8154 Neufeldstrasse Oberglatt CH 2016 - 2017

412

NEU

Zimmer

A

413

rgrä

Ch

se

r

au

ss

ieru

ng ss e

Zie

iss wie

ss tra

B 41 5

Ra

tere

Ge

Neufeldstrasse 41 2

se

© kga architekten

Un

n

Trottoir

A

41 4

Zie

rgrä

se

Parkplätze

Sp

iel-

-0.30

un

dA

r

ufe

nth

alt

sb

Wasserbecken

Container

Einfahrt gedeckt

ere

Zimmer

Bad Zimmer

12qm

7qm

12qm

Zimmer 15qm

ich Wohnen 24qm

413 412

rkp

fah

rt

lätz

e

ge

de

Tro

ir Ne

ufe

A

Hartbelag

41 1

tto

ckt

lds

Veloraum

Waschküche

37qm

12qm

Eingang

Reduit

15qm

3qm

4.5 Zi

411

Pa

Ein

tra

sse

B Co

nta

ine

r

Wa

sse

rbe

cke

n

rtb

ela

Veloraum

g

42qm

öffe ntlic her

Fuss

weg

410

Haus B 0.00 = 412.40m.ü.M

Zimmer

Zimmer

15qm

12qm

Windfang

Eingang

Waschküche

Bad Eingang 5qm

18qm

10qm

Eingang / Treppenhaus

6qm

29qm

Waschküche

Zimmer

18qm

15qm

r

aus

sie

4qm

Bad

9qm

Kochen / Essen Terrasse

7qm

20qm

Reduit

Zimmer

3qm

12qm

17qm

B

20qm

run

se

g

24qm

Kochen

Zimmer

17qm

äse

12qm

r

Wohnen

Zimmer

24qm

15qm

öffentlic

Wohnen

rgr

5.5 Zi

Sp

iel-

her Fus

ter Un

sen

e Ge

iss

wie

sst

3.5 Zi

ras

B

Ra

Zie

17qm

sweg

äse

4qm

Kochen / Essen

Ch

rgr

WC / DU

4qm

Terrasse

A

Zie

WC / DU 4.5 Zi

Eingang WC / DU

Haus A -0.60

8qm

20qm

B

Windfang

Untere Geisswiesstrasse

Ha

un

d Au

fen

Eingang

tha

ltsb

ere

17qm

ich

Terrasse 17qm

Rasen

Zimmer

Zimmer

15qm

12qm

WC

Gang

3qm

1qm

Bad 6qm

Kochen / Essen 20qm

Chaussierung

Zimmer

Wohnen

Terrasse

15qm

24qm

17qm

Ziergräser

Ziergräser

A

Spiel- und Aufenthaltsbereich

Situation Dachaufsicht, 1:500

0

5

10

20

30

Situation Dachaufsicht, 1:500

0

Neufeldstrasse

Untere Geisswiesstrasse

Nordostfassade, 1:200

N W 0

S m

0

1

2

3

4

5

10

15

.40 13

20

m

.00 14

0m

7.8

ho

sc

e rdg

m

.60 10

0

:20

,1 ss

0m

5.0

E

0m

2.2

m

.60 -0 m

.00 ±0

m

.90 -3

e

ss

tra

lds

ufe

Ne

0

:20

itt

n ch

A

,1 -A

Neufeldstrasse

S

Südostfassade, 1:200

Architecture Portfolio 2020

Federico Salvalaio Architect

NEU Page 35

5

10

20

30


Finished inner court - view from exterior


EDG

Residential 30024 Metropolitan City of Venice Veneto IT 2017 - 2019

4 Semi-Detached Houses sqm. 650.0 €. 965’000.00 NC SD+DD

What does ‘feel at home’ mean? Peace, intimacy, wellness perhaps. Quality and technology helps architecture to achieve an urge for high-quality dwellings. Opening towards nature, slower daily rhythms. Nature can now embraces every space, during day as well as during night-time. Housing complex, immersed into countryside but just a few minutes from city-centre, is designed for who choose independence, comfort and peace. Four independent units linked from a common space as entrance for complex, gives a new way to life near to city.

© L2F_____ARCHITETTURA

Architecture Portfolio 2020

Federico Salvalaio Architect

EDG Page 37


Living room and kitchen - view from interior


Type plan - GF: 45sqm footprint 1- entrance 2- kitchen+dining 3- living 4- WC 5- storage 6- garage

Architecture Portfolio 2020

Type plan - 1F: 40sqm footprint 7- corridor 8- small bedroom-studio 9- bathroom 10- master bedroom 11- closet 12- terraces

Federico Salvalaio Architect

EDG Page 39


Antonio Visentini 1729/1730: “Dal Palazzo Grimani verso Canareggio� during a robots invasion


WAT

Architecture Portfolio 2020

Public Space / Educational Ca’ Tron Palace 1957 Santa Croce 30135 Venice IT 2017

Civic Center + Expansion IUAV University Architecture of Venice sqm. 800.0+400.0 €. -R / CP SD

ENCLOSURE How can Ca’Tron Palace be a civic centre up-todate with the multitude of changes involved in our high-speed world? The aim of the project is to give a new identity, anew life starting from existing configuration, the historical sedimentation of passing time. Resolving the ambiguity restoring the main entrance (now closed) despite actual second access give new life to inner garden, a rare treasure enclosed inside brick walls. Just bringing back things as they were: building was design to work as a centre for commerce, for products imported from all over the world, for people. The linear connection between inner court and Canal Grande, from earth to water, as deep root in Venice’s dichotomy.

Federico Salvalaio Architect

WAT Page 41


Final Proposal - Visualization into a 90°degrees rotated view of exterior courtyard


Refurbishment and new construction throughout usage of robots and robotic process applied to architecture. Control of the robots was achieved by utilizing the program ABB RobotStudio 6.03. An advantage of this strategy is that we were also able to simulate many fabrication options with confidence that the robotic moves were extremely accurate compared with what would happen in the real process. Due to this, many issues were avoided while still in the digital stage and opportunities were able to be recognized and tested with minimal risk, which benefited the overall fabrication efficiency.

Architecture Portfolio 2020

Federico Salvalaio Architect

WAT Page 43



esistente .1

WER

Interior Design 30016 Jesolo Lido Metropolitan City of Venice Veneto IT 2019

vista fronte esterna

vista fronte esterna

Restaurant sqm. 80.0 €. 35’000.00 R SD

esistente .1

vista fronte interna

The idea was not only a “slow food” restaurant but a meeting point for locals and tourists, a place to rest and disconnect in the heart of the city. A place where you can spend hours, working or relaxing, listening to music and enjoying good company. The inner part of the restaurant, the floor and the ceiling are at a lower level, this allows to create a homely and cosy space. The interiors are based on the contrast of natural materials’ texture and warm hues like painted sheet metal and bricks, sand and olive green. The outcomes are several different nooks, each one for a different occasion.

vista fronte interna © L2F_____ARCHITETTURA

Architecture Portfolio 2020

Federico Salvalaio Architect

WER Page 45


Counter bar - view from interior


For its design, inspiration came from terraces and gardens of place, clam and relaxed spaces, spontaneous and full of vegetation. In these patios, usually can be found an extraordinary mixture of textures and colours, typical of the inner spaces, private and enclosed: rough bricks, ceramics, concrete, worn paint and tiles. Colourful inflatables with their ironic and funny force, placed upside down from ceiling, add a young, modern and light touch to the interior.

Architecture Portfolio 2020

Federico Salvalaio Architect

WER Page 47



LIV

Architecture Portfolio 2020

Interior Design 30027 Metropolitan City of Venice Veneto IT 2014

Retail sqm. 40.0 ₏. 20’000.00 R / NC SD+DD+CD

Starting from the concept of abstraction in relation to the subject, and the loosing of meaning of representation. To the isometric drawing, the most complete form of representation that allows to observe a cube in the largest number of faces at the same time will be associated at the use of model to become a unique form of representation. Obtained independence of the object from the subject, designer has the ability to activate a process, with different method from the normal criteria for the composition. The process can be called de-composition process, if it is possible to create a hybrid speech among cultural references.

Federico Salvalaio Architect

LIV Page 49


I M R A ET IC M R A ET RIC C T M I A ME TR IC E A R R AM ET RIC R T M A RA ME T C I E A A P AR M ETR RIC A P AR M xET IC A P AR M ETR IC P ARA M ETR IC C A R I P AR M ET R A P AR M E;)R ET P ARA M AM IC A C R R I P AR PA ET R P M ETR ET A


ITM

Public Space 40121 Via de’ Carbonesi Bologna IT 2019

Indoor Market + Retail sqm. €. R / CP SD Honour Mention

New Spaces for a Market The creative push is towards what Einstein calls “space as box”. Space as an instrument of individual and community emancipation, which reflects and challenges society to stimulate renewal. In the philosophy of Plato, the cave is a place of passage from the world of things to the world of ideas, a path that allows access to “higher” knowledge. Boxes that contain objects; boxes that contain other boxes and multiply the container; boxes that open and close; boxes that turn into something else. Design is not a game but allows you to play: with shapes, spaces, materials and colours. What is inside dialogues with what is outside and the cultural relationship between man and nature becomes visible. “Perhaps with all that we have discovered, we end up discovering nature again”.

Federico Salvalaio Architect

ITM Page 51

NEW SPACES FOR A MARKET 44°29’28.9”N 11°20’27.0”E

f o o d p ro m o ti o n s kit c h e n re s e rv e d a re a re s t a u r a n t -

1 F. 0 4 1 F. 0 3 1 F. 0 2 1 F. 0 1

1 st flo o r pla n / + 3 . 7 8 1/500

1F.03 1F.01

1F.04

1F.02

o s t e ri a o ffi c e s e m o ti o n a l s p a c e / m a r k e t c a fè / b a r g a lle r y

-

G F. 0 5 G F. 0 4 G F. 0 3 G F. 0 2 G F. 0 1

g r o u n d fl o o r p la n / + 0 . 0 0 1/500

GF.05

GF.03

GF.03

GF.03

Architecture Portfolio GF.03 2020 G F. 0 1

GF.02

GF.04


Food, market, bar and Romans ruins- view from interior promenade


addictive / subtractive Design starts from the idea to start a dialogue with the pre-existent building, a relation based on two basilar concepts: complexity and contradiction. Choosing ‘flying’ brassed escalator to connect the three different levels: Purpose was to integrate silently new form hosting different and various public functions without competing with existing building. Brassed metal is chosen to relate to the existing architecture and its surrounding area in contrast with typical materials and ruins, witnesses of time passing. Considering the site as a cavern (or empty space to fill with different functions) as a bounding box to use as container for new functions and spaces open to public. Italian typical market will take place inside of this wonder-box.

Architecture Portfolio 2020

Federico Salvalaio Architect

ITM Page 53


Final proposal - view from exterior


DE-POT

Architecture Portfolio 2020

Public Spaces 93160 Fort de Villiers Noisy-le-Grande Paris FR 2018

Sport Centre sqm. 5’000.0 €. -R / CP SD Wilmotte Foundation

De-Pot is a new landmark! De-Pot is a new point of interest for the city! De-Pot is a container! It’s a container in its industrial meaning; it’s a container because it hosts sports and leisure activities. De-Pot is a Sport Factory! The project is located in a context of historical and architectonic interest: Fort of Villiers. The best way to preserve the past is recycle it for the present. The project wants to consider the act of recycling as a value: as heritage, Fort of Villiers is an act of recycling of the present; as “waste material”, the container is an act of recycling of the future.

Federico Salvalaio Architect

DE-POT Page 55


Final proposal - isometric view of complex

Place for fun - view from exterior


Fort de Villiers hides his relevance underground. The first step starts from the clear identity of the existing court: the void is a trace in which the volume of the project can be wrapped around. Therefore, the new volume embraces the court, preserving the existent, for evaluated the Fort, adding a new layer that gives new opportunities to the area. The final shape is conceived as a modelling of the “courtyard building”: by pulling one side down and lifting the opposite one up, the volume is a continuous sloping green promenade, connected to the landscape and inspired by the character of the park. Subsequently, a new series of smaller volumes – created from the container unit – follows the old path of the galleries, generating a venue through which temporary events and leisure facilities can take place.

Architecture Portfolio 2020

Federico Salvalaio Architect

DE-POT Page 57


Final proposal - view from exterior


MMM

Architecture Portfolio 2020

Public Spaces 07020 Capo d’Orso Sardinia IT 2018

Museum + Hospitality sqm. €. R / CP SD 3rd place

Complexity / Contradiction Enchanting space around as a distance to journey, nothing defined, nothing definitive: this is freedom. Perception is freedom only if people perceive clearly with deep interest and curiosity. Architecture is here thought as a journey, described by a story that end into museum - at the highest point of Capo d’Orso. A series of buildings, place along the path, moving curiosity and enhancing the perception of this unique location. Concept moved looking for a formal freedom within contrast between elements: old and new materials, forms. All to guarantee a meaningful respect toward nature and its power, leading actor of this site. Otherwise perception is conceived by means of natural elements such as light.

Federico Salvalaio Architect

MMM Page 59


to memorial

to library

to museum

BY E!

W EL C O M E!

Final proposal - plan of Military Museum, scale 1:100

N 0

1

2

3

4

5

10

15

20


Design starts from the idea to start a dialogue with the pre-existent building, a relation based on two basilar concepts: complexity and contradiction. Choosing a slender and thin volume, idea was to integrate silently new form hosting different and various public functions without competing with existing building. Weathering steel, exterior skin for all new volumes, is chosen to relate to the existing architecture and its surrounding area and with its oxidation leaving a trace of time passing. Considering the fort as the ship, truly grasp from years to the site of Capo d’Orso. So the complementary of a ship is the wake it leaves behind. The museum long and thin volume evokes a ships wake, indomitable companion in journey.

03

02

01

5

0

Architecture Portfolio 2020

Federico Salvalaio Architect

MMM Page 61



RE-USE

Architecture Portfolio 2020

Public Spaces 80129 Castel Sant’Elmo via Tito Angelini 22 Naples IT 2014

Museum sqm. 3’500.0 €. -R / NC SD+DD+CD Bachelor Thesis pr. Russo Salvatore pr. Aymonino Aldo pr. Boscato Giosuè

“Castel Sant’Elmo is a medieval castle, today used as museum. Located on the top of Vomero’s hill, in Naples (Italy). Named as ‘Paturcium’ during Romans domination, was built as appeared today where since X century can be traced the church of Saint’Erasmo (from Eramo to Ermo and finally Elmo). This massive building (the biggest in Naples), grow up from rock (yellow turf of Naples). For its unique defensive position, during the years the castle was a very attractive war objective: from its position (+250 meters over see level) is possible to control easily all city of Naples, its gulf, all the road arriving from or departing to the other cities.”

Federico Salvalaio Architect

RE-USE Page 63


1.444

2.246

A

2.940

14.823 13.459

8.461

9.353

A

1.526

1.200

B 5.457

B A

4.502 1.953

*ipotesi

2.235

0.628

0.9

B

B

A

0.775

2.906

1.364

12.555


The columns and beams were modelled using “beam” elements, an element used typically to model long and slender members which usually have constant, compact cross-sections. Force tensions were applied by using a load-pay technique which axially shrinks the constrained string elements and in so doing tensions it. The model of the frame was held to simulate as closely as possible its connections. It was found that the mass and centre of mass of the model were very close to those of the actual surveyed giving a great deal of confidence in the geometric accuracy of the model. 0.939

5.247

6.591

5.288

12.555

FEM Model The detailed finite element model of the existing structure frame was built and solved using Strand7. The complex geometry of the castle and underground volume frame was modelled using over 10000 “thin shell” plate elements. The various colours of these elements in the model designate sections of different thickness. Regions of rapidly changing shape and thickness and where the stress gradients are likely to be high, are modelled with many small elements to capture accurately the structure’s performance.

The brief of ‘underground RE-USE’ was to transform the underground spaces of the Saint Elmo Castle in Naples, plus its water-cisterns. Firstly was request (by Ministry of Cultural Heritage and Activities) to analyse seismic reaction of existing structures, and after that to formalize a proposal for re-using this underground space. New theatre is placed inside core of castle, encapsulated into a journey starting from low level, ascending throw sky-opened spaces or darken rooms, ending into the two huge water cisterns excavated into turf (extracted material was cut into blocks and used for external building, atop open plaza). Visitors are suspended between different stimulations for sense: light and dark, opened and closed spaces, small and huge volumes. 22.726 6.305

0.741

0.858

4.940

6.525

0.879

0.924

6.781

2.906

1.364

7.130

0.740

1.918

5.457

B

1.755

2.222

1.973

2.044

1.998

2.044

1.944

2.042

8.461

2.313

15.2

9.353

14.823

1.992

30.7

13.459

A

1.991

4.453

B

11.6

23.9

A 0

5

25metri

1.200

16.2

24.751

*ipotesi 8.8 32.2

9.8 26.6

1.953

0.628

29.295 29.923

4.502 2.235 37.240

0.930

4.807

4.622

0.781

5.075

36.590 0.717

4.970

0.726

4.45

+26.75 m.

B

A

1.000

27.688 32.158

B +20.93 m.

A 5.731

5.590

34.282

5.63

5.605

9.5

5.549

3.1

1.2

1.526

2.2

2.940

7.2

15.8

11.5

1.444

34.7

12.2

2.246

+15.18 m.

22.4

0.775

2.030 2.832

+10.59 m.

+1.51 m. +1.20 m.

+0.00 m. 2.710 3.438

1.425

4.194

1.425

5.683

4.294 5.719

1.425

4.295 5.690 31.329

2.067

35.634

Architecture Portfolio 2020

Federico Salvalaio Architect

RE-USE Page 65

1.425

4.309 5.700

1.4


.1 2

21

21

.6


EX-CA

Placed in a central zone of lower part of Bergamo, closed to railway station and gate to city center, appears to be well served by public transports and connected to highway Milan-Venice and the international airport ‘Orio al Serio’. Building is composed by two blocks forming an angle of 15 degree, with a structural span of 12x12 meters by a perfect square module repeated 17 times on length.

Office + co-working spaces sqm. €. R / CP SD

Public Spaces 24121 ex Consorzio Agrario SS42 via Bono Bergamo IT 2019

0.1 0.1 0.1

0.2

0.2

1.2

1.2

1.2

1.2

1.1

1.3

2.1

2.1

2.1

2.1

2.1

2.1

2.1

3.1

3.1

a b s tr a c t

Architecture Portfolio 2020

1/5 00

a b s tr a c t

1/5 00

Federico Salvalaio Architect

EX-CA Page 67


Auditorium - Partial view from exterior

Co-working spaces - Partial view from interior


Accessibility and mobility as force-fields for place spaces all along existing volume, split on two stories, carefully driven by a decreasing public exposure to a fully private apartments. The volumes’ intersection is emphasized by a bow-window, artifact to conduct light inside auditorium and conference-rooms, simultaneously opened widespread to city.

fro n t e lu n g o via b a rtolo m e o b o n o

fro n t e lu n g o via b a rtolo m e o b o n o

1/5 0 0

fro n t e lu n g o via b a rtolo m e o b o n o

1/5 0 0

fro n t e c o rt e i n t e r n a

fro n t e c o rt e i n t e r n a

1/5 0 0

s e zio n e

Federico Salvalaio Architect

s e zio n e

1/5 0 0

1/5 0 0

fro n t e c o rt e i n t e r n a

Architecture Portfolio 2020

1/5 0 0

l o n g it u d i n a l e

l o n g it u d i n a l e

1/5 0 0

EX-CA Page 69

1/5 0 0



BBZ

Primary School sqm. 450.0 Fr. 1’200’000.00 R / CP SD+DD 2nd place

Public Space 8268 Romanshornestrasse Areneberg Thurgau CH 2016

As part of the study order, an architectural one is to be built for the school and sports building on Arenenberg Expression can be formulated, which does justice to the building and the place in the overall context. The angular structure characterizes the historical axis from the east the main entrance to the castle and seminar hotel and affects the spatial situation in the eastern part of the park. In addition to attracting access from the east, there is the volumetric training of the atticas are of central importance. The starting point for us is a “homogenization of the design elements”. Without the building its identity to try to take the appearance of the school wing design with precise interventions upgrade and thereby give the building ensemble an attractive face on all sides. © kga architekten

ger h driDet.1

Det.3

Det.7

Det.9

Det.11

Det.13

Det.15

Det.2

Det.4

Det.8

Det.10

Det.12

Det.14

Det.16

h

.

n

der

Det.3

Det.7

Det.5 Det.4 Det.8

Det.1

r n. Die

Det.2

Det.5

Det.6

Turnhalle

2.40

Det.6

Turnhalle

Stuhlmagazin

-0.37 Waschküche

Architecture Portfolio 2020

-und Beratungszentrum Arenenberg

Schnittfassade Zwischentrakt Nord 1:100

Schnittfassade Turnhalle Nord 1:100

Federico Salvalaio Architect

BBZ Page 71

Tiefkühlraum



P-MAR

Public Space 31049 Marconi Plaza Valdobbiadene Veneto IT 2019

Project begins from morphological comparison between historical examples of piazzas at same scale: Padua’s Eremitani, Piazza delle Erbe in Vicenza, Valdobbiadene. Driving from results, design aims to giving back harmonious feeling to inhabitants. Carefully carving proportions inside piazza’s space, for a ratio between its span (or length) and buildings’ heights; proposal is centred of a construction of new colonnade, as reminiscence of Italian tradition of enclosing public space by covered elements. Columns are intentionally over-dimensioned to emphasized public role and social aim in designing the new open space. To solve traffic problem and different vehicular flows, project proposed to cut-off traffic from new plaza, relying one-way circulation only on north and south.

34.000

34.000 34.000

34.000

34.000

34.000

Architecture Portfolio 2020

Plaza sqm. -€. -R / CP SD UNESCO Heritage Short-listed

Federico Salvalaio Architect

P-MAR Page 75



YYY

A vital aspect of the design process is the ability of the architect to develop a building design based on the feedback they receive for each iteration. Photo-realistic rendering can add immense value in terms of visual information that can be digested, used, and thrown away if necessary to make the end product the best it can be. Photo-realistic renderings are often created at either end of the design process (to win competitions or to sell a project near its completion). However, investing in that feedback loop and introducing photorealistic renderings throughout the process gives the design a chance to grow, get better, and be more complete in the end.

CG VIsualitation various

Architecture Portfolio 2020

Federico Salvalaio Architect

YYY Page 77



SAM

Architecture Portfolio 2020

Sacred Space 46100 Saint Andrew Church Mantua IT 2014

R DD Digital Restitution

The Basilica of Sant’Andrea is a Roman Catholic co-cathedral and minor basilica in Mantua, Lombardy. It is one of major works of 15th-century Renaissance architecture of Northetn Italy. Commissioned by Ludovico II Gonzaga, the church was begun in 1472 according to designs by Leon Battista Alberti on a site occupied by a Benedictine monastery, of which the bell tower (1414) remains. The building was only finished 328 years later. Though later changes and expansions altered Alberti’s design, the church is still considered to be one of Alberti’s most complete works. It looms over Piazza Mantegna. The nave is roofed by a barrel vault, one of first times such a form was used in such monumental scale since antiquity, probably modelled on the Basilica of Maxentius in Rome.

Federico Salvalaio Architect

SAM Page 79


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.