Skip to main content

Rajashree Portfolio

Page 1

RAJASHREE GANDHALIKAR Architecture Design Portfolio Selected work 2014 - 2020


HELLO My name is Rajashree. I am 2020 Graduate from Boston Architectural College. I have a Bachelor’s Degree in Architecture obtained at Dr. BNCA Pune University, India. Additionally, I have working experience in few reputed firms which helped me to build up my work skills. I am a self motivated person and has dared to dream big and believe in myself if I would like to be successful. In my experience, I quickly learn that creation and imagination are powerful skills to be successful in this design profession. By formulating our own unique creations, we may able to create a significant architecture building that personify and embody the diverse cultures that exist in this world

Rajashree Gandhalikar Billerica MA rajashree.gandhalikar@the-bac.edu 781-392-8509

My thoughts “To work in a challenging environment to contribute to the best of my ability towards growth and development and to gain work experience and knowledge in an Architectural firm to help me to explore my skills and realize my potential. Willing to work as a key player in a challenging & creative environment and in the process, evolve as a better human being”.


RESUME RAJASHREE GANDHALIKAR

Passionate, a Problem Solver & a Good Collaborator with Excellent Sense of Design. Desire to work in a challenging environment to contribute to the best of my ability towards the personal growth and development of an Architectural firm that will help me explore my skills and realize my potential. Willing to work as a Key Player in Challenging & Creative Environment.

PROFESSIONAL EXPERIENCE Julia Chuslo Architects, Duxbury Architectural Drafter

EDUCATION

PERSONAL INFORMATION

2020

Master of Architecture, Boston Architectural College, Boston

2014

Bachelor of Architecture, Dr. BN College of Architecture, India

May 2021 - Present

•

Planning, scheduling, implementation & coordination of quality built homes from development through final

E- mail rajashree.gandhalikar@the-bac.edu

construction on a timely basis •

Phone 781-392-8509

Coordinating and completing construction drawings, electrical plans etc.

E4H Environments for Health Architecture, Boston Jan 2020 - April 2020 Architectural Intern

WORKSHOPS AND CONFERENCES •

Procore Certified May 2020

•

Attended various workshops held in college.

LinkedIn https://www.linkedin.com/in/rajashree-gandhalikar-44818a72/

•

Primary support to the Project Manager or Partner in charge

•

Attended the international conference on “Healthy Cities “at J.W Marriot

•

Implement the data gathering effort

•

Attended Real estate workshop by author of Rich Dad, Poor Dad

•

Develop and test functional concepts

Website

•

Coordinate with Project Designer and Architect during schematic design phase

https://issuu.com/r.gandhalikar/docs/rajashree_portfolio

•

Liaison with clients to identify and define project requirements, scope and objectives

•

Produced construction drawings in Revit ,BIM platform and Bluebeam.

•

Perform various coordinating tasks like scheduling and risk management, along with administrative duties,

•

Designed Hypothetical Projects for College Design Assignments.

like maintaining project documentation and handling financial queries.

•

Participated and supported participants at NASA conventions

Demonstrate strong written, verbal and visual communication skills to effectively be the point of contact to

•

Organized various events for festivals at the School & College level.

•

EXTRACURRICULAR ACTIVITIES

clients.

BOSTON ARCHITECTURAL COLLEGE GATEWAY PROJECTS Boston Chinatown Neighborhood Center (BCNC), Boston Feb 2019- May 2019 Architectural Intern •

through visualization ,analysis, feasibility studies, drawing, documentation and diagramming. •

Provenance Land, Mumbai, India Four Seasons Residences Jan 2016 - April 2016 Junior Architect •

Collaborated with Gensler architect on drawings of residential design plans.

•

Corrected drawings to ensure accurate implementation of final floor plan.

•

Provide regular progress updates on site work and maintain the project schedule.

•

Organize meetings and regular calls with U.S. delegates and as well provide meeting minutes.

Creative Business Associates, Mumbai, India June 2014 - Jan 2016 Junior Architect Develop interior designs and landscape designs for several governmental projects such as Mumbai International Airport landscape design elements. •

Autocad Sketch up

Enable School Building Committee to complete a Feasibility Study associated with renovation and a new school building serving the Pre-K to 8 student body.

•

Revit

Create and update project schedules and budgets

Lincoln Public School, Lincoln Sep 2018 - Dec 2018 Architectural Intern •

SOFT SKILLS

PHOTO EDITING/ COMPOSITIONS

Developed recommendations for better spatial and programmatic alignments of BCNC’s facility Ash Street

Visited working sites on regular basis to gather status updates of work and prepared reports for senior

Microsoft Office

Indesign Illustrator Photoshop

Fusion 360 Rhinoceros Grasshopper Lumion

OTHER COMPETENCIES

V-ray rendering

Team Management Budgeting and Estimating Project Management Landscape Design Presentations

Encape

leadership. •

Worked on Concept sketches, schematic drawings through the design development.

•

Produced 3D & 2D visualizations ,construction estimate/ quotations of various projects.

•

Prepared Presented on completing design developments and drawings.

Space Developers, Pune, India June 2013 - Mar 2014 Architectural Intern •

Interacted with clients on the private residence as well as commercial structures

•

Active participation on site visit and site meeting

Collaboration Communication Problem Solving Critical Thinking


CONTENTS PROFESSIONAL

01

MASSACHUSETTS GENERAL HOSPITAL, WALTHAM p. 01

GATEWAY LINCOLN PUBLIC SCHOOLS

07 p. 15

02

BETH ISRAEL DEACONESS MEDICAL CENTER, CHESTNUT HILL , MA p. 03

PROFESSIONAL

INDEPENDENT PROJECTS

FLOOR PLAN AND FRONT YARD LANDSCAPE03 p. 05 MAILBOX RESTORATION

RANDOM PROJECTS

08

BOSTON CHINATOWN NEIGHBORHOOD CENTER p. 19

09

ASHFORD ROYALE, MUMBAI p. 23

14

RECREATIONAL PARK, DAPIWALI, THANE

p. 07

p. 25

15 p. 09

DADAR PLUMBING STATION, MUMBAI

ACADEMIC DESIGN STUDIO 4 - INTEGRATIVE DESIGN p. 11

06

10

HOBBIES AND INTERESTS

11 p.27

p. 29


MASSACHUSETTS GENERAL HOSPITAL, WALTHAM PROJECT ROLE PURPOSE TIMELINE

E4H Architecture

: : : :

THIRD FLOOR RENNOVATION WORK ON CONSTRUCTION DOCUMENTS CREATE DIFFERENT DEPARTMENTS JAN 2020 - FEB 2020 SOFTWARE : REVIT, BLUEBEAM, PROCORE

PROJECT SUMMARY

MG West 3rd Floor Implementation, in this project the entire 3rd floor is demolished and completely rennovated.

RCP PLAN (PART 3)

The 3rd floor is classified into various departments PT/OT , Ortho, Nero etc Construction drawings were provided to the client making about every detail.

SKETCH DIAGRAMS

1


INTERIOR ELEVATION

ELEVATION PLAN PART 1

INTERIOR ELEVATION

2


BETH ISRAEL DEACONESS MEDICAL CENTER, CHESTNUT HILL , MA MOB Security Survey PROJECT ROLE PURPOSE TIMELINE SOFTWARE

: : : : :

E4H Architecture

INSTALL SECURITY SYSTEM CREATE EXISTING AND PROPOSED PLAN PROVIDE MORE SECURED ENVIRONMENT TO THE STAFF FEB 2020 REVIT, AUTOCAD

PROJECT SUMMARY

BIDMC, MOB Security Survey is project in which the forth floor is to be provided with new security systtems.

EXISTING DESIGN PLAN

Existing space was surveyed and marked with existing devices and a new plan with more security devices was proposed. A intent of these changes was to provide the staff with secure environment and system.

3


DESIGN CHANGES PROPOSED

4


FLOOR PLAN AND LANDSCAPE DESIGN OPTIONS

Independent Projects

INDEPENDENT WORK

RESEARCH TOPICS - LANDSCAPE DESIGNS TASKSMARKING DIMENSIONS REMOVAL OF LAWNS FLATTENING OF GROUND PURCHASE MATERIALS INSTALL PLANT NEW PLANTS

FINAL LANDSCAPE DESIGN

LANDSCAPE DESIGN

FRONT ELEVATION

5


DESIGN OPTIONS

OPTION 1

OPTION 2

OPTION 3

OPTION 4

6


WALK-IN CLOSET

Independent Projects

INDEPENDENT WORK

PRECEDANT STUDY MATERIALS RESEARCH TOPICS - TEMPORARY/ PERMANENET PARTITIONS TASKSPURCHASE MATERIAL FABRICATION STAIN DIMENSIONS INSTALLMENT

DESIGN OPTIONS

OPTION 3 AND

OPTION 1

LASER CUT OPTION 1

OPTION 2

FINAL DESIGN DRAWING

FINAL PRODUCT

7


MAILBOX

RANDOM PROJECTS

INDEPENDENT WORK

INDEPENDENT WORK

PRECEDANT STUDY MATERIALS

DESIGN DRAWING RESEARCH TOPICS - DIY POSTBOX TASKSPURCHASE MATERIAL FABRICATION STAIN DIMENSIONS INSTALLMENT

RESEARCH TOPICS - LANDSCAPE, FIREPIT IDEAS, HOW TO COLOR FENCE, GARDEN PLANTERS, WOODEN FLOORING ETC TASKSPURCHASE MATERIAL FABRICATION STAIN DIMENSIONS INSTALLMENT PAINT

FINAL PRODUCT

8


DESIGN STUDIO 4 - INTEGRATIVE DESIGN CLASS

:

DESIGN STUDIO 4 - INTEGRATIVE DESIGN

PURPOSE

:

PROVIDE HEALTH FACILITY TO THE COMMUNITY SPRING SEMESTER 2019 AUTOCAD, REVIT, ILLUSTRATOR, PHOTOSHOP

TIMELINE : SOFTWARE :

Academic SITE ANALYSIS

The site analysis conducted throughout the project helped to study the present scenario of the site and the neighbouring parts of the boston which may be important in designing the site. The given site is a parking garage located on Newbury Street Boston which can be put to good use The site has access from both sides , one from the Dartmouth and other from Newbury Street. Use of brick facade is widely seen in and around the site. The site is located with good views which can be the considered as a main focus.

SECTIONAL SYNTHESIS

LEGEND Pedestrian movement

SECTION THR’ NEWBURY STREET

SECTION THR’ DARTMOUTH STREET

Existing building line Sun path

Vehicular traffic flow Short view Long view

PROCESS

9


SITE PLAN

EXTERIOR VIEW

PROGRAMMATIC SECTION

A

PROGRAMMATIC ANALYSIS

A

C

B

B B

PUBLIC

PRIVATE

D

C

E

D SEMI-PUBLIC

E F

PUBLIC

F

DIAGRAM PROGRAMATIC DIAGRAM

EXPERIENCE OF A SENSORIUM THR’ LIGHT, WATER

A

LIBRARY

D HEALTH CARE CENTER

A

SPACE WITH MORE LIGHT

D

B

DORMITARY

E ADMIN AREAS, WAITING

B

DARKEST SPACE

E

C

CLASSROOM, SEMINAR ROOM

F

CAFE

C SPACE WITH RAYS OF LIGHT

F

AUDITORIUM WITH VIEWS AND SKYLIGHT CANTILEVER POOL WITH VIEWS PLEASING GARDEN BELOW GROUND

10


DESIGN STUDIO 4 - INTEGRATIVE DESIGN

Academic

SECTION BB’

SECTION AA’ 94 FT

94 FT

76 FT

76 FT

67 FT

67 FT

58 FT

58 FT

49 FT

49 FT

40 FT

40 FT

32 FT

32 FT

28 FT

28 FT

16 FT

16 FT

4 FT

4 FT GROUND LEVEL

VIEW FROM THE HEALING GARDEN

GROUND LEVEL - 9 FT

- 9 FT

ELEVATION

NORTH ELEVATION

EAST ELEVATION

SOUTH ELEVATION

WEST ELEVATION

11


FIRE SAFETY AND ACCESSIBILITY - CORES / EGRESS

WALL SECTION

LOWER GROUND PLAN

GROUND FLOOR PLAN

FIRST FLOOR PLAN

SECOND FLOOR PLAN

THIRD FLOOR PLAN

FOURTH FLOOR PLAN

FIFTH FLOOR PLAN

SIXTH FLOOR PLAN

SECTION BB’

BASEMENT DETAIL

VENTILATION DIAGRAM Accessible Route

Max. Distance < 250 Ft

Fire Rated Core Perimeter

12


DESIGN STUDIO 4 - INTEGRATIVE DESIGN

Academic

MECHANICAL DIAGRAM

VIEW FROM THE LIBRARY

TYPICAL REFLECTED CEILING

ENCLOSED MECHANICAL DAIGRAM E Fp Dcw T Ahu St

- Electric Service - Fire Protection Service - City Water Service - Transformer - Air Handling Service - Storm Water Detention Tank

B Ct Gen Ps Ss G

- Boiler - Cooling Tower - Generator - Primary Switch - Secondary Switchboard - Gas Line

Fcu Rm Cru

- Fan Coil Unit - Refrigeration Machine - Enery Recovery Unit

LEGEND

Fan Coil Typical

TYPICAL MECHANICAL PLAN - SIXTH FLOOR

Supply Return Mechanical Chase

Pot Light Typical Light Fixture Typical Fire Speaker Typical Sprinker Typical

13


RENDERINGS

ENTRANCE VIEW FROM NEWBURY STREET

POOL VIEW LOOKING TOWARDS DARTMOUTH AND NEWBURY STREET

AUDITORIUM LOOKING TOWARDS BACK BAY

SENSORIUM 1

SENSORIUM 2

SENSORIUM 3

AUDITORIUM LOOKING TOWARDS NEWBURY STREET

14


LINCOLN PUBLIC SCHOOLS, MASSACHUCETS CLASS PURPOSE

: :

TIMELINE : SOFTWARE :

GATEWAY PROJECT RENNOVATION, REDESIGN AND FABRICATION SPRING SEMESTER 2018 AUTOCAD, ILLUSTRATOR, SKETCHUP, PHOTOSHOP

Gateway Project CONDUCTED WORKSHOP TO UNDERSTAND STUDENT DESIRES Comfortable and colorful seating for different activities (Bean bag chairs)

The Lincoln School project is a comprehensive renovation of the existing school campus at 6 Ballfi eld Road, serving the Pre-K to 8th student body in the Town of Lincoln. The Lincoln School Building Committee was created in May 2017 and consists of representatives of the school administration, various town committees and at-large community members. The committee selected a partnership of SMMA and Ewing Cole Architects as the project design team for the renovation and redesign of the existing K-8 school. In June, the Town voted to move forward with plans for a $93.9M project concept that aims to meet those values. On December 1st, the Town approved the funding that will allow the project to begin.

Space to do HW/Computers Comfortable seating

Space to play in bad weather Vending Machine Fountain

Lounge/Indoor Playground: • Comfortable seating for different activities (bean bags) • Colorful & attractive space to be in bad weather • Area for HW & Computers • Space to rest & lounge • Art displays

Easy to access lockers Comfortable seating Art display on walls

The Lincoln School Building Committee applied for a Gateway Project through the Boston Architectural College to engage existing students in the design development process associated with the school building project.

STUDENT DESIRES ANALYSIS

Corridors + Connector: • Bright & colorful • Art displays • Vending Machines • Easy to access lockers • Space to sit and relax

Indoor play structures Protection from rain Sloped roof ( Glass planted)

AREAS OF FOCUS FOR THE BAC GATEWAY

Different functional spaces

Places to play and run around

Comfortable seatings

Big tree with grass to sit under

Connection with nature

Study with natural physical environment

We engaged collaboratively with the Lincoln Public School students to design the common areas for the student body, with a focus on: 1. Learning Commons 2. Corridors 3. Outdoor Gathering Areas 4. Courtyard/Outdoor Classroom 5. Gym Connector

(SOURCE : Ewing Cole )

Both water (pool) and plants (garden) should be considered

Shade in the winter Transparent material for shade Views of nature

STUDENT DESIRES ANALYSIS

Group seating

Outdoor Classroom/Courtyard:

Interaction with nature Physical activity area

Some sculpture were created by students, art is also important for students

• Shade from roof or tree for bad weather & sun • Comfortable seating for different activities • Space to rest & lounge • Group seating • Art displays • Connection to nature, including water & plants • Study with natural environment • Physical activity area

15


DESIGN STRATEGIES

PROPOSALS : OUTDOOR CLASSROOM

STRATEGIES Each of the strategies is a design tool, the shape and form of which can be developed to match the overall aesthetics of the project. The strategies respond to the various considerations that inform the learning enviroment.

Overall Diagram showing Design Strategy Implementation

16


LINCOLN PUBLIC SCHOOLS, MASSACHUCETS FURNITURE WORKSHOP AND RESEARCH

Gateway Project PROCESS FURNITURE PROPOSALS

The process started from reseach of standard sizes of furniture and multiple iterations.

BOOKSHELF / CHAIR • Privacy within a larger public area • Space for 1-2 people to sit/read • Can be used in library/media center or Learning Commons • Can also be designed to fi t into corridors alongside lockers

PROTOTYPE OF FLOWER TABLE

CUBBY HOLE • Privacy within a larger public area • Space for 3-4 people to sit/read • Can be used in library/media center or Learning Commons • Good use for corners & small/tight areas

FLOWER TABLE • Can be adapted for group or individual activities • Attractive & colorful • Encourages art • Flexible for different kinds of uses Prototype were designed based on the workshop conducted with the school students

17


PROTOTYPE ITERATION

Based on standard dimensions , confortable resting angles, can accomodate 2, 3 people few iterations of furniture modules were designed.

FINALISED PROTOTYPE

Finalised design module of a seating with book shelf was then fabricated in a sturdy furniture module

18


BOSTON CHINATOWN NEIGHBORHOOD CENTER, MASSACHUCETS CLASS PURPOSE

: :

TIMELINE : SOFTWARE :

Gateway Project

GATEWAY PROJECT RENNOVATION, REDESIGN AND PROBLEM SOLVING FALL SEMESTER 2018 REVIT, AUTOCAD, ILLUSTRATOR, PHOTOSHOP, MICROSOFT EXCEL , INDESIGN SITE NOTES

Boston Chinatown Neighborhood Center (BCNC) responds to community needs by delivering holistic,family-centered, and culturally competent programs. Founded in 1969, BCNC is the largest nonprofit social service provider for Asian American and Asian immigrant families in the Greater Boston area – supporting over 2000 children, youth, and adults each year at three locations in Boston and Quincy. BCNC’s facility at Ash Street in Chinatown houses a variety of programs, administrative offices, and community and educational services. As times change, programs evolve, shrink, and grow- often in direct contest with inflexible spaces in the building. Reconsidering the complexities of space planning,programming, and building systems may provide BCNC with a clearer road map for the future and a more effective means to satisfy its unique mission.Working with staff, families, and constituent groups affiliated with BCNC, students in this Gateway project will develop recommendations for better spatial and programmatic alignments. Through analysis, feasibility studies, drawing, documentation, and diagramming, students will help BCNC to understand their specific spatial constraints and opportunities as they pursue options for future modifications.

CLASSROOMS - Dedicated Adult Edu. Class Space - Need another Kindergarden classroom

MIXED USE SPACES EXISTING CONDITIONS

- Under used Media room/Music room - Parent Pick-Up spots - Recycling room placement - Flexible spaces

OFFICES - Dedicated department storage - Offices near alike department offices - Small meeting rooms - Family servives part-time office space

19


SITE VISIT

SURVEY RESULTS

ROOM USE FREQUENCY

Survey helped in setting up principles and changes to be done Design concept and Statement

SITE EFFICIENCY

• • • • •

Re-organization of spaces in order to create proper served and serving spaces. Relocate existing partitions providing more space for storage and easy access. Improvements like furnishing, new wall paint are to be done. Introduce glazing to create more productive environment workspace , privarcy and natural light. Provide acoustic inserts in order to create break-out zones that help minimize noise and distractions.

20


BOSTON CHINATOWN NEIGHBORHOOD CENTER, MASSACHUCETS

Gateway Project

SUMMARY OF SURVEY

WORKSHOP AND RESEARCH

PROPOSED CHANGES

WORKSHOP RESULT

First Floor

Second Floor

Third Floor

Forth Floor

Fifth Floor

21


RENDERINGS OF THE INTERIOR SPACES

PROPOSED CHANGES

LEVEL 4

LEVEL 1 Welcoming area expanded to allow for additional seating & open space. •

Segemented office spaces turned into open concept space to allow for better working space.

•

Front Desk reduced in size to increase lobby open space and reduce pinch points

•

Bar style bench seating for adults and children proposed near rear entrance/exit.

•

The changes gave a new improved color schemes and more office space woth more openess.

LEVEL 5

22


Creative Business Associates

ASHFORD ROYALE, MUMBAI PROJECT

:

HOUSING LANDSCAPE AND CONSTRUCTION ROLE : TO PREPARE SCHEMATIC DRAWINGS AND DESIGN LANDSCAPE ELEMENTS. PURPOSE : TO PROVIDE LANDSCAPE AMENITIES TO THE RESIDENTIAL HOUSING TIMELINE : YEAR 2015 SOFTWARE : AUTOCAD, SKETCHUP, PHOTOSHOP

MASTER PLAN

SCHEMATIC DIAGRAMS

ZONING

PUBLIC SEMI PRIVATE SEMI PUBLIC

PUBLIC

SEMI PUBLIC

PUBLIC

SEMI PUBLIC

SEMI PRIVATE

Proposed greens

23


LANDSCAPE LAYERS

OVERVIEW OF ZONES

Proposed greens

Hardscape

Softscape

RENDERINGS STAGE

SKATING RING

HALF BASKET BALL

MEDITATION AREA

PLAY AREA AMPHITHEATRE

BOX CRICKET SITTING SPACES

24


RECREATIONAL PARK, DAPIWALI, THANE PROJECT : ROLE : PURPOSE : TIMELINE :

RECREATIONAL PARK TO PREPARE SCHEMATIC DRAWINGS AND DESIGN LANDSCAPE ELEMENTS. TO GIVE A BASIC DESIGN IDEAS ABOUT RECREATIONAL PARK AS LOCAL TOURISM YEAR 2015

Creative Business Associates

25


26


DADAR PLUMBING STATION, MUMBAI PROJECT

:

BEAUTIFICATION, LANDSCAPING AND DEVELOPMENT OF GARDEN

ROLE

:

TO PREPARE AUTO-CAD CONSTRUCTION DRAWING WITH A REFERENCE FROM A SOURCE, BASIC RENDERING, LIST OF PLANTATION AND QUOTE YEAR 2014 AUTOCAD, MICROSOFT EXCEL

TIMELINE : SOFTWARE :

Creative Business Associates

27


28


HOBBIES AND INTERESTS PAINTING

DIY HOME DECOR

LOVE SUCCULENT AND BONSIA

MEMES

29


Turn static files into dynamic content formats.

Create a flipbook
Rajashree Portfolio by r.gandhalikar - Issuu