EPIC 2019: Spire - Intrusion-Tolerant SCADA for the Power Grid

Page 1

Spire: Intrusion-Tolerant SCADA for the Power Grid Amy Babay University of Pittsburgh School of Computing and Information


Importance of SCADA for the Power Grid • Supervisory Control and Data Acquisition (SCADA) systems form the backbone of critical infrastructure services • To preserve control and monitoring capabilities, SCADA systems must be constantly available and run at their expected level of performance (able to react within 100-200ms)

• SCADA system failures and downtime can cause catastrophic consequences, such as equipment damage, blackouts, and human casualties October 2019

Electric Power Industry Conference (EPIC)

2


Emerging Power Grid Threats • Perimeter defenses are not sufficient against determined attackers – Stuxnet, Dragonfly/Energetic Bear, Black energy (Ukraine 2015), Crashoverride (Ukraine 2016) – Becoming a target for nation-state attackers

October 2019

Electric Power Industry Conference (EPIC)

3


SCADA Vulnerabilities SCADA systems are vulnerable on several fronts:

HMI

• SCADA system compromises – SCADA Master – system-wide damage – RTUs, PLCs – limited local effects – HMIs

• Network level attacks – Routing attacks that disrupt or delay communication – Isolating critical components from the rest of the network October 2019

Electric Power Industry Conference (EPIC)

Primary SCADA Master

Backup SCADA Master

PLC

RTU

Physical Equipment

Physical Equipment

4


The Spire System • Spire is an intrusion-tolerant SCADA system for the power grid: it continues to work correctly even if some critical components have been compromised • Intrusion tolerance as the core design principle: – Intrusion-tolerant network

– Intrusion-tolerant consistent state – Intrusion-tolerant SCADA Master

• Open Source - http://dsn.jhu.edu/spire

October 2019

Electric Power Industry Conference (EPIC)

5


Roadmap • Demonstrating the problem: Red Team Experiment at Pacific Northwest National Labs (PNNL)

• Spire System – How it works • Deployment Scenarios – Power Plant Deployment at Hawaiian Electric Company – Wide-area Transmission Architecture – Immediate Next Steps October 2019

Electric Power Industry Conference (EPIC)

6


Red Team Experiment March 27 – April 7, 2017

October 2019

Electric Power Industry Conference (EPIC)

7


DoD ESTCP Red Team Experiment • DoD ESTCP experiment hosted at Pacific Northwest National Labs • Evaluated NISTcompliant commercial SCADA architecture and Spire – Each attacked by Sandia National Labs red team October 2019

Electric Power Industry Conference (EPIC)

8


DoD ESTCP Red Team Results • NIST-compliant system completely taken over – MITM attack from enterprise network – Direct access to PLC from operational network

• Spire completely unaffected – Attacks in enterprise and operational network – Given complete access to a replica and code – Red team gave up after several days October 2019

Electric Power Industry Conference (EPIC)

9


Spire: How it works

October 2019

Electric Power Industry Conference (EPIC)

10


SCADA Vulnerabilities SCADA systems are vulnerable on several fronts:

HMI

• SCADA system compromises – SCADA Master – system-wide damage – RTUs, PLCs – limited local effects – HMIs

• Network level attacks – Routing attacks that disrupt or delay communication – Isolating critical components from the rest of the network October 2019

Electric Power Industry Conference (EPIC)

Primary SCADA Master

Backup SCADA Master

PLC

RTU

Physical Equipment

Physical Equipment

11


Spire: Addressing System Compromises • Byzantine Fault Tolerant Replication (BFT) – – – –

Correctly maintains state in the presence of compromises 3f+1 replicas needed to tolerate up to f intrusions 2f+1 connected correct replicas required to make progress Prime protocol – latency guarantees under attack [ACKL11]

October 2019

Electric Power Industry Conference (EPIC)

12


Spire: Addressing System Compromises • Byzantine Fault Tolerant Replication (BFT) – – – –

Correctly maintains state in the presence of compromises 3f+1 replicas needed to tolerate up to f intrusions 2f+1 connected correct replicas required to make progress Prime protocol – latency guarantees under attack [ACKL11]

• What prevents an attacker from reusing the same exploit to compromise more than f replicas?

October 2019

Electric Power Industry Conference (EPIC)

13


Spire: Addressing System Compromises • Byzantine Fault Tolerant Replication (BFT) – – – –

Correctly maintains state in the presence of compromises 3f+1 replicas needed to tolerate up to f intrusions 2f+1 connected correct replicas required to make progress Prime protocol – latency guarantees under attack [ACKL11]

• Diversity

– Present a different attack surface so that an adversary cannot exploit a single vulnerability to compromise all replicas – Multicompiler from UC Irvine [HNLBF13]

October 2019

Electric Power Industry Conference (EPIC)

14


Spire: Addressing System Compromises • Byzantine Fault Tolerant Replication (BFT) – – – –

Correctly maintains state in the presence of compromises 3f+1 replicas needed to tolerate up to f intrusions 2f+1 connected correct replicas required to make progress Prime protocol – latency guarantees under attack [ACKL11]

• Diversity

– Present a different attack surface so that an adversary cannot exploit a single vulnerability to compromise all replicas – Multicompiler from UC Irvine [HNLBF13]

• What prevents an attacker from compromising more than f replicas over time?

October 2019

Electric Power Industry Conference (EPIC)

15


Spire: Addressing System Compromises • Byzantine Fault Tolerant Replication (BFT) – – – –

Correctly maintains state in the presence of compromises 3f+1 replicas needed to tolerate up to f intrusions 2f+1 connected correct replicas required to make progress Prime protocol – latency guarantees under attack [ACKL11]

• Diversity

– Present a different attack surface so that an adversary cannot exploit a single vulnerability to compromise all replicas – Multicompiler from UC Irvine [HNLBF13]

• Proactive Recovery

– Periodically rejuvenate replicas to a known good state to cleanse any potentially undetected intrusions – 3f+2k+1 replicas needed to simultaneously tolerate up to f intrusions and k recovering replicas [SBCNV10] – 2f+k+1 connected correct replicas required to make progress October 2019

Electric Power Industry Conference (EPIC)

16


The Spire System: Single Control Center

CHAPTER 3. INTRUSION-TOLERANT SCADA FOR THE POWER GRID

Figure 3.5: Int rusion-Tolerant SCADA syst em archit ecture for a single control center deployment with 6 replicas (f Electric = 1, Power k =Industry 1). Conference (EPIC) October 2019 17


The Spire System: Single Control Center

Six Spire replicas, monitoring and controlling three power grid scenarios (two distribution, one generation)

October 2019

Electric Power Industry Conference (EPIC)

18


Hawaiian Electric Company Power Plant Deployment January 22 – February 2, 2018

October 2019

Electric Power Industry Conference (EPIC)

19


DoD ESTCP Hawaiian Electric Company Deployment Setup • Spire test deployment at HECO – “Mothballed” Honolulu plant – Managed small power topology, controlling 3 physical breakers via a Modbus PLC

• Deployment goals – Operate correctly in real environment without adverse effects – Meet performance requirements

October 2019

Electric Power Industry Conference (EPIC)

20


DoD ESTCP Hawaiian Electric Company Deployment Results • Ran continuously for 6 days without adverse effects on other plant systems • Timing experiment using sensor to measure HMI reaction time showed that Spire met latency requirements October 2019

Electric Power Industry Conference (EPIC)

21


Wide-Area Transmission: Beyond a Single Control Center

October 2019

Electric Power Industry Conference (EPIC)

22


Wide-Area Transmission Systems Control Center

LAN

HMI HMI

Primary SCADA Master

Backup SCADA Master

PLC

RTU

Physical Equipment

Physical Equipment

SCADA Master Primary

SCADA Master Hot Standby

Wide Area Network

PLC

RTU

RTU

Physical Equipment

Physical Equipment

Physical Equipment

Substation

Substation

Substation

• SCADA systems support large power grids with PLCs in many substations spanning hundreds of miles • What happens if the control center is disconnected? October 2019

Electric Power Industry Conference (EPIC)

23


Wide-Area Transmission Systems Primary Control Center

Cold-Backup Control Center

LAN

LAN

HMI HMI

Primary SCADA Master

Backup SCADA Master

PLC

RTU

Physical Equipment

Physical Equipment

SCADA Master Primary

SCADA Master Hot Standby

HMI

SCADA Master Primary

SCADA Master Hot Standby

Wide-Area Network

RTU

RTU

Physical Equipment

Physical Equipment

Substation

Substation

• Primary-Backup architecture is not sufficient to address malicious attacks – cold-backup takes time to come online; hot-backup subject to “split-brain” problem October 2019

Electric Power Industry Conference (EPIC)

24


Resilient Wide-Area Architecture • To protect against sophisticated network attacks, Spire supports multiple control sites • But control sites are expensive… – Spire can operate with two control centers + additional sites that can be served by commodity data centers (that lack the ability to communicate with PLCs and RTUs in the field)

October 2019

Electric Power Industry Conference (EPIC)

25


Resilient Wide-Area Architecture • Successfully withstands: 1 intrusion, 1 disconnected site, 1 replica undergoing proactive recovery Data Center 1 SM

Data Center 2 SM

SM

Control Center 1 HMI

SM

SM

SM

SM

Control Center 2

Spines SM

SM

SM

SM

SM

HMI

Spines

RTU

RTU Physical Equipment

Substation October 2019

Physical Equipment

Substation

Electric Power Industry Conference (EPIC)

26


Resilient Wide-Area Architecture • Successfully withstands: 1 intrusion, 1 disconnected site, 1 replica undergoing proactive recovery Data Center 1 SM

Data Center 2 SM

SM

Control Center 1 HMI

SM

SM

SM

SM

Control Center 2

Spines SM

SM

SM

SM

SM

HMI

Spines

RTU

RTU Physical Equipment

Substation October 2019

Physical Equipment

Substation

f = 1, k = 4 3f + 2k + 1 = 12 total replicas 2f + k + 1 = 7 correct needed

Electric Power Industry Conference (EPIC)

27


Wide Area Update Latency Plot

• 30-hour wide-area deployment of configuration 3+3+3+3 • Control centers at JHU and SVG, data centers at WAS and NYC • 10 emulated substations sending periodic updates • 1.08 million updates (108K from each substation) • Nearly 99.999% of updates delivered within 100ms (56.5ms average) October 2019

Electric Power Industry Conference (EPIC)

28


Wide Area: Latency Under Attack

• Targeted attacks designed to disrupt the system • All combinations of site disconnection (due to network attack) + proactive recovery October 2019

Electric Power Industry Conference (EPIC)

29


Wide Area: Latency Under Attack

• Targeted attacks designed to disrupt the system • All combinations of intrusion + site disconnection (due to network attack) + proactive recovery October 2019

Electric Power Industry Conference (EPIC)

30


Deployment Plan: Next Steps

October 2019

Electric Power Industry Conference (EPIC)

31


First Step: Network-Level Resilience • Protects communication infrastructure – Standard, insecure protocols (e.g. Modbus, DNP3) limited to direct (cable) connection between proxy and device

• Accommodates existing system architecture and components Control Center HMI

SCADA Master

Proxy

Proxy

Intrusion-Tolerant Communication Infrastructure Proxy

Proxy RTU

October 2019

PLC

Physical Equipment

Physical Equipment

Substation

Substation Electric Power Industry Conference (EPIC)

32


Second Step: Full Intrusion-Tolerance • Employs full power of Spire system, protecting against system intrusions/compromises as well as network attacks – Protects communication infrastructure (intrusion-tolerant network) – Protects SCADA Master (intrusion-tolerant system state)

• Requires substantial architectural changes Data Center 1 SM

Data Center 2 SM

SM

Control Center 1 HMI

SM

SM

SM

SM

Control Center 2

Spines SM

SM

SM

SM

SM

HMI

Spines RTU

RTU Physical Equipment

Substation October 2019

Physical Equipment

Substation

Electric Power Industry Conference (EPIC)

33


Resources • Amy Babay

www.cs.pitt.edu/~babay/

• Yair Amir www.cs.jhu.edu/~yairamir/ • JHU DSN Lab www.dsn.jhu.edu • Spread Concepts LLC www.spreadconcepts.com • Spire www.dsn.jhu.edu/spire/ • Multicompiler www.github.com/securesystemslab/multicompiler

• Papers:

– Deploying Intrusion-Tolerant SCADA for the Power Grid www.dsn.jhu.edu/papers/DSN_2019_SCADA_Experience.pdf – Toward an Intrusion-Tolerant Power Grid: Challenges and Opportunities www.dsn.jhu.edu/papers/scada_ICDCS_2018.pdf – Network-Attack-Resilient Intrusion-Tolerant SCADA for the Power Grid www.dsn.jhu.edu/papers/scada_DSN_2018.pdf

October 2019

Electric Power Industry Conference (EPIC)

34


Backup Slides

October 2019

Electric Power Industry Conference (EPIC)

35


DoD ESTCP Red Team Takeaways • Today’s power grid is vulnerable • There is a difference between current best practices and state-of-the-art research-based solutions • Secure network setup using cloud expertise (protected the system for two days) • Customized intrusion-tolerant protocols (defended the system in the presence of an intrusion on the third day)

October 2019

Electric Power Industry Conference (EPIC)

36


Spire Operation

CHAPTER 3. INTRUSION-TOLERANT SCADA FOR THE POWER GRID

Figure 3.5: Int rusion-Tolerant SCADA syst em archit ecture for a single control center deployment with 6 replicas (f Electric = 1, Power k =Industry 1). Conference (EPIC) October 2019 37


Spire Operation

CHAPTER 3. INTRUSION-TOLERANT SCADA FOR THE POWER GRID

* Operator Button-Click *

Figure 3.5: Int rusion-Tolerant SCADA syst em archit ecture for a single control center deployment with 6 replicas (f Electric = 1, Power k =Industry 1). Conference (EPIC) October 2019 38


Spire Operation

CHAPTER 3. INTRUSION-TOLERANT SCADA FOR THE POWER GRID

Send to f+k+1 replicas

Figure 3.5: Int rusion-Tolerant SCADA syst em archit ecture for a single control center deployment with 6 replicas (f Electric = 1, Power k =Industry 1). Conference (EPIC) October 2019 39


Spire Operation

CHAPTER 3. INTRUSION-TOLERANT SCADA FOR THE POWER GRID Agreement protocol execution

Figure 3.5: Int rusion-Tolerant SCADA syst em archit ecture for a single control center deployment with 6 replicas (f Electric = 1, Power k =Industry 1). Conference (EPIC) October 2019 40


Spire Operation

CHAPTER 3. INTRUSION-TOLERANT SCADA FOR THE POWER GRID Threshold signature generation

Figure 3.5: Int rusion-Tolerant SCADA syst em archit ecture for a single control center deployment with 6 replicas (f Electric = 1, Power k =Industry 1). Conference (EPIC) October 2019 41


Spire Operation

CHAPTER 3. INTRUSION-TOLERANT SCADA FOR THE POWER GRID

Signed Command Delivery

Figure 3.5: Int rusion-Tolerant SCADA syst em archit ecture for a single control center deployment with 6 replicas (f Electric = 1, Power k =Industry 1). Conference (EPIC) October 2019 42


Spire Operation

CHAPTER 3. INTRUSION-TOLERANT SCADA FOR THE POWER GRID

Signed Command Validation, Delivery and Execution

Figure 3.5: Int rusion-Tolerant SCADA syst em archit ecture for a single control center deployment with 6 replicas (f Electric = 1, Power k =Industry 1). Conference (EPIC) October 2019 43


Spire Operation

CHAPTER 3. INTRUSION-TOLERANT SCADA FOR THE POWER GRID

Status update generation

Figure 3.5: Int rusion-Tolerant SCADA syst em archit ecture for a single control center deployment with 6 replicas (f Electric = 1, Power k =Industry 1). Conference (EPIC) October 2019 44


Spire Operation

CHAPTER 3. INTRUSION-TOLERANT SCADA FOR THE POWER GRID

Send to f+k+1 replicas

Figure 3.5: Int rusion-Tolerant SCADA syst em archit ecture for a single control center deployment with 6 replicas (f Electric = 1, Power k =Industry 1). Conference (EPIC) October 2019 45


Spire Operation

CHAPTER 3. INTRUSION-TOLERANT SCADA FOR THE POWER GRID Agreement protocol execution

Figure 3.5: Int rusion-Tolerant SCADA syst em archit ecture for a single control center deployment with 6 replicas (f Electric = 1, Power k =Industry 1). Conference (EPIC) October 2019 46


Spire Operation

CHAPTER 3. INTRUSION-TOLERANT SCADA FOR THE POWER GRID Threshold signature generation

Figure 3.5: Int rusion-Tolerant SCADA syst em archit ecture for a single control center deployment with 6 replicas (f Electric = 1, Power k =Industry 1). Conference (EPIC) October 2019 47


Spire Operation

CHAPTER 3. INTRUSION-TOLERANT SCADA FOR THE POWER GRID

Signed Command Delivery

Figure 3.5: Int rusion-Tolerant SCADA syst em archit ecture for a single control center deployment with 6 replicas (f Electric = 1, Power k =Industry 1). Conference (EPIC) October 2019 48


Spire Operation

CHAPTER 3. INTRUSION-TOLERANT SCADA FOR THE POWER GRID

Signed Command Validation and Display Update

Figure 3.5: Int rusion-Tolerant SCADA syst em archit ecture for a single control center deployment with 6 replicas (f Electric = 1, Power k =Industry 1). Conference (EPIC) October 2019 49