┘
└
Project Package PROJECT NAME: PROJECT VALUE:
S Shaped Classroom Block_Project Package_Crazy_Architecturee_Rev.0
US$
222,677.28
PROJECT DURATION:
5.2 Month Timeline
PROJECT LOCATION:
Harare, Zimbabwe
PROJECT BRIEF:
S Shaped Classroom Block, with floor area of; 1,125 m²
Summary of basic materials, further details available inside Package Cement 2,301 bags ¾ Stones 165.0 m³ R/Sand 133.5 m³ Bricks 148,835 bricks P/Sand 161.8 m³ 230 B/Force 174 rolls 115 B/Force 45 rolls 230 DPC 20 rolls 115 DPC 5 rolls
┐
┌