Bob Civil

Page 1

Company Profile

01 | ABOUT US AND OUR SERVICES 2 02 | PORTFOLIO 4 03 | CASE STUDY 6 04 | PROJECT SPECIFICATIONS 8 05 | PROJECT AND TIME ESTIMATATION 10 06 | PROJECT TIMELINE 12 07 | ADDITIONAL SERVICE OFFER 14 08 | TERMS AND CONDITION 16 09 | THANKS 18 10 | CONTRACT AND SIGN OFF 20 01 | ABOUT US AND OUR SERVICES 22
TABLE OF CONTENT

ABOUT US

BOB CIVILS PTY LTD is 100% owned by Botswana citizens with a vast building experience in the mining & building,industry. We mainly specialize in mining & construction. The company posses all the required resources and expertise to provide a quality services that symbolizes excellence to ensure that the client’s expectations are met at all times .It is driven by the passion of its directors and dedicated employees to have a positive impact on the in Botswana ,to strive to promote economic development,whilst protecting the environment.

We are dedicated to provide professional services for the benefits of our clients, stake holders and the community at large.We aim to provide our services to both the public and private sector whilst improving economic and environmental conditions which is part of our mandadate.

Vision

We strive to be a pioneering local construction for economy growth poverty alleviation and environmental protection

Mission

To be uncompromising in quality,proffessionalism,intergrity and inovation

To be reliable by meeting and exceeding our client’s expectations

To be responsible by utilizing building methods that are environmentally friendly

PARTNERS & TEAM

BOB CIVILS PTY LTD has a team of professionals encompassing of, Enginneers,Technicians, Artisans, Builders and Managers, thus ensuring expertise and uperalle service for our clients. Our partners reinforce our committment to deliver quality service and products to our clients.

SERVICES

AGGREBIND

• Soul Distributors of Aggrebind in Southern Africa.

• Solution to cheap durable roads with a guarantee of 12 years.

• Solution on building Run ways for aircrafts

• Stabilization of any road depending on the specification from the client and traffic accomodation of the particular road.

• Good for access roads, parking lots internal roads

THE SMARTER CHOICE

■ for ■

SOIL-STABILIZATION

NEW ROAD CONSTRUCTION

■ for ■

EXISTING ROAD TOP SEALING & REJUVENATION

■ for ■

DUST & EROSION CONTROL

■ for ■

SITE-FABRICATED & FACTORY-PRODUCED BRICKS/BLOCKS/PAVERS

ROCK-SOLID SOLUTIONS YOU CAN COUNT ON ™

Why AggreBind Is The Smarter Choice and leaves the competition in the dust...

Welcome

Here you will find answers to the challenges you face in road construction and repair, dust control and avoidance of erosion, production of building materials from on-site elements (whether soil, sand or construction/mining waste)...and much more. All based on the superior soil stabilization achieved by our advanced (patented) cross-linking polymer breakthroughs. No matter if you are a local Municipality or State/Federal agency... if you are a Private Company or Public Corporation... or a Contractor that serves the local community or major corporate clients... If you're dealing with constraints on production timing, budget challenges or worksites where conventional methods are impractical and traditional materials are problematic in supply or transport, AggreBind will equip you with solutions that save money, time, and headaches.

Guatemala, Rural Development Project ROCK-SOLID SOLUTIONS YOU CAN COUNT ON ™
the world of AggreBind. 2 POTHOLES BEFORE MUD DUST MINING BUILDING
to

HUGE COST SAVINGS

■ For the same length of a fully completed AggreBind road, a traditional cement road will cost 2.4X more.

(See Cost Comparison chart on page 5)

■ Stabilizing of just the soil base layer with AggreBind reduces costs by 40% to 60%.

■ Top surface sealing with AggreSeal can extend the life of an existing road at a fraction of the cost, over time, of conventional surfacing methods.

■ Using AggreBloc for block and brick production yields cost savings of 35% to 45% versus cement — as verified by independent assessment.

COMPLETION TIME ACCELERATED

■ AggreBind roads can be completed in 1/4 the time it takes to build a traditional road; in some situations, up to 10 times faster. 1 kilometer of completed road can be successfully installed in 3 to 5 workdays.

■ AggreBind roads can typically be opened to traffic in 1 to 2 hours after being surface sealed — with a single pass of a bowser. (AggreBind reaches maximum strength in 28 days of full curing.)

■ With AggreDust, used for dust and erosion control, “fugitive” dust is stopped in its tracks; roadways and treated areas can be opened for traffic in as little as one hour.

PERFORMANCE GUARANTEE

■ We give a Five Year Product Guarantee made possible by a proprietary tracer acting like a kind of DNA that determines the integrity of the installation you commissioned. Our earliest installations have been in place since 2005 with zero failure rate.

TANGIBLE BENEFITS FROM OUR CROSS-LINKING POLYMER

■ AggreBind ‘s unique, proprietary cross-linking polymer increases CBR — load bearing capacity of all soils — by 4X to 6X...and also enhances the soil’s tensile strength ...all verified by independent laboratory testing. In fact, AggreBind is pound for pound more powerful than cement.

■ AggreBloc provides structural housing solutions with soil as well as non-cohesive materials like desert sand or crushed rubble.

■ AggreBind and AggreSeal are resistant to the most common road spillage — oil, gasoline/petrol, food/ drink, most acids.

■ All standard wearing top surfaces will bond to an AggreBind polymer-stabilized road base.

■ Our road surfaces withstand damage from UV radiation (verified for at least 12 years with no observed deterioration).

■ Laboratory tested with hazardous waste, AggreBind’s powerful molecular encapsulation can effectively prevent the release of environmentally harmful material, making it non-hazardous for safe disposal. This is patented technology from AggreBind.

ON-SITE APPLICATION VERSATILITY

■ All AggreBind products work not only with soil but also with non-cohesive materials like desert sand.

■ Works with clay content in the soil but clay is not required for construction of roads or the manufacturing of blocks, bricks and pavers.

■ We work with fresh water, river water as well as salt/seawater up to 4% salt content: when diluting AggreBind’s concentrated liquid polymer.

■ AggreBind and AggreSeal are available in a range of colors including BLACK (sends an important “signal of progress” to the rural community).

■ AggreBloc enables building blocks and bricks to be constructed from virtually all local in situ materials — including soil, sand, and construction or mining waste — and where conventional methods are too costly or impractical.

■ AggreBind’s BOND-BACK capability means integrity of the stabilized material is maintained with no loss of strength. This makes for easy, effective patching and repair work of any surface readily done with hand tools and minimal labor.

LABOR BENEFITS

■ Takes less labor because AggreBind road base is often one-shot and done… not multi-layered.

■ AggreBind offers a full week of training at no charge (with a minimum order) — enough time to train a typical road working/construction crew in how to efficiently install.

All AggreBind products are completely eco-friendly... safe for flora, fauna, all wildlife; EPA-compliant, non-toxic, nonflammable, will not degrade into the environment.

AggreBind's unique cross-linking polymer formulations have taken soil stabilization to the next level, achieving results similar to concrete but with no cement. Called by some a "disruptive technology," we help you win with water resistant, environmentally friendly road structures, dust control coatings and site-fabricated building materials (blocks, bricks and pavers) — all at remarkable cost savings.

3
All imagery supplied by AggreBind field operations or royalty-free (under licenses)

For New Road Construction

Faster, More Versatile, Less Expensive

It takes a tough polymer to make a ROCK-SOLID/SUPER LOAD-BEARING™ road...and AggreBind does that with almost any soil...even desert sand, without the multiple layers demanded by traditional road construction. AggreBind works with the widest bandwidth of soils.

Soil StabilizationConventional Road

AggreBind is a patented soil stabilizer and when properly used will create a solid, hydrophobic (water-resistent), load-bearing base or road sub-base. In many situations, it can deliver an effective self-sealed road or in high traffic areas, a traditional wearing surface may be applied as a topper to the AggreBind base.

■ AggreBind’s proprietary cross-linking styrene acrylic polymer is unique, delivering superior soil stabilization and enhancing the soil’s load bearing capacity by 400% to 600%.

■ AggreBind reduces overall road construction cost by 40% to 60% when compared to traditional methods.

■ You can get a finished road up to 10 times faster.

■ Local fresh water, river water and salt water can all be utilized when diluting AggreBind’s concentrated polymer.

■ Works with clay content in the soil but clay is not required. There is no requirement for “cohesive” soils.

■ AggreBind roads can typically be opened to traffic within 2 hours after being sealed or when the surace seal is dry to the touch.

■ AggreBind’s patented technology is available in colors including BLACK (a great “signal” to rural communities of progress...)

■ AggreBind has been tested to be UV resistent up to 12 years.

■ Our patented formulation has a proprietary tracer that acts like a kind of DNA to validate integrity of the installation you commissioned.

■ You get a Five Year Product Replacement Guarantee. (Our earliest installations are in place since 2005...with zero failure.)

SOIL STA B I L I Z AT I O N B A S E C O U R S E S U B - B A S E C O U R S E
AggreBind
DURING AFTER BEFORE BEFORE BEFORE AFTER AFTER ROADWAYS SIDEWALKS 4

AggreBind Beats Conventional Methods Cold

KILOMETER ROAD COST COMPARISON

In virtually any country and its currency where construction is being done, a concrete road of same length costs 2.4 times what an average AggreBind road would cost; Asphalt is 1.8 times and Paving is 1.23 times what an AggreBind road costs.

■ AggreBind’s BOND-BACK capability means integrity and strength of the stabilized material is maintained; any damage to AggreBind treated layers can be easily repaired with hand tools.

■ AggreBind is eco-friendly... safe for flora, fauna; EPA-compliant, non-toxic, will not degrade into the environment. (When other soil stabilizers say they are biodegradable, what they don’t tell you is they are likely to degrade and the road will have to be re-done multiple times over multiple years.)

■ Big savings on material handling: to stabilize 1 cubic yard of soil/sand, 540 pounds of cement are needed… this in contrast to about 4 Liters of AggreBind polymer...weighing only 8 pounds.

■ You get a full week of technical training for the road working/construction crews — at no extra charge (given a minimum order).

■ Numerous wearing surfaces can go on top of an AggreBind subbase — asphalt, chip seal, bitumen emulsion, micro-pavement and concrete. In rural and low traffic areas, the road base can be top sealed with Aggrebind’s surfacing mixture.

At AggreBind, we are working to change the way roads are made. With 21 Million kilometers of roads in the world... and only 35% paved*... that leaves nearly 14 Million kilometers for AggreBind to transform...at less cost, less effort and less harm to the environment!

* Reference: Meijer, J.R. et.al, Global patterns of current and future road infrastructure, Environ. Res. Lett. 13 (2018)

1
COST INDEX RATIO ( 1km x 6m width @ 150mm depth)
Concrete Asphalt Paving Aggrebind 240 183 123 100 Cost Index Ratio vs AggreBind
BEFORE BEFORE BEFORE AFTER AFTER AFTER 5 www.aggrebind.com

For Dust Control

Unpaved Road Dust, Eroding Soil, Migrating Sand, Fugitive Coal Dust... Stopped Dead In Their Tracks

“Fugitive” dust & other airborne/waterborne particles from unpaved roads, construction and mining sites are a huge and growing problem worldwide:

■ Poses serious health hazards, spreading infections

■ Pollutes water quality, destroying aquatic habitats as sediment washes into waterways

■ Causes negative impact on crop yields, e.g. infestation

■ Blocks water supply and drainage channels to people, animals & plants

AggreDust stops flying dust, eroding dirt and migrating sand where they start: putting in place a flexible yet strong co-polymer-bonded surfacing in a clear, durable “skin”.

■ The road or area can be open to traffic with one hour spacing of curing and formation of a clear film

■ Solvent-free, safe, non-toxic, non-flammable, non-polluting

■ No leeching or dissipating into soil

■ No loss of stacked product from wind erosion

■ Water-diluted, easy to apply by spraying

Controlling dust and soil erosion will increase agricultural yields, reduce operational costs, reduce equipment repairs and maintenance, improve the health for formerly exposed workers and the local community.

AggreDust is proven for particle control on Unpaved Roads, Sand Migration, Volcanic Ash, Mining Tailings, Airport Runways, Construction Sites, Oil & Gas Operations and Military Applications.

* No respiratory protection required, except with poor ventilation; see Material Data Sheet at www. aggrebind.com

MINING • EXCAVATION • MILLING
SEALING EROSION CONTROL
6
EMBANKMENT STABILIZATION

For Road Surfacing Top Surfacing For Old & New Roads ...Saves You Time & Money

Listening to our Clients, we learn a lot...and they told us they wanted an intermediate solution between our flagship product AggreBind (for full road construction) and AggreDust (which just sprays a light but strong "skin" to stop dispersion of airborne particles).

This is where AggreSeal comes in beautifully because it is specially formulated to deliver all the key ROCK-SOLID™ benefits of AggreBind plus the ease of application of AggreDust — and at an attractive price well below conventional methods of top surfacing.

■ You can use AggreSeal as a topper on any conventional new or old road sub-base like concrete...and finish the road faster & cheaper

■ AggreSeal can be the Top Surface of a new road base that has been AggreBind-built

■ The road is ready for traffic in 2 hours after being sealed or when the surface is dry to the touch

■ Comes in a variety of colors including Black - so you get the look of asphalt but with a lower cost

■ Easy to apply, AggreSeal doesn't need frequent repair and recovery like asphalt

■ With our proprietary polymer's BOND-BACK capability, it maintains the physical integrity & strength of the stabilized road...if repairs are needed

■ AggreSeal's physical/chemical character is permanent and irreversible after curing, with no contamination to the environment

WALKWAYS TOP SURFACING TOP SURFACING BEFORE BEFORE AFTER BEFORE AFTER AFTER GOVERNMENT PROJECTS COMMUNITY PROJECTS 7 www.aggrebind.com

For Self-Fabricated Blocks/Bricks/Pavers Rammed Earth Buildings Date Back 6000 Years... With AggreBloc, We Bring Construction Into The 21st Century With Our Patented Technology...

For centuries communities have relied on clay as the “binding force” to produce their blocks and bricks...with all the attendant problems. At AggreBind, we knew it would take a tough polymer to create an alternate, more effective “binding force” powerful enough to produce ROCK-SOLID™ building materials out of soil or sand. That’s exactly what AggreBloc’s unique cross-linking polymer delivers with its superior particle encapsulation and stronger soil stabilization — even with zero clay content.

■ AggreBloc provides structural solutions for producing blocks, bricks and pavers and importantly increases flexible tensile strength — especially critical in earthquake areas.

■ In total Cost Savings, AggreBloc is 35% to 45% cheaper than conventional methods for block and brick production (independent assessment).

■ Virtually any water source can be used for mixing with the AggreBloc solution... and where clean water is in short supply, sea water (up to 4% saline) and (mildly) contaminated water can be utilized.

■ AggreBloc converts almost all natural soils, on-site sands, mine waste, et.al. at dosage rates of +/- 4 Liters of our proprietary polymer (about 4.2 Kilograms in weight) per cubic meter of materials stabilized.

• In contrast, conventional concrete-based roadwork requires a huge +/- 180 Kilograms of Cement per cubic meter of material stabilized — as well as incurring added cost for importing the quantities of necessary aggregates/sand to the local site.

■ Can produce blocks & bricks in any size to meet design requirements and can be made in a wide range of colors. Works with all standard mechanical or hand compaction machines & mixing equipment.

■ AggreBloc prevents moisture penetration and rain will not cause wall damage; walls are non-combustible and have a high fire rating; therefore, extremely suitable for dwellings in high fire risk areas.

■ Versus cement production with its super-high energy demands, AggreBloc is significantly more energy-efficient.

AGGREBLOC MANUFACTURING FROM IN SITU SOIL SIGNAGE BRICKWORK INTERIOR BRICKWORK
8
WHOLE HOUSE BRICKWORK

■ With AggreBloc manufacturing, no firing of blocks and bricks is required (which adds cost and would increase pollution in the earth’s atmorphere).

■ AggreBloc walls have high thermal mass and naturally store energy (warm or cool), creating a stable internal temperature and saving “energy dollars” every year for the life of the building.

■ Any damaged area can be easily repaired because of AggreBloc’s bond back capability.

■ AggreBloc offers the only stabilizing polymer that can be used for vertical construction. Our load-bearing earth walls can support and integrate with roof structures, doors and windows.

VARIOUS SIZES

VARIOUS SHAPES

The UN Center for Human Settlements predicts that 35 million new homes per year are needed to meet the world’s requirements ...at a rate of 95,000 homes per day. Their conclusion: “Using traditional methods of concrete construction... these targets will be nearly impossible to achieve.”

Now, with AggreBloc, communities have the opportunity and the means to create economically viable, structurally sound and well-insulated, permanent soil-stabilized homes — using the very on-site materials that already exist in abundance in their villages and towns.

BRICK MAKING BRICK MAKING SOLID WALL, LOAD-BEARING CONSTRUCTION
9 www.aggrebind.com
QUICK, SAFE LOW-COST HOUSING

The "Secret" At The Heart of AggreBind's Superior Soil Stabilization

AggeBind's cross-linking polymer takes Soil Stabilization to the next level and leaves ordinary Soil Stabilizers in the dirt

Soil Stabilization has been a building method used for thousands of years — from the times of the ancient pyramids and the Great Wall of China right up to the present. Until recently this approach has enabled structures to be built relying on the binding properties of clay soil and basic "rammed earth" techniques. Now there’s AggreBind and AggreBloc...

Soil Stabilization: A Quick Look

For road construction, the primary objectives of Soil Stabilization are twofold:

1) To improve a load-bearing values (CBR) of the underlying soil, ideally by 400% to 600% and

2) To prevent the ingress of water from the surface into the treated layer since water penetration and frost are critical contributors to road failure.

Wearing Surface

Stabilized Base From On-Site Materials

Compacted Sub-Soil

Today, many products call themselves "Soil Stabilizers" but are woefully inadequate:

- Some do not work at all unless there is a very high clay content

- Some only "lubricate" the compacting of clay particles but have no true binding action

- Others improve loadbearing capacity, but only by a small measure

- So-called "green" stabilizers (organic in origin) tout themselves as being a "biodegradable alternative" to bitumen... but in reality, a biodegradable road for certain will break down sooner rather than later...

Unlike other Soil Stabilizers, including so-called polymer-based stabilizers, AggreBind does not require any clay content and the to-be-treated layer does not have to depend on the binding properties of clay for an effective road base to emerge.

■ AggreBind is the only long string cross-linking polymer with tracers on the market: it adheres to and stabilizes virtually any cohesive or non-cohesive surface including desert sand.

■ Independent laboratory testing conclusively documents AggreBind’s capability to increase the load-bearing strength (CBR) of the stabilized material between 400% and 600%.

■ With our patented technology, we are the only company providing a range of colors including Black for roads (as well as for the production of blocks/ bricks/pavers.)

■ Compared with polymer-based competitors, AggreBind is far ahead of the pack — producing roads that are ROCK-SOLID/SUPER LOAD-BEARING™ comparable to, and in some cases, stronger than concrete construction.

10
PREPPING THE GROUND AGGREBIND AND GRAVEL COMPOSITE

SNAPSHOT: THE PROCESS OF "AGGREBINDING"

Our “Aggrebinding” process starts by coating each individual particle of soil (sand or other non-organic "waste" material) with the AggreBind polymer concentrate and water solution. The coated material is mixed thoroughly, then compacted for roads or compressed in molds to produce blocks, bricks or pavers.

The molecular action of "cross-linking" occurs as the coated particulates come into direct contact with each other:

Once "cross-linked," the coated soil, sand or other material is fully solidified during compaction to form a solid and powerfully strong structure.

The result is water-resistant, hydrophobic, has greatly enhanced tensile strength and withstands hot and cold temperature extremes (-70°f to 325°f /-57°c to +163°c).

AggreBind is most often used to stabilize on-site materials and create solid, strong subbase and base courses. In some parts of the world — for example developing countries, but nowadays in developed countries as well — AggreBind soil stabilization is being used to construct the entire road. In this case, the road can then be top-sealed with AggreBind to provide a water resistant and durable surface.

Our 5 Year Product Replacement Guarantee UNIQUE IN THE INDUSTRY

The AggreBind polymer formula is infused with unique and proprietary “tracers” that are similar to a marker or a kind of chemical "DNA."

The tracer enables the Company, any time after installation, to validate the correct application of AggreBind in the installation. Specifically, this allows us to determine how much AggreBind was used per cubic yard / cubic meter.

This unique ability to "qualify and quantify" is the foundation of AggreBind’s quality control system, enabling the contractor, private customer or government Client to know whether or not the work was constructed according to the correct specification.

With this special capability for post-installation analysis, AggreBind is able to offer:

5 YEAR PRODUCT REPLACEMENT GUARANTEE

In-Situ Material 1 3 2 4 5 Add sharp & angular material Add fines & the AggreBind:H2O mix Mix the material, profile &
Becomes a solid hydrophobic mass
compact
Evaporation of free-water from AGB system AGB system starts to cross-link as water volume is reducing
Complete 3-D Cross-linking
SCARCIFYING THE SOIL SOIL READY MIX IN AGGREBIND PROFILING GROUND COMPACTING AGGREBIND TOPCOAT FINISHED ROADBED ADDING THE MIXTURE 11 www.aggrebind.com

ROCK-SOLID SOLUTIONS YOU CAN COUNT ON ™

KEEPING A TON OF MONEY IN OUR CLIENTS' POCKETS IS JUST ONE REASON AGGREBIND INSTALLATIONS ARE ON EVERY CONTINENT with Antarctica in the works soon...

Eco-friendly AggreBind solutions are at work saving time, money and hassle for our Clients in a host of applications worldwide:

■ New road construction

■ Roadway top surfacing

■ Pothole and rut repair

■ Dust control, sand migration and slope erosion control

■ Roadway marking

■ In-situ production of building blocks/bricks/ pavers

■ Airport and military applications

Your authorized AggreBind Dealer is:

AggreBind Inc.

New Haven, Connecticut, USA

Tel.: +1-203-785-1808

Email: info@aggrebind.com

www.aggrebind.com

■ Hazardous waste containment, for quarry and mining tailings as well as coal and ore stockpiles

■ Dust reduction at solar power facilities, and more

Copyright ©2020 AggreBind

Price list for AGRIBIND

Common rehabilitation of existing gravel roads that link villages with high ways. Existing gravel is processed as road bed and additional 150mm layer is imported mainly for spot improvement and dam filling. The 150mm will be stabilized with Agribind Road master and top seal colour of choice. This include drainage and cleaning of road side and also design of the road. This spec is 6m carriage wa and 1m shoulder both sides making the road 8m. Work rate is 25km per month and 5 years guarantee on the works. This package is priced at USD 250.000

This package its ideal for your city/ town internal roads on residential and industrial areas. Existing road to ripped and processed as road bed and 150mm of crusher dust or quarry waste to be stabilized with agribind road master and top seal of colour of choice road to a maximum width of 6m depending on availability of space. 5 years guarantee on the works and 30km a month. The package is priced at USD 225.000

This is your village internal roads where existing road is prepared to be road bed and 150mm of gravel is imported and stabilized with agribind road master and top seal colour of . 5years guarantee on the works 30km of production in a month can be achieved. This package is USD 185.00

This package is ideal for high ways where by national roads and dual carriage on the construction of the base. The aggrebind can be used to replace cement to make a very hard base to avoid pot holes on the road and the other big benefit is if you stabilize the base with aggrebind you end up reducing the layer of asphalt by almost 50%

This is a package ideal for production roads on the farms or network of farming roads This is where bush clearing is done to construct a 5m wide carriageway then 150mm of foriegn material is important and stabilized The production per month of the this type is 15km. This package is USD 200.000

On this package we focus on potholes and parkings and client be charged per square meter at USD 6.5 and any additional works to be done on the scope will be charged extra

NB All projects nominated by client forms our responsibility from the day of signing of the contract to the official hand over of the project hence even if works have not commenced we maintain the road by grading/spot improvement to make it user friendly until stabilization starts.

01 02 03 04
05 06

MINING

• Mining open pit and underground

• Ore hanlage

• Maintenance of mining roads and stabilization

• Drilling and Blasting

• Civil Works in Mine

• Camp site development and catering

• Mining Supplies

• Dump Management and Stabilising

CIVIL WORKS OF

• SUB BASE

• BASE

GRADING AND MAINTENANCE OF GRAVEL ROADS

• ROAD BED

CHIPPING ON DST ROADS

ASPHALT OVERLAYING ON HIGHWAY

WATER

• Water Pipe lines

• Sewage Works & Pipe lines

• Water Storage Facilities

• Water Reticulation

Drainage Systems & Water

COMPANY PROFILE

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.