TABLE 3 PHOTOS Sharni
Chenai-I
Chenai-II
TABLE NO:4 SOIL & MOISTURE CONSERVATION MEASURES NEEDED IN FOREST AREAS NAME OF AREA
LATITUDE/ LONGITUDE
Chenai-I
31'53'88" 77'54'13"
ChenaiII
31'53'88" 77'54'13"
Sharni
31'53'88" 77'54'14"
PRESCRIPTION Trenching Live Hedge CheckDams Trenching Live Hedge CheckDams Trenching Live Hedge CheckDams
QUANTITY 1x.50x.30m=2000 Nos 300 Rms 3x1.5x1.5m=30 Nos 2x1.5x1.5m=30 Nos 1x.50x.30m=2200 Nos 300 Rms 3x1.5x1.5m=30 Nos 2x1.5x1.5m=40 Nos 1x.50x.30m=2600 Nos 200 Rms 3x1.5x1.5m=25 Nos 2x1.5x1.5m=30 Nos
AVAILABILT Y OF LOCAL MATERIAL
OLD WORK NEED REPAIRING (QUANTITY)
FINAL PRESCRIPTION NEW PRESCRIPTION
NEW QUANTITY
RATE/ CUM
COST (Rs)
Stone & local species
NA
Trenching
1x.30x.30m= 14400 Nos
9.9
142560
Stone & local species
NA
Trenching
1x.30x.30m= 13800 Nos
9.9
136620
Stone & local species
NA
Trenching
1x.30x.30m= 13800 Nos
9.9
136620
Volume: IX Chapter: 4 Page No:
101