ORLEANS PARISH SCHOOL BOARD PURCHASING/ANCILLARY SERVICES DEPARTMENT 3520 General DeGaulle Drive, Suite 5078, New Orleans, LA 70114 Leslie J. Rey, Director (504) 304-5645
May 6, 2013
ADDENDUM NO. 1 INVITATION TO BID NO. 13-0023 COOLING TOWER REPLACEMENT AT MCDONOGH 35 SENIOR HIGH SCHOOL This Addendum and clarification items form a part of the Contract Documents and modifies the original Bid Documents issued April 24, 2013. Acknowledge receipt of this Addendum on the bid form. Failure to do so may subject Bidder to disqualification. This addendum consists of 1 page Item 1
Q. Can you provide us with the existing cooling towers thermal design capacity (flow rate in GPM; inlet water design temperature; outlet water design temperature; design wet bulb temperature) A. This should be field-verified using the identifying plates on the cooling towers, I can arrange another site visit if required.
Item 2
Q. What is the existing cooling towers fan HP? A. This should be field-verified using the identifying plates on the cooling towers, I can arrange another site visit if required.
Item 3
Q. Are there any new fan motor controls required? A. This project is intended to be a turnkey installation project. The existing cooling towers are to be removed and the new units installed in their place. Installation should comply with the manufacturer specifications for installation. The cooling towers should be fully operational and complete. Where "complete" is used, it shall mean complete with all connections, supports, attachments and incidental items necessary for a finished and properly operating assembly or installation. BY:
Mr. Leslie J. Rey Purchasing/Ancillary Services Director