Schiecentrale Timeline Development Schiecentrale Timeline Development
First situation of this area before 20th century, to be assumed there was a chapel of St. Jobs and long warehouse.
1909: Expansion of the area: Ketelhuis was expanded. Former Kantine and 25kv was built together with long storage at the waterside.
00
19
10
19
1905: The chapel was not existed anymore. The warehouse was expanded: Ketelhuis and Schiecentrale was built with 2 chimneys.
1927: Demolition of long storage at the waterside.
20
19
1922: The Turbinehuis and former Stroom building was built together with the demolition of one chimney.
30
19
1955: Former Kantine and 25kv were demolished and replaced with recent Kantine and 25kv building together with 2 oil tanks and Portierhuis development.
40
19
1953: Stroom building was expanded attach with the Schicentrale and Ketelhuis.
50
19