Internship Portfolio

Page 1

HOPE

SCARLET MIRROR: RESTAURANT

Project Brief: The client has hired you to verify the suitability of the site depicted in the plan provided for use as a restaurant. They have asked that you develop a preliminary design that meets the requirements listed and that includes a preliminary material palette. Based upon your findings, the client may sign a lease for the building or elect to review another local building that might better suit their needs.

Design Statement: The Scarlet Mirror is a place to look and feel your best on the inside and the outside. The use of mirrors in the design helps to elevate the space as well as give the customers opportunity to appreciate themselves. The reflective materials add a layer of depth and glamour that is carried through out the space. The various shapes and curves guide the users to the tables where they can enjoy an evening or meal. The red and black materials are balanced to create an environment that is inviting and loving while keeping the modern edge.

This parenting add from 1992 confirms that we go through a significant change where we do not truly see ourselves or our worth. This usually happens in the teenage years and typically isn’t addressed until our mid twenties or older. AKA after drinking age. My idea was to design a cocktail bar around healing our vision of ourselves while being in an free, fun and loving environment. The affirmations are scattered throughout the space and near mirrors so when reading the statements you can appreciate that you are telling yourselves the words rather than someone else. Many of us have no problem hyping up our friends but when it comes to our own self love we lack support.

CHEROKEE STUDIOS PROJECT: MARIPOSA DESIGNS

Project Brief: You have been hired by a client to design the interiors of her new office space located on the first floor of an existing mixed use building, Cherokee Studios located in West Hollywood, California. The client owns a graphic design firm that is well known for its print, digital, and environmental work in the music and film industries. The design of the office should reflect a creative and collaborative work environment. The exterior architecture of the building must remain unchanged.

Design Statement: This design reflects the musical roots of the Cherokee Studio while still creating a naturalistic and sustainable space where work can be facilitated. Soft fabrics and vibrant color are paired to create a fun atmosphere.

Sustainable Statement: Mariposa Designs choose to participate in the LEED v4.1 Sourcing Raw Materials option by using recycled content materials, bio based products and wood products. The options listed will be sourced from three different reputable sustainable manufacturers. These sustainable decisions help impact the environment in positive ways.

I choose to use Urban Wood Goods as the reclaimed wood company. Their mission is to reuse old but stable wood from buildings that have outlived their time. The wood used is from the 1800s-1900s. The wood brings in a unique texture and grain for each one of a kind piece.

MDC is what is used for most of the upholstery and wall covering through out the project. MDC Interior Solutions is 3rd party verified defined in ISO 14001 Environmental Management. Their responsibility statement includes a recycling program that reuses and recycles in both pre and post consumer waste.

Interface is sustainability sourced and has been redesigned to be able to incorporate recycled materials in the carpet tiles. This company is third party certified by ReEntry® program

RAIN BEAUTY: RETAIL

Project Brief: Using the plan provided, students will design a brick and mortar retail space within a mall leasehold space. Only the retail floor space will be designed. Within the design, students must include a cash wrap (3’W min),ADA compliant components, provide well-designed circulation and reinforce the brand identity.

Design Statement: Rain Beauty is an open and organic space that uses natural materials to convey and earthy feel. The natural materials contribute to the sustainability that the company advocates for. The colors and patterns are used to transport the customer to a relaxing environment. The Scarlet Macaw bird is an important part of the branding in Rain Beauty, so much in fact that the company supports the endangered Scarlet Macaw birds by donating a 5% of their annual profits to the cause.

CUSTOM DESIGN SKETCHES

STUDIO ART

1 2 3 4 5 6 A B C D RECEPTION 401 CHECK IN 402 BREAK/COPY 403 NORTH HALLWAY 404 CALL STATION 405 EXAM 1 406 EXAM 2 407 EXAM 3 408 EXAM 4 409 BOTOX 410 EMG 411 EEG 412 TEAM AREA 413 TECH 414 SUPPLIES 415 STORAGE 416 CLEAN LINEN 417 SOUTH HALLWAY 418 RR1 419 SOILED LINEN 420 RR2 421 NORTH CORRIDOR 422 SOUTH CORRIDOR 423 WOMENS RR 424 MENS RR 425 A A A A B B B B B E A6.00 A6.00 401 422C 2 3 1 1 ALIGN 4' 0" 13'9" 7'10 1/2" 5'5 1/2" 6'4 1/2" 9' 3 1/2" 23' 0" 8' - 0 3/4" 6' 5" 6' - 11" 2' 5" 8' 9 1/4" 10' 4 1/2" 10' - 5 1/2" 6' 2" E E E E E E F F D D C D C D D C B B C B D B B D C B C B B C B A C A A A A A D 403B AL GN AL GN 423B 423A 422A 422B 405 406 407 408 409 410 411 412 413B 420 421 413A 414 415 416 402A 403A 419 417 5' -0CLEAR A6.00 2 BEVERAGE CENTER ELEVATIONA7.00 F F AL GN F F AL GN AL GN B B B A A A 17' - 9 1/4" 7'11 1/4" 4'9 1/2" 11' 9 3/4" 5'5 1/2" 4'5" 8' 3 3/4" 7' - 0 1/4" 3' 7" 5' 0 1/4" 1' - 0" 6' 11 3/4" 4'10 1/4" 2'10" 3'4" 6'3" 9' 1" 6'3" 3' 4" CLEAR 5' 0" 3' 4" 6'2 1/4" 6' 3" 3'4" 6'7" 9' 1" 2' 5 1/4" 7' 2 1/2" 9'7 1/4" B CLEAR 5' - 0" CLEAR 5' -0 7' 2 1/2" 5' 11 3/4" A A A A RATED TO THE DECK ABOVE. INSULATED TO THE DECK ABOVE. INSULATED TO 12" ABOVE CEILING. PLUMBING. A A CONDITION AT EXTERIOR MULLION. CONDTION AT CONCRETE/COLUMN. WALL TYPE LEGEND NEW DOOR NEW WALL EXISITING WALL DEMO WALL EXISITING DOOR WALL AND DOOR LEGEND 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 RECEPTION CHECK IN BREAK/COPY NORTH HALLWAY CALL STATION EXAM 1 EXAM 2 EXAM 3 EXAM 4 BOTOX EEG EMG TEAM AREA PROCEDURE SUPPLIES TECH STORAGE CLEAN LINEN SOUTH HALLWAY RR 1 SOILED LINEN RR 2 NORTH CORRIDOR SOUTH CORRIDOR WOMENS RR MENS RR ROOM SCHEDULE www.autodesk.com/revit Scale Project number Date Drawn by Checked by Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail 1/8" = 1'-0" 5/2/2022 5:28:02 PM A1.00 CONSTRUCTION SHEET DES 414 Neurology Clinic South Cedar 04/30/2022 HMA SMP No.DescriptionDate 1/8" = 1'-0" 1 CONSTRUCTION PLAN CONSTRUCTION PLAN GENERAL NOTES: 1. ALL PARTITION LOCATIONS SHALL BE AS SHOWN ON FLOOR PLAN. IN CASE OF CONFLICT NOTIFY DESIGNER. FLOOR PLAN BY DESIGNER TAKES PRECEDENCE OVER ALL OTHER PLANS. 2. ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB, LEVEL, SQUARE AND TRUE. 3. THE CONTRACTOR SHALL PROVIDE SUFFICIENT FRAMING OR BLOCKING OF ALL WALL OPENINGS FOR MECHANICAL, ELECTRICAL, AND ARCHITECTURAL ELEMENTS, INCLUDING SHELVING, SIDELIGHT, DOORS, MILLWORK, ETC. LOCATED IN OR ON WALLS. ALL CONCEALED LUMBER TO BE SEALED AND FIRE TREATED. 4. ALL GYPSUM BOARD PARTITIONS SHALL BE TAPED AND SANDED SMOOTH WITH NO VISIBLE JOINTS. ALL EXPOSED GYPSUM BOARD EDGES TO HAVE FLEXIBLE VINYL CORNER GUARDS AS SPECIFICIED, U.O.N. 5. NEW PARTITIONS TO ALIGN WITH EXISTING WINDOW FRAMES/SILLS OR EXISTING WALLS/COLUMNS U.O.N. 6. NEW PARTITIONS AT WINDOWS TO BE CENTERED ON MULLLIONS U.O.N. 7. ALL PARTITIONS IN EXCESS OF 30 -0 LENGTH SHALL HAVE FULL HEIGHT CONTROL JOINT INSTALLED WITH 30 -0 MAXIMUM SPACING. 8. WHENEVER OPENINGS ARE CUT THROUGH FIRE RATED PARTITIONS, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR WHOM THE HOLE IS CUT TO PATCH AND REPAIR ANY OPENINGS TO MAINTAIN THE INTEGRITY OF THE FIRE RATING. 9. FIREPROOFING, IF ANY, SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENTRATING THE FIREPROOFING SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL CONDITION AND FIRE RATING, AT THE SUBCONTRACTORS EXPENSE. 10. ALL DOOR FRAMES TO BE INSTALLED PLUMB, STRAIGHT AND TRUE. MAINTAIN ADEQUATE TOLERANCES AND CLEARANCES SO THAT ALL DOORS FIT AS SPECIFIED. 11. ALL DOORS SHALL HAVE 1 -6 CLEARANCE ON STRIKE/PULL SIDE OF DOOR. NOTIFY DESIGNER OF EXCEPTIONS PRIOR TO CLOSING OF PARTITIONS. 12. PROVIDE ALL PARTS NECESSARY FOR PROPER OPERATION OF ALL DOORS. 13. ALL HARDWARE TO BE ADA COMPLIANT AND AS SPECIFIED. 14. ALL DOUBLE DOORS TO BE CENTERED IN WALL SPACE U.O.N. 15. ALL THRESHOLDS NOT TO EXCEED 1/2 IN HEIGHT. 16. PROVIDE AND INSTALL COMMERCIAL GRADE ROLLER SHADES AT ALL EXTERIOR WINDOWS. SHADES TO HAVE 3% OPENNESS FACTOR. CONTRACTOR TO SUBMIT COLOR OPTIONS TO DESIGNER FOR SELECTION. 17. MODIFY AND SUPPLEMENT EXISTING SPRINKLER SYSTEM AS REQUIRED BY CODE PER PARTITION LAYOUT. BUILDING SPRINKLER SYSTEM MUST NOT BE DISRUPTED DURING CONSTRUCTION. 18. MECHANICAL CONTRACTOR TO REVIEW ALL THERMOSTAT LOCATIONS WITH DESIGNER PRIOR TO INSTALLATION. CONSTRUCTION PLAN KEYNOTES: 1. SEE SHEET A5.00 FOR AND CONSTRUCTION PLAN OF RESTROOMS. 2. SEE SHEET A7.00 FOR RECEPTION DESK DETAILS. 3. PROVIDE AND INSTALL WATER LINE FOR ICE MAKER IN BREAK ROOM REFRIGERATOR.

3.

1. ALL FLOORING TILES SHALL BE LAID IN A "MONOLITHIC" PATTERN WITH ALL GRAIN OR TEXTURE RUNNING IN THE SAME DIRECTION, UNLESS OTHERWISE NOTED.

2. ADHESIVE: SHALL BE A PRODUCT APPROVED FOR USE IN THIS TYPE OF INSTALLATION BY THE FLOORING OR BASE MANUFACTURER.

3. EXECUTION: FLOORING SHALL BE INSTALLED BY EXPERIENCED INSTALLERS APPROVED BY MANUFACTURER, AND IN STRICT ACCORDANCE WITH MANUFACTURER'S INSTALLATION SPECIFICATIONS.

4. VINYL BASE: STANDARD (AS SPECIFIED) 4" VINYL COVE BASE TO BE INSTALLED WHERE VCT OR LINOLEUM TILE OCCURS, UNLESS OTHERWISE NOTED.

WALL FINISH GENERAL NOTES:

1. SURFACE PREPARATION: ALL WALLS SHALL BE PROPERLY PREPARED, SPACKLED, SANDED, ETC. TO PROVIDE A SMOOTH SURFACE. ALL ELECTRICAL SWITCHES AND OUTLET PLATES, SURFACE HARDWARE, ETC., SHALL BE REMOVED BEFORE PAINTING OR WALLCOVERING.

2. PROTECTION: ALL WORK BY OTHERS SHALL BE ADEQUATELY PROTECTED AGAINST DAMAGE FROM PAINT AND FROM THE APPLICATION OF THE VARIOUS ADHESIVES USED IN INSTALLING ALL WALL COVERINGS. ON COMPLETION, ALL OTHER WORK SHALL BE LEFT FREE OF DAUBS, SPOTS, AND SPLATTERS OF PAINT AND ADHESIVES.

3. INSTALLATION: ALL WALL COVERING SHALL BE HUNG IN STRICT ACCORDANCE WITH THE RESPECTIVE MANUFACTURER'S WRITTEN INSTRUCTIONS. ALL SEAMS MUST BE CLOSELY AND NEATLY BUTTED AND ALIGNED TO THE WALL COVERING PATTERN, ALL AIR POCKETS AND BUBBLES ELIMINATED, AND THERE MUST BE A FIRM BOND OF THE WALL COVERING TO THE UNDERLYING WALL SURFACES. EXCEPT WHERE INDICATED, ALL SEAMS MUST BE MADE A MINIMUM OF 4" FROM ALL INSIDE AND OUTSIDE CORNERS AND NO HORIZONTAL SEAMS WILL BE ACCEPTED. ALL FINISHED SURFACES MUST BE CLEANED AS THE WORK PROGRESSES AND ALL EXCESS PASTE AND ADHESIVES MUST BE REMOVED.

4. PAINTING: ALL PAINT SHALL BE RECOMMENDED BY THE PAINT MANUFACTURERS FOR SPECIFIC SURFACES. PROVIDE THE FOLLOWING PAINT SYSTEMS FOR THE VARIOUS SUBSTRATES INDICATED. SEE FINISH PLANS FOR EXACT LOCATION.

DRYWALL PARTITIONS:

1ST COAT PRIMER

2ND COAT LATEX, EGGSHELL

3RD COAT LATEX, EGGSHELL

DRYWALL SOFFITS & COVES:

1ST COAT PRIMER

2ND COAT LATEX, FLAT

3RD COAT LATEX, FLAT HOLLOW METAL FRAMES & MISC. METAL ITEMS:

1ST COAT PRIMER

2ND COAT LATEX, SEMI-GLOSS

3RD COAT LATEX, SEMI-GLOSS

5. ALL HOLLOW METAL DOORS FRAMES TO BE PAINTED P5

6. PAINTING & WALL COVERING INSTALLATION TO OCCUR BEFORE MILLWORK INSTALLATION.

PORCELAIN/CERAMIC TILE GENERAL NOTES:

1. GROUT LINES AT TILE FLOORS AND WALLS NOT TO EXCEED 3/16 WIDTH.

FINISH PLAN KEY NOTES

1. PROVIDE AND INSTALL WT1 WITH MT1 FROM FLOOR TO 4 -0 A.F.F. INSTALL WC3 FROM 4 -0” A.F.F. TO CEILING.

2. PAINT GYP. BOARD CEILING P4

3. PAINT GYP. BOARD SOFFIT P4

4. SEE A5.00 FOR BREAK ROOM FLOORING PATTERN PLAN

1 2 4 5 6 A B C D 405 406 407 408 409 410 411 412 413 414 415 416 417 418 403 419 420 421 404 402 401 422 423 424 425 CPT1 WC2 B1 WC2 B1 PT1 B1 PT1 B1 CPT1 LIN CPT1 TS1 PT2 B1 PT2 B1 WC1 B1 WC1 B1 PT2 B1 WC1 B1 VF1 WC2 B1 PT1 B1 CPT1 TS1 TS1 VF1 VF1 VF1 VF1 VF1 VF1 WC1 B1 PT2 B1 WC2 B1 PT1 B1 WC1 B1 PT2 B1 WC2 B1 WC1 B1 PT2 B1 WC2 B1 PT1 B1 PT2 B1 WC1 B1 WC2 B1 PT1 B1 CPT1 FT1 FT1 TS2 TS2 PT1 B1 CPT1 CPT1 CPT1 VF1 PT2 B1 WC1 B1 WC2 B1 PT2 B1 PT1 B1 VF1 PT1 B1 TS1 TS1 TS1 TS1 TS1 TS1 TS1 TS1 CPT1 CPT1 CPT1 CPT2 CPT2 CPT2 CPT2 WC4 B2 WC4 B2 WC2 B1 WC2 B1 FT1 FT1 TS2 TS2 PT1 B1 4 1 1 1 2 1 2 3 TS3 TS3 TS3 TS3 SC SC SC SC EXC SC SC TS3 TS3 TS3 SC SC NEW DOOR NEW WALL EXISITING WALL DEMO WALL EXISITING DOOR WALL AND DOOR LEGEND 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 RECEPTION CHECK IN BREAK/COPY NORTH HALLWAY CALL STATION EXAM 1 EXAM 2 EXAM 3 EXAM 4 BOTOX EEG EMG TEAM AREA PROCEDURE SUPPLIES TECH STORAGE CLEAN LINEN SOUTH HALLWAY RR 1 SOILED LINEN RR 2 NORTH CORRIDOR SOUTH CORRIDOR WOMENS RR MENS RR ROOM SCHEDULE FLOOR WALL BASE TRANSITION STRIP FINISH SYMBOL LEGEND www.autodesk.com/revit Scale Project number Date Drawn by Checked by Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail 1/8" = 1'-0" 5/2/2022 5:35:36 PM A3.00 FINISH SPECIFICATIONS DES 414 Neurology Clinic South Cedar 04/30/2022 HMA SMP No.DescriptionDate 1/8" = 1'-0" 1 FINISH FLOOR PLAN FINISH PLAN GENERAL NOTES 1. SUBMITTALS: UPON RECEIPT OF ALL FINISHES FROM MANUFACTURE(S), A PROPERLY TAGGED SAMPLE WITH MANUFACTURER'S LABEL SHALL BE SUBMITTED TO PROJECT DESIGNER FOR APPROVAL BEFORE INSTALLATION. GOODS SUPPLIED FROM MORE THAN ONE DYE LOT FOR USE IN A SINGLE AREA WILL NOT BE ACCEPTED. DRAWDOWNS OF PAINTS SPECIFIED TO BE SUBMITTED TO DESIGNER FOR APPROVAL. 2. FLOOR PREPARATION: FLOORS SHALL BE CHECKED FOR MOISTURE CONTENT. FLOOR MUST BE FREE FROM MOISTURE, DUST, OILS, GREASE, WAX, OR OTHER FOREIGN MATTER. CRACKS 1/8" OR MORE, HOLES AND UNEVENNESS MUST BE FILLED WITH LATEX-BASED FLOOR FILLER. ANY PROTRUDING OBJECTS SHOULD BE GROUND SMOOTH WITH THE FLOOR SURFACE. CARPETING GENERAL NOTES 1. FLOOR PREPARATION: PREPARE SUBSTRATE TO ENSURE QUALITY INSTALLATION. CLEANING FLOORS: THE CONTRACTOR SHALL BROOM CLEAN AND PREPARE FLOORS TO SATISFACTORY CONDITION TO RECEIVE MATERIALS. CURING: CONCRETE SUB FLOORS SHOULD HAVE CURED FOR AT LEAST 90 DAYS PRIOR TO INSTALLATION. UNDERLAYMENT/LEVELING COAT: SHALL BE USED TO ELIMINATE HEIGHT DIFFERENCES AT FINISH FLOORING TRANSITIONS. UNDERLAYMENT TO CONSIST OF PLYWOOD IN THE APPROPRIATE THICKNESS TO BE GLUED AND POWER NAILED TO THE SUB FLOOR. FOR MINOR FINISH THICKNESS DIFFERENCES, PROVIDE LATEX COMPOUND "FEATHERING" TO MAKE A SMOOTH TRANSITION. 2. LAYOUT: ALL CARPET, UNLESS OTHERWISE STATED, SHALL RUN IN SAME DIRECTION. STANDARD SEAMLESS BROADLOOM WIDTHS SHALL BE USED UNLESS THE SIZE REQUIRED NECESSITATES SEAMING. SEAMS SHALL BE KEPT TO A MINIMUM. SEAMS SHALL GENERALLY NOT OCCUR AT DOORWAYS PERPENDICULAR TO THE DOOR. SEAMS OCCURRING AT DOORS PARALLEL TO THE DOORS
SHALL BE CENTERED DIRECTLY UNDER THE DOOR.
CARPET TO PORCELAIN TILE TRANSITIONS TO BE FLUSH. CARPET INSTALLER TO FUR UP SUBFLOOR SO CARPET MEETS TILE FLUSH.
4. VINYL BASE: STANDARD (AS SPECIFIED) 4" VINYL COVE BASE TO BE INSTALLED WHERE CARPET OCCURS, UNLESS OTHERWISE NOTED. VCT AND LINOLEUM TILE GENERAL NOTES
1 2 4 5 6 A B C D 405 406 407 408 409 410 411 412 413 414 415 416 417 418 403 419 420 421 404 402 401 422 423 424 425 2 2 ET1 GC1 CH3 4 5 5 5 5 5 5 TC1 D1 GC1 L1 L1 LF1 L1 LF1 TC1 CH2 CH2 ST1 S1 T1 S1 T1 21 5 4 19 20 5 4 GC1 19 D1 TC1 4 5 17 COPIER 19 D1 TC1 T2 18 1 CH2 21 3 12 13 12 13 12 13 12 13 12 13 12 13 12 13 12 13 12 13 NEW DOOR NEW WALL EXISITING WALL DEMO WALL EXISITING DOOR WALL AND DOOR LEGEND 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 RECEPTION CHECK IN BREAK/COPY NORTH HALLWAY CALL STATION EXAM 1 EXAM 2 EXAM 3 EXAM 4 BOTOX EEG EMG TEAM AREA PROCEDURE SUPPLIES TECH STORAGE CLEAN LINEN SOUTH HALLWAY RR 1 SOILED LINEN RR 2 NORTH CORRIDOR SOUTH CORRIDOR WOMENS RR MENS RR ROOM SCHEDULE www.autodesk.com/revit Scale Project number Date Drawn by Checked by Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail Consultant Address Address Phone Fax e-mail 1/8" = 1'-0" 5/2/2022 6:43:17 PM A4.00 FURNITURE / EQUIPMENT SHEET DES 414 Neurology Clinic South Cedar 04/30/2022 HMA SMP No.DescriptionDate 1/8" = 1'-0" 1 FURNITURE EQUIPMENT PLAN FURNITURE/EQUIPMENT PLAN GENERAL NOTES: 1. FURNITURE INFORMATION IS FOR MOVING AND PLACEMENT REFERENCE ONLY. 2. VERIFY FURNITURE SPECIFICATIONS WITH MANUFACTUTER REPRESENTATIVE. 3. TENANT IS RESPONSIBLE FOR MOVING AND FURNITURE COORDINATION. 4. TENANT AND TENANT S CONTRACT WORKERS ARE RESPONSIBLE FOR REPAIRING ANY DAMAGE DONE TO FINISHED CONSTRUCTION WORK DUE TO MOVING FURNITURE, FIXTURES AND/OR EQUIPMENT. FURNITURE/EQUIPMENT PLAN KEY NOTES: 1. SEE SHEET A7.00 FOR RECEPTION DESK DETAILS. 2. SEE SHEET A5.00 FOR ENLARGED EQUIPMENT PLAN OF RESTROOMS. 3. CLIENT PROVIDED REFRIGERATOR. 4. SEE STEELCASE DRAWINGS FOR WALL UNIT DETAILS 5. SEE ROOM 406 FOR TYP FURNITURE CODES
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.