INVASIVE PLANT PROGRAM 2023 ANNUAL REPORT – DECEMBER 2023
2023 Invasive Plant Program Work Plan Priorities and Results Priorities
Results
Planning An updated list was created for the Area Update the list of PRRD owned/occupied Controller contract including the removal of properties and cross-reference the several relinquished solid waste sites and a properties for historical invasive plant community park. infestation using the Report Invasives data. Treatments occurred from May-September Create a schedule of treatment months 2023 by MGP Contracting. Treatment started to ensure proper timing of treatment. earlier than years previous because of early growing conditions. Purchased 1400 Invasive Plant Books and Inventory current outreach materials and shared with community groups and events as update/purchase as required. requested. There were no changes to legislation or Amend all accompanying legislation and ancillary documents that required updates in ancillary documentation to be consistent 2023. with the current strategic plan direction.
Inventory and Surveys Area Contractor visited all PRRD sites as per Site visits required for 1/3 of PRRD the contractual obligations. 51 sites were owned/occupied lands. treated and all parks and Solid Waste and wastewater sites were monitored for efficacy.
Treatment All PRRD sites were visited and infested sites Treat all invasive species were treated an average 1-4 times as surveyed/inventoried on PRRD necessary. owned/occupied lands using the designated three pass system.
Treatment Monitoring This is the 3rd year of the Area Controllers contract, 30% of the PRRD sites will be monitored for treatment in 2023.
Sites were visually inspected for treatment efficacy during site inspections throughout the season during scheduled or routine facility and property inspections by PRRD Field Services staff.