DUCT ILATION AIR
54mm COLD
GAS FIRED TER WATER HEA
SV
c/w IV
SION HWS EXPAN VESSEL
TPSV
M
INSITE TPSV
ER
HWS CYLIND
*
ER
HWS CYLIND
Mitton
*
CWS RISE 35mm SBT EL TO HIGH LEV
CWS TO 28mm SBM TANK HIGH LEVEL
*
ONDARY DHWS SEC PUMP SET CIRCULATION
ERS S TO CYLIND
100mm MS
CW
54mm SBM
S HEADER
CWS
SEE CONN'N
DETAILS
BOILERS RETURN TO AINER MARY HTG c/w IV & STR 100mm PRI LOSS HEADER M FROM LOW FRO W FLO MARY HTG IV PRI c/w mm 100 HEADER LOW LOSS BOILERS TO RE c/w IV FLOW TO STO 100mm HTG
CWS FROM 54mm SBM T CONN'N 28mm OUTLE FTENER SO ON WATER
SV
ENVIRONMENTAL
CONTRACTING
AIR CONDITIONING
AFTERCARE
P1 MORRISONS’ INNOVATIVE BRIDGWATER RDC RATED ‘BREEAM EXCELLENT’
P2 SHEFFIELD HALLAM UNIVERSITY BOOSTER SET P2 STORES OF THE FUTURE
P4 COOL RUNNINGS! DOSING P4 DON’T FORGETPOT
HIG P4 PORTABLE PLANT ROOMS
DOC
RISE TO H LEVEL
AAC
RISE TO HIGH LEVEL
SION HTG EXPAN VESSEL
SION HTG EXPAN VESSEL
HELPLINE
E TO ANSION LIN 50mm EXP LSV HEADER c/w LOW LOSS M STORE RETURN FRO HTG mm IV 100 HEADER c/w S LOS TO LOW
MAKE UP UNIT
c/w IV TO SYSTEM KE UP LINE N UNIT ESSURISATIO MAKE UP/PR L FIL RO VED MIK H 15mm VAL WS DTLL WIT c/w IV & 22mm MC IT UN MAKE UP CONN'N TO & DCV TAP c/w IV 15mm TO BIB
50mm MA
SELS ANSION VES IT NCH TO EXP 40mm BRA CONN'N TO EACH UN m WITH 20m
F&R 100mm HTG S CW 35mm SBT S F&R HW 54x28mm S 54mm BMCW 80mm GAS
OSTER SET
FEED TO BO
EXTRACT AIR EXTRACT AIR
VE AHU1 F&R TO SER 80mm HTG SEE SCHEMATIC DWG 'S FOR CONN
SPRING 2012
NER
WATER SOFTE
54mm COLD
GAS
100mm GA
54mm SBM
COLD WATER 16,000 LITRE E TANK STORAG
GAS FIRE TER WATER HEA
DOC
INDER
FEED TO CYL
S FLOW 54mm HW SV
M BAKERY
DUCT FRO
M DELI
DUCT FRO
MORRISONS’ INNOVATIVE BRIDGWATER RDC RATED ‘BREEAM EXCELLENT’ Sustainability is a vital consideration for Mitton in everything we do. Environmental issues play a major role in scheme design and construction, and our key objective is to provide our customers with effective and efficient solutions, with respect to emerging concepts such as Simplified Building Energy Modelling and whole building life calculations from concept to eventual demolition. When modelling for Morrisons’ new Regional Distribution Centre in Bridgwater, the entire team from design and construction through to mechanical and electrical services worked closely together with the remit to achieve a post construction BREEAM Excellent rating on completion of the build.
needed, the entire site is a model for sustainability. Air rotation systems in the warehouses provide effective frost protection heating. All systems link into a comprehensive Building Monitoring System to achieve and maintain optimum levels of performance across the board. SBEM (Simplified Building Energy Model) calculations were completed by Mitton to determine CO2 emission rates, with Mitton carrying out a site-wide EPC for BREEAM purposes as well as individual building EPCs. The post-construction BREEAM Excellent rating achieved reflects the commitment, drive and dedication of the entire team.
Innovation was the driver for Morrisons’ Bridgwater RDC team, reflecting the supermarket giant’s own commitment to environmentally sustainable practices. From the incorporation of solar panels to heat the hot water on the bulk warehouse office and transport office through to rainwater harvesting systems for flushing toilets and the inclusion of shut off valves, non-concussive taps and drives which ramp down when not
T 01274 691177
E projects@mittonmechanical.com
s
50 ssl +13.8 14.180
W www.mittonmechanical.com