extra pressure affect on the overburden pressure which in

and the leak in pipe rams, while the Egyptian well the

turn affect on the total pore pressure of the well.

loss of circulation affect on Hydrostatic head.

2. The two killing methods was different as in Macondow they tried with Kill mud then with relief well and finally the top hat. In case of Egyptian well we tried to kill the well with kill mud and Engineering method was the best 3. Macondo was off shore while the Egyptian well

is

onshore.

5. The depth of Macondo was too high while the Egyptian well was 4600 m as TD. 6. The total cost of killing for Makondo was too high (over 20 billion dollar) while the Egyptian well was low killing cost ($ 50.000). From all the above discussion, we can find that, well control

4. The 2 cases was completely different in the reason of bow

is a vital process as it may cost the life of the rig crew and

out: The Macondo because the cement job was not good

must be early detected to avoid disaster as Macondo well.

The main categories of oil well control

Offshore Blowout preventer.

Petroleum Today - October 2019 47


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Volume 38th October 2019 by petroleum today mag - Issuu