Infographics Veessen Wapenveld ENG 2015

Page 1

Flood channel Veessen-Wapenveld

Current situation

New situation Westdijk (dyke)

By constructing two new dykes, a high water channel will be created between the villages of Veessen and Wapenveld. There will be farmland between the dykes. In the event of extreme high water, this area will be capable of discharging a proportion of the water from the river IJssel.

high water

Oostdijk (dyke) high water

flood channel IJssel

IJssel

550 - 1500 m

WINDESHEIM

E

Oostdijk (dyke)

S

W

N

IJssel

H AT T E M

IJss

quay bridge Werverdijk brug Werverdijk

Key to map: ‘text’

el

N337 Westdijk (dyke)

WERVEN

modified / new situation

outlet

MARLE

new, modified or replaced objects new quay/dyke

IJssel bridge + inflow construction

pumping Oo station (dy stdij ke k )

pumping station

flood channel

flood channel

new bridge

W est

high water channel

dij

WIJHE

k(

WAPENVELD

current

dy

ke

Grote Wetering

)

dyke

VORCHTEN

Ap

motorway

ns

ete eW

oor

ot

Gr

eld

(provincial) road

g

aal

rin

kan

railway track

(ch ann

VEESSEN

el) HEERDE

A50

bridge Kerkdijk + inflow construction

Planning 1 2 3 4

Under the Kerkdijk bridge, there is a quay with an inflow construction built on it. The inflow construction can be opened as soon as the water from the IJssel reaches 5.65 metres NAP.

Effect Project decision Preparation phase Start of work Delivering water safety

OLST

71 cm drop in water level during high water. Scale:

1 2011

www.roomfortheriver.nl

2 2012

3 2013

4 2014

2015

0

2.000 m

2016 Jan 2015 / 36


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.