Mitton Insite Newsletter Spring 12

Page 1

DUCT ILATION AIR

54mm COLD

GAS FIRED TER WATER HEA

SV

c/w IV

SION HWS EXPAN VESSEL

TPSV

M

INSITE TPSV

ER

HWS CYLIND

*

ER

HWS CYLIND

Mitton

*

CWS RISE 35mm SBT EL TO HIGH LEV

CWS TO 28mm SBM TANK HIGH LEVEL

*

ONDARY DHWS SEC PUMP SET CIRCULATION

ERS S TO CYLIND

100mm MS

CW

54mm SBM

S HEADER

CWS

SEE CONN'N

DETAILS

BOILERS RETURN TO AINER MARY HTG c/w IV & STR 100mm PRI LOSS HEADER M FROM LOW FRO W FLO MARY HTG IV PRI c/w mm 100 HEADER LOW LOSS BOILERS TO RE c/w IV FLOW TO STO 100mm HTG

CWS FROM 54mm SBM T CONN'N 28mm OUTLE FTENER SO ON WATER

SV

ENVIRONMENTAL

CONTRACTING

AIR CONDITIONING

AFTERCARE

P1 MORRISONS’ INNOVATIVE BRIDGWATER RDC RATED ‘BREEAM EXCELLENT’

P2 SHEFFIELD HALLAM UNIVERSITY BOOSTER SET P2 STORES OF THE FUTURE

P4 COOL RUNNINGS! DOSING P4 DON’T FORGETPOT

HIG P4 PORTABLE PLANT ROOMS

DOC

RISE TO H LEVEL

AAC

RISE TO HIGH LEVEL

SION HTG EXPAN VESSEL

SION HTG EXPAN VESSEL

HELPLINE

E TO ANSION LIN 50mm EXP LSV HEADER c/w LOW LOSS M STORE RETURN FRO HTG mm IV 100 HEADER c/w S LOS TO LOW

MAKE UP UNIT

c/w IV TO SYSTEM KE UP LINE N UNIT ESSURISATIO MAKE UP/PR L FIL RO VED MIK H 15mm VAL WS DTLL WIT c/w IV & 22mm MC IT UN MAKE UP CONN'N TO & DCV TAP c/w IV 15mm TO BIB

50mm MA

SELS ANSION VES IT NCH TO EXP 40mm BRA CONN'N TO EACH UN m WITH 20m

F&R 100mm HTG S CW 35mm SBT S F&R HW 54x28mm S 54mm BMCW 80mm GAS

OSTER SET

FEED TO BO

EXTRACT AIR EXTRACT AIR

VE AHU1 F&R TO SER 80mm HTG SEE SCHEMATIC DWG 'S FOR CONN

SPRING 2012

NER

WATER SOFTE

54mm COLD

GAS

100mm GA

54mm SBM

COLD WATER 16,000 LITRE E TANK STORAG

GAS FIRE TER WATER HEA

DOC

INDER

FEED TO CYL

S FLOW 54mm HW SV

M BAKERY

DUCT FRO

M DELI

DUCT FRO

MORRISONS’ INNOVATIVE BRIDGWATER RDC RATED ‘BREEAM EXCELLENT’ Sustainability is a vital consideration for Mitton in everything we do. Environmental issues play a major role in scheme design and construction, and our key objective is to provide our customers with effective and efficient solutions, with respect to emerging concepts such as Simplified Building Energy Modelling and whole building life calculations from concept to eventual demolition. When modelling for Morrisons’ new Regional Distribution Centre in Bridgwater, the entire team from design and construction through to mechanical and electrical services worked closely together with the remit to achieve a post construction BREEAM Excellent rating on completion of the build.

needed, the entire site is a model for sustainability. Air rotation systems in the warehouses provide effective frost protection heating. All systems link into a comprehensive Building Monitoring System to achieve and maintain optimum levels of performance across the board. SBEM (Simplified Building Energy Model) calculations were completed by Mitton to determine CO2 emission rates, with Mitton carrying out a site-wide EPC for BREEAM purposes as well as individual building EPCs. The post-construction BREEAM Excellent rating achieved reflects the commitment, drive and dedication of the entire team.

Innovation was the driver for Morrisons’ Bridgwater RDC team, reflecting the supermarket giant’s own commitment to environmentally sustainable practices. From the incorporation of solar panels to heat the hot water on the bulk warehouse office and transport office through to rainwater harvesting systems for flushing toilets and the inclusion of shut off valves, non-concussive taps and drives which ramp down when not

T 01274 691177

E projects@mittonmechanical.com

s

50 ssl +13.8 14.180

W www.mittonmechanical.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.