Infographics Elst ENG 2015

Page 1

Removal of obstacles in Elst

Current situation

During high water, the elevated grounds of the stone factory at Elst are a bottleneck for the discharge of water from the river Nederrijn. Removing the stone factory and, to a large extent, excavating the site will give the river more space.

New situation stone factory

high water

flood plain

bank

lowered bank

lowered flood plain

chimney

Nederrijn The stone factory is being demolished, while sections of the site are being excavated.

Excavating the site of the stone factory will connect the Amerongse Bovenpolder with the Elster Buitenwaarden (flood plains).

N W

E

Amerongse Bovenpolder

S

The former site of the stone factory has been earmarked for nature and recreational purposes. N416 lateral moraine

Key to map: planning area ‘text’

modified / new situation new, modified or replaced objects

slow-moving traffic bridge

ELST

former stone factory site

Utrechtse Heuvelrug

knoll

excavation new bridge

former stone factory site

widening oxbow lowering bank Elster Buitenwaarden (flood plains)

jetty for passers-by

bridge

chimney Nederrijn

(provincial) road

N225

Ne

Planning 1 2 3 4

Project decision Preparation phase Start of work Delivering water safety

de

rri

jn

Effect At least a 13 cm drop in water level during high water. Scale:

1 2010

www.roomfortheriver.nl

2 2011

3 2012

4 2013

0

300 m

2014 Jan 2015 / 24


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.