Preliminary Fee Proposal

27

Inchydoney Island Spa NODA has been working with Inchydoney Island Lodge and Spa since 2013 when we completed the front lobby and reception area. Our inspiration comes from the surrounding landscape and seascape - neutrals, greys and warm sandy colour with hints of blues and turquoise greens.

2

Winner of many awards from Ireland’s Leading Spa Resort at the World Travel Awards and Ireland's Leading Resort at the Irish Hospitality Awards to Best Four Star Hotel at the Hotel & Catering Review Gold Medal Awards, Inchydoney Is a unique place.

28

NODA Preliminary Fee Proposal for Bective House Hotel AREA

OBJ PRELIMINARY INTERIOR BUDGET

protected structure Basement Bar Reception/Dining/Kitchen/ Con Bar

interior Design % fee to tender

FF&E protected FF&E new structure build

Construction & site

10.00%

180,000

90,000

500,000

6.00%

30,000

14,000

1,100,000

6.00%

66,000

30,000

42,000

30,000

90,000

60,000

100,000

60,000

700,000

6.00%

Pool/Spa

1,500,000

6.00%

contemporary bedrooms

5,000,000 lump sum 100,000*

Conference Area and Bar

FEE to tender

1,800,000

20,000 incl

Restrooms

30,000

10,000

558,000

294,000

total ex vat to tender MOCK UP BEDROOM PACK (essential)

6%

3

typical bedroom corridor and application throughout

10%

30,000

49,000000@ 1.2 % site

tender

49,000000@ .6 % site

site

588,000 294,000

Final FF&E fee

tbc

tbc

Preliminary Fee Proposal

* lump sum for the contemporary bedrooms, recognising the repetitive nature of the block. This fee covers 5 bedroom designs to tender

5

4

29

30

Notes on Preliminary Fee Proposal This fee proposal is approximate and is subject to final clarification on budgets and inter Design Team assignment of works. It is based on the Preliminary Cost plan, as prepared by OBJ, and provided by JFA. This Cost plan currently excludes the FF&E and the OS&E. If appointed, we will work with the client and QS to assemble these budgets, and discuss methods of procurement. Our fee will be finalised once these budgets are agreed. Protected Structures Interiors We have approached the Protected Structures Areas as requiring individual attention and design. No two rooms will be designed the same, and each will have its own unique character. These spaces require time, attention and expertise, and hence attract a higher design premium. Contemporary Bedrooms We have approached these bedrooms as cost effectively as possible, recognising that there is a significant repeat element involved. We have priced designing each of the 4 typical bedrooms, and an additional bedroom for DAC purposes. This design work can then apply to the roll out of the other similar bedrooms without further design fee. However, should the number of room types increase, we will need to increase the fee pro rata. M&E We work with the m&e consultant to ensure that the services are well coordinated, within all interior spaces, and visible grilles/smoke heads/vents/ are coordinated within the overall design. In addition, we will position the switches and sockets, select the finishes and ensure compliance. We include 1% of the m&e budget as fee to cover this work. Doors and Stairs For public front of house areas, we have included for aesthetic design of doors and selection of ironmongery. We will issue a cad drawing of the doors showing the elevation, materials and ironmongery to the lead Architect for inclusion in their door schedule.

6

RCP We will issue design intent drawings, showing position of coffers/ downstands/materials and finishes for all FOH ceilings. We will issue lighting and M&E set outs, including finishes to the lead Architect for their their final coordination and integration into the scheme. Structural design/framings etc of ceilings will not be shown on our drawings.

7

31

32

FF&E Selection and Procurement FF&E includes furniture, fittings and equipment and includes: All loose furniture/lamps/curtains/rugs/dressings/books/vases/Urns/etc We have included for the selection and tendering of the FF&E items where they have been included in the OBJ Preliminary Cost plan. The total budget for ff&e has yet to be determined but will be charged at the following rates: FF&E for the Main house/protected structure are selected on a bespoke room by room basis. Our fee for this work is based on 10% of the ff&e cost. FF&E for the contemporary areas : Our fee for this work is based on 5% of the ff&e cost. Our scope of work regarding ff&e will be as follows: ●

Selection of elements from suppliers /procurement agent/ website and presentation of options /with respect to budget

Scaling and accurate representation on drawings

Fabric and finishes selection and specification

Click to add speaker notes

6

7

8

9

Share


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Bective House hotel Interiors Proposal by Noda_Arch - Issuu