Current situation

Flood plain excavation at Middelwaard

flood plain

New situation summer quay

bank

To improve the discharge capacity of the river Nederrijn during high water, the Middelwaard (flood plain) is being widened.

excavated flood plain

lowered summer quay

lowered bank

high water Nederrijn

Nederrijn

Additional discharge capacity is being created by means of lowering the summer quay and the riverbank. Rhenense brug (bridge) Utrechtse Heuvelrug

N W

N233

E S

Nederrijn

industrial estate RHENEN

high water lowering bank

Key to map: planning area ‘text’

lowering summer quay

N225

modified / new situation

excavating flood plain

existing objects new, modified or replaced objects

Nederr

lowering dyke

Utrechtse Heuvelrug

ijn

Rhenense brug (bridge)

excavation building

Middelwaard (flood plain)

(provincial) road

industrial estates summer quay

Planning Effect 1 2 3 4

Project decision Preparation phase Start of work Delivering water safety

3 cm drop in water level during high water. Scale:

1 2010

www.roomfortheriver.nl

2 2011

2012

3

4

0

400 m

2013 Jan 2015 / 22