Dyke reinforcement amerdonge

Page 1

New situation along Bergsche Maas

Dyke reinforcement Amer/Donge The dyke is to be made higher and wider over a length spanning c. 940 metres. Because expanding the river here is not an option. Reinforcing the dyke will protect the hinterland from flooding.

ditch

new dyke profile

New situation along Oude Maasje

industrial site

maintenance path

new dyke profile

cycle path/footpath

road

Hank

high water

high water

Bergsche Maas

1

Oude Maasje

2

N283 De Pontonnier industrial site

N W

HANK

Bergsche Maas

E

The reinforced dyke will protect the hinterland to the south of the Bergsche Maas and the Oude Maasje from flooding.

S maintenance path Key to map: ‘text’

1

modified / new situation Oude Maasje

existing objects dyke reinforcement motorway (provincial) road

new dyke profile

cycle path/footpath 2

Keizersveerse brug (bridge)

Bergsche Maas

A27

De Pontonnier industrial site

RAAMSDONKVEER

Overdiepse Polder 1 new dyke profile 2

Oude

Planning 1 2 3 4

floodgate Schipdiep

Project decision Preparation phase Start of work Delivering water safety

Maas

je

Effect Preventing flooding or breach of the dyke during exceptional high water. kaartschaal: Scale:

1

2012 www.roomfortheriver.nl

2

3

2013

2014

0

4

300 m

2015 Jan 2015 / 13


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.