RAJASHREE PORTFOLIO

Page 1

RAJASHREE GANDHALIKAR

Architecture Design Portfolio

Selected work 2014 - 2021

781-392-8509

RAJASHREE GANDHALIKAR

Passionate, a Problem Solver & a Good Collaborator with Excellent Sense of Design. Desire to work in a challenging environment to contribute to the best of my ability towards the personal growth and development of an Architectural firm that will help me explore my skills and realize my potential. Willing to work as a Key Player in Challenging & Creative Environment.

Henningson Durham Richardson, INC

Sep 2021 - Present Design Coordinator II

• Prepare detailed drawings, layouts, sketches, and graphic representations of architecture designs by hand or using computer-aided design software

• Develop, lead and manage building information models and processes, including coordination with other discipline.

• Contribute to the development of specifications covering architectural matters and assist with code analysis/reviews.

• Assist Project Architects, other Architectural Project Coordinators or Technicians as needed, and take responsibility for work in all phases of the architectural process

• Perform other duties as needed

• Additional skills and knowledge of softwares like Kahua, CM-13, Pro-est, Procore , DOB NOW etc

Habitat for Humanity North Central Massachusetts, Acton

June 2021 - Present Construction Supervisor

• Plans, safety and quality requirements, supervise specific construction activity and provide leadership to volunteers.

• Work closely with construction manager and executive director to ensure materials and service needs are provided in a timely manner to the job sites .

• Anticipate problems and issues typical of building and personally act on same if necessary to help ensure schedules are met and work plans are enabled.

E4H Environments for Health Architecture, Boston

Jan 2020 - April 2020 Architectural Intern

• Primary support to the Project Manager or Partner in charge

• Implement the data gathering effort

• Develop and test functional concepts

• Coordinate with Project Designer and Architect during schematic design phase

• Liaison with clients to identify and define project requirements, scope and objectives

• Produced construction drawings in Revit, BIM platform and Bluebeam.

• Perform various coordinating tasks like scheduling and risk management, along with administrative duties, like maintaining project documentation and handling financial queries.

• Demonstrate strong written, verbal and visual communication skills to effectively be the point of contact to clients.

Provenance Land, Mumbai, India

Four Seasons Residences

Jan 2016 - April 2016 Junior Architect

Collaborated with Gensler architect on drawings of residential design plans.

• Corrected drawings to ensure accurate implementation of final floor plan.

• Provide regular progress updates on site work and maintain the project schedule.

• Organize meetings and regular calls with U.S. delegates and as well provide meeting minutes.

• Develop Power Point presentations of design developments and drawings.

Creative Business Associates, Mumbai, India

June 2014 - Jan 2016 Junior Architect

• Develop interior designs and landscape designs for several governmental projects such as Mumbai International Airport landscape design elements.

• Visited working sites on regular basis to gather status updates of work and prepared reports for senior leadership.

• Worked on Concept sketches, schematic drawings through the design development.

• Produced 3D & 2D visualizations ,construction estimate/ quotations of various projects.

• Prepared Presented on completing design developments and drawings.

EDUCATION

2020 Master of Architecture, Boston Architectural College, Boston 2014 Bachelor of Architecture, Dr. BN College of Architecture, India

WORKSHOPS AND CONFERENCES

• Procore Certified May 2020

• Attended various workshops held in college.

• Attended the international conference on “Healthy Cities “at J.W Marriot

• Attended Real estate workshop by author of Rich Dad, Poor Dad

Phone

781-392-8509

E-mail

rajashree.gandhalikar24@gmail.com

LinkedIn

https://www.linkedin.com/in/ra-jashree-gandhalikar-44818a72/

Website

https://issuu.com/r.gandhalikar/docs/rajashree_portfolio

SOFT SKILLS

Revit

Autocad

Microsoft office Sketch up

V-ray rendering

Enscape

PHOTO EDITING/ COMPOSITIONS

Adobe Illustrator

Indesign Adobe Photoshop

OTHER COMPETENCIES

Team Management

Project Management

Presentations

Minute Meetings

Collabration

Communication

Problem Solving

Critical Thinking

PERSONAL INFORMATION
RESUME

PROJECT : ROLE :

TO GIVE A BASIC DESIGN IDEAS ABOUT RECREATIONAL PARK AS LOCAL TOURISM RECREATIONAL PARK, DAPIWALI, THANE

TO PREPARE SCHEMATIC DRAWINGS AND DESIGN LANDSCAPE ELEMENTS.

TIMELINE : PURPOSE : YEAR 2015

RECREATIONAL PARK
Creative Business Associates
02

RECREATIONAL PARK, DAPIWALI, THANE

PROJECT : ROLE : RECREATIONAL PARK

TO PREPARE SCHEMATIC DRAWINGS AND DESIGN LANDSCAPE ELEMENTS.

PURPOSE : YEAR 2015

TIMELINE :

TIMELINE : PURPOSE : YEAR 2015

TO GIVE A BASIC DESIGN IDEAS ABOUT RECREATIONAL PARK AS LOCAL TOURISM

TO GIVE A BASIC DESIGN

Creative Business Associates
± 18'-10" V.I.F. ± 93'-1" V.I.F. V.I.F. 15'-2"V.I.F. ± 12'-0" V.I.F. 4'-6" V.I.F. ± 18'-11" V.I.F. 4'-0"10'-11" 5'-0" 8'-0" V.I.F. 2'-6" V.I.F. ± 23'-11" V.I.F. 9'-5" 15'-1"
04 15 13 14 15 15 13 2'-9" 9'-0" 1'-5"MAX 8 4 18 3 GCT-1 CB-1 GCT-2 15 13 11 16 1'-6" * 1'-5"MAX 9'-0" GCT-1 CB-1 GCT-2 9'-0" 1-6" * 21 20 3'-4"2'-10" 18 3 4 GCT-2 GCT-1 CB-1 FIRSTFLOOR-TOILETEQUIPMENTANDACCESSORIESSCHEDULE CONTRACTORPROVIDEDANDINSTALLEDITEMS ITEM NO. ITEMREF. DESCRIPTION SIZESPECIFICATIONQTY 1 INTEGRALCOUNTERTOPW/BACKSPLASH -2 UNDERTHECOUNTERLAVATORYMULTIPLE STATIONSFORGENERALUSE -3UE005LIQUIDSOAPDISPENSER
6UE004TOILETPAPERDISPENSER
7UE004ATOILETPAPERDISPENSER-ADA
8UE001APAPERTOWEL/WASTEDISPENSERRECESSED-15440
9UE004BSANITARYNAPKINTAMPONVENDOR
10UE954PARTITION-MOUNTEDSANITARYNAPKINDISPOSAL UNIT-SERVINGTWOCOMPARTMENTS -15440 4 11- WATERCLOSET,WALLHUNG -15440 6 12- WATERCLOSET,ELONGATED,WALLHUNG,ADA COMPLIANT -15440 3 13- URINAL,WALLHUNG - 15440 1 14- URINAL,WALLHUNG,ADACOMPLIANT - 15440 1 15- URINALPARTITION - 1544016- TOILETPARTITION - 1544017- TOILETPARTITION,ELONGATED,ADACOMPLIANT- 1544018- FREESTANDINGLAVATORY(SINK)
19PLASTICSHOWERCOMPARTMENTADA (INSIDEOFTERRAZOBASE36"X36"CLEAR) -20- ADACOMPLIANTFOLDINGSHOWERSEAT -21- SHOWERCURTAINANDROD -22- LOCKERFURN/BENCH4'-0" -23- METALLOCKER/SINGLETIER-ADA -24- METALLOCKERDOUBLETIER -25- FOLDINGSEAT -26- PARTITION-MOUNTEDSANITARYNAPKINDISPOSAL UNIT-SERVINGONECOMPARTMENTS -E7EL004SINGLEPOLETOGGLESWITCH.'K'INDICATESKEY OPERATED -P3PL005FLOORDRAIN -15440OWNERPROVIDEDANDINSTALLEDITEMS ITEM NO. ITEMREF. DESCRIPTION SIZESPECIFICATIONQTY AUE039TRASHRECEPTACLE NOTES: 1.REFERTOA600SERIESFORTOILETROOMLAYOUTS. B04GIRLSTOILET ±20'-0"V.I.F. ± 11'-10" V.I.F. 9'-0"GWB ℄ ℄ EQ. EQ. EQ. EQ. 17'-0"V.I.F. ± 5'-3" V.I.F. ± 6'-9" V.I.F. 7'-11"V.I.F. ±4'-11"V.I.F. ℄ ℄ 2'-0" 9'-0"GWB B16ABOYSTOILET
-15440 6 4UE014MIRROR -15440 6 5UE024GRABBARSADACOMPLIANT -15440 6
-15440 6
-15440 3
9
-15440
- 15440 6

TO GIVE A BASIC DESIGN IDEAS ABO TO PREPARE SCHEMATIC DRAWING TIMELINE : PURPOSE : YEAR 2015

TO PREPARE SCHEMATIC DRAWINGS AND DESIGN LANDSCAPE ELEMENTS.

TIMELINE : PURPOSE : YEAR 2015

TO GIVE A BASIC DESIGN IDEAS ABOUT RECREATIONAL PARK AS LOCAL TOURISM

ROLE
PROJECT :
: RECREATIONAL PARK
THANE
RECREATIONAL PARK, DAPIWALI,
Creative Business Associates
PRE-KINDERGARTEN B17 OFFICE 61 PRE-KINDERGARTEN B18 PRE-KINDERGARTEN B19 PRE-KINDERGARTEN B20 GYMNASIUM 40 ROOM B4 SWITCHBOARD ROOM B5 STORE F.R.A. B6 STAIR BOILERROOM TOILET B13 MEN'S ROOM B16 STORAGE STAIR ROOM B22 RECEIVING TOILET B26 GIRL'S TOILET B27 BOY'S EQ.RM. B21 GROUND STORERM. B25 ROOM B29 STORE EMR B19 ROOM B2 FAN UP AUDITORIUM UP UP UP UP STAIR STAIR UP UP UP UP UP PLATFORM 55 STORERM 43 JSC 29 STORAGE STORAGE STORAGE GYMSTOREROOM 37 STORERM. 36 REFUSERM 17 STORERM 16 FURNITURESTORERM 31 STORERM 53 SPACE 50 PIPE OFFICE 61 OFFICE 61 OFFICE 61 STAIR ROOMSTORAGE DN UP TOILET B14 WOMEN'S TOILET B10A UNISEX TOILET B10B UNISEX STORAGE B4 CONTROLROOM B62 ELEVATOR B11 B15 B17 B17A B17B B18A B18 B61C B61B B61A B61 B56AB56B B17C B1D B1C B3B B3A B40A B40B B13 B13A B14B14A B10A B10B B10 B1AB1B B62 B15A B1E B1F B1G B6 Scale:3/32"=1'-0" 1BASEMENTPLAN A101 10'-8"21'-4" 42'-8" A113 2 A601 1 A113 A107 2 A114 1 1 A201 1 A201 A202 A108 6 W1 A602 A602 2 A108 1 A601 3 A066 A601 2
2NDGRADEC.R. 242 SPEECHC.R. 200 A.P.OFFICE 201 OFFICE 203 OFFICE 214 ROOM 215 STORAGE LIBRARY 221 2NDGRADEC.R. 224 ROOM 225 STORAGE GUIDANCEOFFICE 239 SCHOOLGRADES 240 ICTELEMENTARY SP.EDUCATIONC.R. 204 NON-D75 1STGRADEC.R. 205 1STGRADEC.R. 206 1STGRADEC.R. 212 ROOM 213 STORAGE KINDERGARTEN 216 COMPUTERLAB 218 4THGRADEC.R. 220 3RDGRADEC.R. 222 3RDGRADEC.R. 226 5THGRADEC.R. 227 3RDGRADEC.R. 236 3RDGRADEC.R. 237 3RDGRADEC.R. 238 SCHOOLGRADES 241 ICTELEMENTARY 2NDGRADEC.R. 243 2NDGRADEC.R. 244 STAIR STAIR ROOM 229 STORAGE ROOM 233 STORAGE TOILET 234 GIRL'S TOILET 228 BOY'S ROOM 217 STORAGE TOILET 207 GIRL'STOILET 209 BOY'S J.C. 208 TOILET 202 STAFF LOWERROOF R01 ROOM 21 STORAGE ROOM 23 STORAGE VEST 32 DN UP DN UP UPDNDNUP DN DN STAIR UP UP 244 244A 239 234 230 230A 228 226A 226 218 221A 221B 214 206A 206 204 203 201 200 242 240241 213A 213B 211A211B 236 243 J.C. 230 F.R.A F.R.A F.R.A Scale:3/32"=1'-0" 1SECONDFLOORPLAN A1030 10'-8"21'-4" 42'-8" A604 1 A201 1 A201 2 A202 A106 A106 4 A106 A108 A108 7

RECREATIONAL PARK, DAPIWALI, THANE

PROJECT : ROLE : RECREATIONAL PARK

TO PREPARE SCHEMATIC DRAWINGS AND DESIGN LANDSCAPE ELEMENTS.

TO PREPARE SCHEMATIC DRAWING

PURPOSE : YEAR 2015

TIMELINE :

TIMELINE :

PURPOSE : YEAR 2015

TO GIVE A BASIC DESIGN IDEAS ABOUT RECREATIONAL PARK AS LOCAL TOURISM

TO GIVE A BASIC DESIGN IDEAS ABO

Creative Business Associates
C2
Scale:3/16"1'-0" 1ELEVATORHOISTWAYWALLSECTION
A411 1 08
A302 05'-4"10'-8" 21'-4"

:

PURPOSE : CREATE DIFFERENT DEPARTMENTS

:

SOFTWARE :

JAN 2020 - FEB 2020

REVIT, BLUEBEAM, PROCORE

PROJECT SUMMARY

MG West 3rd Floor Implementation, in this project the entire 3rd floor is demolished and completely rennovated.

The 3rd floor is classified into various departments PT/OT , Ortho, Nero etc

Construction drawings were provided to the client making about every detail.

SKETCH DIAGRAMS

RCP PLAN (PART 3)

ROLE
TIMELINE
PROJECT :
WORK ON CONSTRUCTION DOCUMENTS
THIRD FLOOR RENNOVATION
INTERIOR ELEVATION INTERIOR ELEVATION
ELEVATION PLAN PART 1

DESIGN CHANGES PROPOSED

TASKSMARKING DIMENSIONS

REMOVAL OF LAWNS

FLATTENING OF GROUND

PURCHASE MATERIALS

INSTALL PLANT NEW PLANTS

FINAL LANDSCAPE DESIGN

RESEARCH TOPICS - LANDSCAPE DESIGNS
LANDSCAPE DESIGN
INDEPENDENT WORK Independent Projects
FRONT ELEVATION
OPTION 2 OPTION 3 OPTION 4 OPTION 1 DESIGN OPTIONS

RESEARCH TOPICS - TEMPORARY/

PERMANENET

PARTITIONS

TASKSPURCHASE MATERIAL FABRICATION STAIN DIMENSIONS INSTALLMENT

PRECEDANT STUDY MATERIALS

INDEPENDENT WORK WALK-IN CLOSET
FINAL DESIGN DRAWING
FINAL PRODUCT OPTION 1 LASER CUT OPTION 1 OPTION 2
DESIGN OPTIONS
Independent Projects
OPTION 3 AND

RESEARCH

TOPICS - DIY POSTBOX

TASKSPURCHASE MATERIAL FABRICATION STAIN DIMENSIONS INSTALLMENT

DESIGN DRAWING FINAL PRODUCT

RESEARCH TOPICS - LANDSCAPE, FIREPIT IDEAS, HOW TO COLOR FENCE, GARDEN PLANTERS, WOODEN FLOORING ETC

TASKSPURCHASE MATERIAL FABRICATION STAIN DIMENSIONS INSTALLMENT PAINT

PRECEDANT STUDY MATERIALS
INDEPENDENT WORK
WORK
INDEPENDENT

TIMELINE :

PURPOSE : SPRING SEMESTER 2019 AUTOCAD, REVIT, ILLUSTRATOR, PHOTOSHOP PROVIDE HEALTH FACILITY

SITE ANALYSIS

SOFTWARE :

The site analysis conducted throughout the project helped to study the present scenario of the site and the neighbouring parts of the boston which may be important in designing the site.

The given site is a parking garage located on Newbury Street Boston which can be put to good use

The site has access from both sides , one from the Dartmouth and other from Newbury Street.

SECTIONAL SYNTHESIS

Use of brick facade is widely seen in and around the site. The site is located with good views which can be the considered as a main focus. SECTION THR’ NEWBURY STREET SECTION THR’ DARTMOUTH STREET

CLASS : DESIGN STUDIO 4 - INTEGRATIVE DESIGN
Existing
Short
Long
Sun
Pedestrian movement
building line Vehicular traffic flow
view
view LEGEND
path
THE COMMUNITY DESIGN STUDIO 4 - INTEGRATIVE DESIGN PROCESS Academic
TO

PROGRAMMATIC ANALYSIS

PUBLIC PRIVATE SEMI-PUBLIC PUBLIC DIAGRAM EXPERIENCE OF A SENSORIUM THR’ LIGHT, WATER A B D C E F A B C D E F SPACE WITH MORE LIGHT DARKEST SPACE SPACE WITH RAYS OF LIGHT AUDITORIUM WITH VIEWS AND SKYLIGHT CANTILEVER POOL WITH VIEWS PLEASING GARDEN BELOW GROUND A B C B D E F PROGRAMATIC DIAGRAM A B C D E F LIBRARY DORMITARY CLASSROOM, SEMINAR ROOM ADMIN AREAS, WAITING CAFE HEALTH CARE CENTER PROGRAMMATIC SECTION EXTERIOR VIEW

SECTION AA’ SECTION BB’

FROM THE HEALING GARDEN

NORTH ELEVATION EAST ELEVATION SOUTH ELEVATION WEST ELEVATION
GROUND LEVEL 4 FT 16 FT 28 FT 32 FT 40 FT 49 FT 58 FT 67 FT 76 FT 94 FT - 9 FT
ELEVATION
GROUND LEVEL 4 FT 16 FT 28 FT 32 FT 40 FT 49 FT 58 FT 67 FT 76 FT 94 FT - 9 FT
VIEW POOL VIEW LOOKING TOWARDS DARTMOUTH AND NEWBURY STREET AUDITORIUM LOOKING TOWARDS BACK BAY AUDITORIUM LOOKING TOWARDS NEWBURY STREET ENTRANCE VIEW FROM NEWBURY STREET SENSORIUM 1 SENSORIUM 2 SENSORIUM 3

LINCOLN PUBLIC SCHOOLS, MASSACHUCETS

CLASS : GATEWAY PROJECT

TIMELINE :

Gateway Project

CONDUCTED WORKSHOP TO UNDERSTAND STUDENT DESIRES

SOFTWARE :

RENNOVATION, REDESIGN AND FABRICATION AREAS OF FOCUS FOR THE BAC GATEWAY

PURPOSE : SPRING SEMESTER 2018 AUTOCAD, ILLUSTRATOR, SKETCHUP, PHOTOSHOP

The Lincoln School project is a comprehensive renovation of the existing school campus at 6 Ballfi eld Road, serving the Pre-K to 8th student body in the Town of Lincoln.

The Lincoln School Building Committee was created in May 2017 and consists of representatives of the school administration, various town committees and at-large community members. The committee selected a partnership of SMMA and Ewing Cole Architects as the project design team for the renovation and redesign of the existing K-8 school. In June, the Town voted to move forward with plans for a $93.9M project concept that aims to meet those values. On December 1st, the Town approved the funding that will allow the project to begin.

The Lincoln School Building Committee applied for a Gateway Project through the Boston Architectural College to engage existing students in the design development process associated with the school building project.

We engaged collaboratively with the Lincoln Public School students to design the common areas for the student body, with a focus on: 1. Learning Commons 2. Corridors 3. Outdoor Gathering Areas 4. Courtyard/Outdoor Classroom 5. Gym Connector
Space to play in bad weather Vending Machine Fountain Comfortable and colorful seating for different activities (Bean bag chairs) Space to do HW/Computers Comfortable seating Easy to access lockers Comfortable seating Art display on walls Indoor play structures Protection from rain Sloped roof ( Glass planted) Lounge/Indoor Playground: • Comfortable seating for different activities (bean bags) • Colorful & attractive space to be in bad weather • Area for HW & Computers • Space to rest & lounge • Art displays Corridors + Connector: • Bright & colorful • Art displays • Vending Machines • Easy to access lockers • Space to sit and relax STUDENT DESIRES ANALYSIS STUDENT DESIRES ANALYSIS Outdoor Classroom/Courtyard: • Shade from roof or tree for bad weather & sun • Comfortable seating for different activities • Space to rest & lounge • Group seating • Art displays • Connection to nature, including water & plants • Study with natural environment • Physical activity area Places to play and run around Big tree with grass to sit under Study with natural physical environment Both water (pool) and plants (garden) should be considered Different functional spaces Comfortable seatings Connection with nature Shade in the winter Transparent material for shade Views of nature Group seating Interaction with nature Physical activity area Some sculpture were created by students, art is also important for students (SOURCE : Ewing Cole )

STRATEGIES

Each of the strategies is a design tool, the shape and form of which can be developed to match the overall aesthetics of the project.

The strategies respond to the various considerations that inform the learning enviroment.

DESIGN STRATEGIES
PROPOSALS : OUTDOOR CLASSROOM
Overall Diagram showing Design Strategy Implementation

FURNITURE WORKSHOP AND RESEARCH

• Privacy within a larger public area

• Space for 1-2 people to sit/read

• Can be used in library/media center or Learning Commons

• Can also be designed to fi t into corridors alongside lockers BOOKSHELF / CHAIR

• Privacy within a larger public area

• Space for 3-4 people to sit/read

• Can be used in library/media center or Learning Commons

• Good use for corners & small/tight areas FLOWER TABLE

• Can be adapted for group or individual activities

• Attractive & colorful

• Encourages art

• Flexible for different kinds of uses

PROCESS FURNITURE PROPOSALS

The process started from reseach of standard sizes of furniture and multiple iterations.

Prototype were designed based on the workshop conducted with the school students

LINCOLN PUBLIC SCHOOLS, MASSACHUCETS
CUBBY HOLE PROTOTYPE OF FLOWER TABLE
Gateway Project

LINCOLN PUBLIC SCHOOLS, MASSACHUCETS

Gateway Project
FINALISED PROTOTYPE PROTOTYPE ITERATION
Finalised design module of a seating with book shelf was then fabricated in a sturdy furniture module
Based on standard dimensions , confortable resting angles, can accomodate 2, 3 people few iterations of furniture modules were designed.

TO PREPARE SCHEMATIC DRAWINGS AND DESIGN LANDSCAPE ELEMENTS.

TIMELINE : PURPOSE : YEAR 2015

TO GIVE A BASIC DESIGN IDEAS ABOUT RECREATIONAL PARK AS LOCAL

PROJECT : ROLE : RECREATIONAL PARK
TOURISM
MEMES LOVE SUCCULENT AND BONSIA DIY HOME DECOR PAINTING

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
RAJASHREE PORTFOLIO by r.gandhalikar - Issuu