BIBIM HOUSE (2022)

Page 1

Existing Ground Floor Plan

Existing Mezzanine Floor Plan

Existing North Elevation

Existing South Elevation

Existing Section 1-1

Existing Section 2-2

Existing Ground Floor Ceiling Plan

Existing Mezzanine Ceiling Plan

Existing Ground Floor Service Plan

Existing Mezzanine Service Plan

Ground Floor Demolition Plan [REVISED]

Mezzanine Demolition Plan

Proposed

Louvre

Louvre

Kitchen Floor Plan

Front Kitchen Elevation

Kitchen Island Table Detail

Restroom Plan

Restroom Elevations

Restroom Details

HAVANA BAR INTA421: DESIGN MADE REAL NICOLE LIMOS 300486194
SITE DOCUMENTATION DESIGN DOCUMENTATION A02 A11 IA15 IA25 IA20 IA30 A12 IA16 A26 IA21 IA31 A13 A17 A27 IA22 A32 IA14 IA24 IA19 IA29 IA18 IA28 IA23 A33 A34 A35
DRAWING SCHEDULE
Mezzanine Plan
Plan
Site
Plan Revised Section 3-3
Section 4-4
Section
Proposed Ground Floor
Revised
Revised
5-5 Revised Section 6-6 Private Dining Elevation Entrance Elevation
Louvre Plan & Elevations
Design Element Details
Design Element Model Revised Ground Floor Ceiling Plan
Bar Shelf Detail
Wall Mirror Detail Revised Electrical Plan Revised Plumbing Plan Revised Furniture Plan Material & Finishes Schedule Product & Fixtures Schedule
Appendix
Product & Fixtures Schedule
Photos
Exterior Site
Photos
Interior Site
Photos
Interior Site
Accessible Restroom Elevation
Back Kitchen Elevation Revised Mezzanine Ceiling Plan
[REVISED] A07 A09 A03 A05 A10 A04 A06 A08

Dunlop Terrace

and service plans from Wellington City Council Property Maps and may be inaccurate. On-site survey must occur before demolition and construction. This drawing set is a continuation of the prior INTA421 project and is revised based on the given feedback Surrounding buildings include, residential, hospitality, and industrial

WiganStreet

SITE INFORMATION: Current Site Use: Site Address: Type of Project: Client: Client Address: NOTES: 32a / 34 Wigan Street Te Aro, Wellington 6011 Renovating into a Korean themed bar and restaurant. Te Aro, Wellington 6011 Hospitality, Havana Bar and Restaurant Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. Victoria University September 2022 1:500 SITE PLAN Nicole Limos Nicole Limos A02
Building Footprint Wastewater Trunk Main Wastewater Rising Main Wastewater Service Connection Wastewater Manhole Main Stormwater Pipe Direction Stormwater Service Connection Stormwater Manhole Isolate or Backflow Preventer Water Meter Water Main Water Hydrant Contour Lines Site Entrance Building Footprint Wastewater Trunk Main Wastewater Rising Main Wastewater Service Connection Wastewater Manhole Main Stormwater Pipe Direction Stormwater Service Connection Stormwater Manhole Isolate or Backflow Preventer Water Meter Water Main Water Hydrant Contour Lines Site Entrance Water Meter Service Valve Water Hydrant Contour Lines Site Entrance Water Main Building Footprint Wastewater Wastewater Service Connection Wastewater Manhole Stormwater Pipe Stormwater Service Connection Stormwater Manhole Isolate / Backflow Preventer A0 Site Plan 1:500 @ A3Legends:
Drainage

The existing site consists of two worker cottages that were renovated to connect to each other, hence the varying floor levels. Dimensions of the site are based on-site measurements and archived plans from over 100 years ago.

Some measurements may be inaccurate. Ensure on-site measurements before any modifications

Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 Nicole Limos Nicole Limos 1:100 EXISTING FLOOR PLAN A03 UP 10 9 3 UP UP UP UP STEP STEP STEP STEP STEP STEP 150 150 100 150 100 80 W.I.F 5 4 3 2 1 E D C B 10 9 8 7 6 5 4 3 F. STEP 500 A S.L. S.L. S.L. S.L. S.L. S.L. S.L. 11 12 13 4 2 3 5 6 8 9 7 14 1. Main Entrance 2. FOH 3. Kitc hen 4. Restaurant Seating Area 5. Comfort Room 6. Storage Office 7. Outdoor Courtyard 8. Men's Toilet 9. Women's Toilet 10. Bar Seating Area 11. Bar 12. Cellar 13. Rubbish Area 14. Outdoor Seating 15. Fry Station 16. Attic Storage 10 15 16 1 4 3 GROUND FLOOR MEZZANINE FFL: 550 FFL: 650 FFL: 800 FFL: 800 FFL: 650 FFL: 550 FFL: 470 FFL: 0 FFL: 0 FFL: 3000 FFL: 3500 P1 Floor Plan - Existing 1:100 @ A3LEGENDS: Skylight Timber Frame Walls Concrete Exhaust Fan Walk-in-Freezer S.L. F. W.I.F.
S1 E1 A06 A04 E2 S1 S2 A05 A06 A06 S2 A06
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 Nicole Limos Natasha Gunawan 1:50 A04 NORTH ELEVATION E D C B A 3000 Mezzanine FFL 0 Datum 550 Lower FFL 800 Upper FFL E1 North Elevation 1:50 @ A3 A03 LEGENDS: Rusticated Weatherboard Concrete
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 A05 Nicole Limos Nicole Limos 1:50 SOUTH ELEVATION A B C D E 3000 Mezzanine FFL 0 Datum 550 Lower FFL 800 Upper FFL E2 South Elevation - Existing 1:50 @ A3 A03 LEGENDS: Rusticated Weatherboard Concrete
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 A06 Nicole Limos Nicole & Natasha 1:100 EXISTING SECTIONS 5 3 2 1 4 DW DW EXHAUST DUCT/FAN FRYER FRIDGE 5 4 3 2 1 PL. PL. S2 S1 Section 2-2 - Existing Section 1-1 - Existing 1:100 @ A3 1:100 @ A3 A03 A03 LEGENDS: Rusticated Weatherboard Timber Frame Earth Concrete
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 A07 Nicole Limos Natasha Gunawan 1:100 EXISTING CEILING PLAN F. PL. EXT. PL. PROPRIETARY EXTRACTOR FAN KIT POLYCARBONATE ROOFING PLANTER GLASS SLOPE 10° PITCH SLOPE 10° PITCH SLOPE 3° PITCH ROOF MATERIAL VISIBLE SKYLIGHT MATERIAL EXT. EXTRACTOR PL. EXT. SLOPE 30° PITCH 9 8 7 6 5 4 EXT. SLOPE 35° PITCH SLOPE 15° PITCH SLOPE 35° PITCH 5 4 3 2 1 E D C B A 4 3 F. GROUND FLOOR MEZZANINE F. PL. EXT. PL. PROPRIETARY EXTRACTOR FAN KIT POLYCARBONATE ROOFING PLANTER GLASS SLOPE 10° PITCH SLOPE 10° PITCH SLOPE 3° PITCH ROOF MATERIAL VISIBLE SKYLIGHT MATERIAL EXT. EXTRACTOR PL. EXT. SLOPE 30° PITCH 9 8 7 6 5 EXT. SLOPE 35° PITCH SLOPE 15° PITCH SLOPE 35° PITCH 5 4 3 2 1 E D C B A F. GROUND FLOOR P2 Reflected Ceiling Plan - Existing 1:100 @ A3 A03 LEGENDS: Polycarbonate Roofing Roof Material Visible Skylight Material Glass Extractor Planter Proprietary Extractor Fan Kit
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 GREASE TRAP GM SWITCHBOARD GAS METER GREASE TRAP DISHWASHER KITCHEN SINK BASIN WASHING MACHINE GM GREASE TRAP WASTEWATER LINE DW DW DW S STOVE S WM STOVE S WM S B WC WC WC WC WC WC B B B B STOVE STOVE WALL FACED TOILET EXTRACTOR DUCT UNDERGROUND 1500L CAPACITY B Ø100mm @ 1:60 fall Ø40mm @ 1:60 fall Ø40m @ 1:60 fall Ø100mm @ 1:60 fall 5 4 3 2 1 E D C B A F. F. Ø40mm @ 1:60 fall Connection to Main GROUND FLOOR MEZZANINE A08 Nicole Limos Nicole Limos 1:100 EXISTING SERVICE PLAN GREASE TRAP GM SWITCHBOARD GAS METER GREASE TRAP DISHWASHER KITCHEN SINK BASIN WASHING MACHINE GM GREASE TRAP WASTEWATER LINE DW DW DW S STOVE S WM STOVE S WM S B WC WC WC WC WC WC B B B B STOVE STOVE WALL FACED TOILET EXTRACTOR DUCT UNDERGROUND 1500L CAPACITY B Ø100mm @ 1:60 fall Ø40mm @ 1:60 fall Ø40m @ 1:60 fall Ø100mm @ 1:60 fall 5 4 3 2 1 E D C B A F. F. Ø40mm @ 1:60 fall Connection to Main 4 3 GROUND FLOOR MEZZANINE P3 Service Plan - Existing 1:100 @ A3 A03 LEGENDS: Wastewater Line Extractor Duct Switchboard Gas Meter Grease Trap Dishwasher Washing Machine Stove Kitchen Sink Basin Cistern Toilet Extractor Fan Underground - 1500L Capacity

All dimensions to be checked on site by Builder / Fabricator prior to undertaking any demolition, or installation.

Interior flooring (Matai) to be sanded and re-coated

Cellar to be prepared for interior fitting.

Exterior walls to be refurbished with new rusticated weatherboard.

All aspects to be retained, unless otherwise indicated or stated on the plans.

Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 A09 Nicole Limos Nicole Limos 1:100 DEMOLITION PLAN UP 10 9 UP UP UP UP STEP STEP STEP STEP STEP STEP 150 150 100 150 100 80 W.I.F 5 4 3 2 1 E D C B 9 8 7 6 5 F. A S.L. S.L. S.L. S.L. S.L. S.L. S.L. 4 3 GROUND FLOOR MEZZANINE Remove existing kitchen joinery and plumbing in preparation for new kitchen joinery and plumbing Retain existing columns Reuse existing window Demolish existing deck and stairs in preparation for construction of accessibility ramp Remove flooring in preparation for landscaping. Remove existing fixtures and seal off any unnecessary plumbing pipes. Reuse fixtures where possible Skylight size to be increase. Existing beams to be retained Entrance to be pushed back. Refer to proposal for distance. Remove existing fixtures and seal off any unnecessary plumbing pipes. Reuse fixtures where possible Remove existing exhaust duct and seal off previously occupied space. Undertake remedial work on flooring that may have been damaged from prior use. Replace flooring if necessary Ensure flooring is even and up to standard. Replace flooring where necessary. P4 Demolition Plan 1:100 @ A3 A03
Flooring
Timber
Walls Concrete
LEGENDS:
to Remove
Frame
To Demolish

Existing floor and walls to be retained unless otherwise stated on the plan. The ramp, is made to comply, as nearly as is reasonably practicable. This provides accessibility access within the building.

The restroom is moved within building access, allowing plumbing output closer to the main road, as well as the implementation of an accessible restroom. The limited space only allows for two restroom compartments.

The kitchen is moved to where to bar used to be, with an extension into the cellar. This is to bring the space closer to the grease trap.

The bar is moved to the original position of the kitchen with the plumbing position in place. The central louvres allow for operable access that provides a separation between bar and restaurant when deemed necessary.

The outdoor area includes a ramp for accessible access and creates a more even field, relative to prior design.

The mezzanine is extended outwards to provide a private dining area. The space consists of a recessed seating area.

LEGENDS:

Concrete

Timber Flooring

Timber Frame Tiles

Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 A10 Nicole Limos Nicole Limos 1:100 REVISED FLOOR PLAN 9 8 7 6 5 2 1 UP UP UP 5 4 3 2 1 E D C B A 4 3 2 1 UP STEP 100 STEP 150 10 8 7 6 5 4 3 1 2 FFL: 550 FFL: 650 3 4 5 7 FFL: 550 10 8 FFL: 800 9 11 FFL: 800 12 14 FFL: 3450 13 FFL: 3000 FFL: 0 1. Main Entrance 2. Restaurant Seating 3. Kitchen 4. Pantry 5. Rubbish Area 6. Unisex Restrooms 7. Outdoor Courtyard 8. Outdoor Courtyard 9. Bar Seating Area 10. Bar 11. Bar Seating Area 12. Outdoor Bar Seating 13. Storage Space 14. Private Dining GROUND FLOOR MEZZANINE 6915 120 1590 120 1720 5470 S4 S4 S3 S3 S5 S5 S6 S6 120 1900 120 1925 120 120 820 120 1600 120 6 P5 Floor Plan - Revised 1:100 @ A3P8 P7 IA22 A12 A12 IA18 A12 A12 A11 A11 A11 A11 E5/6 E4 E8/9 E7 IA19 A13 IA23 IA22 E3 A13

Existing floor and walls to be retained unless otherwise stated on the plan. The ramp, is made to comply, as nearly as is reasonably practicable. This provides accessibility access throughout the building.

The mezzanine is extended outwards to provide a private dining area. The space consists of a recessed seating area.

The lighting is to be kept levelled with each other, shorten the wire where necessary.

Lighting fixtures and selected furniture specified in lighting and product schedule

Wall Tiles

Brick

Concrete

LEGENDS: Rusticated Weatherboard Timber Frame

Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 A11 Nicole Limos Nicole Limos 1:100 REVISED SECTION 3 / 4 5 4 3 2 1 11 10 9 8 13 14 12 5 3 2 1 4 2 3 7 S4 S3 Section 4-4 - Revised Section 3-3 - Revised 1:100 @ A3 1:100 @ A3 A10 A10 D4 IA20 M5 M1 M4 M1
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 A12 Nicole Limos Nicole Limos 1:100 REVISED SECTION 5 / 6 A B C D E 11 A B C D E 3 1 11 S5 Section 5-5 - Revised 1:100 @ A3 A10 S6 Section 6-6 - Revised 1:100 @ A3 A10 D5 IA21 M1 M1 LEGENDS: Rusticated Weatherboard Timber Frame Concrete M1

The Private Dining Louvres are to be fixed into place at a 45degrees. The acoustic panels to be installed according to product specifications. Entrance louvres are operable. Specification found on the following pages.

Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 Nicole Limos Nicole Limos 1:50 INTERIOR ELEVATIONS A13 350 80 1285 1438 2894 1372 1523 B 4 100 3049 1829 270 2298 2400 202 3242 2035 565 E4 Entrance Elevation 1:50 @ A3 A10 E3 Private Dining Elevation 1:50 @ A3 A10 D1 IA15 P18 P21 P20 M8 P19 P19
Timber Frame Acoustic Panels M1
LEGENDS:

The designed element is an operable louvre made from cedar slats. It is designed to create a optional separation between the bar and restaurant.

Element can be built in and out of site.

Maximum rotation of 45degrees with the aluminium proprietary mechanism hidden inside the timber structural frame.

Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 IA14 Nicole Limos Nicole Limos 1:20 LOUVRE PLAN & ELEVATIONS A1 Louvre Plan & Elevations 1:20 @ A3 A13 D1 D2 IA15 IA15 100 5 2190 5 100 200 100 5 220 220 190 2800 D3 IA15
CEDAR
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 IA15 Nicole Limos Nicole Limos 1:5 LOUVRE DESIGN ELEMENT DETAILS Timber Structural Frame Aluminum Drive Frame Grooved Dowel Pin 10gx75mm Wood Screw 220x30mm Cedar Flush Louvre Blade (Close Position) Timber Structural Frame 220x30mm Cedar Flush Louvre Blade (Open Position) 220x30mm Cedar Flush Louvre Blade (Close Position) Proprietary Manually Operating Mechanism Aluminium Drive Frame Manual Winder (Removable) Timber Structural Frame Proprietary Passive Gearbox 10gx75mm Wood Screw 195 40 CENTRE OPENING D2 D1 D3 Louvre Mechanism Detail Louvre Detail Louvre Mechanism Detail 1:5 @ A3 1:5 @ A3 1:5 @ A3 IA14 IA14 IA14 LEGENDS: Timber
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 Nicole Limos Nicole Limos 1:20 LOUVRE ELEMENT MODEL IA16
used materials are balsa wood, map pins and wood stain. The images indicate the louvre's operability.
The
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 A17 Nicole Limos Nicole Limos 1:100 REVISED CEILING PLAN 5 4 3 2 1 E D C B A P P P P P P P P P R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R P SLOPE 15° PITCH 5 4 3 2 R R R R R R R R R R R R R R R R R R R R R R R R R R R R R P P6 Reflected Ceiling Plan - Revised 1:100 @ A3 A10 LEGENDS: Timber Frame Empty Space Acoustic Panels Pendant Light Recessed Light Wall Mounted Light Fire / Sprinkler System Exhaust Fan Strip Light
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 IA18 Nicole Limos Nicole Limos 1:50 KITCHEN FLOOR PLAN 4 E D RF RF P7 Kitchen Floor Plan 1:50 @ A3 A10 E5/6 IA19 P1 P1 P4 P2 P2 P23 P5 F1 LEGENDS: Tile Timber Frame
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 Nicole Limos Nicole Limos 1:50 KITCHEN ELEVATION IA19 4 150 130 385 90 897 625 615 1165 1215 1215 560 1800 240 2530 4 880 1025 4460 555 865 50 1005 755 E6 Front Kitchen Elevation 1:50 @ A3 IA16 E5 Back Kitchen Elevation 1:50 @ A3 IA16 M4 P3 P4 P5 P3 P2 P2 P4 P5 LEGENDS: Wall Tile
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 Nicole Limos Nicole Limos 1:5 BAR SHELF DETAIL IA20 Oak Veneer Plywood Steel Frame Steel Bracers Welded to Frame Square Drive Screw 8gx3 Wooden Dowel 10x40mm Wood Glue Cedar Wood Bracket D4 Bar Shelf Detail 1:5 @ A3 A11 LEGENDS: Timber
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 Nicole Limos Nicole Limos IA21 1:20 KITCHEN ISLAND TABLE DETAIL Orient Table Top Hidden Island Support Bracket Bag Hook D5 Kitchen Island Table Detail 1:5 @ A3 A12 LEGENDS: Wood
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 IA22 Nicole Limos Nicole Limos As Shown RESTROOM PLAN & ELEVATION E7 P8 Accessible Restroom Elevation Restroom Floor Plan 1:20 @ A3 1:50 @ A3 - A10 E D 3 120 1900 120 625 800 480 120 120 825 120 1600 120 50 405 1145 1600 445 230 1800 720 1755 2475 E8/9 E7 IA23 IA22 M6 M7 P16 P19 P29 P18 P20 F2 LEGENDS: Timber Frame Wall Tiles Floor Tiles
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 IA23 Nicole Limos Nicole Limos 1:20 RESTROOM ELEVATION E9 E8 Restroom Elevation Restroom Elevation 1:20 @ A3 1:20 @ A3 IA20 IA20 D6 D8 IA24 IA25 D7 IA24 M3 P13 P14 P8 P12 P17 P11 P9 P10 P30 P5 M3 LEGENDS: Wall Tiles
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 IA24 Nicole Limos Nicole Limos 1:4 RESTROOM DETAILS CasaBlanca Black Tile 120x120mm Stanza Wall Bracket Stanza Casa Slab Top 1500x600mm 45x90mm Timber Frame 10gx75mm Wood Screw CasaBlanca Black Tile 120x120mm Gripflex Adhesive applied to AS 3958.1 Flexible Sealer Waterproof Gypsum Plasterboard 12.7mm 45x90mm Timber Frame Kemgrout Flexible Grout Stanza Casa Slab Top 1500x600mm Stanza Wall Bracket 10gx75mm Wood Screw D7 D6 Restroom Wall Detail Vanity Detail 1:4 @ A3 1:4 @ A3 IA21 IA21 LEGENDS: Wood

45x90mm Timber Stud LED Driver

45x90mm Timber Stud LED Driver

18mm Plywood Backing 6mm Mirror 12mm Timber Screw

18mm Plywood Backing 6mm Mirror 12mm Timber Screw

Male French Cleat Bracket

Male French Cleat Bracket

Female French Cleat Bracket 10gx75mm Wood Screw

Female French Cleat Bracket 10gx75mm Wood Screw

Stainless Steel

Stainless Steel Case

INSTALLATION NOTES:

Mount structural member to mount mirror to (timber stud, concrete wall etc.)

LED Driver

LED Driver

10gx75mm Wood Screw

10gx75mm Wood Screw

Male French Cleat Bracket

Male French Cleat Bracket

Female French Cleat Bracket

Female French Cleat Bracket

Install female brackets onto wall, spread evenly to balance mirror weight. Screws are as specified. Ensure screws are installed tightly and has penetrated structural material.

Check brackets are installed level with each other

Install male brackets onto mirror ensuring that male and female brackets align perfectly. Ensure screws are not too long when fixing male brackets as this could penetrate the mirror. Use screws as indicated.

Engage qualified electrician to wire into driver which is located and pre-fitted into the back of mirror

Slide male bracket onto female bracket. Will not require further glue if installed correctly.

*Regularly clean with mild liquid detergent or soap and water.

*DO NOT use cream cleaners or bleach

*DO NOT use cleaning pads with abrasive surfaces as this may destroy the material

LEGENDS: Plywood

Site Address: Client:
Address:
Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 IA25 Nicole Limos Nicole Limos As Shown WALL MIRROR DETAIL
Client
NOTES: Drawing
D8 D9 Wall Mirror Detail Wall Mirror Back 1:2 @ A3 1:10 @ A3 IA21 IA21

Lighting type indicated and specified in the lighting specifications on page IA31 & IA32

Some lighting options are limited due to the incline of the roofing, resulting in the chosen style of lighting.

Outdoor lighting is limited due to the walls outer walls being owned by the university.

Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 A26 Nicole Limos Nicole Limos 1:100 REVISED ELECTRICAL PLAN 5 4 3 2 1 E D C B A SLOPE 15° PITCH P P P P P P P P P R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R P R R R 2 2 2 L6 L6 L6 L6 L6 L6 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L6 L7 L7 L7 L7 L2 L2 L2 L2 L2 L2 L3 L3 L3 L3 L3 L3 L3 L3 L3 L1 L1 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L4 L1 L1 L1 L5 L5 L5 L1 L1 L1 L8 L8 L8 L8 L8 5 4 3 2 1 E D C B P P P P P P P P P R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R P R R R 2 2 L6 L6 L6 L6 L6 L6 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L1 L6 L7 L7 L7 L7 L2 L2 L2 L2 L2 L2 L3 L3 L3 L3 L3 L3 L3 L3 L1 L1 L4 L4 L4 L4 L1 L1 L1 L5 L5 L5 L1 L1 L1 L8 L8 L8 L8 L8 P9 Electrical Plan - Revised 1:100 @ A3 A10 Empty Space Timber Frame Pendant Light Power Outlet Recessed Light Wall Mounted Light Fire Alarm / Sprinkler System Ventilation Fan Strip Light One Way Switch, One Pole One Way Switch, Two Pole Two Way Switch, Two Pole Switchboard Electrical Circuits Egress Exit Light

The construction of the elevation buildings allow for the plumbing pipes to access the underfloor areas. This proves to be more beneficial as many of the walls are too narrow to ensure a structurally sound wall.

Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 A27 Nicole Limos Nicole Limos 1:100 REVISED PLUMBING PLAN 10 9 8 4 3 2 1 UP UP UP 5 4 3 2 1 E D C B A 4 1 UP STEP 100 STEP 150 9 8 7 6 5 FFL: 550 FFL: 650 FFL: 550 FFL: 800 FFL: 3450 FFL: 3000 FFL: 0 GROUND FLOOR MEZZANINE FFL: 800 GREASE TRAP DW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW CW CW CW CW CW CW CW CW CW CW Ø100m @ 1:60 fall Ø100m @ 1:60 fall Ø50m @ 1:60 fall Ø50m @ 1:60 fall CONNECTION TO MAIN CW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW 2 1 UP UP 5 4 4 3 2 1 UP STEP 100 STEP FFL: 550 FFL: 650 FFL: 0 GREASE
DW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW CW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW HW CW CW Ø50m @ 1:60 fall CONNECTION TO MAIN CW HW HW HW HW HW HW HW HW HW CW CW CW CW CW CW CW CW P10 Plumbing Plan - Revised 1:100 @ A3 A10 Empty Space Wastewater Cold Water Hot Water Gas
TRAP
Site Address: Client: Client Address: NOTES: Drawing Title: Scale @ A3: Drawn By: Revised By: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 Victoria University September 2022 Te Aro, Wellington 6011 IA28 Nicole Limos Nicole Limos 1:100 REVISED FURNITURE PLAN 9 8 7 6 5 2 1 UP UP UP 5 4 3 2 1 E D C B A 4 3 2 1 UP STEP 100 STEP 150 10 8 6 5 4 3 1 GROUND FLOOR MEZZANINE P11 Furniture Plan - Revised 1:100 @ A3 A10 P24 P33 P27 P27 P33 P23 P23 P23 P23 P36 P40 P40 P37 P37 P39 P22 P22 P23 P35 P34 P4 P27 P27 P27 P26 P37 P40 P33 P33 P33 P31 P32 P23 P35 P28 P27 P27 P27 P25 P33 P33 P33 P36 P27 P39 P38 P33 LEGENDS: Timber Frame Concrete Timber Floor Floor Tiles Furniture and Materials specification indicated and specified on the schedule located on page IA29, IA30, & IA31

Resene Triple Sea Fog; Tone: White; Lime-wash over application

Dulux Glink Gully

CasaBlanca Black 120x120mm

Bevelled Black Gloss Wall Tile 75x150mm

Ship-lap Brown 125x2400x15mm

Majolica Bricks Taupe 120x250mm

Resene Cloudy cc; Tone: White

Acoustic Plus Sound Absorbing Cloud Panels 1200x600x50mm

Resene Eighth Truffle cc; Tone: White

Aquitaine Grigio 40.8x61.4 Glazed Porcelain

Abstract Antracite 600x600; Matte Finish; Porcelain; Antislip

Bamboo X-treme Decking

Site Address: Client: Client Address: NOTES: Drawing Title: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 September 2022 Te Aro, Wellington 6011 Victoria University Nicole Limos Specified By: MATERIAL & FINISHES SCHEDULE CODE WALL CEILING FLOORING COLOUR & FINISHES SCHEDULE M1 M8 M9 F1 F2 F3 M2 M3 M4 M5 M6 M7 Seating Area, Kitchen, Bar Restroom Restroom Kitchen Bar Seating Restroom Toilet Restroom Toilet Private Dining All Kitchen Restroom Outdoor Area Resene Interior Paint Dulux Interior Paint Wall Tiles Wall Tiles Timber Wall Wall Tile Resene Interior Paint Resene Ceiling Paint Floor Tile Floor Tile Floor Tile Acoustic Ceiling Panels Resene Dulux The Tile Depot The Tile Depot Timberwall Artedomus Resene Resene Coem Abstract Plantation Bamboo EcoPlus Systems Resene Dulux The Tile Depot The Tile Depot Timberwall Artedomus Resene Resene Tile Trends The Tile Depot Plantation Bamboo N87-007-084 NZ9F8 Black / Ceramic Black / Ceramic Brown / Pine Taupe / Porcelain BR75-009-070 N90-007-078 Beige / Porcelain Charcoal / Porcelain Brown / Bamboo White / Glass Fibre EcoPlus Systems
LOCATION PRODUCT SPECIFICATIONS MANUFACTURER COLOUR / MATERIAL SUPPLIER M1 M2 M9 F2 F3 F1 M3 M4 M5 M6 M7 IA29

Gas Range, 48", 8 Burners, 2 Gas Ovens, LPG

Free-standing French Door Refrigerator Freezer, 36"

Insert Range Hood, 48"

Opal, Flex Spout, Pull-out

Zalo Kitchen Sink Double 855mm with Ranks and Overflow

Pass-through Dishwasher

Orient Table Top. Bamboo ply 30mm

Stainless Steel

Stainless Steel

Stainless Steel

Chrome

Stainless Steel

Stainless Steel

Bamboo Ply

Fisher & Paykel

Fisher & Paykel

Fisher & Paykel

Archant

ABI Interiors

Nisbets

Harrows

Stanza Casa Slab Top 1500mm, Wall mounted

Gisele Tower Basin Mixer

Obround LED Mirror

Above Bench Basin

Contract Wall Mounted Soap Dispenser 132

Dyson Airblade dB Hand Dryer

Koo Bamboo Bathroom Bin

Square Hand Wall Basin 420x250x150

Surface Mounted Horizontal Baby Change Table

Roval Surface Mounted Paper Towel Dispenser

Cali Toilet Roll Holder

Asher Back to Wall Toilet Suite

MacDonald CleanSeal® 90° Grab Rail

250mm Exhaust Fan

Reign Toilet Brush

ADAIR Mirror 400x1500mm

Greens Tapware

Trendy Glass & Mirror Athena Bathroom

Walnut

Matte Black / European Brass

N/A

Gloss White Finish

Chrome

Grey

Bamboo

Ceramic White

Light Grey

Satin Stainless Steel

Matte Black / Brass

White / Glazed Porcelain

Stainless Steel

Oakley Plumbing

Plumbing Plus

Plumbing Plus

Plumbing Plus

Robertson Bathware

Prosan

Spotlight

Elite Bathroomware

Macdonald Industries Limited

Macdonald Industries Limited

ABI Interiors

ABI Interiors

Macdonald Industries Limited

Babar Stool. 1020x500x470 Seat 760H

Babar Chair. 770x450x440 Seat 460H

Zara Sofa - Seater, Natural 800x700x1650 Seat 430H

Link Display System

Maker

Silver

Timber / Polyresin White

Black Metal / Glass

Bunnings

Freedom Furniture

Freedom Furniture

European Beech / Fabric

European Beech / Fabric

Fabric / Ash / Rattan

Veneer American Ash

Harrows

Harrows

Cintesi

Harrows

Site Address: Client: Client Address: NOTES: Drawing Title: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 September 2022 Te Aro, Wellington 6011 Victoria University Nicole Limos Specified By: PRODUCT & FIXTURES SCHEDULE CODE KITCHEN RESTROOM FURNITURE PRODUCTS & FIXTURES
LOCATION PRODUCT SPECIFICATIONS MANUFACTURER COLOUR / MATERIAL SUPPLIER P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 P18 P19 P20 P21 P29 P30 P22 P23 P24 P25 Kitchen Kitchen & Bar Kitchen Kitchen & Bar Kitchen Kitchen Kitchen Restroom Restroom / Accessible Toilet Restroom / Accessible Toilet Restroom Restroom / Accessible Toilet Restroom Restroom Accessible Toilet Accessible Toilet Restroom Toilet Toilet Accessible Toilet Toilet Toilet Restroom Bar Seating Area Restaurant Seating Area / Kitchen Restaurant Seating Storage Stove Unit & Oven Refrigerator & Freezer Range-hood Tap Sink Dishwasher Extended Dining Table Vanity Tap Mirror Basin Soap Dispenser Hand Dryer Rubbish Bin Sink Changing Table Towel Dispenser Toilet Roll Holder Toilet Grab Rail Exhaust Fan Toilet Brush Mirror Bar Stool Dining Chair Sofa Chair Storage Unit Fisher & Paykel Fisher & Paykel Fisher & Paykel Opal ABI
Progetto
SCHEDULE
Starline Harrows
Elementi Dyson KOO Clark ASI ASI ABI ABI MacDonald Comfort
REIGN ADAIR Harrows Harrows Cintesi Harrows
IA30

Dexter Oval Wall Hanger 520H x 240W

Bamboo Ply 30mm

Pallet Floor Cushion Cotton

Bowral Dining Table 1800x900mm

Bowral Dining Bench 1100x355x453mm

Trumpet Pedestal Base

Seba Kitchen Sink 550mm with Overflow and Rack

Ledge Banquette 850x480

Tokio Teak Dining Chair

Blok Teak Outdoor Bar Table 1090x1090x1090

Trestle Dining Table and 2 Bench Outdoor Dining Set

Jack Outdoor Reclaimed Teak and Wicker Counter height Bar Chair

Black Metal Bamboo

Cotton / Anthracite

Solid Tasmanian Oak

Solid Tasmanian Oak

Black Powdercoat / Steel

Stainless Steel

Upholstery / Timber

Poly-fibre / Teak

Reclaimed Teak

Reclaimed Teak

Wicker / Teak

The Plant Project

Harrows

NNE Furniture

Freedom Furniture

Freedom Furniture

Harrows

ABI Interiors

Harrows

Design Warehouse

Design Warehouse

Design Warehouse

Design Warehouse

Teda 11W White CCT LED Downlight

Junistar Lux 8W 2700K Black Round LED Downlight, Dimmable

Deksel Pendent Light

Deksel Wall Light

Typography Staff Wall Sconce

Captain Flint Outdoor Wall Light

LED Square Step Light

Core Razor Surface Mount Exit Light

White

Black / Aluminium

Aged Copper

Aged Copper

Black Anodised / Gold Anodised

Brushed Stainless Steel / Black

Charcoal

White

Lighting Plus

Lighting Plus

The Lighting Outlet

The Lighting Outlet

ECC

ECC

The Lighting Outlet

The Lighting Outlet

Site Address: Client: Client Address: NOTES: Drawing Title: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 September 2022 Te Aro, Wellington 6011 Victoria University Nicole Limos Specified By: PRODUCT & FIXTURES SCHEDULE CODE PRODUCTS & FIXTURES
LOCATION PRODUCT SPECIFICATIONS MANUFACTURER COLOUR / MATERIAL SUPPLIER P26 P27 P28 P31 P32 P35 P33 P36 P34 P37 P38 / 39 P40 L1 L2 L3 L4 L5 L6 L7 L8 Restaurant Seating Area Bar, Restaurant, Kitchen Areas Private Dining Restaurant Seating Restaurant Seating Bar Seating Bar, Restaurant Seating Area Outdoor Area Bar Outdoor Area Outdoor Area Outdoor Area Bar Seating, Restaurant Seating, Restroom Kitchen Kitchen Bench Bar Seating, Bar Private Dining / Bar Seating Restroom Outdoor Courtyard Entrance Ramp Exit Points Planter Tabletop Floor Cushion Dining Table Dining Bench Bar Height Booth Tablebase Outdoor Dining Chair Sink Outdoor Dining Table Outdoor Dining Set Outdoor Bar Chair Recessed Downlight Downlight Pendant Light Wall Mounted Light Wall Mounted Light Wall Mounted Light Step Light Exit Light
Harrows NNEVL BOWRAL BOWRAL Harrows Harrows Design
Design Warehouse Design Warehouse Design Warehouse
Rakumba
Lighting
SCHEDULE
The Plant Project
Warehouse ABI
TEDA Junistar CLA Lighting CLA Lighting
Flos Brilliant Lighting Atom
IA31
LIGHTING
Site Address: Client: Client Address: NOTES: Drawing Title: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 September 2022 Te Aro, Wellington 6011 Victoria University Nicole & Natasha Drawn By: APPENDIX A32
Site Address: Client: Client Address: NOTES: Drawing Title: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 September 2022 Te Aro, Wellington 6011 Victoria University Nicole & Natasha Photographer: EXTERIOR SITE PHOTOS A33
Site photos taken by Nicole Limos and Natasha Gunawan in July and August 2022
Images contain the exterior images of Havana, including the outdoor courtyard in the back and the adjacent rubbish room accessible on the side.
Site Address: Client: Client Address: NOTES: Drawing Title: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 September 2022 Te Aro, Wellington 6011 Victoria University Nicole & Natasha Photographer: INTERIOR SITE PHOTOS A34
July
Site photos taken by Nicole Limos and Natasha Gunawan in
and August 2022
Images contain the interior images of the bar and fry area of the Havana Bar building
Site Address: Client: Client Address: NOTES: Drawing Title: Company: Date: Sheet No. 32a / 34 Wigan Street Te Aro, Wellington 6011 September 2022 Te Aro, Wellington 6011 Victoria University Nicole & Natasha Photographer: INTERIOR SITE PHOTOS A35
photos taken by Nicole Limos
Natasha Gunawan in July and August 2022
the interior images
the restaurant,
Site
and
Images contain
of
seating area, storage and bathroom in the Havana Bar building