Sample Physical Condition Report

Page 1

Physical Condition Survey for Generic Hospital

Reference: 0000 Issue

Reviewed By

Verified By

Alys Meston

Tom Downing

Paul Groom

Production Team

Project Supervisor

Director

Prepared By

File Ref: 0000 Oakleaf Surveying Ltd

Telephone: 0870 738 6047

7 Brookfield

Fax:

0870 738 6048

Duncan Close

E-mail:

facilities@oakleafgroup.biz

Northampton NN3 6WL

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey

Buildings included in this report Generic Hospital (STG) - Whole Hospital Site (inc. Grounds) (ALL) Generic Hospital (STG) - Atkinson Morley Wing (AMW) Generic Hospital (STG) - Bronte House (BRH) Generic Hospital (STG) - Chest & Breast Clinic (CBC) Generic Hospital (STG) - Clare House (CLR) Generic Hospital (STG) - Central Pharmacy Store (CPS) Generic Hospital (STG) - Education Centre (EDC) Generic Hospital (STG) - Energy Centre (Boiler House) (ENC) Generic Hospital (STG) - GU Medicine (GUM) Generic Hospital (STG) - Grosvenor Wing (GVR) Generic Hospital (STG) - Hotung Centre (HOT) Generic Hospital (STG) - Ingelby House (IGH) Generic Hospital (STG) - Knightsbridge Wing (KNB) Generic Hospital (STG) - Lanesborough Wing (LNS) Generic Hospital (STG) - Maxillo Facial Dental Unit (MXF) Generic Hospital (STG) - Portacabin 1 to 23 (P) Generic Hospital (STG) - Portacabin 1 (P01) Generic Hospital (STG) - Portacabin 2 (P02) Generic Hospital (STG) - Portacabin 3 (P03) Generic Hospital (STG) - Portacabin 4 (P04) Generic Hospital (STG) - Portacabin 5 (P05) Generic Hospital (STG) - Portacabin 6 (P06) Generic Hospital (STG) - Portacabin 10 (P10) Generic Hospital (STG) - Portacabin 11 (P11) Generic Hospital (STG) - Portacabin 12 (P12) Generic Hospital (STG) - Portacabin 16 (P16) Generic Hospital (STG) - Portacabin 17 (P17) Generic Hospital (STG) - Portacabin 18 (P18) Generic Hospital (STG) - Portacabin 19 (P19) Generic Hospital (STG) - Portacabin 20 (P20) Generic Hospital (STG) - Portacabin 21 (P21) Generic Hospital (STG) - Portacabin 22 (P22) Generic Hospital (STG) - Portacabin 23 (P23) Generic Hospital (STG) - Staff Social Club (SSC) Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey Generic Hospital (STG) - External Grounds (STE) Generic Hospital (STG) - St James Wing (STJ) Generic Hospital (STG) - Wolfson Site (WFS)

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey

Index Executive Summary Survey Method Physical Condition Methodology Risk Assessment Matrix Remaining Life of Building Elements Remaining Life of M & E Elements

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey

Executive Summary Oakleaf have undertaken a Physical Condition Survey of Generic Hospital for Generic NHS Trust. The surveys undertaken within this study relate to conditions prevailing on site from the 15th of June to the 3rd of August 2010. Backlog Maintenance Works Total remedial work required for the BUILDING and M&E Elements: Building Survey M & E Survey TOTAL COST Cost per m2 (average)

£ 11,185,370 £ 2,547,670 £ 13,733,040 £ 105.80/m2

(Please note that this is based on an estimated Gross Internal Floor Area of 129,802m2) Budget for Future Maintenance Works Total remedial work likely to be required within a five year period for the BUILDING and M&E Elements: Building Survey M&E Survey TOTAL COST Cost per m2 (average)

£ 12,296,372 £ 9,082,820 £ 21,379,192 £ 164.71/m2

(Please note that this is based on an estimated Gross Internal Floor Area of 129,802m2) Combined Backlog and Future Maintenance Costs: £ 35,112,232 Breakdown of Risk Scores based on Backlog Costs (Year 2010 ONLY) The BACKLOG costs of the blocks surveyed fall into the following Risk Scores: Low Risk (Score 1 - 6) £ 3,031,250 Moderate Risk (Score 7 - 10) £ 2,349,169 Significant Risk (Score 11 - 16) £ 3,623,621 High Risk (Score 17 - 25) £ 4,729,000 Risk Adjusted Backlog Total: £ 8,553,609 (The Risk Adjusted costs are based on an average remaining life of 27 years) Breakdown of Risk Scores based on Backlog & Budget Costs (Year 2010 to 2015) The TOTAL costs of the blocks surveyed fall into the following Risk Scores: Low Risk (Score 1 - 6) £ 13,208,232 Moderate Risk (Score 7 - 10) £ 9,884,479 Significant Risk (Score 11 - 16) £ 7,290,521 High Risk (Score 17 - 25) £ 4,729,000 Risk Adjusted Total:

£ 12,882,160

(The Risk Adjusted costs are based on an average remaining life of 27 years) These figures are exclusive of Prelims, Profit, Contingency, Fees, Expenses and VAT. Please note that these costs are for backlog works only, they exclude costs relating to any proposed service or facilities developments. They are based on bringing all areas up to a sound and operational (not new) condition.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey

Survey Method Oakleaf have developed specific data capture pro-forma’s to cover each aspect of the regulations for each type of survey. This approach enables us to not only identify which items do not meet an appropriate condition, but also those which do. We consider that this approach is thorough and also enables the client to confirm that no items have simply been missed. Client Checks on Data Capture This approach enables the client to be able to check all on site data captured to see first hand that all items are covered and that nothing has been missed. Survey Quality Checks It also provides a mechanism to standardise on the quality of information being collected and allows ongoing monitoring of survey staff to check for quality and standard. Hand Held Electronic Data Capture using PDA's Oakleaf have their own data capture software which we will use to ensure data consistency. This uses prepopulated 'pick lists' to ensure data integrity between all auditors.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey

Physical Condition Methodology Oakleaf have developed specific data capture pro-forma’s to cover each aspect of a Physical Condition Appraisal. Oakleaf's approach is not only to identify which items do not meet an appropriate condition, but also those which do. We consider that this approach is thorough and also enables the client to confirm that no items have simply been missed. We will also provide a written Executive Summary that lists the main findings. Aspects covered in the appraisal:Each element states Condition Category (A, B, C, or D). Each element has been identified with a budget cost to repair it. Each element has been identified with a remaining life expectancy when it will have to be either repaired or replaced. Each element has been identified with a budget cost to upgrade it to Condition 'A'. All the above have been recorded on our standard pro-forma’s and listed in a spreadsheet and database to enable the local users to maintain and update the data base on an ongoing basis. The survey covers:The Condition Survey comprises a systematic, uniform and objective basis for the gathering of condition information of all exposed and accessible parts of the establishment. The survey report covers all areas of the establishment, unless specifically excluded by the Client, and details external elements of the building (Roofs, External walls, windows and doors etc.) at Block Level, whilst internal elements are examined at Room Level. Outbuildings, boundaries and external pavings/roads and play fields were also inspected. Soft play areas and soft landscaping were excluded from the survey. The survey was limited to the external elements of the structure of the fabric of the building and a visual non-intrusive inspection was undertaken to the interior of the building, sufficient enough to identify necessary maintenance works. No testing, measurement or dismantling works were carried out, nor calculations carried out to verify the original design intent. Operating and Maintenance files including 'As Fitted' drawings were available to assist with the survey. Where the structure was covered, unexposed or inaccessible, an inspection was not undertaken, and those parts cannot be reported free from defect. At the time of survey, the premises were occupied and access to all area was available. All costs provided are based upon present day competitive prices, and are budget estimates only, to be seen as a likely indication of the cost of the works. The surveys identify all works that are needed at the time of the survey and/or which will become necessary within five years of the survey date, with such needs being priority coded and costed. They also note any major, predictable repair and maintenance needs likely to arise within the following five-year period, so that these may be used to help inform the Client’s future Estate Strategy. Where infringements of statutory requirements were observed they are noted in this report. However the absence of such observed infringements does not constitute proof nor enable the certification that the installations comply in all aspects with statutory requirements. The investigation of asbestos contamination is beyond the scope of the survey. Reference should be made to the asbestos register for the building and where necessary specialist advice should be sought. Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey Each building (block) has been appraised under the following categories:BUILDING A) Physical Structure B) External Fabric C) Internal Fabric D) Roof F) External Works G) Gardens MECHANICAL H) Drainage I) Heating Systems J) Steam Systems K) Vent & Air Con L) Medical Gases M) Hot/Cold Water N) Lifts O) Main Plant (Boilers/Calorifiers) P) Main Plant (Fixed Plant) P) Lightning Protection ELECTRICAL R) Electrical V) Fire Alarms W) Telecoms Each element category has been sub-divided into subsidiary components for ease of identification for example structure has been sub-divided into: General Structure, Foundations, Ground Stability etc. A supplementary note and cost has been provided to support identifiable work listed under subsidiary components i.e. a roof frame may require numerous items of repair such as work to wall plates, tie rods, bracing, etc. Each subsidiary component has been graded, utilising the DfES system viz: Condition A = Good. Performing as intended and operating efficiently. B = Satisfactory. Performing as intended but exhibiting minor deterioration. B(C) = Items currently condition B but will fall to condition C within 5 year period. C = Poor. Exhibiting major defects and/or not operating as intended. D = Bad. Life expired and/or serious risk of imminent failure. In addition a repair cost has been entered against each repair to bring the component up to a sound/operationally safe condition. An estimate of time remaining until the repair is implemented has also been allocated. Time allocation covers a five year projection. Extent of items has been measured and a descriptive note recording location within premises so that items can be located. A note describing the fault and corrective work has been provided together with its location by floor and room number. Digital Photographs We have included digital photographs of key items requiring remedial work to assist in communicating the works required.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey

Risk Assessment Matrix

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047



Physical Condition Survey

Remaining Life of Building Elements When calculating the remaining life of elements Oakleaf use the BMI publication: Life Expectancy of Building Components. Below are building elements that have the potential to fall within the 5 year backlog maintenance plan and their respective life expectancy. Timber Pitched Roof Asphalt Flat Roof Bitumen Felt Flat Roof Slate Covering to Pitched Roof Tile Covering to Pitched Roof Softwood Windows Hardwood Windows Aluminium Windows Cast Iron Gutters PVC Gutters PVC Windows Steel Windows Vinyl Sheet Flooring Carpet Flooring Decorations Lathe and Plaster Ceiling Suspended Ceilings

85 years 35 years 20 years 75 years 65 years 35 years 50 years 45 years 50 years 30 years 35 years 50 years 10 years 10 years 7 years 60 years 25 years

Clearly these are affected by on site conditions and in many cases have deteriorated to the extent that they require replacement within the above stated periods. Conversely; if the element has reached the end of its expected life but is in good condition the stated remaining life will be greater than the above.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey

Remaining Life of M & E Elements When calculating the remaining life of elements Oakleaf use the BMI publication: Life Expectancy of Building Components. Below are building elements that have the potential to fall within the 5 year backlog maintenance plan and their respective life expectancy. Plastic Water Storage Tank GRP Water Storage Tank PVCU Water Storage Tank Copper Pipework Boiler Solid Fuel Back Boiler Major Pump Radiators Thermostatic Radiator Valves Aluminium Air-Conditioning Ductwork Steel Air-Conditioning Ductwork Air-Conditioning Heater Air-Conditioning Chiller Air-Conditioning Pump Air-Conditioning Fan Heating Program Controller/Timer Thermostat Controls Electric Lighting Circuit Electric Power Circuit Fuse Box/Consumer Unit Power Outlet Socket Light Switch Fluorescent Luminaire Fluorescent Tube Incandescent Light Bulb Wet Riser Sprinkler System Dry Riser Sprinkler System Sprinkler Head Traction Drive Passenger Lift Hydraulic Passenger Lift Industrial Scissor Lift

30 years 35 years 25 years 40 years 20 years 20 years 12 years 25 years 15 years 30 years 25 years 15 years 15 years 15 years 15 years 15 years 15 years 30 years 30 years 30 years 25 years 25 years 15 years 3 years 2 years 30 years 40 years 25 years 30 years 25 years 20 years

Clearly these are affected by on site conditions and in many cases have deteriorated to the extent that they require replacement within the above stated periods. Conversely; if the element has reached the end of its expected life but is in good condition the stated remaining life will be greater than the above.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey - Costs Summary

Year Total

Building

Engineering

Status Backlog 2010

£13,733,040.00

£11,185,370

£2,547,670

Total

£13,733,040

£11,185,370

£2,547,670

VAT

£2,403,282

£1,957,440

£445,842

Fees

£2,059,956

£1,677,806

£382,151

Total

£18,196,278

£14,820,615

£3,375,663

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey - Costs Summary

EstateManager Year Total

Building

Engineering

Status Budget - Based on year condition 'B' becomes condition 'C' or worse 2011

£1,163,332.00

£1,113,332

£50,000

2012

£3,036,223.00

£2,361,823

£674,400

2013

£6,433,440.00

£2,459,360

£3,974,080

2014

£3,623,460.00

£2,187,830

£1,435,630

2015

£7,122,737.00

£4,174,027

£2,948,710

Total

£21,379,192

£12,296,372

£9,082,820

VAT

£3,741,359

£2,151,865

£1,589,494

Fees

£3,206,879

£1,844,456

£1,362,423

Total

£28,327,429

£16,292,693

£12,034,737

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey - Costs Summary

EstateManager Year Total

Building

Engineering

Overall Budget - Backlog & Budget Total

£35,112,232

£23,481,742

£11,630,490

VAT

£6,144,641

£4,109,305

£2,035,336

Fees

£5,266,835

£3,522,261

£1,744,574

Total

£46,523,707

£31,113,308

£15,410,399

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey - Backlog Summary

Site :

STG - Generic Hospital

Block : AMW - Atkinson Morley Wing Condition: Year

C Year Total

C Building

Engineering

2010

£500

£0

£500

Block Total :

£500

£0

£500

Site :

STG - Generic Hospital

Block : BRH - Bronte House Condition: Year

C Year Total

C Building

Engineering

2010

£112,210

£109,600

£2,610

Block Total :

£112,210

£109,600

£2,610

Site :

STG - Generic Hospital

Block : CBC - Chest & Breast Clinic Condition:

C

C

Year

Year Total

Building

2010

£4,016,100

£4,000,000

£16,100

Block Total :

£4,016,100

£4,000,000

£16,100

Site :

Engineering

STG - Generic Hospital

Block : CLR - Clare House Condition:

D

C

Year

Year Total

2010

£1,036,560

£766,760

£269,800

Block Total :

£1,036,560

£766,760

£269,800

Site :

Building

Engineering

STG - Generic Hospital

Block : CPS - Central Pharmacy Store Condition: Year

C Year Total

B Building

Engineering

2010

£720,000

£720,000

£0

Block Total :

£720,000

£720,000

£0

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager Site :

Physical Condition Survey - Backlog Summary

STG - Generic Hospital

Block : EDC - Education Centre Condition: Year

C Year Total

C Building

Engineering

2010

£66,150

£40,150

£26,000

Block Total :

£66,150

£40,150

£26,000

Site :

STG - Generic Hospital

Block : ENC - Energy Centre (Boiler House) Condition: Year

C Year Total

C Building

Engineering

2010

£50,660

£36,160

£14,500

Block Total :

£50,660

£36,160

£14,500

Site :

STG - Generic Hospital

Block : GUM - GU Medicine Condition: Year

C Year Total

C Building

Engineering

2010

£27,660

£27,260

£400

Block Total :

£27,660

£27,260

£400

Site :

STG - Generic Hospital

Block : GVR - Grosvenor Wing Condition: Year

C Year Total

C Building

Engineering

2010

£319,450

£207,600

£111,850

Block Total :

£319,450

£207,600

£111,850

Site :

STG - Generic Hospital

Block : HOT - Hotung Centre Condition: Year

C Year Total

C Building

Engineering

2010

£5,260

£5,200

£60

Block Total :

£5,260

£5,200

£60

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager Site :

Physical Condition Survey - Backlog Summary

STG - Generic Hospital

Block : IGH - Ingelby House Condition: Year

C Year Total

C Building

Engineering

2010

£170,410

£135,000

£35,410

Block Total :

£170,410

£135,000

£35,410

Site :

STG - Generic Hospital

Block : KNB - Knightsbridge Wing Condition:

C

C

Year

Year Total

Building

2010

£1,176,275

£1,146,475

£29,800

Block Total :

£1,176,275

£1,146,475

£29,800

Site :

Engineering

STG - Generic Hospital

Block : LNS - Lanesborough Wing Condition:

C

C

Year

Year Total

Building

Engineering

2010

£3,441,300

£2,043,150

£1,398,150

Block Total :

£3,441,300

£2,043,150

£1,398,150

Site :

STG - Generic Hospital

Block : MXF - Maxillo Facial Dental Unit Condition: Year

C Year Total

C Building

Engineering

2010

£233,925

£201,325

£32,600

Block Total :

£233,925

£201,325

£32,600

Site :

STG - Generic Hospital

Block : P01 - Portacabin 1 Condition: Year

C Year Total

C Building

Engineering

2010

£700

£550

£150

Block Total :

£700

£550

£150

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager Site :

Physical Condition Survey - Backlog Summary

STG - Generic Hospital

Block : P02 - Portacabin 2 Condition: Year

C Year Total

C Building

Engineering

2010

£1,585

£1,525

£60

Block Total :

£1,585

£1,525

£60

Site :

STG - Generic Hospital

Block : P04 - Portacabin 4 Condition: Year

C Year Total

C Building

Engineering

2010

£60,200

£60,000

£200

Block Total :

£60,200

£60,000

£200

Site :

STG - Generic Hospital

Block : P05 - Portacabin 5 Condition: Year

N/A Year Total

C

Building

Engineering

2010

£150

£0

£150

Block Total :

£150

£0

£150

Site :

STG - Generic Hospital

Block : P06 - Portacabin 6 Condition: Year

C Year Total

C Building

Engineering

2010

£80,030

£80,000

£30

Block Total :

£80,030

£80,000

£30

Site :

STG - Generic Hospital

Block : P10 - Portacabin 10 Condition: Year

C Year Total

Building

Engineering

2010

£32,380

£32,380

£0

Block Total :

£32,380

£32,380

£0

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager Site :

Physical Condition Survey - Backlog Summary

STG - Generic Hospital

Block : P11 - Portacabin 11 Condition: Year

C Year Total

C Building

Engineering

2010

£20,800

£15,150

£5,650

Block Total :

£20,800

£15,150

£5,650

Site :

STG - Generic Hospital

Block : P12 - Portacabin 12 Condition: Year

C Year Total

B Building

Engineering

2010

£1,500

£1,500

£0

Block Total :

£1,500

£1,500

£0

Site :

STG - Generic Hospital

Block : P16 - Portacabin 16 Condition: Year

C Year Total

B Building

Engineering

2010

£550

£550

£0

Block Total :

£550

£550

£0

Site :

STG - Generic Hospital

Block : P18 - Portacabin 18 Condition: Year

N/A Year Total

C

Building

Engineering

2010

£300

£0

£300

Block Total :

£300

£0

£300

Site :

STG - Generic Hospital

Block : P19 - Portacabin 19 Condition: Year

C Year Total

Building

Engineering

2010

£40,000

£40,000

£0

Block Total :

£40,000

£40,000

£0

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager Site :

Physical Condition Survey - Backlog Summary

STG - Generic Hospital

Block : P20 - Portacabin 20 Condition: Year

C Year Total

B Building

Engineering

2010

£400

£400

£0

Block Total :

£400

£400

£0

Site :

STG - Generic Hospital

Block : P21 - Portacabin 21 Condition: Year

C Year Total

B Building

Engineering

2010

£80,000

£80,000

£0

Block Total :

£80,000

£80,000

£0

Site :

STG - Generic Hospital

Block : P22 - Portacabin 22 Condition: Year

C Year Total

C Building

Engineering

2010

£2,250

£1,650

£600

Block Total :

£2,250

£1,650

£600

Site :

STG - Generic Hospital

Block : STE - External Grounds Condition: Year

C Year Total

Building

Engineering

2010

£512,800

£512,800

£0

Block Total :

£512,800

£512,800

£0

Site :

STG - Generic Hospital

Block : STJ - St James Wing Condition:

C

C

Year

Year Total

2010

£1,104,185

£510,235

£593,950

Block Total :

£1,104,185

£510,235

£593,950

Generic Hospital Physical Condition Survey

Building

Engineering

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager Site :

Physical Condition Survey - Backlog Summary

STG - Generic Hospital

Block : WFS - Wolfson Site Condition: Year

C Year Total

C Building

Engineering

2010

£418,750

£409,950

£8,800

Block Total :

£418,750

£409,950

£8,800

SiteTotal :

£13,733,040

£11,185,370

£2,547,670

Report Total :

£13,733,040

£11,185,370

£2,547,670

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey - Budget Summary

Site :

STG - Generic Hospital

Block : AMW - Atkinson Morley Wing Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

Building

Engineering

2011

£35,100

£35,100

£0

2012

£913,500

£913,500

£0

Block Total :

£948,600

£948,600

£0

STG - Generic Hospital

Block : BRH - Bronte House Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

Building

Engineering

2012

£1,200

£0

£1,200

2013

£15,600

£15,600

£0

2015

£23,450

£21,200

£2,250

Block Total :

£40,250

£36,800

£3,450

STG - Generic Hospital

Block : CBC - Chest & Breast Clinic Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

Building

Engineering

2012

£7,450

£0

£7,450

2013

£53,750

£0

£53,750

2014

£12,650

£0

£12,650

2015

£24,750

£0

£24,750

Block Total :

£98,600

£0

£98,600

STG - Generic Hospital

Block : CLR - Clare House Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Building

Engineering

2012

£9,000

£6,200

£2,800

2013

£36,950

£16,600

£20,350

2014

£21,600

£12,000

£9,600

2015

£168,600

£163,800

£4,800

Block Total :

£236,150

£198,600

£37,550

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager Site :

Physical Condition Survey - Budget Summary

STG - Generic Hospital

Block : EDC - Education Centre Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

Building

Engineering

2012

£49,500

£24,500

£25,000

2013

£5,400

£4,600

£800

2014

£4,400

£800

£3,600

2015

£114,950

£105,200

£9,750

Block Total :

£174,250

£135,100

£39,150

STG - Generic Hospital

Block : ENC - Energy Centre (Boiler House) Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

2011

£5,200

2012 2013

Building

Engineering

£5,200

£0

£468,000

£0

£468,000

£137,600

£130,000

£7,600

2014

£4,900

£0

£4,900

2015

£190,400

£21,200

£169,200

Block Total :

£806,100

£156,400

£649,700

STG - Generic Hospital

Block : GUM - GU Medicine Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Building

Engineering

2012

£38,660

£38,660

£0

2013

£5,460

£260

£5,200

2014

£7,600

£5,400

£2,200

2015

£19,400

£5,400

£14,000

Block Total :

£71,120

£49,720

£21,400

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager Site :

Physical Condition Survey - Budget Summary

STG - Generic Hospital

Block : GVR - Grosvenor Wing Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

2011

Site :

£173,750

Building

Engineering

£173,750

£0

2012

£5,550

£4,950

£600

2013

£246,150

£190,050

£56,100

2014

£542,850

£17,400

£525,450

2015

£647,800

£622,400

£25,400

Block Total :

£1,616,100

£1,008,550

£607,550

STG - Generic Hospital

Block : HOT - Hotung Centre Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

Building

Engineering

2013

£200

£0

£200

2015

£3,880

£3,680

£200

Block Total :

£4,080

£3,680

£400

STG - Generic Hospital

Block : IGH - Ingelby House Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

2011

Site :

£125,240

Building £125,240

Engineering £0

2012

£79,800

£71,300

£8,500

2013

£168,550

£113,870

£54,680

2014

£1,739,680

£1,602,800

£136,880

2015

£213,840

£130,190

£83,650

Block Total :

£2,327,110

£2,043,400

£283,710

STG - Generic Hospital

Block : KNB - Knightsbridge Wing Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Building

Engineering

2011

£90,100

£90,100

£0

2012

£134,900

£132,100

£2,800

2013

£169,900

£162,200

£7,700

2014

£50,700

£17,700

£33,000

2015

£261,440

£45,640

£215,800

Block Total :

£707,040

£447,740

£259,300

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager Site :

Physical Condition Survey - Budget Summary

STG - Generic Hospital

Block : LNS - Lanesborough Wing Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

2011

Site :

£231,065

Building

Engineering

£231,065

£0

2012

£782,934

£638,734

£144,200

2013

£4,903,810

£1,230,910

£3,672,900

2014

£929,730

£381,580

£548,150

2015

£1,975,842

£1,542,992

£432,850

Block Total :

£8,823,381

£4,025,281

£4,798,100

STG - Generic Hospital

Block : MXF - Maxillo Facial Dental Unit Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

Building

Engineering

2011

£47,050

£47,050

£0

2012

£14,400

£12,400

£2,000

2013

£93,000

£90,850

£2,150

2014

£1,950

£0

£1,950

2015

£89,900

£62,700

£27,200

Block Total :

£246,300

£213,000

£33,300

STG - Generic Hospital

Block : P01 - Portacabin 1 Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Building

Engineering

2011

£22,500

£22,500

£0

2012

£300

£0

£300

2013

£350

£0

£350

2014

£200

£0

£200

2015

£19,800

£4,000

£15,800

Block Total :

£43,150

£26,500

£16,650

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager Site :

Physical Condition Survey - Budget Summary

STG - Generic Hospital

Block : P02 - Portacabin 2 Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

2011

Site :

£17,670

Building

Engineering

£17,670

£0

2012

£725

£525

£200

2013

£7,950

£7,400

£550

2014

£1,150

£0

£1,150

2015

£10,100

£3,150

£6,950

Block Total :

£37,595

£28,745

£8,850

STG - Generic Hospital

Block : P03 - Portacabin 3 Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

Building

Engineering

2012

£1,200

£0

£1,200

2013

£700

£0

£700

2014

£1,200

£0

£1,200

2015

£150

£0

£150

Block Total :

£3,250

£0

£3,250

STG - Generic Hospital

Block : P04 - Portacabin 4 Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

Building

Engineering

2013

£2,750

£0

£2,750

2014

£200

£0

£200

2015

£800

£0

£800

Block Total :

£3,750

£0

£3,750

STG - Generic Hospital

Block : P05 - Portacabin 5 Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Building

Engineering

2012

£800

£0

£800

2013

£200

£0

£200

2014

£5,000

£0

£5,000

Block Total :

£6,000

£0

£6,000

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager Site :

Physical Condition Survey - Budget Summary

STG - Generic Hospital

Block : P10 - Portacabin 10 Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

Building

Engineering

2012

£19,500

£19,500

£0

2014

£23,600

£23,600

£0

Block Total :

£43,100

£43,100

£0

STG - Generic Hospital

Block : P11 - Portacabin 11 Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

Building

Engineering

2011

£17,600

£17,600

£0

2012

£350

£0

£350

2013

£2,900

£0

£2,900

2015

£29,350

£14,450

£14,900

Block Total :

£50,200

£32,050

£18,150

STG - Generic Hospital

Block : P12 - Portacabin 12 Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

Building

Engineering

2011

£1,500

£1,500

£0

2012

£1,250

£1,250

£0

2014

£800

£0

£800

2015

£1,200

£600

£600

Block Total :

£4,750

£3,350

£1,400

STG - Generic Hospital

Block : P16 - Portacabin 16 Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Building

Engineering

2012

£59,800

£59,800

£0

2013

£3,150

£2,950

£200

2014

£1,850

£0

£1,850

2015

£12,800

£12,800

£0

Block Total :

£77,600

£75,550

£2,050

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager Site :

Physical Condition Survey - Budget Summary

STG - Generic Hospital

Block : P17 - Portacabin 17 Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

Building

Engineering

2014

£400

£0

£400

2015

£3,100

£3,100

£0

Block Total :

£3,500

£3,100

£400

STG - Generic Hospital

Block : P18 - Portacabin 18 Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

Building

Engineering

2012

£200

£0

£200

2013

£1,800

£0

£1,800

2014

£600

£0

£600

Block Total :

£2,600

£0

£2,600

STG - Generic Hospital

Block : P20 - Portacabin 20 Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

Building

Engineering

2011

£1,125

£1,125

£0

2012

£600

£600

£0

2013

£700

£700

£0

2014

£550

£550

£0

Block Total :

£2,975

£2,975

£0

STG - Generic Hospital

Block : P21 - Portacabin 21 Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Building

Engineering

2013

£200

£0

£200

2014

£3,200

£0

£3,200

Block Total :

£3,400

£0

£3,400

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager Site :

Physical Condition Survey - Budget Summary

STG - Generic Hospital

Block : P22 - Portacabin 22 Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

2012

£200

2014 2015 Block Total :

Building

Engineering £0

£200

£1,000

£0

£1,000

£2,400

£2,000

£400

£3,600

£2,000

£1,600

STG - Generic Hospital

Block : STE - External Grounds Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

Building

Engineering

2013

£500

£500

£0

2015

£185,300

£185,300

£0

Block Total :

£185,800

£185,800

£0

STG - Generic Hospital

Block : STJ - St James Wing Budget based on year condition 'B' becomes condition 'C' or worse Year

Site :

Year Total

Building

Engineering

2011

£361,750

£311,750

£50,000

2012

£423,604

£416,604

£7,000

2013

£483,820

£418,020

£65,800

2014

£129,850

£126,000

£3,850

2015

£2,603,850

£707,650

£1,896,200

Block Total :

£4,002,874

£1,980,024

£2,022,850

STG - Generic Hospital

Block : WFS - Wolfson Site Budget based on year condition 'B' becomes condition 'C' or worse Year

Year Total

Building

Engineering

2011

£33,682

£33,682

£0

2012

£22,800

£21,200

£1,600

2013

£92,050

£74,850

£17,200

2014

£137,800

£0

£137,800

2015

£519,635

£516,575

£3,060

Block Total :

£805,967

£646,307

£159,660

SiteTotal :

£21,379,192

£12,296,372

£9,082,820

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager Report Total :

Physical Condition Survey - Budget Summary £21,379,192

Generic Hospital Physical Condition Survey

£12,296,372

£9,082,820

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Summary of Block Appraisal Cost by Condition Grade

Site

Block

GIA (m2)

Block Total Cost/m2 Grade

Physical Condition STG - Generic Hospital

P06 - Portacabin 6

18

£80,030

4,368.4

4

STG - Generic Hospital

CBC - Chest & Breast Clinic

1,468

£4,114,700

2,802.9

4

STG - Generic Hospital

CPS - Central Pharmacy Store

463

£720,000

1,555.1

4

STG - Generic Hospital

P19 - Portacabin 19

58

£40,000

691.8

4

STG - Generic Hospital

P04 - Portacabin 4

99

£63,950

646.4

4

STG - Generic Hospital

IGH - Ingelby House

4,200

£2,497,520

594.6

4

STG - Generic Hospital

P21 - Portacabin 21

195

£83,400

427.1

4

STG - Generic Hospital

CLR - Clare House

3,000

£1,272,710

424.2

4

STG - Generic Hospital

ENC - Energy Centre (Boiler House)

2,400

£856,760

357.0

4

STG - Generic Hospital

LNS - Lanesborough Wing

36,714

£12,264,681

334.1

4

STG - Generic Hospital

WFS - Wolfson Site

3,956

£1,224,717

309.6

4

STG - Generic Hospital

EDC - Education Centre

860

£240,400

279.5

4

STG - Generic Hospital

BRH - Bronte House

690

£152,460

221.0

4

STG - Generic Hospital

GVR - Grosvenor Wing

9,300

£1,935,550

208.1

4

STG - Generic Hospital

KNB - Knightsbridge Wing

9,100

£1,883,315

207.0

4

STG - Generic Hospital

P10 - Portacabin 10

376

£75,480

200.6

4

STG - Generic Hospital

STJ - St James Wing

25,974

£5,107,059

196.6

4

STG - Generic Hospital

P12 - Portacabin 12

35

£6,250

179.0

4

STG - Generic Hospital

P02 - Portacabin 2

232

£39,180

169.1

4

STG - Generic Hospital

P11 - Portacabin 11

496

£71,000

143.2

4

STG - Generic Hospital

P22 - Portacabin 22

41

£5,850

141.0

4

STG - Generic Hospital

MXF - Maxillo Facial Dental Unit

3,514

£480,225

136.7

4

STG - Generic Hospital

P05 - Portacabin 5

50

£6,150

123.0

4

STG - Generic Hospital

P16 - Portacabin 16

642

£78,150

121.8

4

STG - Generic Hospital

P01 - Portacabin 1

378

£43,850

116.1

4

STG - Generic Hospital

P17 - Portacabin 17

45

£3,500

78.3

3

STG - Generic Hospital

GUM - GU Medicine

1,450

£98,780

68.1

2

STG - Generic Hospital

P20 - Portacabin 20

54

£3,375

62.7

2

STG - Generic Hospital

P18 - Portacabin 18

64

£2,900

45.4

2

78

£3,250

41.5

2

23,238

£949,100

40.8

2

STG - Generic Hospital

P03 - Portacabin 3

STG - Generic Hospital

AMW - Atkinson Morley Wing

STG - Generic Hospital

HOT - Hotung Centre

310

£9,340

30.1

2

STG - Generic Hospital

STE - External Grounds

129,802

£698,600

5.4

1

STG - Generic Hospital

SSC - Staff Social Club

290

£0

0.0

1

STG - Generic Hospital

P23 - Portacabin 23

14

£0

0.0

1

Overall Total:

Generic Hospital Physical Condition Survey

£35,112,232

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Summary of Block Appraisal Cost by Total Cost

Site

Block

GIA (m2)

Block Total Cost/m2 Grade

Physical Condition STG - Generic Hospital

LNS - Lanesborough Wing

36,714

£12,264,681

334.1

4

STG - Generic Hospital

STJ - St James Wing

25,974

£5,107,059

196.6

4

STG - Generic Hospital

CBC - Chest & Breast Clinic

1,468

£4,114,700

2,802.9

4

STG - Generic Hospital

IGH - Ingelby House

4,200

£2,497,520

594.6

4

STG - Generic Hospital

GVR - Grosvenor Wing

9,300

£1,935,550

208.1

4

STG - Generic Hospital

KNB - Knightsbridge Wing

9,100

£1,883,315

207.0

4

STG - Generic Hospital

CLR - Clare House

3,000

£1,272,710

424.2

4

STG - Generic Hospital

WFS - Wolfson Site

3,956

£1,224,717

309.6

4

STG - Generic Hospital

AMW - Atkinson Morley Wing

23,238

£949,100

40.8

2

STG - Generic Hospital

ENC - Energy Centre (Boiler House)

2,400

£856,760

357.0

4

STG - Generic Hospital

CPS - Central Pharmacy Store

463

£720,000

1,555.1

4

STG - Generic Hospital

STE - External Grounds

129,802

£698,600

5.4

1

STG - Generic Hospital

MXF - Maxillo Facial Dental Unit

3,514

£480,225

136.7

4

STG - Generic Hospital

EDC - Education Centre

860

£240,400

279.5

4

STG - Generic Hospital

BRH - Bronte House

690

£152,460

221.0

4

STG - Generic Hospital

GUM - GU Medicine

1,450

£98,780

68.1

2

STG - Generic Hospital

P21 - Portacabin 21

195

£83,400

427.1

4

STG - Generic Hospital

P06 - Portacabin 6

18

£80,030

4,368.4

4

STG - Generic Hospital

P16 - Portacabin 16

642

£78,150

121.8

4

STG - Generic Hospital

P10 - Portacabin 10

376

£75,480

200.6

4

STG - Generic Hospital

P11 - Portacabin 11

496

£71,000

143.2

4

STG - Generic Hospital

P04 - Portacabin 4

99

£63,950

646.4

4

STG - Generic Hospital

P01 - Portacabin 1

378

£43,850

116.1

4

STG - Generic Hospital

P19 - Portacabin 19

58

£40,000

691.8

4

STG - Generic Hospital

P02 - Portacabin 2

232

£39,180

169.1

4

STG - Generic Hospital

HOT - Hotung Centre

310

£9,340

30.1

2

STG - Generic Hospital

P12 - Portacabin 12

35

£6,250

179.0

4

STG - Generic Hospital

P05 - Portacabin 5

50

£6,150

123.0

4

STG - Generic Hospital

P22 - Portacabin 22

41

£5,850

141.0

4

STG - Generic Hospital

P17 - Portacabin 17

45

£3,500

78.3

3

STG - Generic Hospital

P20 - Portacabin 20

54

£3,375

62.7

2

STG - Generic Hospital

P03 - Portacabin 3

78

£3,250

41.5

2

STG - Generic Hospital

P18 - Portacabin 18

64

£2,900

45.4

2

STG - Generic Hospital

SSC - Staff Social Club

290

£0

0.0

1

STG - Generic Hospital

P23 - Portacabin 23

14

£0

0.0

1

Overall Total:

Generic Hospital Physical Condition Survey

£35,112,232

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Summary of Block Appraisal Cost by Cost/m2

Site

Block

GIA (m2)

Block Total Cost/m2 Grade

Physical Condition STG - Generic Hospital

P06 - Portacabin 6

18

£80,030

4,368.4

4

STG - Generic Hospital

CBC - Chest & Breast Clinic

1,468

£4,114,700

2,802.9

4

STG - Generic Hospital

CPS - Central Pharmacy Store

463

£720,000

1,555.1

4

STG - Generic Hospital

P19 - Portacabin 19

58

£40,000

691.8

4

STG - Generic Hospital

P04 - Portacabin 4

99

£63,950

646.4

4

STG - Generic Hospital

IGH - Ingelby House

4,200

£2,497,520

594.6

4

STG - Generic Hospital

P21 - Portacabin 21

195

£83,400

427.1

4

STG - Generic Hospital

CLR - Clare House

3,000

£1,272,710

424.2

4

STG - Generic Hospital

ENC - Energy Centre (Boiler House)

2,400

£856,760

357.0

4

STG - Generic Hospital

LNS - Lanesborough Wing

36,714

£12,264,681

334.1

4

STG - Generic Hospital

WFS - Wolfson Site

3,956

£1,224,717

309.6

4

STG - Generic Hospital

EDC - Education Centre

860

£240,400

279.5

4

STG - Generic Hospital

BRH - Bronte House

690

£152,460

221.0

4

STG - Generic Hospital

GVR - Grosvenor Wing

9,300

£1,935,550

208.1

4

STG - Generic Hospital

KNB - Knightsbridge Wing

9,100

£1,883,315

207.0

4

STG - Generic Hospital

P10 - Portacabin 10

376

£75,480

200.6

4

STG - Generic Hospital

STJ - St James Wing

25,974

£5,107,059

196.6

4

STG - Generic Hospital

P12 - Portacabin 12

35

£6,250

179.0

4

STG - Generic Hospital

P02 - Portacabin 2

232

£39,180

169.1

4

STG - Generic Hospital

P11 - Portacabin 11

496

£71,000

143.2

4

STG - Generic Hospital

P22 - Portacabin 22

41

£5,850

141.0

4

STG - Generic Hospital

MXF - Maxillo Facial Dental Unit

3,514

£480,225

136.7

4

STG - Generic Hospital

P05 - Portacabin 5

50

£6,150

123.0

4

STG - Generic Hospital

P16 - Portacabin 16

642

£78,150

121.8

4

STG - Generic Hospital

P01 - Portacabin 1

378

£43,850

116.1

4

STG - Generic Hospital

P17 - Portacabin 17

45

£3,500

78.3

3

STG - Generic Hospital

GUM - GU Medicine

1,450

£98,780

68.1

2

STG - Generic Hospital

P20 - Portacabin 20

54

£3,375

62.7

2

STG - Generic Hospital

P18 - Portacabin 18

64

£2,900

45.4

2

78

£3,250

41.5

2

23,238

£949,100

40.8

2

STG - Generic Hospital

P03 - Portacabin 3

STG - Generic Hospital

AMW - Atkinson Morley Wing

STG - Generic Hospital

HOT - Hotung Centre

310

£9,340

30.1

2

STG - Generic Hospital

STE - External Grounds

129,802

£698,600

5.4

1

STG - Generic Hospital

SSC - Staff Social Club

290

£0

0.0

1

STG - Generic Hospital

P23 - Portacabin 23

14

£0

0.0

1

Overall Total:

Generic Hospital Physical Condition Survey

£35,112,232

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey - Risk Summary Site STG

Generic Hospital Grand Totals

Generic Hospital Physical Condition Survey

Low

Moderate

Significant

High

Total

£3,031,250

£2,349,169

£3,623,621

£4,729,000

£8,553,609

£3,031,250

£2,349,169

£3,623,621

£4,729,000

£8,553,609

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - ALL Whole Hospital Site (inc. Grounds) Backlog Costs

Impending Costs

Building

£0.00

Year 1

£0.00

Engineering

£0.00

Year 2

£0.00

Statutory

£0.00

Year 3

£0.00

Fire

£0.00

Year 4

£0.00

Year 5

£0.00

TOTAL

£0.00

£0.00

TOTAL

£0.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£0.00

Moderate

£0.00

Significant

£0.00

High

£0.00

Non-Critical Backlog (NCB) = Low + Moderate =

£0.00

Safety-Critical Backlog (SCB) = Significant + High =

£0.00

Remaining Life (RL) = Risk Adj Backlog (£) =

90 NCB RL

+ SCB =

£0.00 90

£0.00

+

£0.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£0.00

STG Generic Hospital - AMW Atkinson Morley Wing Backlog Costs Building

Impending Costs

£0.00

Year 1

£35,100.00

Engineering

£500.00

Year 2

£913,500.00

Statutory

£0.00

Year 3

£0.00

Fire

£0.00

Year 4

£0.00

Year 5

£0.00

TOTAL

£948,600.00

£500.00

TOTAL

£949,100.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£0.00

Moderate

£500.00

Significant

£0.00

High

£0.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

Non-Critical Backlog (NCB) = Low + Moderate =

£500.00

Safety-Critical Backlog (SCB) = Significant + High =

£0.00

Remaining Life (RL) = Risk Adj Backlog (£) =

90 NCB RL

+ SCB =

£500.00 90

+

£0.00

£500.00 £0.00

RISK ADJUSTED BACKLOG:

£5.56

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - BRH Bronte House Backlog Costs Building Engineering

Impending Costs

£109,600.00

Year 1

£0.00

£2,610.00

Year 2

£1,200.00

Statutory

£0.00

Year 3

£15,600.00

Fire

£0.00

Year 4

£0.00

Year 5

£23,450.00

TOTAL

£40,250.00

£112,210.00

TOTAL

£152,460.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£7,200.00

Moderate

£104,200.00

Significant

£810.00

High

£0.00

Non-Critical Backlog (NCB) = Low + Moderate =

£111,400.00

Safety-Critical Backlog (SCB) = Significant + High =

£810.00

Remaining Life (RL) = Risk Adj Backlog (£) =

30 NCB RL

+ SCB =

£111,400.00 30

£810.00

+

£112,210.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£4,523.33

STG Generic Hospital - CBC Chest & Breast Clinic Backlog Costs Building

Impending Costs

£4,000,000.00

Year 1

£0.00

£16,100.00

Year 2

£7,450.00

Statutory

£0.00

Year 3

£53,750.00

Fire

£0.00

Year 4

£12,650.00

Year 5

£24,750.00

TOTAL

£98,600.00

Engineering

£4,016,100.00

TOTAL

£4,114,700.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£8,100.00

Moderate

£8,000.00

Significant

£0.00

High

£4,000,000.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

£16,100.00

Non-Critical Backlog (NCB) = Low + Moderate =

£4,000,000.00

Safety-Critical Backlog (SCB) = Significant + High = Remaining Life (RL) = Risk Adj Backlog (£) =

0 NCB RL

+ SCB =

£16,100.00 0

+

£4,000,000.00

£4,016,100.00 £0.00

RISK ADJUSTED BACKLOG:

£4,016,100.00

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - CLR Clare House Backlog Costs

Impending Costs

Building

£766,760.00

Year 1

Engineering

£0.00

£269,800.00

Year 2

£9,000.00

Statutory

£0.00

Year 3

£36,950.00

Fire

£0.00

Year 4

£21,600.00

Year 5

£168,600.00

TOTAL

£236,150.00

£1,036,560.00

TOTAL

£1,272,710.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£397,160.00

Moderate

£485,800.00

Significant

£151,600.00

High

£2,000.00

Non-Critical Backlog (NCB) = Low + Moderate =

£882,960.00

Safety-Critical Backlog (SCB) = Significant + High =

£153,600.00

Remaining Life (RL) = Risk Adj Backlog (£) =

20 NCB RL

+ SCB =

£882,960.00 20

+

£153,600.00

£1,036,560.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£197,748.00

STG Generic Hospital - CPS Central Pharmacy Store Backlog Costs Building

Impending Costs

£720,000.00

Year 1

£0.00

Engineering

£0.00

Year 2

£0.00

Statutory

£0.00

Year 3

£0.00

Fire

£0.00

Year 4

£0.00

Year 5

£0.00

TOTAL

£0.00

£720,000.00

TOTAL

£720,000.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£0.00

Moderate

£0.00

Significant

£0.00

High

£720,000.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

£0.00

Non-Critical Backlog (NCB) = Low + Moderate =

£720,000.00

Safety-Critical Backlog (SCB) = Significant + High = Remaining Life (RL) = Risk Adj Backlog (£) =

0 NCB RL

+ SCB =

£0.00 0

+

£720,000.00

£720,000.00 £0.00

RISK ADJUSTED BACKLOG:

£720,000.00

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - EDC Education Centre Backlog Costs

Impending Costs

Building

£40,150.00

Year 1

£0.00

Engineering

£26,000.00

Year 2

£49,500.00

Statutory

£0.00

Year 3

£5,400.00

Fire

£0.00

Year 4

£4,400.00

Year 5

£114,950.00

TOTAL

£174,250.00

£66,150.00

TOTAL

£240,400.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£4,200.00

Moderate

£0.00

Significant

£61,350.00

High

£600.00

Non-Critical Backlog (NCB) = Low + Moderate =

£4,200.00

Safety-Critical Backlog (SCB) = Significant + High =

£61,950.00

Remaining Life (RL) = Risk Adj Backlog (£) =

30 NCB RL

+ SCB =

£4,200.00 30

+

£61,950.00

£66,150.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£62,090.00

STG Generic Hospital - ENC Energy Centre (Boiler House) Backlog Costs

Impending Costs

Building

£36,160.00

Year 1

£5,200.00

Engineering

£14,500.00

Year 2

£468,000.00

Statutory

£0.00

Year 3

£137,600.00

Fire

£0.00

Year 4

£4,900.00

Year 5

£190,400.00

TOTAL

£806,100.00

£50,660.00

TOTAL

£856,760.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£1,500.00

Moderate

£13,160.00

Significant

£36,000.00

High

£0.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

Non-Critical Backlog (NCB) = Low + Moderate =

£14,660.00

Safety-Critical Backlog (SCB) = Significant + High =

£36,000.00

Remaining Life (RL) = Risk Adj Backlog (£) =

30 NCB RL

+ SCB =

£14,660.00 30

+

£36,000.00

£50,660.00 £0.00

RISK ADJUSTED BACKLOG:

£36,488.67

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - GUM GU Medicine Backlog Costs Building

Impending Costs

£27,260.00

Year 1

£0.00

Engineering

£400.00

Year 2

£38,660.00

Statutory

£0.00

Year 3

£5,460.00

Fire

£0.00

Year 4

£7,600.00

Year 5

£19,400.00

TOTAL

£71,120.00

£27,660.00

TOTAL

£98,780.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£12,760.00

Moderate

£11,100.00

Significant

£3,200.00

High

£600.00

Non-Critical Backlog (NCB) = Low + Moderate =

£23,860.00

Safety-Critical Backlog (SCB) = Significant + High =

£3,800.00

Remaining Life (RL) = Risk Adj Backlog (£) =

45 NCB RL

+ SCB =

£23,860.00

+

45

£3,800.00

£27,660.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£4,330.22

STG Generic Hospital - GVR Grosvenor Wing Backlog Costs

Impending Costs

Building

£207,600.00

Year 1

£173,750.00

Engineering

£111,850.00

Year 2

£5,550.00

Statutory

£0.00

Year 3

£246,150.00

Fire

£0.00

Year 4

£542,850.00

Year 5

£647,800.00

TOTAL

£1,616,100.00

£319,450.00

TOTAL

£1,935,550.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£254,250.00

Moderate

£50,200.00

Significant

£15,000.00

High

£0.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

Non-Critical Backlog (NCB) = Low + Moderate =

£304,450.00

Safety-Critical Backlog (SCB) = Significant + High =

£15,000.00

Remaining Life (RL) = Risk Adj Backlog (£) =

40 NCB RL

+ SCB =

£304,450.00 40

+

£15,000.00

£319,450.00 £0.00

RISK ADJUSTED BACKLOG:

£22,611.25

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - HOT Hotung Centre Backlog Costs Building

Impending Costs

£5,200.00

Year 1

Engineering

£60.00

Year 2

£0.00

Statutory

£0.00

Year 3

£200.00

Fire

£0.00

Year 4

£0.00

Year 5

£3,880.00

TOTAL

£4,080.00

£5,260.00

TOTAL

£0.00

£9,340.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£5,260.00

Moderate

£0.00

Significant

£0.00

High

£0.00

Non-Critical Backlog (NCB) = Low + Moderate =

£5,260.00

Safety-Critical Backlog (SCB) = Significant + High =

£0.00

Remaining Life (RL) = Risk Adj Backlog (£) =

60 NCB RL

+ SCB =

£5,260.00

£0.00

+

60

£5,260.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£87.67

STG Generic Hospital - IGH Ingelby House Backlog Costs

Impending Costs

Building

£135,000.00

Year 1

£125,240.00

Engineering

£35,410.00

Year 2

£79,800.00

Statutory

£0.00

Year 3

£168,550.00

Fire

£0.00

Year 4

£1,739,680.00

Year 5

£213,840.00

TOTAL

£2,327,110.00

£170,410.00

TOTAL

£2,497,520.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£52,180.00

Moderate

£97,230.00

Significant

£21,000.00

High

£0.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

Non-Critical Backlog (NCB) = Low + Moderate =

£149,410.00

Safety-Critical Backlog (SCB) = Significant + High =

£21,000.00

Remaining Life (RL) = Risk Adj Backlog (£) =

50 NCB RL

+ SCB =

£149,410.00 50

+

£21,000.00

£170,410.00 £0.00

RISK ADJUSTED BACKLOG:

£23,988.20

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - KNB Knightsbridge Wing Backlog Costs Building

Impending Costs

£1,146,475.00

Year 1

£90,100.00

Engineering

£29,800.00

Year 2

£134,900.00

Statutory

£0.00

Year 3

£169,900.00

Fire

£0.00

Year 4

£50,700.00

Year 5

£261,440.00

TOTAL

£707,040.00

£1,176,275.00

TOTAL

£1,883,315.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£79,795.00

Moderate

£21,600.00

Significant

£1,070,080.00

High

£4,800.00

Non-Critical Backlog (NCB) = Low + Moderate =

£101,395.00

Safety-Critical Backlog (SCB) = Significant + High =

£1,074,880.00

Remaining Life (RL) = Risk Adj Backlog (£) =

5 NCB RL

£101,395.00

+ SCB =

5

+

£1,074,880.00

£1,176,275.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£1,095,159.00

STG Generic Hospital - LNS Lanesborough Wing Backlog Costs

Impending Costs

Building

£2,043,150.00

Year 1

£231,065.00

Engineering

£1,398,150.00

Year 2

£782,934.00

Statutory

£0.00

Year 3

£4,903,810.00

Fire

£0.00

Year 4

£929,730.00

Year 5

£1,975,842.00

TOTAL

£8,823,381.00

£3,441,300.00

TOTAL

£12,264,681.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£1,346,340.00

Moderate

£821,029.00

Significant

£1,273,931.00

High

£0.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

Non-Critical Backlog (NCB) = Low + Moderate =

£2,167,369.00

Safety-Critical Backlog (SCB) = Significant + High =

£1,273,931.00

Remaining Life (RL) = Risk Adj Backlog (£) =

30 NCB RL

+ SCB =

£2,167,369.00 30

+

£1,273,931.00

£3,441,300.00 £0.00

RISK ADJUSTED BACKLOG:

£1,346,176.63

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - MXF Maxillo Facial Dental Unit Backlog Costs

Impending Costs

Building

£201,325.00

Year 1

£47,050.00

Engineering

£32,600.00

Year 2

£14,400.00

Statutory

£0.00

Year 3

£93,000.00

Fire

£0.00

Year 4

£1,950.00

Year 5

£89,900.00

TOTAL

£246,300.00

£233,925.00

TOTAL

£480,225.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£27,850.00

Moderate

£109,275.00

Significant

£96,800.00

High

£0.00

Non-Critical Backlog (NCB) = Low + Moderate =

£137,125.00

Safety-Critical Backlog (SCB) = Significant + High =

£96,800.00

Remaining Life (RL) = Risk Adj Backlog (£) =

50 NCB RL

+ SCB =

£137,125.00 50

+

£96,800.00

£233,925.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£99,542.50

STG Generic Hospital - P Portacabin 1 to 23 Backlog Costs

Impending Costs

Building

£0.00

Year 1

£0.00

Engineering

£0.00

Year 2

£0.00

Statutory

£0.00

Year 3

£0.00

Fire

£0.00

Year 4

£0.00

Year 5

£0.00

TOTAL

£0.00

£0.00

TOTAL

£0.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£0.00

Moderate

£0.00

Significant

£0.00

High

£0.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

Non-Critical Backlog (NCB) = Low + Moderate =

£0.00

Safety-Critical Backlog (SCB) = Significant + High =

£0.00

Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£0.00 10

+

£0.00

£0.00 £0.00

RISK ADJUSTED BACKLOG:

£0.00

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - P01 Portacabin 1 Backlog Costs

Impending Costs

Building

£550.00

Year 1

£22,500.00

Engineering

£150.00

Year 2

£300.00

Statutory

£0.00

Year 3

£350.00

Fire

£0.00

Year 4

£200.00

Year 5

£19,800.00

TOTAL

£43,150.00

£700.00

TOTAL

£43,850.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£0.00

Moderate

£150.00

Significant

£550.00

High

£0.00

Non-Critical Backlog (NCB) = Low + Moderate =

£150.00

Safety-Critical Backlog (SCB) = Significant + High =

£550.00

Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£150.00 10

£550.00

+

£700.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£565.00

STG Generic Hospital - P02 Portacabin 2 Backlog Costs Building

Impending Costs

£1,525.00

Year 1

£17,670.00

Engineering

£60.00

Year 2

£725.00

Statutory

£0.00

Year 3

£7,950.00

Fire

£0.00

Year 4

£1,150.00

Year 5

£10,100.00

TOTAL

£37,595.00

£1,585.00

TOTAL

£39,180.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£1,160.00

Moderate

£175.00

Significant

£250.00

High

£0.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

£1,335.00

Non-Critical Backlog (NCB) = Low + Moderate =

£250.00

Safety-Critical Backlog (SCB) = Significant + High = Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£1,335.00 10

+

£250.00

£1,585.00 £0.00

RISK ADJUSTED BACKLOG:

£383.50

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - P03 Portacabin 3 Backlog Costs

Impending Costs

Building

£0.00

Year 1

£0.00

Engineering

£0.00

Year 2

£1,200.00

Statutory

£0.00

Year 3

£700.00

Fire

£0.00

Year 4

£1,200.00

Year 5

£150.00

TOTAL

£3,250.00

£0.00

TOTAL

£3,250.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£0.00

Moderate

£0.00

Significant

£0.00

High

£0.00

Non-Critical Backlog (NCB) = Low + Moderate =

£0.00

Safety-Critical Backlog (SCB) = Significant + High =

£0.00

Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£0.00 10

£0.00

+

£0.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£0.00

STG Generic Hospital - P04 Portacabin 4 Backlog Costs Building

Impending Costs

£60,000.00

Year 1

£0.00

Engineering

£200.00

Year 2

£0.00

Statutory

£0.00

Year 3

£2,750.00

Fire

£0.00

Year 4

£200.00

Year 5

£800.00

TOTAL

£3,750.00

£60,200.00

TOTAL

£63,950.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£200.00

Moderate

£0.00

Significant

£60,000.00

High

£0.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

£200.00

Non-Critical Backlog (NCB) = Low + Moderate =

£60,000.00

Safety-Critical Backlog (SCB) = Significant + High = Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£200.00 10

+

£60,000.00

£60,200.00 £0.00

RISK ADJUSTED BACKLOG:

£60,020.00

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - P05 Portacabin 5 Backlog Costs Building

Impending Costs

£0.00

Year 1

£0.00

Engineering

£150.00

Year 2

£800.00

Statutory

£0.00

Year 3

£200.00

Fire

£0.00

Year 4

£5,000.00

Year 5

£0.00

TOTAL

£6,000.00

£150.00

TOTAL

£6,150.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£150.00

Moderate

£0.00

Significant

£0.00

High

£0.00

Non-Critical Backlog (NCB) = Low + Moderate =

£150.00

Safety-Critical Backlog (SCB) = Significant + High =

£0.00

Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£150.00 10

£0.00

+

£150.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£15.00

STG Generic Hospital - P06 Portacabin 6 Backlog Costs Building

Impending Costs

£80,000.00

Year 1

£0.00

Engineering

£30.00

Year 2

£0.00

Statutory

£0.00

Year 3

£0.00

Fire

£0.00

Year 4

£0.00

Year 5

£0.00

TOTAL

£0.00

£80,030.00

TOTAL

£80,030.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£30.00

Moderate

£0.00

Significant

£80,000.00

High

£0.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

£30.00

Non-Critical Backlog (NCB) = Low + Moderate =

£80,000.00

Safety-Critical Backlog (SCB) = Significant + High = Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£30.00 10

+

£80,000.00

£80,030.00 £0.00

RISK ADJUSTED BACKLOG:

£80,003.00

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - P10 Portacabin 10 Backlog Costs Building

Impending Costs

£32,380.00

Year 1

£0.00

Engineering

£0.00

Year 2

£19,500.00

Statutory

£0.00

Year 3

£0.00

Fire

£0.00

Year 4

£23,600.00

Year 5

£0.00

TOTAL

£43,100.00

£32,380.00

TOTAL

£75,480.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£9,880.00

Moderate

£0.00

Significant

£22,500.00

High

£0.00

Non-Critical Backlog (NCB) = Low + Moderate =

£9,880.00

Safety-Critical Backlog (SCB) = Significant + High =

£22,500.00

Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£9,880.00 10

+

£22,500.00

£32,380.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£23,488.00

STG Generic Hospital - P11 Portacabin 11 Backlog Costs

Impending Costs

Building

£15,150.00

Year 1

£17,600.00

Engineering

£5,650.00

Year 2

£350.00

Statutory

£0.00

Year 3

£2,900.00

Fire

£0.00

Year 4

£0.00

Year 5

£29,350.00

TOTAL

£50,200.00

£20,800.00

TOTAL

£71,000.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£14,900.00

Moderate

£5,000.00

Significant

£900.00

High

£0.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

£19,900.00

Non-Critical Backlog (NCB) = Low + Moderate =

£900.00

Safety-Critical Backlog (SCB) = Significant + High = Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£19,900.00 10

+

£900.00

£20,800.00 £0.00

RISK ADJUSTED BACKLOG:

£2,890.00

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - P12 Portacabin 12 Backlog Costs Building

Impending Costs

£1,500.00

Year 1

£1,500.00

Engineering

£0.00

Year 2

£1,250.00

Statutory

£0.00

Year 3

£0.00

Fire

£0.00

Year 4

£800.00

Year 5

£1,200.00

TOTAL

£4,750.00

£1,500.00

TOTAL

£6,250.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£550.00

Moderate

£350.00

Significant

£600.00

High

£0.00

Non-Critical Backlog (NCB) = Low + Moderate =

£900.00

Safety-Critical Backlog (SCB) = Significant + High =

£600.00

Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£900.00 10

£600.00

+

£1,500.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£690.00

STG Generic Hospital - P16 Portacabin 16 Backlog Costs Building

Impending Costs

£550.00

Year 1

£0.00

Engineering

£0.00

Year 2

£59,800.00

Statutory

£0.00

Year 3

£3,150.00

Fire

£0.00

Year 4

£1,850.00

Year 5

£12,800.00

TOTAL

£77,600.00

£550.00

TOTAL

£78,150.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£550.00

Moderate

£0.00

Significant

£0.00

High

£0.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

£550.00

Non-Critical Backlog (NCB) = Low + Moderate =

£0.00

Safety-Critical Backlog (SCB) = Significant + High = Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£550.00 10

+

£0.00

£550.00 £0.00

RISK ADJUSTED BACKLOG:

£55.00

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - P17 Portacabin 17 Backlog Costs

Impending Costs

Building

£0.00

Year 1

£0.00

Engineering

£0.00

Year 2

£0.00

Statutory

£0.00

Year 3

£0.00

Fire

£0.00

Year 4

£400.00

Year 5

£3,100.00

TOTAL

£3,500.00

£0.00

TOTAL

£3,500.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£0.00

Moderate

£0.00

Significant

£0.00

High

£0.00

Non-Critical Backlog (NCB) = Low + Moderate =

£0.00

Safety-Critical Backlog (SCB) = Significant + High =

£0.00

Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£0.00 10

£0.00

+

£0.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£0.00

STG Generic Hospital - P18 Portacabin 18 Backlog Costs Building

Impending Costs

£0.00

Year 1

£0.00

Engineering

£300.00

Year 2

£200.00

Statutory

£0.00

Year 3

£1,800.00

Fire

£0.00

Year 4

£600.00

Year 5

£0.00

TOTAL

£2,600.00

£300.00

TOTAL

£2,900.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£0.00

Moderate

£300.00

Significant

£0.00

High

£0.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

£300.00

Non-Critical Backlog (NCB) = Low + Moderate =

£0.00

Safety-Critical Backlog (SCB) = Significant + High = Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£300.00 10

+

£0.00

£300.00 £0.00

RISK ADJUSTED BACKLOG:

£30.00

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - P19 Portacabin 19 Backlog Costs Building

Impending Costs

£40,000.00

Year 1

£0.00

Engineering

£0.00

Year 2

£0.00

Statutory

£0.00

Year 3

£0.00

Fire

£0.00

Year 4

£0.00

Year 5

£0.00

TOTAL

£0.00

£40,000.00

TOTAL

£40,000.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£0.00

Moderate

£0.00

Significant

£40,000.00

High

£0.00

Non-Critical Backlog (NCB) = Low + Moderate =

£0.00

Safety-Critical Backlog (SCB) = Significant + High =

£40,000.00

Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£0.00 10

+

£40,000.00

£40,000.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£40,000.00

STG Generic Hospital - P20 Portacabin 20 Backlog Costs Building

Impending Costs

£400.00

Year 1

£1,125.00

Engineering

£0.00

Year 2

£600.00

Statutory

£0.00

Year 3

£700.00

Fire

£0.00

Year 4

£550.00

Year 5

£0.00

TOTAL

£2,975.00

£400.00

TOTAL

£3,375.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£400.00

Moderate

£0.00

Significant

£0.00

High

£0.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

£400.00

Non-Critical Backlog (NCB) = Low + Moderate =

£0.00

Safety-Critical Backlog (SCB) = Significant + High = Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£400.00 10

+

£0.00

£400.00 £0.00

RISK ADJUSTED BACKLOG:

£40.00

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - P21 Portacabin 21 Backlog Costs Building

Impending Costs

£80,000.00

Year 1

Engineering

£0.00

Year 2

£0.00

Statutory

£0.00

Year 3

£200.00

Fire

£0.00

Year 4

£3,200.00

Year 5

£0.00

TOTAL

£3,400.00

£80,000.00

TOTAL

£0.00

£83,400.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£0.00

Moderate

£0.00

Significant

£80,000.00

High

£0.00

Non-Critical Backlog (NCB) = Low + Moderate =

£0.00

Safety-Critical Backlog (SCB) = Significant + High =

£80,000.00

Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£0.00 10

+

£80,000.00

£80,000.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£80,000.00

STG Generic Hospital - P22 Portacabin 22 Backlog Costs Building

Impending Costs

£1,650.00

Year 1

£0.00

Engineering

£600.00

Year 2

£200.00

Statutory

£0.00

Year 3

£0.00

Fire

£0.00

Year 4

£1,000.00

Year 5

£2,400.00

TOTAL

£3,600.00

£2,250.00

TOTAL

£5,850.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£2,250.00

Moderate

£0.00

Significant

£0.00

High

£0.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

£2,250.00

Non-Critical Backlog (NCB) = Low + Moderate =

£0.00

Safety-Critical Backlog (SCB) = Significant + High = Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£2,250.00 10

+

£0.00

£2,250.00 £0.00

RISK ADJUSTED BACKLOG:

£225.00

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - P23 Portacabin 23 Backlog Costs

Impending Costs

Building

£0.00

Year 1

£0.00

Engineering

£0.00

Year 2

£0.00

Statutory

£0.00

Year 3

£0.00

Fire

£0.00

Year 4

£0.00

Year 5

£0.00

TOTAL

£0.00

£0.00

TOTAL

£0.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£0.00

Moderate

£0.00

Significant

£0.00

High

£0.00

Non-Critical Backlog (NCB) = Low + Moderate =

£0.00

Safety-Critical Backlog (SCB) = Significant + High =

£0.00

Remaining Life (RL) = Risk Adj Backlog (£) =

10 NCB RL

+ SCB =

£0.00 10

£0.00

+

£0.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£0.00

STG Generic Hospital - SSC Staff Social Club Backlog Costs

Impending Costs

Building

£0.00

Year 1

£0.00

Engineering

£0.00

Year 2

£0.00

Statutory

£0.00

Year 3

£0.00

Fire

£0.00

Year 4

£0.00

Year 5

£0.00

TOTAL

£0.00

£0.00

TOTAL

£0.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£0.00

Moderate

£0.00

Significant

£0.00

High

£0.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

Non-Critical Backlog (NCB) = Low + Moderate =

£0.00

Safety-Critical Backlog (SCB) = Significant + High =

£0.00

Remaining Life (RL) = Risk Adj Backlog (£) =

50 NCB RL

+ SCB =

£0.00 50

+

£0.00

£0.00 £0.00

RISK ADJUSTED BACKLOG:

£0.00

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - STE External Grounds Backlog Costs Building

Impending Costs

£512,800.00

Year 1

Engineering

£0.00

Year 2

£0.00

Statutory

£0.00

Year 3

£500.00

Fire

£0.00

Year 4

£0.00

Year 5

£185,300.00

TOTAL

£185,800.00

£512,800.00

TOTAL

£0.00

£698,600.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£500.00

Moderate

£337,900.00

Significant

£174,400.00

High

£0.00

Non-Critical Backlog (NCB) = Low + Moderate =

£338,400.00

Safety-Critical Backlog (SCB) = Significant + High =

£174,400.00

Remaining Life (RL) = Risk Adj Backlog (£) =

90 NCB RL

+ SCB =

£338,400.00 90

+

£174,400.00

£512,800.00

TOTAL

£0.00

TOTAL NON RISK

RISK ADJUSTED BACKLOG:

£178,160.00

STG Generic Hospital - STJ St James Wing Backlog Costs

Impending Costs

Building

£510,235.00

Year 1

£361,750.00

Engineering

£593,950.00

Year 2

£423,604.00

Statutory

£0.00

Year 3

£483,820.00

Fire

£0.00

Year 4

£129,850.00

Year 5

£2,603,850.00

TOTAL

£4,002,874.00

£1,104,185.00

TOTAL

£5,107,059.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£747,385.00

Moderate

£246,800.00

Significant

£109,000.00

High

£1,000.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

Non-Critical Backlog (NCB) = Low + Moderate =

£994,185.00

Safety-Critical Backlog (SCB) = Significant + High =

£110,000.00

Remaining Life (RL) = Risk Adj Backlog (£) =

50 NCB RL

+ SCB =

£994,185.00 50

+

£110,000.00

£1,104,185.00 £0.00

RISK ADJUSTED BACKLOG:

£129,883.70

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Risk Adjusted Backlog

STG Generic Hospital - WFS Wolfson Site Backlog Costs Building Engineering

Impending Costs

£409,950.00

Year 1

£33,682.00

£8,800.00

Year 2

£22,800.00

Statutory

£0.00

Year 3

£92,050.00

Fire

£0.00

Year 4

£137,800.00

Year 5

£519,635.00

TOTAL

£805,967.00

£418,750.00

TOTAL

£1,224,717.00

TOTAL BACKLOG + IMPENDING Risk Adjusted Backlog Costs Low

£56,700.00

Moderate

£36,400.00

Significant

£325,650.00

High

£0.00 TOTAL

TOTAL NON RISK

Generic Hospital Physical Condition Survey

Non-Critical Backlog (NCB) = Low + Moderate =

£93,100.00

Safety-Critical Backlog (SCB) = Significant + High =

£325,650.00

Remaining Life (RL) = Risk Adj Backlog (£) =

35 NCB RL

+ SCB =

£93,100.00 35

+

£325,650.00

£418,750.00 £0.00

RISK ADJUSTED BACKLOG:

£328,310.00

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Physical Condition Survey - Block Photo References

STG Generic Hospital Block ALL - Whole Hospital Site (inc. Grounds)

Build Year:

1870

Type of Construction:

Whole Hospital Site (inc. Grounds)

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block AMW - Atkinson Morley Wing

Build Year:

2003

Type of Construction:

Brick built five storey building with a combination of pitched and flat roofs.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block BRH - Bronte House

Build Year:

1870

Type of Construction:

Brick crossed walled three storey building with a combination of pitched and flat roofs.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block CBC - Chest & Breast Clinic

Build Year:

1970

Type of Construction:

Timber framed pre-fab single storey building with a flat roof.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block CLR - Clare House

Build Year:

1900

Type of Construction:

Brick crossed walled three storey building with a combination of pitched and flat roofs.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block CPS - Central Pharmacy Store

Build Year:

1970

Type of Construction:

Timber framed pre-fab single story building with a flat roof.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block EDC - Education Centre

Build Year:

1970

Type of Construction:

Concrete framed brick clad structure with flat mineral felt roofs.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block ENC - Energy Centre (Boiler House)

Build Year:

1970

Type of Construction:

Concrete framed brick clad structure with flat asphalt felt roofs.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block GUM - GU Medicine

Build Year:

2000

Type of Construction:

Single storey brick block with flat single ply membrane roofs.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block GVR - Grosvenor Wing

Build Year:

1975

Type of Construction:

Brick built four storey building with a combination of flat roofs.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block HOT - Hotung Centre

Build Year:

2005

Type of Construction:

Two storey steel framed/brick structure with feature pyramid style entrance and waiting area.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block IGH - Ingelby House

Build Year:

1970

Type of Construction:

Brick built fourteen storey building with a combination of flat roofs.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block KNB - Knightsbridge Wing

Build Year:

1880

Type of Construction:

Conglomerate of building styles predominantly based around brick Victorian ward buildings with various temporary timber framed structures to infills.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block LNS - Lanesborough Wing

Build Year:

1975

Type of Construction:

Brick built five storey building with a combination of flat roofs.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block MXF - Maxillo Facial Dental Unit

Build Year:

1980

Type of Construction:

Brick built three storey building with a combination of flat roofs.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block P - Portacabin 1 to 23

Build Year:

1990

Type of Construction:

Temporary buildings.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block SSC - Staff Social Club

Build Year:

1970

Type of Construction:

Brick built single storey building with a flat roof.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block STE - External Grounds

Build Year:

1870

Type of Construction:

External grounds.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block STJ - St James Wing

Build Year:

1985

Type of Construction:

Brick built six storey building with a combination of pitched and flat roofs.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Physical Condition Survey - Block Photo References

STG Generic Hospital Block WFS - Wolfson Site

Build Year:

1960

Type of Construction:

Brick built three storey building built into a slope with a combination of flat roofs.

Generic Hospital Physical Condition Survey

October 2010 Project 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Redecoration required within 5 year maintenance schedule (cost includes decanting the ward). Suspended. Plasterboard. Carpet: Need to replace contract quality carpet 37No. offices. Slip resistant vinyl sheet. Vinyl Sheet. Terrazzo. Brickwork (plastered). Sanitary fittings: Ceramic wash hand basin. Kitchen facilities. Sanitary fittings: Sink unit. Sanitary fittings: Ceramic WC. Sanitary fittings: Ceramic sink. Clinical units. Sanitary fittings: Metal sluice.

Site : Generic Hospital - STG Block : Atkinson Morley Wing - AMW Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

B(C)

£162,000

2

0

2 2

4

2012

02 - Ceiling 02 - Ceiling 03 - Floor

B B B(C)

£0 £0 £24,900

15 20 1

0 0 0

0 0 0 0 2 3

0 0 6

2025 2030 2011

03 - Floor 03 - Floor 03 - Floor 05 - Condition of internal walls 08 - Fixed Units

B B B B B

£0 £0 £0 £0 £0

7 7 15 20 7

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2017 2017 2025 2030 2017

08 - Fixed Units 08 - Fixed Units 08 - Fixed Units 08 - Fixed Units 08 - Fixed Units 08 - Fixed Units

B B B B B B

£0 £0 £0 £0 £0 £0

7 7 7 7 7 20

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

2017 2017 2017 2017 2017 2030

Location: 01 - First Floor Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Redecoration required within 5 year maintenance schedule (cost includes decanting the ward). Suspended. Plasterboard. Carpet: Need to replace contract quality carpet 5No. offices. Brickwork (plastered). Sanitary fittings: Ceramic wash hand basin. Kitchen facilities. Sanitary fittings: Ceramic WC. Sanitary fittings: Ceramic sink. Clinical units. Sanitary fittings: Metal sluice.

C - Building - Internal Fabric 01 - Decorations

B(C)

£322,500

2

0

2 2

4

2012

02 - Ceiling 02 - Ceiling 03 - Floor

B B B(C)

£0 £0 £3,400

15 20 1

0 0 0

0 0 0 0 2 3

0 0 6

2025 2030 2011

05 - Condition of internal walls 08 - Fixed Units

B B

£0 £0

20 7

0 0

0 0 0 0

0 0

2030 2017

08 - Fixed Units 08 - Fixed Units 08 - Fixed Units 08 - Fixed Units 08 - Fixed Units

B B B B B

£0 £0 £0 £0 £0

7 7 7 7 20

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2017 2017 2017 2017 2030

B(C)

£42,500

2

0

2 2

4

2012

02 - Ceiling 02 - Ceiling 02 - Ceiling 03 - Floor 05 - Condition of internal walls 08 - Fixed Units 08 - Fixed Units 08 - Fixed Units 08 - Fixed Units

B B B B B B B B B

£0 £0 £0 £0 £0 £0 £0 £0 £0

15 20 20 20 20 7 7 7 7

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0

2025 2030 2030 2030 2030 2017 2017 2017 2017

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

7 20

0 0

0 0 0 0

0 0

2017 2030

Location: -01 - Lower Ground Floor C - Building - Internal Fabric 01 - Decorations

Generic Hospital Physical Condition Survey

Redecoration required within 5 year maintenance schedule. Suspended. Concrete soffit. Plasterboard. Concrete. Brickwork (plastered). Kitchen facilities. Sanitary fittings: Ceramic sink. Sanitary fittings: Ceramic WC. Sanitary fittings: Ceramic wash hand basin. Clinical units. Sanitary fittings: Metal sluice. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Redecoration required within 5 year maintenance schedule (cost includes decanting the ward). Suspended. Plasterboard. Carpet: Need to replace contract quality carpet 5No. offices. Brickwork (plastered). Kitchen facilities. Sanitary fittings: Ceramic WC. Sanitary fittings: Ceramic sink. Clinical units. Sanitary fittings: Ceramic wash hand basin. Sanitary fittings: Metal sluice.

Location: 02 - Second Floor C - Building - Internal Fabric 01 - Decorations

B(C)

£267,250

2

0

2 2

4

2012

02 - Ceiling 02 - Ceiling 03 - Floor

B B B(C)

£0 £0 £3,400

15 20 1

0 0 0

0 0 0 0 2 3

0 0 6

2025 2030 2011

05 - Condition of internal walls 08 - Fixed Units 08 - Fixed Units 08 - Fixed Units 08 - Fixed Units 08 - Fixed Units

B B B B B B

£0 £0 £0 £0 £0 £0

20 7 7 7 7 7

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

2030 2017 2017 2017 2017 2017

08 - Fixed Units

B

£0

20

0

0 0

0

2030

01 - Decorations

B(C)

£119,250

2

0

2 2

4

2012

02 - Ceiling 02 - Ceiling 03 - Floor

B B B(C)

£0 £0 £3,400

15 20 1

0 0 0

0 0 0 0 2 3

0 0 6

2025 2030 2011

05 - Condition of internal walls 08 - Fixed Units

B B

£0 £0

20 7

0 0

0 0 0 0

0 0

2030 2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

Location: 03 - Third Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

Redecoration required within 5 year maintenance schedule (cost includes decanting the ward). Suspended. Plasterboard. Carpet: Need to replace contract quality carpet 5No. offices. Brickwork (plastered). Sanitary fittings: Ceramic wash hand basin. Kitchen facilities. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units 08 - Fixed Units 08 - Fixed Units 08 - Fixed Units

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B B B

£0 £0 £0 £0

7 7 7 20

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2017 2017 2017 2030

Sanitary fittings: Ceramic WC. Clinical units. Sanitary fittings: Ceramic sink. Sanitary fittings: Metal sluice.

02 - Ceiling

B

£0

20

0

0 0

0

2030

03 - Floor

B

£0

20

0

0 0

0

2030

Steel: Profiled sheet (mild steel), unpainted. Concrete.

01a - Attached - Covering

B

£0

50

0

0 0

0

2060

Slate.

01c - Attached - Flashing 01e - Attached - Rafters 01f - Attached - Purlins 01g - Attached - Guttering 01h - Attached - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

20 50 50 10 10

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2030 2060 2060 2020 2020

Lead. Steel. Steel. Box gutters. Internal (assumed condition, due to no access).

Location: 04 - Fourth Floor C - Building - Internal Fabric

Location: Roof 01 D - Building - Roof

0 0 0 0 0

Location: Roof 02 D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

02a - Flat - Covering

B

£0

20

0

0 0

0

2030

Asphalt: Covered with pebbles.

02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B B B

£0 £0 £0 £0 £0 £0

20 50 20 20 20 20

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

2030 2060 2030 2030 2030 2030

Paving slabs. Reinforced concrete. Lead. Brickwork. Integrated. Internal (assumed condition, due to no access).

01 - General Structure

B

£0

90

0

0 0

0

2100

Brickwork: Generally sound.

02 - Foundations 03 - Ground Stability 04 - Chimneys

B B B

£0 £0 £0

90 90 30

0 0 0

0 0 0 0 0 0

0 0 0

2100 2100 2040

Generally sound. Generally sound. Steel flue.

B B B B B

£0 £0 £0 £0 £0

40 90 30 15 10

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2050 2100 2040 2025 2020

PVCU panelling. Brickwork. DPC. Aluminium - Double. Aluminium.

Location: Whole Block A - Building - Physical Structure

B - Building - External Fabric 01d - Masonry - Finish 01d - Masonry - Finish 03 - DPC 04 - Windows 06 - Doors

0 0 0 0 0

C - Building - Internal Fabric Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 12 - Comments

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£0

0

0

3 3

9

2010

Internal doors: Oakleaf informed of ongoing issues with locking mechanisms.

B

£0

12

0

0 0

0

2022

Radiant panels in acceptable order.

B

£0

10

0

0 0

0

2020

Grilles/diffusers in acceptable order.

B

£0

8

0

0 0

0

2018

Medical gases in acceptable order.

B

£0

8

0

0 0

0

2018

Physical Plant - Plant 1: Medium temperature hot water primary pump set in acceptable order.

03 - Controls

B

£0

10

0

0 0

0

2020

05 - AHUs

N/A

£0

0

0

0 0

0

2010

05 - AHUs

B

£0

16

0

0 0

0

2026

05 - AHUs

B

£0

16

0

0 0

0

2026

Physical Plant - Plant 2: AHU control panels in acceptable order. Physical Plant - Plant 2: AHU number 29 not running. It was noted that no 'U' tube was fitted. Physical Plant - Plant 2: AHU number 30 in acceptable order. Physical Plant - Plant 2: AHU number 27 intense therapy primary care unit, in acceptable order. It was noted that no liquid was in the U tubes.

Facet: 2 - Engineering Location: 00 - Ground Floor I - Engineering - Heating Systems 01 - Heat Emitters K - Engineering - Vent & Air Con 03 - Grilles & Diffusers L - Engineering - Medical Gases 05 - Comments O - Engineering - Main Plant 02 - Pumps

P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Physical Plant - Plant 2: AHU number 25 in acceptable order. Physical Plant - Plant 2: AHU number 26 in acceptable order. Physical Plant - Plant 2: AHU number 28 in acceptable order. Physical Plant - Plant 1: 2No. standby generators in acceptable order. Physical Plant - Plant 1: Xplate heat exchangers in acceptable order. Physical Plant - Plant 1: Condensing recovery unit including pumps in acceptable order. Physical Plant - Plant 1: Medplus medical air dryers in acceptable order. Physical Plant - Plant 1: Medplus medical vacuum unit in acceptable order.

05 - AHUs

B

£0

16

0

0 0

0

2026

05 - AHUs

B

£0

17

0

0 0

0

2027

05 - AHUs

B

£0

17

0

0 0

0

2027

08 - Generators

B

£0

25

0

0 0

0

2035

09 - Comments

B

£0

7

0

0 0

0

2017

09 - Comments

B

£0

7

0

0 0

0

2017

09 - Comments

B

£0

12

0

0 0

0

2022

09 - Comments

B

£0

13

0

0 0

0

2023

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

05 - Emergency Lighting

B

£0

8

0

0 0

0

2018

01 - Sounders

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

Remedial Action

R - Engineering - Electrical Surface fluorescent lights in acceptable order. Surface fluorescent lights in acceptable order. Offices: CAT II lights in acceptable order. Corridors: Emergency lights in acceptable order.

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

Corridors: Fire alarm sounders in acceptable order. Corridors: Smoke detectors in acceptable order.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Surface fluorescent lights in acceptable order. Emergency lights in acceptable order.

Location: 01 - First Floor R - Engineering - Electrical 04 - Lighting Installation

B

£0

6

0

0 0

0

2016

05 - Emergency Lighting

B

£0

8

0

0 0

0

2018

B

£0

10

0

0 0

0

2020

Fire alarm sounders in acceptable order.

02 - Pumps

B

£0

9

0

0 0

0

2019

03 - Calorifiers

C

£500

0

0

3 3

9

2010

03 - Calorifiers

B

£0

8

0

0 0

0

2018

Physical Plant: All pumps in acceptable order. Physical Plant: Steam calorifier water generator has a noisy pump, cost to investigate. Steam calorifier water generator in acceptable order.

B

£0

8

0

0 0

0

2018

Physical Plant: AHUs in acceptable order.

B

£0

7

0

0 0

0

2017

Surface fluorescent lights in acceptable order.

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation 05 - Emergency Lighting

B B

£0 £0

7 8

0 0

0 0 0 0

0 0

2017 2018

Surface fluorescent lights in acceptable order. CAT II lights in acceptable order. Emergency lights in acceptable order.

V - Engineering - Fire Alarms 01 - Sounders

Location: -01 - Lower Ground Floor O - Engineering - Main Plant

P - Engineering - Main Plant 05 - AHUs R - Engineering - Electrical 04 - Lighting Installation

Location: 02 - Second Floor R - Engineering - Electrical

V - Engineering - Fire Alarms Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Fire alarm sounders in acceptable order. Smoke detectors in acceptable order.

01 - Sounders

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation 05 - Emergency Lighting

B B

£0 £0

7 8

0 0

0 0 0 0

0 0

2017 2018

01 - Sounders

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

B

£0

18

0

0 0

0

2028

Water tank in acceptable order.

B

£0

12

0

0 0

0

2022

Bait charging equipment in acceptable order.

Location: 03 - Third Floor R - Engineering - Electrical Surface fluorescent lights in acceptable order. CAT II lights in acceptable order. Emergency lights in acceptable order.

V - Engineering - Fire Alarms Fire alarm sounders in acceptable order. Smoke detectors in acceptable order.

Location: 04 - Fourth Floor M - Engineering - Hot/Cold Water 08 - Tanks & Bylaws P - Engineering - Main Plant 09 - Comments Block Total

Generic Hospital Physical Condition Survey

£949,100.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling. Carpet will require replacing within the maintenance schedule. Linoleum to corridors. Kitchenette requires replacing. Female WC in acceptable condition. Male WC in acceptable condition. Minor damp to entrance door surround.

Site : Generic Hospital - STG Block : Bronte House - BRH Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

B(C)

£5,200

3

0

2 2

4

2013

02 - Ceiling 03 - Floor

B B(C)

£0 £9,200

20 5

0 0

0 0 2 2

0 4

2030 2015

03 - Floor 08 - Fixed Units 08 - Fixed Units

B C B

£0 £1,500 £0

15 0 15

0 0 0

0 0 3 2 0 0

0 6 0

2025 2010 2025

08 - Fixed Units

B

£0

15

0

0 0

0

2025

11 - Signs of Water Ingress

C

£600

0

0

4 3 12

2010

01 - Decorations

B(C)

£5,200

3

0

2 2

4

2013

02 - Ceiling 03 - Floor 03 - Floor 08 - Fixed Units

B B B B(C)

£0 £0 £0 £12,000

20 6 15 5

0 0 0 0

0 0 0 3

0 0 0 3

0 0 0 9

2030 2016 2025 2015

08 - Fixed Units

B

£0

10

0

0 0

0

2020

Location: 01 - First Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

Redecoration required as part of a regular maintenance schedule. Suspended ceiling. Carpet to offices. Linoleum to corridors. 2No. WCs will require refurbishment within the maintenance schedule. Kitchenette. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Suspended ceiling. Carpet to offices. Linoleum to corridors. Kitchenette. 2No. WCs in good condition. Second floor was refurbished circa 2008.

Location: 02 - Second Floor C - Building - Internal Fabric 01 - Decorations

B(C)

£5,200

3

0

2 2

4

2013

02 - Ceiling 03 - Floor 03 - Floor 08 - Fixed Units 08 - Fixed Units 12 - Comments

B B B B B N/A

£0 £0 £0 £0 £0 £0

20 6 15 10 10 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

2030 2016 2025 2020 2020 2010

04 - Windows

C

£52,000

0

0

3 3

9

2010

40No. sliding sash windows in poor decorative order to elevation 01. Windows offer poor insulating properties and cost allows for upgrading.

06 - Doors

B

£0

10

0

0 0

0

2020

Timber double doors in good order.

C

£5,600

0

0

3 3

9

2010

7No. sliding sash windows in poor decorative order to elevation 02 (10% contingency for replacement). Windows offer poor insulating properties and cost allows for upgrading.

Location: Elevation 01 B - Building - External Fabric

Location: Elevation 02 B - Building - External Fabric 04 - Windows

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 06 - Doors

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£500

0

0

2 2

4

2010

Redecorate double fire exit doors.

C

£46,400

0

0

3 3

9

2010

33No. sliding sash windows in poor decorative order to elevation 03. Windows offer poor insulating properties and cost allows for upgrading.

B

£0

20

0

0 0

0

2030

Modern steel flue.

C

£500

0

0

2 2

4

2010

Redecorate double doors to Plant Room.

C

£1,500

0

0

3 2

6

2010

Redecorate (sandblast) cast iron fire escape.

C

£600

0

0

2 2

4

2010

Redecorate 3No. fire exit doors to elevation 05.

01a - Attached - Covering

B

£0

40

0

0 0

0

2050

01c - Attached - Flashing 01g - Attached - Guttering 01h - Attached - Down Rainwater Pipes

B B B

£0 £0 £0

20 20 20

0 0 0

0 0 0 0 0 0

0 0 0

2030 2030 2030

Slate roof overhauled and in good condition. Lead flashing. PVCu. PVCu.

Location: Elevation 03 B - Building - External Fabric 04 - Windows

Location: Elevation 04 A - Building - Physical Structure 04 - Chimneys B - Building - External Fabric 04 - Windows

Location: Elevation 05 A - Building - Physical Structure 05 - External Fire Escape B - Building - External Fabric 06 - Doors

Location: Roof 01 D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: Roof 02 D - Building - Roof 02a - Flat - Covering 02e - Flat - Verges/Fascias/Soffits 02g - Flat - Guttering 02h - Flat - Down Rainwater Pipes

B C B B

£0 £400 £0 £0

10 0 20 20

0 0 0 0

0 2 0 0

0 2 0 0

0 4 0 0

2020 2010 2030 2030

Mineral felt. Redecorate fascias. PVCu. PVCu.

02a - Flat - Covering

B

£0

7

0

0 0

0

2017

02j - Flat - Comments

N/A

£0

0

0

0 0

0

2010

Porch to elevation 01: Mineral felt (as roof 04). No access externally.

B B B

£0 £0 £0

7 10 20

0 0 0

0 0 0 0 0 0

0 0 0

2017 2020 2030

To elevation 02: Mineral felt. Lead flashing. Brick parapet.

01 - General Structure

C

£0

0

0

4 4 16

2010

06 - Comments

N/A

£0

0

0

0 0

2010

Signs of building movement to first and second floors with slight skewing to door frames. Defect is not uncommon for a building of this age with no further works recommended. Roof and elevation diagram.

Location: Roof 03 D - Building - Roof

Location: Roof 04 D - Building - Roof 02a - Flat - Covering 02c - Flat - Flashing 02d - Flat - Parapets

Location: Whole Block A - Building - Physical Structure

Generic Hospital Physical Condition Survey

0

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 06 - Comments

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

15

0

0 0

0

2025

Soil pipes overhauled with PVCu replacement.

B

£0

10

0

0 0

0

2020

Steel panel radiators in acceptable order.

B

£0

8

0

0 0

0

2018

Heatre Aquapoint water heater in acceptable order.

B(C)

£600

2

0

2 3

6

2012

2No. Vent Axia extract fan requires upgrading within the maintenance schedule.

Facet: 2 - Engineering Location: 00 - Ground Floor I - Engineering - Heating Systems 01 - Heat Emitters

M - Engineering - Hot/Cold Water 01 - Local Water Heaters

P - Engineering - Main Plant 04 - Extract Fans

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 04 - Extract Fans

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

6

0

0 0

0

2016

Extract fans in acceptable order.

02 - Main Switchgear

B

£0

8

0

0 0

0

2018

MEM main isolators in acceptable order.

03 - Distribution Boards

C

£150

0

0

3 4 12

2010

Wylex distribution board has finger spaces and is potentially posing a danger.

03 - Distribution Boards

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

Wylex distribution board in acceptable order. 2No. surface fluorescent lights require upgrading within the maintenance schedule. CAT II lights in acceptable order.

05 - Emergency Lighting

B

£0

8

0

0 0

0

2018

R - Engineering - Electrical

Emergency lights in acceptable order.

V - Engineering - Fire Alarms Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Sounders in acceptable order. Call points in acceptable order. Smoke detector requires upgrading within the maintenance schedule. Smoke detectors in acceptable order.

01 - Sounders 02 - Call Points 03 - Smoke Detectors

B B B(C)

£0 £0 £150

10 6 5

0 0 0

0 0 0 0 3 3

0 0 9

2020 2016 2015

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

B

£0

7

0

0 0

0

2017

Pipework lagging in acceptable order.

01 - Heating Boilers

B

£0

6

0

0 0

0

2016

Hamworthy boiler is being repaired at present as boiler section cracked.

01 - Heating Boilers

B

£0

6

0

0 0

0

2016

Hamworthy boiler in acceptable order.

Location: -01 - Basement I - Engineering - Heating Systems 02 - Pipework

O - Engineering - Main Plant

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

02 - Pumps

B(C)

£700

5

0

3 3

9

2015

Domestic hot water service secondary pump requires upgrading within the maintenance schedule.

02 - Pumps

B

£0

7

0

0 0

0

2017

03 - Calorifiers

B(C)

£1,000

5

0

3 3

9

2015

Grundfos heating pumps in acceptable order. Calorifier requires upgrading within the maintenance schedule.

B

£0

10

0

0 0

0

2020

Pressurisation unit in acceptable order.

B

£0

8

0

0 0

0

2018

Control panel in acceptable order.

B

£0

10

0

0 0

0

2020

Steel panel radiators in acceptable order.

B

£0

8

0

0 0

0

2018

Heatre Aquapoint water heater in acceptable order.

05 - Pressurisation Units

P - Engineering - Main Plant 03 - Controls

Location: 01 - First Floor I - Engineering - Heating Systems 01 - Heat Emitters M - Engineering - Hot/Cold Water 01 - Local Water Heaters

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 09 - Comments

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£100

0

0

3 3

9

2010

Old fire hose outlet valve requires capping or removing pipework (suspect not in use).

03 - Distribution Boards

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,600

0

0

2 2

4

2010

Wylex distribution board in acceptable order. Surface fluorescent light requires replacement. 8No. tungsten lights require replacement.

04 - Lighting Installation

B(C)

£400

2

0

2 2

4

2012

2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation 05 - Emergency Lighting

B B

£0 £0

7 8

0 0

0 0 0 0

0 0

2017 2018

CAT II lights in acceptable order. Emergency lights in acceptable order.

B B B

£0 £0 £0

10 6 8

0 0 0

0 0 0 0 0 0

0 0 0

2020 2016 2018

Sounders in acceptable order. Call points in acceptable order. Smoke detectors in acceptable order.

R - Engineering - Electrical

V - Engineering - Fire Alarms 01 - Sounders 02 - Call Points 03 - Smoke Detectors

Location: 02 - Second Floor Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

M - Engineering - Hot/Cold Water 09 - Comments

C

£100

0

0

3 3

9

2010

Old fire hose outlet valve requires capping or removing pipework (suspect not in use).

03 - Distribution Boards

C

£60

0

0

3 4 12

2010

Wylex distribution board has finger spaces and is potentially posing a danger.

03 - Distribution Boards

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

Wylex distribution board in acceptable order. 2No. tungsten lights require replacement. Surface fluorescent light requires upgrading within the maintenance schedule.

R - Engineering - Electrical

Block Total

Generic Hospital Physical Condition Survey

£152,460.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Breast Screening Clinic: Redecoration required as part of a regular maintenance schedule. Cost included. Chest Clinic: Redecoration required as part of a regular maintenance schedule. Cost included. Occupational Health Department: Redecoration required as part of a regular maintenance schedule. Cost included. Chest Clinic: Fibreboard ceiling. Occupational Health Department: Suspended ceiling. Breast Screening Clinic: Suspended ceiling. Breast Screening Clinic: Lino requires replacing to corridors (50%). Cost included. Breast Screening Clinic: Carpet requires replacing to corridors and lobbies. Cost included. Breast Screening Clinic: Carpet requires replacing to offices. Cost included. Breast Screening Clinic: Lino requires replacing to X-Ray rooms. Cost included.

Site : Generic Hospital - STG Block : Chest & Breast Clinic - CBC Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

C

£0

0

0

2 2

4

2010

01 - Decorations

C

£0

0

0

2 2

4

2010

01 - Decorations

C

£0

0

0

2 2

4

2010

02 - Ceiling 02 - Ceiling

B B

£0 £0

10 20

0 0

0 0 0 0

0 0

2020 2030

02 - Ceiling

B

£0

20

0

0 0

0

2030

03 - Floor

C

£0

0

0

2 3

6

2010

03 - Floor

C

£0

0

0

2 3

6

2010

03 - Floor

C

£0

0

0

2 3

6

2010

03 - Floor

C

£0

0

0

2 3

6

2010

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Occupational Health Department: Vinyl requires replacing to consulting rooms. Cost included. Chest Clinic: Vinyl tile requires replacing to consulting rooms. Cost included. Chest Clinic: Carpet requires replacing to offices. Cost included. Chest Clinic: Linoleum to circulation routes requires replacing (40%). Cost included. Occupational Health Department: Vinyl requires replacing to circulation areas. Cost included. Occupational Health Department: Carpet will require replacing to offices within the maintenance schedule. Cost included. Breast Screening Clinic: Carpet to consulting rooms. Breast Screening Clinic: Linoleum to consulting rooms. Chest Clinic: Linoleum to circulation routes. Occupational Health Department: Kitchen units require replacing. Cost included. Chest Clinic: Clinical units require replacing. Cost included. Occupational Health Department: Replace clinical units to 4No. consulting rooms. Cost included. Chest Clinic: Refurbish 2No. Patient WCs. Cost included.

03 - Floor

C

£0

0

0

2 3

6

2010

03 - Floor

C

£0

0

0

2 3

6

2010

03 - Floor

C

£0

0

0

2 3

6

2010

03 - Floor

C

£0

0

0

2 3

6

2010

03 - Floor

C

£0

0

0

2 3

6

2010

03 - Floor

B(C)

£0

5

0

2 3

6

2015

03 - Floor

B

£0

6

0

0 0

0

2016

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

08 - Fixed Units

C

£0

0

0

3 3

9

2010

08 - Fixed Units

C

£0

0

0

3 3

9

2010

08 - Fixed Units

C

£0

0

0

3 3

9

2010

08 - Fixed Units

C

£0

0

0

3 3

9

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Occupational Health Department: Refurbish accessible WC. Cost included. Occupational Health Department: Refurbish patient WC. Cost included. Chest Clinic: Refurbish Male & Female Staff Changing Rooms. Cost included. Breast Screening Clinic: Refurbish Staff WCs. Cost included. Breast Screening Clinic: Clinical units require replacing to Development Room. Cost included. Chest Clinic: Refurbish Staff Room including kitchen. Cost included. Breast Screening Clinic: Refurbish Staff Room including kitchen. Cost included. Chest Clinic: Wash hand basins to consulting rooms will require replacing within the maintenance schedule. Cost included. Breast Screening Clinic: Accessible WC in acceptable condition. Breast Screening Clinic: Wash hand basins to consulting rooms. Chest Clinic: Numerous signs of water ingress. Cost included.

08 - Fixed Units

C

£0

0

0

3 3

9

2010

08 - Fixed Units

C

£0

0

0

3 3

9

2010

08 - Fixed Units

C

£0

0

0

3 3

9

2010

08 - Fixed Units

C

£0

0

0

3 3

9

2010

08 - Fixed Units

C

£0

0

0

3 3

9

2010

08 - Fixed Units

C

£0

0

0

3 3

9

2010

08 - Fixed Units

C

£0

0

0

3 3

9

2010

08 - Fixed Units

B(C)

£0

5

0

3 3

9

2015

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2020

11 - Signs of Water Ingress

C

£0

0

0

4 5 20

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Breast Screening Clinic: Numerous roof leaks through ground floor, especially to the Mammogram Storage Room (0.29). Cost included. Chest Clinic: Cylinders stored in Male Changing Room. Breast Screening Clinic: Signs of roof failures to skylights. Cost included.

11 - Signs of Water Ingress

C

£0

0

0

4 5 20

2010

12 - Comments

N/A

£0

0

0

0 0

0

2010

12 - Comments

C

£0

0

0

4 4 16

2010

01 - General Structure

C

£4,000,000

0

0

5 4 20

2010

01 - General Structure

C

£0

0

0

5 4 20

2010

01 - General Structure

C

£0

0

0

5 4 20

2010

02a - Cladding - Attachment 04 - Windows

B C

£0 £0

10 0

0 0

0 0 0 4 3 12

2020 2010

06 - Doors

B(C)

£0

5

0

3 3

2015

Remedial Action

Location: Elevation 01 A - Building - Physical Structure The building is in extremely poor condition and is considered beyond the end of its economic life. Cost allows for a permanent clinical unit with XRay facilities to be built in the same location. Rot damage to frame at corner of elevation 1 and 6. Cost included. Rot damage to frame at corner of elevation 1 and 2. Cost included.

B - Building - External Fabric

9

Composite panels. 30m2 of single glazed timber frames with localised rot damage. Cost included. 2No. double exit doors will require replacement within the maintenance schedule. Cost included.

Location: Elevation 02 Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

A - Building - Physical Structure 01 - General Structure

C

£0

0

0

5 4 20

2010

Rot damage to frame at 2No. locations. Cost included.

04 - Windows

C

£0

0

0

4 3 12

2010

06 - Doors

B

£0

10

0

0 0

0

2020

20m2 of timber frames in generally poor condition. Cost included. 3No. sets of timber double doors.

C

£0

0

0

5 4 20

2010

Rot damage to frame at 4No. locations. Cost included.

C

£0

0

0

4 3 12

2010

9m2 of timber frames in generally poor condition. Cost included.

C

£0

0

0

5 4 20

2010

Localised rot damage to frame. Cost included.

01a - Masonry - Cracking 04 - Windows

B C

£0 £0

20 0

0 0

0 0 0 4 3 12

2030 2010

06 - Doors

C

£0

0

0

3 3

9

2010

Brickwork in good order. 15m2 of rotten timber window frames. Cost included. Replace double entrance doors to Breast Clinic. Cost included.

C

£0

0

0

5 4 20

2010

B - Building - External Fabric

Location: Elevation 03 A - Building - Physical Structure 01 - General Structure B - Building - External Fabric 04 - Windows

Location: Elevation 04 A - Building - Physical Structure 01 - General Structure B - Building - External Fabric

Location: Elevation 05 A - Building - Physical Structure 01 - General Structure

Generic Hospital Physical Condition Survey

Extensive rot damage to frame. Cost included. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

16m2 of timber frames in poor condition. Cost included. Replace double louvre doors to Plant Room. Cost included.

B - Building - External Fabric 04 - Windows

C

£0

0

0

4 3 12

2010

06 - Doors

C

£0

0

0

3 3

9

2010

C

£0

0

0

5 4 20

2010

Extensive rot damage to frame. Cost included.

04 - Windows

C

£0

0

0

4 3 12

2010

06 - Doors

C

£0

0

0

3 3

9

2010

Replace 8m2 of glazing. Cost included. Replace double louvre doors. Cost included.

02a - Flat - Covering

C

£0

0

0

4 4 16

2010

02b - Flat - Decking 02d - Flat - Parapets 02e - Flat - Verges/Fascias/Soffits 02h - Flat - Down Rainwater Pipes 02i - Flat - Skylights

B B B B C

£0 £0 £0 £0 £0

20 10 10 10 0

0 0 0 0 0

0 0 0 0 4

0 0 0 0 0 0 0 0 4 16

2030 2020 2020 2020 2010

02j - Flat - Comments

C

£0

0

0

4 4 16

2010

Location: Elevation 06 A - Building - Physical Structure 01 - General Structure B - Building - External Fabric

Location: Roof 01 D - Building - Roof Mineral felt roof has failed to various locations and is beyond the end of its expected life. Cost included. Woodwool decking. Aluminium capping to parapet. Composite fascia. PVCu. Galvanised steel skylights require replacing. Cost included. Rot damage to clerestory frames to open plan office. Cost included.

Facet: 2 - Engineering Location: 00 - Ground Floor Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

0.C05: Steel panel radiators in acceptable order. 0.C19: Steel panel radiators in acceptable order.

I - Engineering - Heating Systems 01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

12

0

0 0

0

2022

B(C)

£4,000

2

0

4 3 12

2012

03 - Grilles & Diffusers

B

£0

13

0

0 0

0

2023

05 - Cooling Units

C

£4,000

0

0

3 3

9

2010

05 - Cooling Units

C

£4,000

0

0

3 3

9

2010

05 - Cooling Units

B(C)

£4,000

3

0

3 3

9

2013

05 - Cooling Units

B(C)

£4,000

3

0

3 3

9

2013

05 - Cooling Units

B(C)

£4,000

3

0

3 3

9

2013

05 - Cooling Units

B(C)

£8,000

3

0

3 3

9

2013

05 - Cooling Units

B(C)

£4,000

3

0

3 3

9

2013

K - Engineering - Vent & Air Con 01 - Ductwork

Generic Hospital Physical Condition Survey

Breast Screening Clinic: Roof ducting requires upgrading within the maintenance schedule. 0.48: Grilles/diffusers in acceptable order. 0.27: Cassette unit is not big enough and requires replacement. 0.2: Cassette unit is not big enough and requires replacement. 0.36: Air conditioning unit requires upgrading within the maintenance schedule. 0.49: Mitsubishi cassette unit is not big enough and requires upgrading within the maintenance schedule. 0.15: Mitsubishi cassette unit is not big enough and requires upgrading within the maintenance schedule. 0.25: 2No. Mitsubishi cassette units require upgrading within the maintenance schedule. 0.16: Mitsubishi cassette unit is not big enough and requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.5: Mitsubishi cassette unit is not big enough and requires upgrading within the maintenance schedule. 0.32: Air conditioning unit requires upgrading within the maintenance schedule. 0.27: Mitsubishi cassette unit in acceptable order.

05 - Cooling Units

B(C)

£4,000

3

0

3 3

9

2013

05 - Cooling Units

B(C)

£4,000

4

0

3 3

9

2014

05 - Cooling Units

B

£0

8

0

0 0

0

2018

B

£0

8

0

0 0

0

2018

02 - Pumps

B(C)

£400

3

0

2 3

6

2013

02 - Pumps

B

£0

7

0

0 0

0

2017

02 - Pumps

B

£0

9

0

0 0

0

2019

03 - Calorifiers

B

£0

8

0

0 0

0

2018

05 - Pressurisation Units

B

£0

8

0

0 0

0

2018

B

£0

10

0

0 0

0

2020

04 - Extract Fans

B(C)

£600

2

0

2 3

6

2012

04 - Extract Fans

B(C)

£300

4

0

2 3

6

2014

04 - Extract Fans

B(C)

£300

4

0

2 3

6

2014

Remedial Action

O - Engineering - Main Plant 01 - Heating Boilers

0.63: 2No. Potterton Derwent boilers in acceptable order. 0.63: Pump requires upgrading within the maintenance schedule. 0.63: Pump in acceptable order. 0.63: 2No. Grundfos heating pumps in acceptable order. 0.63: Andrews gas calorifier in acceptable order. 0.63: Armstrong pressurisation unit in acceptable order.

P - Engineering - Main Plant 03 - Controls

Generic Hospital Physical Condition Survey

0.C13: Extract control panel in acceptable order. 0.13: 2No. extract fans require upgrading within the maintenance schedule. 0.65: Extract fan requires upgrading within the maintenance schedule. 0.66: Extract fan requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Breast Screening Clinic: 3No. roof extract units require upgrading within the maintenance schedule. 0.26: Extract fan in acceptable order.

04 - Extract Fans

B(C)

£18,000

5

0

2 3

6

2015

04 - Extract Fans

B

£0

6

0

0 0

0

2016

03 - Distribution Boards

B(C)

£7,000

3

0

3 3

9

2013

03 - Distribution Boards

B(C)

£1,600

3

0

3 3

9

2013

03 - Distribution Boards

B(C)

£1,600

4

0

3 3

9

2014

03 - Distribution Boards

B(C)

£300

4

0

3 3

9

2014

03 - Distribution Boards

B

£0

7

0

0 0

0

2017

03 - Distribution Boards

B

£0

10

0

0 0

0

2020

03 - Distribution Boards

B

£0

12

0

0 0

0

2022

04 - Lighting Installation

C

£800

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

Remedial Action

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

0.9: Ottermill combined distribution board and switchgear requires upgrading within the maintenance schedule. 0.C13: 2No. Ottermill distribution boards require upgrading within the maintenance schedule. 0.69A: 2No. Ottermill distribution boards require upgrading within the maintenance schedule. 0.43: Wylex distribution board requires upgrading within the maintenance schedule. 0.13: Square D distribution board in acceptable order. 0.48: MK distribution board in acceptable order. 0.02: MK distribution board in acceptable order. 0.72: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.04: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0.48A: Tungsten light requires replacement. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.48B: Tungsten light requires replacement. 0.74: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0.43: 2No. tungsten lights require replacement. 0.71: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.76: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.77: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.42A: 2No. tungsten lights require replacement. 0.65: Tungsten light requires replacement. 0.07: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0.06: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0.21: 2No. surface fluorescent lights require replacement. 0.05: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0.02: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading.

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.66: Tungsten light requires replacement. 0.73: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0.8: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.59: Medical exam light requires replacement. 0.42: Medical exam light requires replacement. 0.56: Medical exam light requires replacement. 0.57: Medical exam light requires replacement. 0.7: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.85: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.6: Medical exam light requires replacement. 0.62: Medical exam light requires replacement. 0.42: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0.53: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0.C04: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C21: 3No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£150

0

0

2 3

6

2010

04 - Lighting Installation

C

£150

0

0

2 3

6

2010

04 - Lighting Installation

C

£150

0

0

2 3

6

2010

04 - Lighting Installation

C

£150

0

0

2 3

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£150

0

0

2 3

6

2010

04 - Lighting Installation

C

£150

0

0

2 3

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

B(C)

£1,000

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£600

2

0

2 2

4

2012

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.68: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.37: Surface fluorescent light requires upgrading within the maintenance schedule. 0.67: Surface fluorescent light requires upgrading within the maintenance schedule. 0.6: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.57: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.42: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.42B: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C02: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.79: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.61: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 0.58: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C07: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C06: 6No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,200

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.51: 7No. surface fluorescent lights require upgrading within the maintenance schedule. 0.62: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.88: Surface fluorescent light requires upgrading within the maintenance schedule. 0.1: Surface fluorescent light requires upgrading within the maintenance schedule. 0.64: Surface fluorescent light requires upgrading within the maintenance schedule. 0.C16: Surface fluorescent light requires upgrading within the maintenance schedule. 0.C18: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.13: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C19: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.33: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.42A: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.2: Surface fluorescent light requires upgrading within the maintenance schedule. 0.48: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£1,400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.75: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.23: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.3: Surface fluorescent light requires upgrading within the maintenance schedule. 0.C17: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 0.41: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C08: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C05: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.5: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.11: Surface fluorescent light requires upgrading within the maintenance schedule. 0.49: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.55: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 0.01: Surface fluorescent light requires upgrading within the maintenance schedule. 0.12: 3No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.52: Surface fluorescent light requires upgrading within the maintenance schedule. 0.13: Surface fluorescent light requires upgrading within the maintenance schedule. 0.56: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.38: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.82: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 0.36: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.18: 4No. CAT II lights require upgrading within the maintenance schedule. 0.41: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.16: CAT II light requires upgrading within the maintenance schedule. 0.81: CAT II light requires upgrading within the maintenance schedule. 0.35: Surface fluorescent light requires upgrading within the maintenance schedule. 0.25: 15No. CAT II lights require upgrading within the maintenance schedule. 0.51: 2No. CAT II lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£3,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.69A: Surface fluorescent light requires upgrading within the maintenance schedule. 0.78: 2No. CAT II lights require upgrading within the maintenance schedule. 0.15: 2No. CAT II lights require upgrading within the maintenance schedule. 0.29A: 2No. CAT II lights in acceptable order. 0.29: 4No. CAT II lights in acceptable order. 0.69: CAT II lights in acceptable order. 0.84: Emergency lights requires upgrading within the maintenance schedule. 0.C17: Emergency lights requires upgrading within the maintenance schedule. 0.C07: Emergency lights requires upgrading within the maintenance schedule. 0.42A: Emergency lights requires upgrading within the maintenance schedule. 0.C21: Emergency lights requires upgrading within the maintenance schedule. 0.C05: Emergency lights requires upgrading within the maintenance schedule. 0.C16: Emergency lights in acceptable order.

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

05 - Emergency Lighting

B(C)

£200

3

0

4 2

8

2013

05 - Emergency Lighting

B(C)

£200

3

0

2 2

4

2013

05 - Emergency Lighting

B(C)

£200

3

0

4 2

8

2013

05 - Emergency Lighting

B(C)

£200

4

0

4 2

8

2014

05 - Emergency Lighting

B(C)

£200

4

0

4 2

8

2014

05 - Emergency Lighting

B(C)

£200

4

0

4 2

8

2014

05 - Emergency Lighting

B

£0

8

0

0 0

0

2018

B

£0

10

0

0 0

0

2020

Remedial Action

V - Engineering - Fire Alarms 01 - Sounders

Generic Hospital Physical Condition Survey

0.C06: Fire alarm sounders in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.C04: Fire alarm sounders in acceptable order. 0.41: Fire alarm sounders in acceptable order. 0.C18: Fire alarm sounders in acceptable order. 0.23: Smoke detector requires upgrading within the maintenance schedule. 0.C15: Smoke detector requires upgrading within the maintenance schedule. 0.C02: Smoke detector requires upgrading within the maintenance schedule. 0.C21: Smoke detector requires upgrading within the maintenance schedule. 0.01: Smoke detector requires upgrading within the maintenance schedule. 0.19: Smoke detector requires upgrading within the maintenance schedule. 0.33: Smoke detector requires upgrading within the maintenance schedule. 0.84: Smoke detector requires upgrading within the maintenance schedule. 0.C18: Smoke detector requires upgrading within the maintenance schedule. 0.C04: Smoke detector requires upgrading within the maintenance schedule. 0.C05: Smoke detector requires upgrading within the maintenance schedule.

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

16

0

0 0

0

2026

03 - Smoke Detectors

B(C)

£150

2

0

3 3

9

2012

03 - Smoke Detectors

B(C)

£150

2

0

3 3

9

2012

03 - Smoke Detectors

B(C)

£150

2

0

3 3

9

2012

03 - Smoke Detectors

B(C)

£150

3

0

3 3

9

2013

03 - Smoke Detectors

B(C)

£150

3

0

3 3

9

2013

03 - Smoke Detectors

B(C)

£150

3

0

3 3

9

2013

03 - Smoke Detectors

B(C)

£150

3

0

3 3

9

2013

03 - Smoke Detectors

B(C)

£150

3

0

3 3

9

2013

03 - Smoke Detectors

B(C)

£150

3

0

3 3

9

2013

03 - Smoke Detectors

B(C)

£150

3

0

3 3

9

2013

03 - Smoke Detectors

B(C)

£150

3

0

3 3

9

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.C07: Smoke detector requires upgrading within the maintenance schedule. 0.13: Smoke detector requires upgrading within the maintenance schedule. 0.81: Smoke detector requires upgrading within the maintenance schedule. 0.27: Smoke detector requires upgrading within the maintenance schedule. 0.8: Smoke detector requires upgrading within the maintenance schedule. 0.72: Smoke detector requires upgrading within the maintenance schedule. 0.88: Smoke detector requires upgrading within the maintenance schedule. 0.C08: 2No. smoke detectors require upgrading within the maintenance schedule. 0.29: Smoke detector requires upgrading within the maintenance schedule. 0.69A: Smoke detector requires upgrading within the maintenance schedule. 0.88: Fire alarm main panel in acceptable order.

03 - Smoke Detectors

B(C)

£150

3

0

3 3

9

2013

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£300

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

B

£0

12

0

0 0

0

2022

05 - Fire Main/Zone Panel Block Total

Generic Hospital Physical Condition Survey

Remedial Action

£4,114,700.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Generic Hospital - STG Block : Clare House - CLR Facet: 1 - Building Location: 00 - Ground Floor B - Building - External Fabric B

£0

20

0

0 0

0

2030

Hardwood doors to ground floor in generally good order.

01 - Decorations

C

£7,800

0

0

2 2

4

2010

01 - Decorations

C

£7,800

0

0

2 2

4

2010

01 - Decorations

B(C)

£7,800

5

0

2 2

4

2015

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling 02 - Ceiling 03 - Floor

B B C

£0 £0 £9,200

20 20 0

0 0 0

0 0 0 0 2 2

0 0 4

2030 2030 2010

03 - Floor

C

£9,200

0

0

2 2

4

2010

03 - Floor 03 - Floor 08 - Fixed Units

B B C

£0 £0 £12,000

6 20 0

0 0 0

0 0 0 0 3 2

0 0 6

2016 2030 2010

08 - Fixed Units

C

£6,000

0

0

3 2

6

2010

Redecoration required as part of a regular maintenance schedule (including ceilings). West Wing: Redecoration required as part of a regular maintenance schedule. Walk-In Centre: Redecoration required as part of a regular maintenance schedule. West Wing: Smooth plaster ceiling. Walk-In Centre: Suspended ceiling. Plaster ceiling. Walk-In Centre: Plaster ceiling. West Wing: Carpet requires replacing (some water damage). West Wing: Vinyl requires replacing (some water damage). Carpet. Walk-In Centre: Vinyl. West Wing: 2No. WCs require refurbishment. Male WC requires refurbishing including wall repairs.

06 - Doors C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Accessible WC requires refurbishing. West Wing: Sluice Room requires refurbishment. West Wing: Duct covers to corridors are hazardous. Replace wash hand basins to consulting rooms. Male/Female WC to Data Management will require refurbishing during the maintenance schedule. Kitchenette. Walk-In Centre: Wash hand basins to consulting rooms. Walk-In Centre: Patient WCs in acceptable condition. Walk-In Centre: Staff accessible WC in good condition. Walk-In Centre: Clinical units. Walk-In Centre: Kitchen. Walk-In Centre: Staff WCs in good condition. Evidence of damp throughout ground floor. Cost allows for plaster repairs and rain water goods/tank failures.

08 - Fixed Units

C

£10,000

0

0

3 2

6

2010

08 - Fixed Units

C

£10,000

0

0

3 2

6

2010

08 - Fixed Units

C

£1,200

0

0

3 2

6

2010

08 - Fixed Units

C

£9,600

0

0

3 2

6

2010

08 - Fixed Units

B(C)

£12,000

4

0

3 2

6

2014

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

10 15

0 0

0 0 0 0

0 0

2020 2025

08 - Fixed Units

B

£0

15

0

0 0

0

2025

08 - Fixed Units

B

£0

20

0

0 0

0

2030

08 - Fixed Units 08 - Fixed Units 08 - Fixed Units

B B B

£0 £0 £0

20 20 20

0 0 0

0 0 0 0 0 0

0 0 0

2030 2030 2030

11 - Signs of Water Ingress

D

£5,000

0

0

4 4 16

2010

12 - Comments 12 - Comments

N/A N/A

£0 £0

0 0

0 0

0 0 0 0

2010 2010

0 0

Remedial Action

West Wing: This area is derelict. Walk-In Centre: Refurbished in 2008.

Location: 01 - First Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Information Management (Training & adj. Offices): Redecoration required as part of a regular maintenance schedule. Information Management: Redecoration required as part of a regular maintenance schedule. Liaison Psychiatry: Redecoration required as part of a regular maintenance schedule. Information Management (Training & adj. Offices): Plaster ceiling. Information Management: Plaster ceiling. Liaison Psychiatry: Plaster ceiling. Liaison Psychiatry: Carpet requires replacing to Central Wing. Information Management: Carpet requires replacing. Liaison Psychiatry: Carpet will require replacing to West Wing (Psychiatry) within the maintenance schedule. Information Management (Training & adj. Offices): Carpet. Information Management (Training & adj. Offices): Parquet flooring. Liaison Psychiatry: Refurbish kitchen to Psychotherapy Department. Liaison Psychiatry: Refurbish 2No. staff WCs.

01 - Decorations

C

£7,800

0

0

2 2

4

2010

01 - Decorations

C

£7,800

0

0

2 2

4

2010

01 - Decorations

C

£7,800

0

0

2 2

4

2010

02 - Ceiling

B

£0

15

0

0 0

0

2025

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling

B

£0

20

0

0 0

0

2030

03 - Floor

C

£4,160

0

0

2 2

4

2010

03 - Floor

C

£9,200

0

0

2 2

4

2010

03 - Floor

B(C)

£6,200

2

0

2 2

4

2012

03 - Floor

B

£0

6

0

0 0

0

2016

03 - Floor

B

£0

20

0

0 0

0

2030

08 - Fixed Units

C

£10,000

0

0

3 2

6

2010

08 - Fixed Units

C

£16,000

0

0

3 2

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Information Management: Refurbish 2No. WCs. Information Management: Refurbish kitchenette. Liaison Psychiatry: Replace wash hand basins to consulting rooms (16No. in total). Information Management (Training & adj. Offices): Male/Female WC to Training Dept will require refurbishing during the maintenance schedule (2No. sets). Quarry tile to stairs require replacing. Evidence of damp throughout first floor. Cost allows for plaster repairs due to rain water goods/tank failures. Liaison Psychiatry: Extensive damp to fire exit doors.

08 - Fixed Units

C

£16,000

0

0

3 2

6

2010

08 - Fixed Units

C

£1,500

0

0

3 2

6

2010

08 - Fixed Units

C

£12,800

0

0

3 2

6

2010

08 - Fixed Units

B(C)

£40,000

5

0

3 2

6

2015

10 - Stairs

C

£5,000

0

0

3 2

6

2010

11 - Signs of Water Ingress

D

£4,200

0

0

4 4 16

2010

11 - Signs of Water Ingress

C

£600

0

0

4 4 16

2010

01 - Decorations

C

£7,800

0

0

2 2

4

2010

01 - Decorations

C

£7,800

0

0

2 2

4

2010

01 - Decorations

C

£7,800

0

0

2 2

4

2010

01 - Decorations

B(C)

£7,800

3

0

2 2

4

2013

Remedial Action

Location: 02 - Second Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

Information Management: Redecoration required as part of a regular maintenance schedule. Cancer Services: Redecoration required as part of a regular maintenance schedule. Paediatric Psychology: Redecoration required as part of a regular maintenance schedule. Information Management: Redecoration required as part of a regular maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

02 - Ceiling

C

£2,500

0

0

4 3 12

2010

Paediatric Psychology: Replace defective ceilings to 2No offices

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

15

0

0 0

0

2025

02 - Ceiling

B

£0

15

0

0 0

0

2025

02 - Ceiling 03 - Floor

B C

£0 £4,600

20 0

0 0

0 0 2 2

0 4

2030 2010

03 - Floor

B(C)

£4,600

3

0

2 2

4

2013

03 - Floor

B(C)

£4,200

3

0

2 2

4

2013

03 - Floor 03 - Floor

B B

£0 £0

6 6

0 0

0 0 0 0

0 0

2016 2016

08 - Fixed Units

C

£16,000

0

0

3 2

6

2010

08 - Fixed Units

C

£1,500

0

0

2 2

4

2010

08 - Fixed Units

C

£16,000

0

0

3 2

6

2010

08 - Fixed Units

C

£10,000

0

0

3 2

6

2010

Information Management: Suspended ceiling. Information Management: Plaster ceiling. Information Management: Plaster ceiling. Cancer Services: Plaster ceiling. Cancer Services: Carpet requires replacing to 40% of floor. Paediatric Psychology: Carpet will require replacing to 40% of floor within the maintenance schedule. Information Management: Carpet will require replacing to 40% of floor within the maintenance schedule. Paediatric Psychology: Carpet. Information Management: Carpet. Information Management: Refurbish 2No. WCs. Information Management: Kitchenette requires replacing. Cancer Services: Refurbish 2No. WCs. Cancer Services: Refurbish kitchen.

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Paediatric Psychology: 2No. WCs at fire exits require refurbishing. Paediatric Psychology: 8No. wash hand basins require replacing (50%) Information Management: WC in acceptable condition. Information Management: Female WC in good order. Extensive water ingress under flat roof (Roof 06).

08 - Fixed Units

C

£12,000

0

0

3 2

6

2010

08 - Fixed Units

C

£6,400

0

0

3 2

6

2010

08 - Fixed Units

B

£0

10

0

0 0

0

2020

08 - Fixed Units

B

£0

20

0

0 0

0

2030

11 - Signs of Water Ingress

C

£600

0

0

4 4 16

2010

12 - Comments

N/A

£0

0

0

0 0

0

2010

Information Management: This area has had extensive refurbishment.

C

£7,200

0

0

4 3 12

2010

Cast iron soil pipe cracked with replacement required to say 20No. 9m lengths.

C

£1,600

0

0

4 4 16

2010

Replace 1No. concrete lintel to elevation 01.

Location: Elevation 01 A - Building - Physical Structure 06 - Comments

B - Building - External Fabric 04 - Windows

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 04 - Windows

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£60,000

0

0

3 3

9

2010

50No. sliding sash windows in poor decorative order to elevation 01. Windows offer poor insulating properties and cost allows for upgrading.

01b - Masonry - Spalling

C

£400

0

0

4 3 12

2010

04 - Windows

C

£44,000

0

0

3 3

9

2010

Localised spalling (2m2) to elevation 02. 30No. sliding sash windows in poor decorative order with localised rot to elevation 02. Windows offer poor insulating properties and cost allows for upgrading.

C

£1,500

0

0

3 2

6

2010

Sand blast and redecorate cast iron fire escape to elevation 03.

C

£1,600

0

0

2 2

4

2010

Replace 1No. set of fire exit doors.

Location: Elevation 02 B - Building - External Fabric

Location: Elevation 03 A - Building - Physical Structure 05 - External Fire Escape

B - Building - External Fabric 06 - Doors

Location: Elevation 04 B - Building - External Fabric Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 04 - Windows

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£44,000

0

0

3 3

9

2010

30No. sliding sash windows in poor decorative order to elevation 04. Windows offer poor insulating properties and cost allows for upgrading.

04 - Windows

C

£2,600

0

0

4 3 12

2010

04 - Windows

C

£20,100

0

0

3 3

9

2010

04 - Windows

C

£72,500

0

0

3 3

9

2010

Signs of water ingress to lintels associated with crittal steel frames. 16No. crittal steel windows require replacing to elevation 05. Windows offer poor insulating properties and cost allows for upgrading. 72No. sliding sash windows in poor decorative order to elevation 05. Windows offer poor insulating properties and cost allows for upgrading.

04 - Windows

B

£0

20

0

0 0

0

2030

06 - Doors

C

£3,200

0

0

2 2

4

2010

C

£2,200

0

0

3 3

9

2010

2No. steel decorative frames to elevation 06.

04 - Windows

C

£500

0

0

3 3

9

2010

06 - Doors

B

£0

20

0

0 0

0

2030

Replace missing brick to window surround on elevation 06. Aluminium entrance doors.

Location: Elevation 05 B - Building - External Fabric

Aluminium replacement frames in good order. Redecorate 2No. sets double doors.

Location: Elevation 06 A - Building - Physical Structure 04 - Windows B - Building - External Fabric

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: Elevation 07 B - Building - External Fabric 04 - Windows

C

£1,200

0

0

5 4 20

2010

Evidence of ingress to lintels to elevation 07.

04 - Windows

C

£19,200

0

0

3 3

9

2010

14No. crittal steel windows require replacing to elevation 07. Windows offer poor insulating properties and cost allows for upgrading.

C

£36,500

0

0

3 3

9

2010

27No. sliding sash windows in poor decorative order to elevation 08. Windows offer poor insulating properties and cost allows for upgrading.

C

£1,500

0

0

3 2

6

2010

Sand blast cast iron fire escape to elevation 09.

C

£3,200

0

0

2 2

4

2010

Replace 2No. sets double doors.

Location: Elevation 08 B - Building - External Fabric 04 - Windows

Location: Elevation 09 A - Building - Physical Structure 05 - External Fire Escape B - Building - External Fabric 06 - Doors

Location: Elevation 10 B - Building - External Fabric Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 04 - Windows

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£32,400

0

0

3 3

9

2010

24No. sliding sash windows in poor decorative order to elevation 10. Windows offer poor insulating properties and cost allows for upgrading.

01a - Attached - Covering

B

£0

20

0

0 0

0

2030

01b - Attached - Sarking

B

£0

20

0

0 0

0

2030

01c - Attached - Flashing

B

£0

20

0

0 0

0

2030

01e - Attached - Rafters

B

£0

50

0

0 0

0

2060

01f - Attached - Purlins

B

£0

50

0

0 0

0

2060

01g - Attached - Guttering 01h - Attached - Down Rainwater Pipes

B B

£0 £0

15 15

0 0

0 0 0 0

0 0

2025 2025

Slate roof recently overhauled and in good order. Assumed condition, no internal access due to Health and Safety (Asbestos) issues. Lead flashing in acceptable condition. Timber roof structure, no signs of significant defect externally. Timber roof structure, no signs of significant defect externally. Aluminium. Aluminium.

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

02b - Flat - Decking

B

£0

20

0

0 0

0

2030

Location: Roof 01 D - Building - Roof

Location: Roof 02 D - Building - Roof

Generic Hospital Physical Condition Survey

Assumed condition of flat roof, likely mineral felt. Given proximity to overhauled roof considered to be in acceptable condition. Assumed condition of flat roof, likely mineral felt. Given proximity to overhauled roof considered to be in acceptable condition.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Assumed condition of flat roof, likely mineral felt. Given proximity to overhauled roof considered to be in acceptable condition. Brick coping in good order.

02c - Flat - Flashing

B

£0

20

0

0 0

0

2030

02d - Flat - Parapets

B

£0

20

0

0 0

0

2030

01a - Attached - Covering

B(C)

£116,000

5

0

3 4 12

2015

01b - Attached - Sarking

B

£0

20

0

0 0

0

2030

01c - Attached - Flashing

C

£1,500

0

0

4 4 16

2010

01e - Attached - Rafters

B

£0

50

0

0 0

0

2060

01f - Attached - Purlins

B

£0

50

0

0 0

0

2060

01g - Attached - Guttering

C

£8,500

0

0

3 4 12

2010

02a - Flat - Covering

C

£5,000

0

0

4 4 16

2010

02d - Flat - Parapets

C

£800

0

0

5 4 20

2010

Remedial Action

Location: Roof 03 D - Building - Roof Localised re-hanging of slates, significant works likely to be required within the maintenance schedule. Assumed condition, no internal access due to Health and Safety (Asbestos) issues. Coping has failed adjacent Roof 04. Replace along with associated flashing.

Timber roof structure, no signs of significant defect externally. Timber roof structure, no signs of significant defect externally. Ogee style gutters with evidence of failures to joints.

Location: Roof 04 D - Building - Roof Roof failures noted to area below roof. Loose coping to elevation 01.

Location: Roof 05 Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Numerous slipped slates with roof requiring complete replacement. Assumed condition, no internal access due to Health and Safety (Asbestos) issues. Lead flashing in acceptable condition. Timber roof structure, no signs of significant defect externally. Timber roof structure, no signs of significant defect externally. PVCu in good order. PVCu in good order.

D - Building - Roof 01a - Attached - Covering

D

£57,200

0

0

3 4 12

2010

01b - Attached - Sarking

B

£0

20

0

0 0

0

2030

01c - Attached - Flashing

B

£0

20

0

0 0

0

2030

01e - Attached - Rafters

B

£0

50

0

0 0

0

2060

01f - Attached - Purlins

B

£0

50

0

0 0

0

2060

01g - Attached - Guttering 01h - Attached - Down Rainwater Pipes

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

02b - Flat - Decking

B

£0

20

0

0 0

0

2030

02c - Flat - Flashing

B

£0

20

0

0 0

0

2030

02d - Flat - Parapets

B

£0

20

0

0 0

0

2030

Location: Roof 06 D - Building - Roof Assumed condition of flat roof, likely mineral felt. Given proximity to overhauled roof considered to be in acceptable condition. Assumed condition of flat roof, likely mineral felt. Given proximity to overhauled roof considered to be in acceptable condition. Assumed condition of flat roof, likely mineral felt. Given proximity to overhauled roof considered to be in acceptable condition. Brick coping in good order.

Location: Roof 07 Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

D - Building - Roof 01a - Attached - Covering

C

£48,200

0

0

4 3 12

2010

Numerous loose and cracked slates, particularly to hips.

01b - Attached - Sarking

B

£0

20

0

0 0

0

2030

01c - Attached - Flashing

B

£0

20

0

0 0

0

2030

01e - Attached - Rafters

B

£0

50

0

0 0

0

2060

01f - Attached - Purlins

B

£0

50

0

0 0

0

2060

01g - Attached - Guttering

C

£6,500

0

0

4 3 12

2010

01h - Attached - Down Rainwater Pipes

C

£0

0

0

4 3 12

2010

Assumed condition, no internal access due to Health and Safety (Asbestos) issues. Lead flashing in acceptable condition. Timber roof structure, no signs of significant defect externally. Timber roof structure, no signs of significant defect externally. Cast iron Ogee gutters failing to joints. Extensive corrosion noted to rwp. Cost included.

B B B B N/A

£0 £0 £0 £0 £0

40 40 40 40 0

0 0 0 0 0

0 0 0 0 0

2050 2050 2050 2050 2010

Location: Whole Block A - Building - Physical Structure 01 - General Structure 02 - Foundations 03 - Ground Stability 04 - Chimneys 06 - Comments

0 0 0 0 0

0 0 0 0 0

Roof and elevation diagram.

B - Building - External Fabric Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Brickwork in acceptable condition. Brickwork in acceptable condition. No DPC to building, installation is hugely expensive and potentially of limited benefit.

01a - Masonry - Cracking

B

£0

20

0

0 0

0

2030

01c - Masonry - Pointing

B

£0

20

0

0 0

0

2030

03 - DPC

C

£0

0

0

3 3

9

2010

B

£0

30

0

0 0

0

2040

Terrazzo/concrete stairs.

B

£0

12

0

0 0

0

2022

OPD: Walk-In Centre: Grille/diffusers in acceptable order.

B(C)

£4,000

3

0

3 3

9

2013

OPD: Walk-In Centre: 2No. Vaillant boilers require upgrading within the maintenance schedule.

B

£0

7

0

0 0

0

2017

OPD: Walk-In Centre: Grundfos heating pumps in acceptable order.

C

£750

0

0

2 3

6

2010

OPD: Extract fan requires replacement.

C - Building - Internal Fabric 10 - Stairs

Facet: 2 - Engineering Location: 00 - Ground Floor K - Engineering - Vent & Air Con 03 - Grilles & Diffusers

O - Engineering - Main Plant 01 - Heating Boilers

02 - Pumps

P - Engineering - Main Plant 04 - Extract Fans

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

OPD: Extract fan requires upgrading within the maintenance schedule. OPD: No access to end of wing.

04 - Extract Fans

B(C)

£750

3

0

2 3

6

2013

09 - Comments

N/A

£0

0

0

0 0

0

2010

02 - Main Switchgear

C

£2,700

0

0

2 2

4

2010

OPD: Walk-In Centre: 6No. unlockable MEM isolators require replacement with lockable MEM isolators.

02 - Main Switchgear

C

£2,600

0

0

2 2

4

2010

03 - Distribution Boards

B

£0

10

0

0 0

0

2020

03 - Distribution Boards

B

£0

12

0

0 0

0

2022

OPD: 6No. unlockable isolators require replacement with lockable isolators. OPD: Walk-In Centre: MEM distribution boards in acceptable order. OPD: MEM distribution boards in acceptable order.

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,400

0

0

3 2

6

2010

04 - Lighting Installation

C

£2,800

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

OPD: Walk-In Centre: 2No. tungsten lights require replacement. OPD: 7No. fluorescent lights over visual display equipment are not suitable and require upgrading. OPD: 14No. surface fluorescent lights require replacement. OPD: Tungsten light requires replacement.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

OPD: 4No. surface fluorescent lights require upgrading within the maintenance schedule. OPD: 4No. CAT II lights require upgrading within the maintenance schedule. OPD: 4No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£800

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£800

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

OPD: Walk-In Centre: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£3,400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

OPD: Walk-In Centre: 4No. downlights require upgrading within the maintenance schedule. OPD: Walk-In Centre: 17No. surface fluorescent lights require upgrading within the maintenance schedule. OPD: Walk-In Centre: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

OPD: Walk-In Centre: 7No. CAT II lights require upgrading within the maintenance schedule. OPD: Walk-In Centre: Emergency light requires upgrading within the maintenance schedule. OPD: Rewire required to 8 rooms.

04 - Lighting Installation

B(C)

£1,400

5

0

2 2

4

2015

05 - Emergency Lighting

B(C)

£200

5

0

4 2

8

2015

06 - Sockets/Switches

C

£12,000

0

0

3 3

9

2010

08 - Comments

B

£0

7

0

0 0

0

2017

OPD: Walk-In Centre: Door release in acceptable order.

01 - Sounders

B

£0

8

0

0 0

0

2018

OPD: Walk-In Centre: Sounders in acceptable order.

02 - Call Points

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

OPD: Walk-In Centre: Call points in acceptable order. OPD: Walk-In Centre: Smoke detectors in acceptable order.

01 - Heat Emitters

C

£16,100

0

0

2 2

4

2010

01 - Heat Emitters

C

£14,300

0

0

2 2

4

2010

V - Engineering - Fire Alarms

Location: 01 - First Floor I - Engineering - Heating Systems

Generic Hospital Physical Condition Survey

Mental Health: Renew heating/plumbing to 15 rooms. Mental Health: Renew heating/plumbing to 13 rooms. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Mental Health: Renew heating/plumbing to 11 rooms. Mental Health: Renew heating/plumbing to 12 rooms.

01 - Heat Emitters

C

£12,100

0

0

2 2

4

2010

01 - Heat Emitters

C

£13,100

0

0

2 2

4

2010

03 - Distribution Boards

C

£1,100

0

0

3 3

9

2010

03 - Distribution Boards

C

£900

0

0

3 3

9

2010

03 - Distribution Boards

C

£2,400

0

0

3 3

9

2010

03 - Distribution Boards

C

£900

0

0

3 3

9

2010

04 - Lighting Installation

C

£2,000

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,600

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,800

0

0

3 2

6

2010

Remedial Action

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

Mental Health: 2No. MEM rewirable distribution boards require replacement. Mental Health: 2No. MEM rewirable distribution boards require replacement. Mental Health: 3No. MEM rewirable distribution boards require replacement.

Mental Health: 2No. MEM rewirable distribution boards require replacement. Mental Health: 10No. tungsten lights require replacement. Mental Health: 8No. surface fluorescent lights require replacement. Mental Health: 9No. fluorescent lights over visual display equipment are not suitable and require upgrading.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Mental Health: 4No. surface fluorescent lights require upgrading within the maintenance schedule. Mental Health: 15No. CAT II lights require upgrading within the maintenance schedule. Mental Health: 21No. surface fluorescent lights require upgrading within the maintenance schedule. Mental Health: 6No. surface fluorescent lights require upgrading within the maintenance schedule. Mental Health: 7No. CAT II lights require upgrading within the maintenance schedule. Mental Health: 8No. CAT II lights require upgrading within the maintenance schedule. Mental Health: Surface fluorescent light requires upgrading within the maintenance schedule. Mental Health: Emergency light requires upgrading within the maintenance schedule. Mental Health: Emergency light requires upgrading within the maintenance schedule. Mental Health: Rewire 13 rooms. Mental Health: Rewire 11 rooms. Mental Health: Rewire 12 rooms. Mental Health: Rewire required to rooms 14 to 31.

04 - Lighting Installation

B(C)

£800

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£3,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£4,200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

05 - Emergency Lighting

B(C)

£200

3

0

4 2

8

2013

05 - Emergency Lighting

B(C)

£200

5

0

4 2

8

2015

06 - Sockets/Switches 06 - Sockets/Switches 06 - Sockets/Switches 06 - Sockets/Switches

C C C C

£19,500 £16,500 £18,000 £22,500

0 0 0 0

0 0 0 0

3 3 3 3

9 9 9 9

2010 2010 2010 2010

3 3 3 3

Remedial Action

Location: 02 - Second Floor Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Children's Health: Renew heating/plumbing to 13 rooms. Children's Health: Renew heating/plumbing to 13 rooms.

I - Engineering - Heating Systems 01 - Heat Emitters

C

£14,300

0

0

2 2

4

2010

01 - Heat Emitters

C

£14,300

0

0

2 2

4

2010

01 - Heat Emitters

C

£13,200

0

0

2 2

4

2010

01 - Heat Emitters

B

£0

15

0

0 0

0

2025

03 - Distribution Boards

C

£1,400

0

0

3 3

9

2010

Children's Health: 3No. MEM rewirable distribution boards require replacement.

03 - Distribution Boards

C

£1,100

0

0

3 3

9

2010

03 - Distribution Boards

C

£1,100

0

0

3 3

9

2010

Children's Health: 2No. MEM rewirable distribution boards require replacement. Children's Health: 2No. MEM rewirable distribution boards require replacement.

03 - Distribution Boards

B

£0

10

0

0 0

0

2020

Children's Health: Renew heating/plumbing to 12 rooms. Children's Health: Steel panel radiators in acceptable order.

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

Children's Health: MEM distribution board in acceptable order.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Children's Health: Wylex distribution boards in acceptable order. Children's Health: 8No. tungsten lights require replacement. Children's Health: 2No. surface fluorescent lights require upgrading within the maintenance schedule. Children's Health: 22No. surface fluorescent lights require upgrading within the maintenance schedule. Children's Health: 10No. Surface fluorescent lights require upgrading within the maintenance schedule. Children's Health: 11No. CAT II lights require upgrading within the maintenance schedule. Children's Health: 7No. surface fluorescent lights require upgrading within the maintenance schedule. Children's Health: 4No. surface fluorescent lights require upgrading within the maintenance schedule. Children's Health: Surface fluorescent lights in acceptable order. Children's Health: CAT II lights in acceptable order. Children's Health: CAT II lights in acceptable order. Children's Health: Rewire 13 rooms.

03 - Distribution Boards

B

£0

15

0

0 0

0

2025

04 - Lighting Installation

C

£1,600

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£400

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£4,400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£2,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£2,200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

06 - Sockets/Switches

C

£19,500

0

0

3 3

9

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Children's Health: Rewire 12 rooms. Children's Health: Rewire 13 rooms. Children's Health: IT cabling requires tidying.

06 - Sockets/Switches

C

£18,000

0

0

3 3

9

2010

06 - Sockets/Switches

C

£19,500

0

0

3 3

9

2010

08 - Comments

C

£150

0

0

2 1

2

2010

Block Total

Generic Hospital Physical Condition Survey

Remedial Action

£1,272,710.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Extensive water/rot damage with integrity of floor in doubt. Cost included. Extremely dilapidated and beyond economic repair, internal aspects are unfit for permanent habitation.

Site : Generic Hospital - STG Block : Central Pharmacy Store - CPS Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 11 - Signs of Water Ingress

C

£0

0

0

4 4 16

2010

12 - Comments

C

£0

0

0

5 4 20

2010

04 - Windows

C

£0

0

0

4 3 12

2010

13m2 of clerestory glazing (timber) in poor condition. Cost included.

06 - Doors

C

£0

0

0

4 3 12

2010

Replace double louvre doors. Cost included.

Location: Elevation 01 B - Building - External Fabric

Location: Elevation 02 B - Building - External Fabric

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Windows

C

£0

0

0

4 3 12

2010

12m2 of clerestory glazing (timber) in poor condition. Cost included.

06 - Doors

C

£0

0

0

4 3 12

2010

06 - Doors

B(C)

£0

5

0

4 3 12

2015

Replace cladding to fire exit door. Cost included. 2No. timber exit doors, in reasonable condition at time of survey. Cost included.

C

£720,000

0

0

5 4 20

2010

Rot at base of frame to return of elevation 02 and 03. Building is in extremely poor condition both internally and externally and is considered beyond economic repair. Cost allows for replacement.

02a - Cladding - Attachment

C

£0

0

0

4 4 16

2010

04 - Windows

C

£0

0

0

4 3 12

2010

Replace 3m2 of rot damaged cladding. Cost included. 14m2 of clerestory glazing (timber) in poor condition. Cost included.

Location: Elevation 02 & 03 A - Building - Physical Structure 01 - General Structure

Location: Elevation 03 B - Building - External Fabric

Location: Elevation 04 Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B - Building - External Fabric 04 - Windows

C

£0

0

0

4 3 12

2010

8m2 of clerestory glazing (timber) in poor condition. Cost included.

06 - Doors

C

£0

0

0

2 2

4

2010

06 - Doors

B

£0

15

0

0 0

0

2025

Redecorate 2No. doors. Cost included. Galvanised concertina door.

C

£0

0

0

4 4 16

2010

Mature tree within 3 meters of block. Cost included.

02a - Cladding - Attachment

C

£0

0

0

3 3

9

2010

Replace timber cladding to roof plant. Cost included.

02a - Flat - Covering

C

£0

0

0

4 4 16

2010

Viewed from Inglby House: Mineral felt requires replacing with internal failures noted and extensive wear of felt. Cost included.

Location: External G - Building - Gardens 03 - Trees

Location: Roof 01 B - Building - External Fabric

D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02e - Flat - Verges/Fascias/Soffits

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£0

0

0

3 3

9

2010

Redecorate plywood fascia. Cost included.

N/A

£0

0

0

0 0

0

2010

Roof and elevation diagram.

C

£0

0

0

3 2

6

2010

Redecorate timber cladding to all elevations. Cost included.

01 - Heating Boilers

B

£0

8

0

0 0

0

2018

02 - Pumps

B

£0

7

0

0 0

0

2017

02 - Pumps

B

£0

7

0

0 0

0

2017

03 - Calorifiers

B

£0

7

0

0 0

0

2017

0.017: Ideal Concord heating boiler in acceptable order. 0.017: 2No. Grundfos heating pumps in acceptable order. 0.017: Grundfos domestic hot water pump in acceptable order. 0.017: Mercury Gold domestic hot water calorifier in acceptable order.

Location: Whole Block A - Building - Physical Structure 06 - Comments

B - Building - External Fabric 02a - Cladding - Attachment

Facet: 2 - Engineering Location: 00 - Ground Floor O - Engineering - Main Plant

R - Engineering - Electrical Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 03 - Distribution Boards Block Total

Generic Hospital Physical Condition Survey

Cost to B Rem Life Priority C L

B

£0

15

0

0 0

R

Year

Notes

Remedial Action

0

2025

0.017: Hager distribution board in acceptable order.

£720,000.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Redecoration required as part of a regular maintenance schedule. Replace missing suspended ceiling tile to Kitchen. Suspended ceiling. Carpet to offices will require replacing within the maintenance schedule. Carpet to Main Hall (0.010) will require replacing within the maintenance schedule. Lino to Main Hall (0.010). Anti-slip vinyl to Kitchen. Male WCs likely to require refurbishment within the maintenance schedule. Female WCs likely to require refurbishment within the maintenance schedule. Accessible WC likely to require refurbishment within the maintenance schedule.

Site : Generic Hospital - STG Block : Education Centre - EDC Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

B(C)

£13,000

2

0

2 2

4

2012

02 - Ceiling

C

£200

0

0

2 2

4

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £4,600

20 3

0 0

0 0 2 3

0 6

2030 2013

03 - Floor

B(C)

£9,200

5

0

2 3

6

2015

03 - Floor 03 - Floor 08 - Fixed Units

B B B(C)

£0 £0 £40,000

10 10 5

0 0 0

0 0 0 0 3 3

0 0 9

2020 2020 2015

08 - Fixed Units

B(C)

£40,000

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£10,000

5

0

3 3

9

2015

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 11 - Signs of Water Ingress

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£600

0

0

4 5 20

2010

Water ingress to Main Hall (0.010) at vent. Localised repairs required.

01 - Decorations

B(C)

£11,500

2

0

2 2

4

2012

02 - Ceiling

C

£500

0

0

2 2

4

2010

02 - Ceiling 02 - Ceiling 03 - Floor 08 - Fixed Units

B B B B

£0 £0 £0 £0

20 20 10 15

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2030 2030 2020 2025

08 - Fixed Units

B

£0

15

0

0 0

0

2025

Redecoration required as part of a regular maintenance schedule. Mould to soffit in AV cupboard (1.007). Further investigation required. Suspended ceiling. Plaster ceiling. Lino to classrooms. Female WC and changing facilities in good order. Male WC and changing facilities in good order.

04 - Windows

B(C)

£800

4

0

4 3 12

2014

04 - Windows 06 - Doors 08 - Porches

B B B

£0 £0 £0

20 10 10

0 0 0

0 0 0 0 0 0

2030 2020 2020

Location: 01 - First Floor C - Building - Internal Fabric

Location: Elevation 01 B - Building - External Fabric

0 0 0

Timber frames to ground floor will require replacement within the maintenance schedule. Aluminium windows to first floor. Aluminium entrance doors. Aluminium.

Location: Elevation 02 A - Building - Physical Structure Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 05 - External Fire Escape

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£1,200

0

0

4 4 16

2010

Sand blast and redecorate fire escape stairs.

C

£30,000

0

0

4 3 12

2010

Replace 50m2 of glazing (clerestory).

C

£2,500

0

0

2 2

4

2010

Strip and redecorate frame (temporary block).

C B

£800 £0

0 15

0 0

4 3 12 0 0 0

2010 2025

Replace 1No. timber frame. Aluminium window frames in good order.

04 - Windows

C

£600

0

0

4 3 12

2010

04 - Windows 04 - Windows 06 - Doors

C B B

£1,200 £0 £0

0 20 20

0 0 0

4 3 12 0 0 0 0 0 0

2010 2030 2030

Replace soldier course where impact damaged to lintel. Replace timber frame to Kitchen. Aluminium glazing. Aluminium exit doors.

C

£1,800

0

0

4 3 12

2010

Replace 30m2 timber frames to first floor.

02a - Flat - Covering

B

£0

15

0

0 0

0

2025

Mineral felt: Section replaced to north east elevation.

02b - Flat - Decking 02c - Flat - Flashing

B B

£0 £0

20 15

0 0

0 0 0 0

0 0

2030 2025

B - Building - External Fabric 04 - Windows

Location: Elevation 03 A - Building - Physical Structure 01 - General Structure B - Building - External Fabric 04 - Windows 04 - Windows

Location: Elevation 04 B - Building - External Fabric

Location: Elevation 05 B - Building - External Fabric 04 - Windows

Location: Roof 01 D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Central valley to roof has a good level of drainage. PVCu. PVCu. Internal PVCu rainwater pipe.

02f - Flat - Drainage Fall

B

£0

20

0

0 0

0

2030

02g - Flat - Guttering 02h - Flat - Down Rainwater Pipes 02h - Flat - Down Rainwater Pipes

B B B

£0 £0 £0

10 10 10

0 0 0

0 0 0 0 0 0

0 0 0

2020 2020 2020

02a - Flat - Covering

B(C)

£6,000

5

0

4 4 16

2015

02g - Flat - Guttering

C

£600

0

0

4 4 16

2010

02h - Flat - Down Rainwater Pipes

C

£150

0

0

4 4 16

2010

01 - Ductwork

B(C)

£25,000

2

0

2 2

4

2012

Education Centre - Plant Room: Insulation requires upgrading within the maintenance schedule.

05 - Cooling Units

B(C)

£7,000

5

0

3 3

9

2015

1.002: Daikin a/c unit will require upgrading within the maintenance schedule.

Location: Roof 02 D - Building - Roof Mineral felt, replacement works likely to be required. PVCU rainwater goods showing signs of failure to joints. PVCU rainwater goods showing signs of failure to joints.

Facet: 2 - Engineering Location: 00 - Ground Floor K - Engineering - Vent & Air Con

M - Engineering - Hot/Cold Water

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 01 - Local Water Heaters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

7

0

0 0

0

2017

0.011: Heatrae Sadia water heater in acceptable order.

01 - Heating Boilers

B

£0

10

0

0 0

0

2020

Education Centre - Plant Room: Potterton Commercial boiler in acceptable order.

02 - Pumps

B

£0

6

0

0 0

0

2016

Education Centre - Plant Room: 2No. Heating pumps in acceptable order.

B

£0

8

0

0 0

0

2018

Education Centre - Plant Room: Trend control panel in acceptable order.

O - Engineering - Main Plant

P - Engineering - Main Plant 03 - Controls

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 05 - AHUs

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£25,000

0

0

4 3 12

2010

Education Centre - Plant Room: Amenco AHU requires replacement along with associated ducting.

04 - Lighting Installation

C

£1,000

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,000

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

0.001: 5No. Surface fluorescent uplighters will require replacement within the maintenance schedule. 0.007: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.006: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.003: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.016: 3No. CAT II lights require upgrading within the maintenance schedule. 0.001: 5No. Surface fluorescent uplighters will require upgrading within the maintenance schedule. 0.001: Surface fluorescent lights in acceptable order. Education Centre: Surface fluorescent lights in acceptable order. 0.001: Emergency lights in acceptable order.

B

£0

10

0

0 0

0

2020

R - Engineering - Electrical

V - Engineering - Fire Alarms 01 - Sounders Generic Hospital Physical Condition Survey

0.001: Fire alarm sounders in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.016: Smoke detector requires upgrading within the maintenance schedule. 0.001: Smoke detector requires upgrading within the maintenance schedule.

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

08 - Tanks & Bylaws

B(C)

£300

4

0

3 3

9

2014

08 - Tanks & Bylaws

B

£0

8

0

0 0

0

2018

03 - Distribution Boards

B

£0

12

0

0 0

0

2022

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£150

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

Remedial Action

Location: 01 - First Floor M - Engineering - Hot/Cold Water 1.007: Water tank requires insulation within the maintenance schedule. 1.007: Water tank in acceptable order.

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

1.007: MEM distribution board in acceptable order. 1.S02: 3No. surface fluorescent lights require upgrading within the maintenance schedule.

1.009: Halogen downlights will require upgrading within the maintenance schedule. 1.S01: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 1.C03: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 1.C02: 4No. Surface fluorescent uplighters will require upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. Block Total

Generic Hospital Physical Condition Survey

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£240,400.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Major Plant: Concrete soffit in acceptable condition. Major Plant: Quarry tile floor in acceptable condition. Major Plant: Polymer floor in acceptable condition. Major Plant: Fairfaced blockwork in acceptable condition. Major Plant: Fairfaced brickwork in acceptable condition.

Site : Generic Hospital - STG Block : Energy Centre (Boiler House) - ENC Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 02 - Ceiling

B

£0

50

0

0 0

0

2060

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

20

0

0 0

0

2030

04 - Condition of Int. Face of Ext. Wall

B

£0

20

0

0 0

0

2030

04 - Condition of Int. Face of Ext. Wall

B

£0

20

0

0 0

0

2030

B(C)

£5,200

1

0

2 2

4

2011

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling

B

£0

30

0

0 0

0

2040

03 - Floor

B(C)

£9,200

5

0

2 3

6

2015

03 - Floor

B

£0

20

0

0 0

0

2030

04 - Condition of Int. Face of Ext. Wall

B

£0

20

0

0 0

0

2030

Location: 01 - First Floor C - Building - Internal Fabric 01 - Decorations

Generic Hospital Physical Condition Survey

Major Plant: Redecoration required as part of regular maintenance schedule (to offices). Major Plant: Suspended ceiling in good order. Major Plant: Exposed concrete soffit in acceptable condition. Major Plant: Carpet will require replacement during maintenance period. Major Plant: Linoleum to switch rooms in acceptable condition. Major Plant: Fairfaced brickwork in acceptable condition. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Major Plant: Refurbishment of male WC facilities required. Major Plant: Kitchen facilities in good order.

08 - Fixed Units

B(C)

£12,000

5

0

3 3

9

2015

08 - Fixed Units

B

£0

15

0

0 0

0

2025

04 - Windows

B

£0

20

0

0 0

0

2030

04 - Windows

B

£0

20

0

0 0

0

2030

06 - Doors

C

£160

0

0

3 3

9

2010

06 - Doors

B

£0

10

0

0 0

0

2020

B

£0

20

0

0 0

0

2030

Major Plant: Brick bund appears in good order.

C

£6,000

0

0

4 3 12

2010

Major Plant: Steel frames and associated cills in poor condition.

B

£0

15

0

0 0

0

2025

Major Plant: Prefab steel unit in good order.

B

£0

10

0

0 0

0

2020

Major Plant: Galvanised steel louvres.

Location: Elevation 01 B - Building - External Fabric Major Plant: PVCU glazing to first floor in good order. Major Plant: Steel louvres in good order. Major Plant: Redecorate timber doors. Major Plant: Galvanised steel roller shutter.

Location: Elevation 02 A - Building - Physical Structure 01 - General Structure B - Building - External Fabric 04 - Windows

Location: Elevation 03 A - Building - Physical Structure 01 - General Structure B - Building - External Fabric 04 - Windows

Location: Elevation 04 A - Building - Physical Structure Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 01 - General Structure

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

20

0

0 0

0

2030

Major Plant: Brick in acceptable condition.

02a - Flat - Covering

B(C)

£130,000

3

0

4 4 16

2013

02b - Flat - Decking

B

£0

20

0

0 0

0

2030

02c - Flat - Flashing

C

£0

0

0

4 4 16

2010

02f - Flat - Drainage Fall

B

£0

20

0

0 0

0

2030

02i - Flat - Skylights

B

£0

20

0

0 0

0

2030

Major Plant: Asphalt appears in acceptable condition, replacement however likely to be required within maintenance period. Major Plant: Reinforced concrete decking. Major Plant: Skirting and flashing in poor condition. Cost included. Major Plant: Roof drains centrally. Major Plant: Skylights replaced recently and in good order.

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

02b - Flat - Decking

B

£0

20

0

0 0

0

2030

02f - Flat - Drainage Fall

B

£0

10

0

0 0

0

2020

02a - Flat - Covering

C

£20,000

0

0

4 4 16

2010

02b - Flat - Decking

B

£0

20

0

0 0

2030

Location: Roof 01 D - Building - Roof

Location: Roof 02 D - Building - Roof Major Plant: Asphalt with solar reflective paint. Major Plant: Reinforced concrete decking. Major Plant: Internally draining RWG.

Location: Roof 03 D - Building - Roof

Generic Hospital Physical Condition Survey

0

Major Plant: 30% of asphalt covered with bitumen product, replacement works likely to be required. Major Plant: Reinforced concrete decking. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Major Plant: Mineral felt roof and flashing. Major Plant: Reinforced concrete decking. Major Plant: Mineral felt.

Location: Roof 04 D - Building - Roof 02a - Flat - Covering

B

£0

10

0

0 0

0

2020

02b - Flat - Decking

B

£0

20

0

0 0

0

2030

02c - Flat - Flashing

B

£0

10

0

0 0

0

2020

B

£0

20

0

0 0

0

2030

Major Plant: Galvanised steel decked in good order.

B

£0

20

0

0 0

0

2030

Major Plant: Galvanised steel decked in good order.

C

£10,000

0

0

4 4 16

2010

Major Plant: Concrete boiler flue, cost allows for full structural survey every year with localised concrete repairs.

01a - Masonry - Cracking

B

£0

20

0

0 0

0

2030

01b - Masonry - Spalling

B

£0

20

0

0 0

0

2030

01c - Masonry - Pointing

B

£0

20

0

0 0

0

2030

01d - Masonry - Finish

B

£0

20

0

0 0

0

2030

Major Plant: Brick in acceptable condition. Major Plant: Brick in acceptable condition. Major Plant: Brick in acceptable condition. Major Plant: Brick in acceptable condition.

Location: Roof 05 D - Building - Roof 02a - Flat - Covering

Location: Roof 06 D - Building - Roof 02j - Flat - Comments

Location: Whole Block A - Building - Physical Structure 04 - Chimneys

B - Building - External Fabric

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Major Plant: Steel cladding in acceptable condition. Major Plant: Steel cladding in acceptable condition. Major Plant: Steel cladding in acceptable condition.

02a - Cladding - Attachment

B

£0

10

0

0 0

0

2020

02b - Cladding - Cracking

B

£0

10

0

0 0

0

2020

02c - Cladding - Joints

B

£0

10

0

0 0

0

2020

B

£0

8

0

0 0

0

2018

0.017: 3No. compressed air receivers in acceptable order.

02 - Pumps

B(C)

£18,000

2

0

2 3

6

2012

02 - Pumps

B(C)

£750

4

0

2 3

6

2014

02 - Pumps

B(C)

£1,000

5

0

2 3

6

2015

02 - Pumps

B

£0

10

0

0 0

0

2020

02 - Pumps

B

£0

10

0

0 0

0

2020

B(C)

£3,000

5

0

3 3

9

2015

Major Plant: 6No. older boiler feed pumps require upgrading within the maintenance schedule. Major Plant: Grundfos domestic hot water service return pump requires upgrading within the maintenance schedule. Major Plant: 2No. feed pumps require upgrading within the maintenance schedule. Major Plant: New boiler feed pumps in acceptable order. Major Plant: Booster pumps in acceptable order. Major Plant: Holden and Brooke pressurisation unit requires upgrading within the maintenance schedule.

B(C)

£400,000

2

0

4 3 12

2012

Facet: 2 - Engineering Location: 00 - Ground Floor K - Engineering - Vent & Air Con 07 - Comments O - Engineering - Main Plant

05 - Pressurisation Units

P - Engineering - Main Plant 03 - Controls

Generic Hospital Physical Condition Survey

Major Plant: Boiler control for boiler and cold water pump requires upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Major Plant: Control panel in calorifier room in acceptable order. Major Plant: Generators A, B and C require upgrading within the maintenance schedule. Major Plant: Oil booster is tired and requires replacement. 0.016: Smaller air filter grill should be cleaned. Major Plant: Dosing plant cylinder is tired and requires upgrading within the maintenance schedule. 0.017: 3No. automatic solenoids (oil injection) require upgrading within the maintenance schedule. 0.016: Plusair compressor in acceptable order. 0.016: Eco air compressor (back up use) in acceptable order. 0.016: Kaesor compressor in acceptable order. 0.016: MSA 11 kw compressor in acceptable order. Major Plant: Plate heat exchangers in acceptable order.

03 - Controls

B

£0

10

0

0 0

0

2020

08 - Generators

B(C)

£150,000

5

0

4 3 12

2015

09 - Comments

C

£5,000

0

0

3 3

9

2010

09 - Comments

C

£100

0

0

2 3

6

2010

09 - Comments

B(C)

£30,000

2

0

3 3

9

2012

09 - Comments

B(C)

£600

4

0

2 2

4

2014

09 - Comments

B

£0

7

0

0 0

0

2017

09 - Comments

B

£0

8

0

0 0

0

2018

09 - Comments

B

£0

10

0

0 0

0

2020

09 - Comments

B

£0

12

0

0 0

0

2022

09 - Comments

B

£0

15

0

0 0

0

2025

02 - Main Switchgear

B(C)

£20,000

2

0

3 3

9

2012

02 - Main Switchgear

B

£0

25

0

0 0

0

2035

03 - Distribution Boards

C

£3,000

0

0

3 3

9

2010

Remedial Action

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

Comms Room: Switchgear requires upgrading within the maintenance schedule. Major Plant: Switchgear in acceptable order. Comms Room: Bill distribution board with rewirable fuses requires replacement. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.014: MEM distribution board in acceptable order. Major Plant: Merlin Gerin distribution board in acceptable order. Chemical Store: 3No. high bay lights in Chemical Store require replacement. Major Plant: 12No. high bay lights require upgrading within the maintenance schedule. 0.C01: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C02: Surface fluorescent light requires upgrading within the maintenance schedule. 0.13: Surface fluorescent light requires upgrading within the maintenance schedule. 0.14: Surface fluorescent light requires upgrading within the maintenance schedule. 0.C01: Emergency lights requires upgrading within the maintenance schedule. 0.013: Armoured cables need refixing or removing if not used. 0.C01: Door entry/exit requires upgrading within the maintenance schedule.

03 - Distribution Boards

B

£0

7

0

0 0

0

2017

03 - Distribution Boards

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£4,800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

05 - Emergency Lighting

B(C)

£200

4

0

4 2

8

2014

08 - Comments

C

£200

0

0

2 2

4

2010

08 - Comments

B(C)

£150

4

0

2 2

4

2014

02 - Call Points

B

£0

7

0

0 0

0

2017

05 - Fire Main/Zone Panel

B

£0

7

0

0 0

0

2017

Remedial Action

V - Engineering - Fire Alarms 0.C01: Fire alarm call points in acceptable order. 0.C01: Fire alarm main panel in acceptable order.

Location: 01 - First Floor Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

1.009: Ducting in acceptable order. 1.008: Mitsubishi cassette unit requires upgrading within the maintenance schedule. 1.005: 2No. Daikin cassette units require upgrading within the maintenance schedule. 1.006: Daikin cassette unit in acceptable order. 1.008: Fujitsu cassette unit in acceptable order.

K - Engineering - Vent & Air Con 01 - Ductwork

B

£0

10

0

0 0

0

2020

05 - Cooling Units

B(C)

£7,000

5

0

3 3

9

2015

05 - Cooling Units

B(C)

£8,000

5

0

3 3

9

2015

05 - Cooling Units

B

£0

6

0

0 0

0

2016

05 - Cooling Units

B

£0

7

0

0 0

0

2017

B

£0

7

0

0 0

0

2017

1.004: ZIP water heater in acceptable order.

02 - Pumps

B(C)

£1,500

4

0

2 3

6

2014

02 - Pumps

B

£0

10

0

0 0

0

2020

03 - Calorifiers

B

£0

10

0

0 0

0

2020

Major Plant: VT Grundfos pump requires upgrading within the maintenance schedule. Major Plant: Twinhead VT and CT Grundfos pumps in acceptable order. Major Plant: 2No. Calorifiers well lagged and in acceptable order.

03 - Controls

B

£0

6

0

0 0

0

2016

03 - Controls

B

£0

8

0

0 0

0

2018

03 - Controls

B

£0

8

0

0 0

0

2018

03 - Controls

B

£0

8

0

0 0

0

2018

M - Engineering - Hot/Cold Water 01 - Local Water Heaters O - Engineering - Main Plant

P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

1.008: Generator control panel in acceptable order. 1.008: General Services control panel in acceptable order. 1.009: Uninterruptable power supply oil pump control in acceptable order. 1.008: Waste heat boiler control panel in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 03 - Controls

Cost to B Rem Life Priority C L

R

Year

Notes 1.009: Transformer control panels in acceptable order. 1.004: Xpelair extract fan requires upgrading within the maintenance schedule.

B

£0

10

0

0 0

0

2020

B(C)

£300

4

0

2 3

6

2014

03 - Distribution Boards

B

£0

9

0

0 0

0

2019

03 - Distribution Boards

B

£0

12

0

0 0

0

2022

04 - Lighting Installation

B(C)

£1,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

05 - Emergency Lighting

B(C)

£200

4

0

4 2

8

2014

05 - Emergency Lighting

B(C)

£600

4

0

4 2

8

2014

04 - Extract Fans

Remedial Action

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

1.009: 3No. Merlin Gerin distribution board in acceptable order. 1.C02: Hager distribution board in acceptable order. 1.008: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 1.009: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 1.S01: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 1.C03: Surface fluorescent light requires upgrading within the maintenance schedule. 1.007A: Surface fluorescent light requires upgrading within the maintenance schedule. 1.004: Surface fluorescent lights in acceptable order. 1.006: Surface fluorescent lights in acceptable order. 1.005: Surface fluorescent lights in acceptable order. 1.009: Emergency lights requires upgrading within the maintenance schedule. 1.008: 3No. emergency lights require upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 05 - Emergency Lighting

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

8

0

0 0

0

2018

1.009: Uninterruptable power supply unit in acceptable order.

01 - Sounders

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

1.005: Fire alarm sounders in acceptable order. 1.004: Smoke detectors in acceptable order. 1.C01: Smoke detectors in acceptable order. 1.005: Smoke detectors in acceptable order.

02 - Pumps

B

£0

10

0

0 0

0

2020

05 - Pressurisation Units

B

£0

10

0

0 0

0

2020

01 - Cooling Plant

C

£3,000

0

0

3 3

9

2010

01 - Cooling Plant

B

£0

10

0

0 0

0

2020

03 - Controls

B

£0

10

0

0 0

0

2020

03 - Controls

B

£0

15

0

0 0

0

2025

09 - Comments

B

£0

10

0

0 0

0

2020

02 - Main Switchgear

B

£0

10

0

0 0

0

2020

03 - Distribution Boards

C

£2,000

0

0

3 3

9

2010

03 - Distribution Boards

B

£0

20

0

0 0

0

2030

V - Engineering - Fire Alarms

Location: Roof O - Engineering - Main Plant Roof: Grundfos pumps in acceptable order. Roof: Pressurisation unit in acceptable order.

P - Engineering - Main Plant Roof: Cooling plant is old and requires replacement. Roof: Cooling plants in acceptable order. Roof: Large control panel in acceptable order. Roof: Small control panel in acceptable order. Roof: Atlas Copco air dryer in acceptable order.

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

Roof: MEM switchgear in acceptable order. Roof: 2No. rewirable distribution boards require replacement. Roof: Hager distribution board in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. Block Total

Generic Hospital Physical Condition Survey

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£856,760.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Sexual Health: Redecoration required as part of a regular maintenance schedule. Sexual Health: Suspended ceiling. Sexual Health: Plaster ceiling. Sexual Health: Carpets require replacing to offices (20% of floor). Sexual Health: Carpet will require replacing to consulting rooms within the maintenance schedule. Sexual Health: Carpets will require replacing to corridors (office area) within the maintenance schedule. Sexual Health: Carpet to Seminar Room. Sexual Health: Lino to Pharmacy. Sexual Health: Linoleum to Reception. Sexual Health: Anti-slip vinyl to clinic rooms. Sexual Health: Linoleum to corridor. Sexual Health: Refurbish 2No. Reception WCs.

Site : Generic Hospital - STG Block : GU Medicine - GUM Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

B(C)

£31,200

2

0

2 2

4

2012

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling 03 - Floor

B C

£0 £11,960

20 0

0 0

0 0 2 3

0 6

2030 2010

03 - Floor

B(C)

£5,400

4

0

2 3

6

2014

03 - Floor

B(C)

£5,400

5

0

2 3

6

2015

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

15

0

0 0

0

2025

03 - Floor

B

£0

15

0

0 0

0

2025

08 - Fixed Units

C

£6,000

0

0

3 3

9

2010

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Sexual Health: Refurbish 2No. Female WCs. Sexual Health: Clinical units. Sexual Health: Wash hand basins to consulting rooms. Sexual Health: Male and Female WCs/Changing facilities in good order. Sexual Health: 2No. WCs to Blood Test Room. Sexual Health: Evidence of plant leaks to main corridor.

08 - Fixed Units

C

£5,000

0

0

3 3

9

2010

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

10 15

0 0

0 0 0 0

0 0

2020 2025

08 - Fixed Units

B

£0

15

0

0 0

0

2025

08 - Fixed Units

B

£0

20

0

0 0

0

2030

11 - Signs of Water Ingress

C

£600

0

0

4 5 20

2010

01d - Masonry - Finish

C

£800

0

0

4 3 12

2010

06 - Doors

B

£0

15

0

0 0

0

2025

B(C)

£260

2

0

3 3

9

2012

Sexual Health: Redecorate timber exit doors.

B(C)

£260

3

0

3 3

9

2013

Sexual Health: Redecorate exit door.

04 - Windows

B

£0

20

0

0 0

0

2030

06 - Doors

B

£0

15

0

0 0

0

2025

Sexual Health: Aluminium curtain walling. Sexual Health: Aluminium doors.

Location: Elevation 01 B - Building - External Fabric Sexual Health: Redecorate render and associated steel columns. Sexual Health: Aluminium main entrance doors.

Location: Elevation 02 B - Building - External Fabric 06 - Doors

Location: Elevation 03 B - Building - External Fabric 06 - Doors

Location: Elevation 05 B - Building - External Fabric

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 09 - Comments

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

15

0

0 0

0

2025

Sexual Health: Steel louvre blinds.

02a - Cladding - Attachment

B

£0

15

0

0 0

0

2025

02b - Cladding - Cracking

B

£0

15

0

0 0

0

2025

02c - Cladding - Joints

B

£0

15

0

0 0

0

2025

02d - Cladding - Finish

B

£0

15

0

0 0

0

2025

Sexual Health: Plastic clad steel to Plant Room. Sexual Health: Plastic clad steel to Plant Room. Sexual Health: Plastic clad steel to Plant Room. Sexual Health: Plastic clad steel to Plant Room.

B

£0

20

0

0 0

0

2030

Sexual Health: Brick paviors to courtyard.

C

£500

0

0

2 2

4

2010

Sexual Health: Inner courtyard garden is overgrown with attention required.

02a - Flat - Covering

B

£0

15

0

0 0

0

2025

02b - Flat - Decking 02c - Flat - Flashing 02g - Flat - Guttering 02h - Flat - Down Rainwater Pipes

B B B B

£0 £0 £0 £0

20 15 15 15

0 0 0 0

0 0 0 0

0 0 0 0

2030 2025 2025 2025

Sexual Health: Single ply membrane, appears in good order. Sexual Health: Galvanised steel.

Location: Elevation 06 B - Building - External Fabric

Location: External F - Building - External Works 03 - Paths G - Building - Gardens 07 - Comments

Location: Roof 01 D - Building - Roof

0 0 0 0

Sexual Health: PVCu. Sexual Health: PVCu.

Location: Roof 02 D - Building - Roof Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

0

2025

Sexual Health: Single ply membrane, appears in good order. Sexual Health: Galvanised steel.

02a - Flat - Covering

B

£0

15

0

0 0

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater Pipes 02j - Flat - Comments

B B B B B N/A

£0 £0 £0 £0 £0 £0

20 15 15 15 15 0

0 0 0 0 0 0

0 0 0 0 0 4

0 0 0 0 0 0 0 0 0 0 4 16

2030 2025 2025 2025 2025 2010

B B B B B

£0 £0 £0 £0 £0

20 30 20 20 20

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2030 2040 2030 2030 2030

Sexual Health: Concrete tiles.

B

£0

20

0

0 0

0

2030

Sexual Health: Timber velux.

B

£0

30

0

0 0

0

2040

Sexual Health: Brickwork in good order to all elevations.

01a - Masonry - Cracking

B

£0

30

0

0 0

0

2040

04 - Windows

C

£2,400

0

0

4 3 12

2010

04 - Windows

B(C)

£7,200

2

0

4 3 12

2012

Sexual Health: Brickwork in good order to all elevations. Sexual Health: Windows appear to suffer from recurring defect. Split to lower part of casement cost allows for localised repairs. Sexual Health: Redecorate double glazed units to all elevations.

Sexual Health: PVCu. Sexual Health: PVCu. Sexual Health: PVCu. Sexual Health: No safe access, above 3m safe working height.

Location: Roof 03 D - Building - Roof 01a - Attached - Covering 01b - Attached - Sarking 01c - Attached - Flashing 01g - Attached - Guttering 01h - Attached - Down Rainwater Pipes 01i - Attached - Skylights

Sexual Health: Lead. Sexual Health: Aluminium. Sexual Health: Aluminium.

Location: Whole Block A - Building - Physical Structure 01 - General Structure B - Building - External Fabric

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

D - Building - Roof 01h - Attached - Down Rainwater Pipes

C

£0

0

0

4 3 12

2010

Sexual Health: Clear debris from rain water pipe outlets. No cost allocated.

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

0.005: Low surface temperature radiator in acceptable order.

04 - Insulation

B

£0

7

0

0 0

0

2017

1.M01: Ducts and insulation in acceptable order.

B

£0

8

0

0 0

0

2018

1.M01: Steam accumulator vessel in acceptable order.

C

£300

0

0

2 2

4

2010

0.025: 2No. Grilles require cleaning, but are in generally acceptable order.

Facet: 2 - Engineering Location: 00 - Ground Floor I - Engineering - Heating Systems

J - Engineering - Steam Systems 06 - Comments

K - Engineering - Vent & Air Con 03 - Grilles & Diffusers

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 03 - Grilles & Diffusers

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

12

0

0 0

0

2022

Sexual Health: Grilles/diffusers in acceptable order.

B

£0

7

0

0 0

0

2017

1.M01: 2No. Cold water tanks in acceptable order.

02 - Pumps

B(C)

£1,200

3

0

2 3

6

2013

1.M01: 2No. Brook Crompton variable temperature pumps in average order, however will require upgrading within the maintenance schedule.

02 - Pumps

B(C)

£1,200

3

0

2 3

6

2013

1.M01: 2No. Brook Crompton constant temperature pumps in average order, however will require upgrading within the maintenance schedule.

02 - Pumps

B(C)

£1,200

3

0

2 3

6

2013

03 - Calorifiers

B

£0

8

0

0 0

0

2018

1.M01: 2No. Brook Crompton primary heating pumps in average order, however they will require upgrading within the maintenance schedule. 1.M01: 2No. Steam heating calorifiers in acceptable order.

M - Engineering - Hot/Cold Water 08 - Tanks & Bylaws

O - Engineering - Main Plant

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

1.M01: Heating calorifier in acceptable order. 1.M01: Pressurisation unit and pumps in acceptable order.

03 - Calorifiers

B

£0

10

0

0 0

0

2020

05 - Pressurisation Units

B

£0

7

0

0 0

0

2017

03 - Controls

B

£0

7

0

0 0

0

2017

1.M01: 4No. Solenoids and valves in acceptable order.

03 - Controls

B

£0

12

0

0 0

0

2022

1.M01: 2No. Control panels in acceptable order.

05 - AHUs

B

£0

10

0

0 0

0

2020

05 - AHUs

B

£0

10

0

0 0

0

2020

1.M01: AHU to WC in acceptable order. 1.M01: AHU to Seminar Room in acceptable order.

P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

05 - AHUs

B

£0

10

0

0 0

0

2020

1.M01: AHU to central area in acceptable order.

05 - AHUs

B

£0

10

0

0 0

0

2020

1.M01: AHU central area extract in acceptable order.

02 - Main Switchgear

C

£100

0

0

3 3

9

2010

0.M01: Replace covers to contactors. (suspect not in use).

03 - Distribution Boards

B

£0

10

0

0 0

0

2020

0.M01: Ottermill distribution board.

03 - Distribution Boards

B

£0

10

0

0 0

0

2020

0.M02: Ottermill distribution board.

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

03 - Distribution Boards

B

£0

18

0

0 0

0

2028

0.M03: Hager distribution board in acceptable order.

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,600

5

0

2 2

4

2015

0.023: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 0.002: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.022: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.118: Surface fluorescent light requires upgrading within the maintenance schedule. 0.032: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 0.031: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.003: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C08: 8No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C02: 8No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C03: 8No. surface fluorescent lights require upgrading within the maintenance schedule.

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.C06: 7No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C04: 10No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C011: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C09: 8No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C010: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C01: 10No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£1,400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£2,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£2,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

Generic Hospital Physical Condition Survey

Remedial Action

0.04: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.005: CAT II lights in acceptable order. 0.005: Fluorescent down lights in acceptable order. Sexual Health: Surface fluorescent lights in acceptable order. Sexual Health: CAT II lights in acceptable order. 1.M01: Surface fluorescent lights in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

0.C06: Fire alarm sounders in acceptable order. 0.C01: Fire alarm sounders in acceptable order. 0.C06: Smoke detectors in acceptable order. 1.M01: Smoke detectors in acceptable order. 0.005: Smoke detectors in acceptable order.

V - Engineering - Fire Alarms 01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

Block Total

Generic Hospital Physical Condition Survey

£98,780.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Medical Records/Medical School: Redecoration required within 5 year maintenance schedule to 10% of the floor. Medical Records/Medical School: Redecoration required within 5 year maintenance schedule to 90% of the floor. Medical Records/Medical School: Suspended: Remove tiles and replace with new (nominal area). Medical Records/Medical School: Suspended. Medical Records/Medical School: Suspended. Medical Records/Medical School: Carpet: Need to replace contract quality carpet - Located to 0.069. Medical Records/Medical School: Carpet: Need to replace contract quality carpet - Located to 0.066. Medical Records/Medical School: Carpet: Need to replace contract quality carpet - Located to 0.062, 0.063 and 0.058.

Site : Generic Hospital - STG Block : Grosvenor Wing - GVR Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

B(C)

£10,500

1

0

2 2

4

2011

01 - Decorations

B(C)

£95,000

3

0

2 2

4

2013

02 - Ceiling

C

£2,500

0

0

2 2

4

2010

02 - Ceiling

B

£0

7

0

0 0

0

2017

02 - Ceiling

B

£0

20

0

0 0

0

2030

03 - Floor

C

£750

0

0

2 3

6

2010

03 - Floor

C

£10,900

0

0

2 3

6

2010

03 - Floor

B(C)

£3,000

2

0

2 3

6

2012

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Medical Records/Medical School: Carpet: Need to replace contract quality carpet 0.021, 0.070, 0.071 and 0.072. Medical Records/Medical School: Carpet: Need to replace contract quality carpet - Located to 0.068. Medical Records/Medical School: Vinyl: Need to replace vinyl sheet flooring to 0.022. Medical Records/Medical School: Ceramic tiling. Medical Records/Medical School: Slip resistant vinyl flooring. Medical Records/Medical School: Vinyl sheet. Medical Records/Medical School: Terrazzo. Medical Records/Medical School: Demountable timber panel: Replace with new, as starting to show signs of wear to panel to cistern - Located to 0.020. Medical Records/Medical School: Brickwork (plastered). Medical Records/Medical School: Sanitary fittings: Ceramic wash hand basin: Replace with new due to age and condition, 1No. Medical Records/Medical School: Sanitary fittings: Ceramic wash hand basin: Replace with new due to age and condition, 2No.

03 - Floor

B(C)

£11,500

3

0

2 3

6

2013

03 - Floor

B(C)

£600

4

0

2 3

6

2014

03 - Floor

B(C)

£1,000

5

0

2 3

6

2015

03 - Floor

B

£0

7

0

0 0

0

2017

03 - Floor

B

£0

13

0

0 0

0

2023

03 - Floor

B

£0

13

0

0 0

0

2023

03 - Floor

B

£0

15

0

0 0

0

2025

05 - Condition of internal walls

B(C)

£600

3

0

2 3

6

2013

05 - Condition of internal walls

B

£0

25

0

0 0

0

2035

08 - Fixed Units

C

£700

0

0

3 3

9

2010

08 - Fixed Units

B(C)

£1,400

3

0

3 3

9

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Medical Records/Medical School: Sanitary fittings: Ceramic WC. Medical Records/Medical School: Kitchen facilities. Medical Records/Medical School: Sanitary fittings: Ceramic wash hand basin. Medical Records/Medical School: Sanitary fittings: Ceramic WC. Medical Records/Medical School: Sanitary fittings: Ceramic urinal bowl. Medical Records/Medical School: Sanitary fittings: Ceramic wash hand basin.

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2020

08 - Fixed Units

B

£0

10

0

0 0

0

2020

08 - Fixed Units

B

£0

10

0

0 0

0

2020

01 - Decorations

B(C)

£13,250

3

0

2 2

4

2013

02 - Ceiling

C

£3,850

0

0

2 2

4

2010

02 - Ceiling 02 - Ceiling 02 - Ceiling 03 - Floor

B B B B(C)

£0 £0 £0 £500

20 20 20 3

0 0 0 0

0 0 0 2

0 0 0 3

0 0 0 6

2030 2030 2030 2013

03 - Floor

B

£0

7

0

0 0

0

2017

Remedial Action

Location: -01 - Basement C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

Plant Area: Redecoration required within 5 year maintenance schedule. Plant Area: Suspended: Remove tiles and replace with new (Localised replacement).

Plant Area: Suspended. Plant Area: Plasterboard. Plant Area: Concrete soffit. Plant Area: Vinyl: Need to replace vinyl sheet flooring Located to 01.012. Plant Area: Quarry tiles. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Plant Area: Slip resistant vinyl sheet. Plant Area: Brickwork (plastered): Brush of efflorescence and make good to wall - Located to 01.011A.

03 - Floor

B

£0

13

0

0 0

0

2023

05 - Condition of internal walls

C

£500

0

0

2 3

6

2010

05 - Condition of internal walls

B(C)

£300

3

0

2 3

6

2013

Plant Area: Demountable Panel: Replace timber panel - Located to WC 01.011A.

05 - Condition of internal walls

B

£0

20

0

0 0

0

2030

05 - Condition of internal walls

B

£0

20

0

0 0

0

2030

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

12 - Comments

C

£0

0

0

2 2

4

2010

Plant Area: Brickwork (plastered). Plant Area: Fairfaced brickwork: Painted (brickwork). Plant Area: Sanitary fittings: Ceramic WC. Plant Area: Sanitary fittings: Ceramic wash hand basin. Plant Area: Male WC has been stripped out and is currently used as a store.

01 - Decorations

C

£76,000

0

0

2 2

4

2010

01 - Decorations

B(C)

£21,700

1

0

2 2

4

2011

Location: 01 - First Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

Exec Offices: Redecoration required within 5 year maintenance schedule (70% of floor). Exec Offices: Redecoration required within 5 year maintenance schedule (20% of floor). October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Exec Offices: Redecoration required within 5 year maintenance schedule (10% of floor). Exec Offices: Suspended: Remove tiles and replace with new (10% to 1.086). Exec Offices: Suspended: Concealed grid - Take down and replace with new (10%, this is due to the use of the area being predominately office and not public space). Exec Offices: Suspended. Exec Offices: Suspended. Exec Offices: Plasterboard. Exec Offices: Carpet: Need to replace contract quality carpet office (50% of floor area). Exec Offices: Carpet: Need to replace contract quality carpet to 1.089. Exec Offices: Carpet: Need to replace contract quality carpet (20% of floor area). Exec Offices: Vinyl: Need to replace vinyl tile flooring to 1.076. Exec Offices: Carpet: Need to replace contract quality carpet Located to 1.002, 1.C09 and 1.C10. Exec Offices: Carpet: Need to replace contract quality carpet to 1.097. Exec Offices: Carpet: Need to replace contract quality carpet (10% of floor area).

01 - Decorations

B(C)

£11,000

3

0

2 2

4

2013

02 - Ceiling

C

£300

0

0

2 2

4

2010

02 - Ceiling

B(C)

£42,000

5

0

2 2

4

2015

02 - Ceiling 02 - Ceiling 02 - Ceiling 03 - Floor

B B B C

£0 £0 £0 £84,000

7 10 20 0

0 0 0 0

0 0 0 2

0 0 0 3

0 0 0 6

2017 2020 2030 2010

03 - Floor

B(C)

£6,000

1

0

2 3

6

2011

03 - Floor

B(C)

£33,600

1

0

2 3

6

2011

03 - Floor

B(C)

£750

1

0

2 3

6

2011

03 - Floor

B(C)

£1,950

2

0

2 3

6

2012

03 - Floor

B(C)

£4,000

3

0

2 3

6

2013

03 - Floor

B(C)

£16,800

3

0

2 3

6

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Exec Offices: Carpet: Need to replace contract quality carpet (10% of floor area). Exec Offices: Vinyl: Need to replace slip resistant vinyl flooring to 1.007, 1.008. Exec Offices: Quarry tiles. Exec Offices: Vinyl sheet flooring. Exec Offices: Vinyl sheet. Exec Offices: Concrete. Exec Offices: Brickwork (plastered): Replace blown plaster - Located to 1.045. Exec Offices: Ceramic tiling. Exec Offices: Fairfaced blockwork. Exec Offices: Fairfaced brickwork. Exec Offices: Brickwork (plastered). Exec Offices: Kitchen facilities: Replace to 1.036 & 1.005. Exec Offices: Sanitary fittings: Ceramic wash hand basin: Replace with new due to age and condition 5No. Exec Offices: Sanitary fittings: Ceramic WC: Replace with new due to age and condition 5No. Exec Offices: Sanitary fittings: Ceramic Urinal. Exec Offices: Sanitary fittings: Ceramic wash hand basin. Exec Offices: Sanitary fittings: Ceramic WC.

03 - Floor

B(C)

£16,800

4

0

2 3

6

2014

03 - Floor

B(C)

£750

5

0

2 3

6

2015

03 - Floor 03 - Floor

B B

£0 £0

7 10

0 0

0 0 0 0

0 0

2017 2020

03 - Floor 03 - Floor 05 - Condition of internal walls

B B C

£0 £0 £400

10 20 0

0 0 0

0 0 0 0 2 3

0 0 6

2020 2030 2010

05 - Condition of internal walls 05 - Condition of internal walls

B B

£0 £0

15 20

0 0

0 0 0 0

0 0

2025 2030

05 - Condition of internal walls

B

£0

20

0

0 0

0

2030

05 - Condition of internal walls

B

£0

20

0

0 0

0

2030

08 - Fixed Units

C

£3,000

0

0

3 3

9

2010

08 - Fixed Units

B(C)

£3,500

3

0

3 3

9

2013

08 - Fixed Units

B(C)

£4,000

5

0

3 3

9

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2020

08 - Fixed Units

B

£0

10

0

0 0

0

2020

08 - Fixed Units

B

£0

10

0

0 0

0

2020

Remedial Action

Location: 02 - Second Floor Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Exec Offices: Redecoration required within 5 year maintenance schedule to stairs. Exec Offices: Redecoration required within 5 year maintenance schedule. Exec Offices: Suspended: Replace with new (10%) Located to 2.124, 2.050,2.071, 2.074 and 2.111. Exec Offices: Suspended: Replace with new - Located to circulation routes and stairs. Exec Offices: Suspended. Exec Offices: Plasterboard. Exec Offices: Suspended. Exec Offices: Terrazzo: Repair damaged section of terrazzo flooring, suggest installation of treading to prevent further damage - Located to stairs.

C - Building - Internal Fabric 01 - Decorations

C

£2,000

0

0

2 2

4

2010

01 - Decorations

B(C)

£62,000

1

0

2 2

4

2011

02 - Ceiling

C

£1,250

0

0

2 2

4

2010

02 - Ceiling

B(C)

£26,000

5

0

2 2

4

2015

02 - Ceiling 02 - Ceiling 02 - Ceiling 03 - Floor

B B B C

£0 £0 £0 £500

7 20 20 0

0 0 0 0

0 0 0 2

0 0 0 3

0 0 0 6

2017 2030 2030 2010

03 - Floor

C

£9,600

0

0

2 3

6

2010

03 - Floor

B(C)

£38,400

1

0

2 3

6

2011

03 - Floor

B(C)

£28,800

3

0

2 3

6

2013

03 - Floor

B(C)

£1,150

5

0

2 3

6

2015

03 - Floor

B

£0

7

0

0 0

0

2017

Generic Hospital Physical Condition Survey

Exec Offices: Carpet: Need to replace contract quality carpet (10% of Offices). Exec Offices: Carpet: Need to replace contract quality carpet (40% of Offices). Exec Offices: Carpet: Need to replace contract quality carpet (30% of Offices). Exec Offices: Vinyl: Need to replace vinyl sheet flooring Located to 2.122 and 2.119. Exec Offices: Slip resistant vinyl sheet. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Exec Offices: Terrazzo. Exec Offices: Ceramic tiling. Exec Offices: Brickwork (plastered). Exec Offices: Brickwork (plastered): Make good cracking plasterwork - Located to 2.088,2.130 and 2.C18. Exec Offices: Kitchen facilities: Replace with new due to age and condition - Located to 2.083. Exec Offices: Kitchen facilities: Replace with new due to age and condition - Located to 2.122. Exec Offices: Sanitary fittings: Oakleaf informed of ongoing drainage issues to urinals and female WCs, suggest further investigation. Exec Offices: Sanitary fittings: Ceramic WC: Replace with new due to age and condition, 1No. Exec Offices: Sanitary fittings: Ceramic wash hand basin: Replace with new due to age and condition, 2No. Exec Offices: Kitchen facilities. Exec Offices: Sanitary fittings: Ceramic urinal. Exec Offices: Sanitary fittings: Ceramic wash hand basin. Exec Offices: Sanitary fittings: Ceramic WC.

03 - Floor 05 - Condition of internal walls 05 - Condition of internal walls

B B B

£0 £0 £0

20 7 20

0 0 0

0 0 0 0 0 0

0 0 0

2030 2017 2030

05 - Condition of internal walls

B

£0

20

0

0 0

0

2030

08 - Fixed Units

C

£5,000

0

0

3 3

9

2010

08 - Fixed Units

C

£3,000

0

0

3 3

9

2010

08 - Fixed Units

C

£1,000

0

0

3 3

9

2010

08 - Fixed Units

B(C)

£800

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£1,400

3

0

3 3

9

2013

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

08 - Fixed Units

B

£0

10

0

0 0

0

2020

08 - Fixed Units

B

£0

10

0

0 0

0

2020

Remedial Action

Location: 03 - Third Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 01 - Decorations

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Redecoration required within 5 year maintenance schedule Located to stairs. Plasterboard. Steel. Asbestos panel. Brickwork (plastered). Fairfaced brickwork.

B(C)

£2,000

3

0

2 2

4

2013

B B B B B

£0 £0 £0 £0 £0

20 20 10 20 20

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2030 2030 2020 2030 2030

B(C)

£3,900

5

0

4 3 12

2015

Aluminium - Single: Redecorate and make good painted aluminium window frames, overhaul 26 windows - Located to elevation 1.

B(C)

£13,500

5

0

4 3 12

2015

Aluminium - Single: Redecorate and make good painted aluminium window frames, overhaul 90 windows - Located to elevation 2.

01d - Masonry - Finish

C

£1,000

0

0

4 3 12

2010

04 - Windows

B(C)

£10,500

5

0

4 3 12

2015

Brickwork: Need to remove vegetation - Located to elevation 3. Aluminium - Single: Redecorate and make good painted aluminium window frames, overhaul 70 windows - Located to elevation 3.

02 - Ceiling 02 - Ceiling 05 - Condition of internal walls 05 - Condition of internal walls 05 - Condition of internal walls

0 0 0 0 0

Location: Elevation 01 B - Building - External Fabric 04 - Windows

Location: Elevation 02 B - Building - External Fabric 04 - Windows

Location: Elevation 03 B - Building - External Fabric

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

06 - Doors

C

£175

0

0

3 3

9

2010

Softwood timber: Redecorate and make good 1No. - Located to elevation 3.

06 - Doors

B(C)

£175

5

0

3 3

9

2015

Softwood timber: Redecorate and make good 1No. - Located to elevation 3.

B(C)

£6,000

5

0

4 3 12

2015

Aluminium - Single: Redecorate and make good painted aluminium window frames, overhaul 40 windows - Located to elevation 4.

B(C)

£6,000

5

0

4 3 12

2015

Aluminium - Single: Redecorate and make good painted aluminium window frames, overhaul 40 windows - Located to elevation 5.

B(C)

£2,100

5

0

4 3 12

2015

Aluminium - Single: Redecorate and make good painted aluminium window frames, overhaul 14 windows - Located to elevation 6.

Location: Elevation 04 B - Building - External Fabric 04 - Windows

Location: Elevation 05 B - Building - External Fabric 04 - Windows

Location: Elevation 06 B - Building - External Fabric 04 - Windows

Location: Plant Room Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Softwood timber: Redecorate and make good 1No. - Located to Plant Room. Softwood timber: Redecorate and make good 1No. - Located to Plant Room.

B - Building - External Fabric 06 - Doors

C

£175

0

0

3 3

9

2010

06 - Doors

B(C)

£175

5

0

3 3

9

2015

02a - Flat - Covering

C

£250

0

0

4 4 16

2010

02a - Flat - Covering

B(C)

£429,500

5

0

4 4 16

2015

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering

B B B B(C)

£0 £0 £0 £0

10 10 10 5

0 0 0 0

0 0 0 4

2020 2020 2020 2015

B

£0

10

0

0 0

0

2020

B B B B B

£0 £0 £0 £0 £0

15 20 20 20 20

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2025 2030 2030 2030 2030

Location: Roof 01 D - Building - Roof

02h - Flat - Down Rainwater pipes

0 0 0 0 0 0 4 16

Asphalt: Clear rubbish & vegetation. Asphalt: Asphalt roof covering requires renewal inclusive of making good the decking and relay chippings (skirting showing signs of deterioration and patch repairs). Reinforced concrete. Aluminium. Brickwork: Rendered. Integrated: Replace with new (cost included in covering). Internal (assumed condition, due to no access).

Location: Roof 02 D - Building - Roof 02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

0 0 0 0 0

Mineral felt. Reinforced concrete. Mineral felt. Integrated. Internal (assumed condition, due to no access).

Location: Roof 03 Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Asphalt: Clear rubbish & vegetation. Asphalt: Asphalt roof covering requires renewal inclusive of making good the decking and relay chippings (skirting showing signs of deterioration and patch repairs). Reinforced concrete. Integrated: Replace with new (cost included in covering). Internal (assumed condition, due to no access).

D - Building - Roof 02a - Flat - Covering

C

£250

0

0

4 4 16

2010

02a - Flat - Covering

B(C)

£25,300

5

0

4 4 16

2015

02b - Flat - Decking 02g - Flat - Guttering

B B(C)

£0 £0

10 5

0 0

0 0 0 4 4 16

2020 2015

B

£0

6

0

0 0

0

2016

02a - Flat - Covering

C

£250

0

0

4 4 16

2010

02a - Flat - Covering

B(C)

£36,050

5

0

4 4 16

2015

02b - Flat - Decking 02g - Flat - Guttering

B B(C)

£0 £0

10 5

0 0

0 0 0 4 4 16

2020 2015

02h - Flat - Down Rainwater pipes

B

£0

20

0

0 0

0

2030

02i - Flat - Skylights

B

£0

10

0

0 0

0

2020

C

£250

0

0

4 4 16

2010

02h - Flat - Down Rainwater pipes

Location: Roof 04 D - Building - Roof Asphalt: Clear rubbish & vegetation. Asphalt: Asphalt roof covering requires renewal inclusive of making good the decking and relay chippings (skirting showing signs of deterioration and patch repairs). Reinforced concrete. Integrated: Replace with new (cost included in covering). Internal (assumed condition, due to no access). PVCU skylight.

Location: Roof 05 D - Building - Roof 02a - Flat - Covering

Generic Hospital Physical Condition Survey

Asphalt: Clear rubbish & vegetation. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Asphalt: Asphalt roof covering requires renewal inclusive of making good the decking and relay chippings (skirting showing signs of deterioration and patch repairs). Reinforced concrete. Integrated: Replace with new (cost included in covering). Internal (assumed condition, due to no access).

02a - Flat - Covering

B(C)

£14,300

5

0

4 4 16

2015

02b - Flat - Decking 02g - Flat - Guttering

B B(C)

£0 £0

10 5

0 0

0 0 0 4 4 16

2020 2015

B

£0

10

0

0 0

0

2020

01 - General Structure

B

£0

40

0

0 0

0

2050

Brickwork: Generally sound.

02 - Foundations 03 - Ground Stability 04 - Chimneys

B B B

£0 £0 £0

40 40 10

0 0 0

0 0 0 0 0 0

0 0 0

2050 2050 2020

Generally sound. Generally sound. Steel flue.

B B B B B B B

£0 £0 £0 £0 £0 £0 £0

40 40 40 10 15 10 10

0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

2050 2050 2050 2020 2025 2020 2020

Brickwork. Brickwork. Brickwork. DPC. Aluminium - Double. Aluminium. Canopy: Steel framed steel sheet roof.

02h - Flat - Down Rainwater pipes

Location: Whole Block A - Building - Physical Structure

B - Building - External Fabric 01a - Masonry - Cracking 01b - Masonry - Spalling 01c - Masonry - Pointing 03 - DPC 04 - Windows 06 - Doors 08 - Porches

0 0 0 0 0 0 0

Facet: 2 - Engineering Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 00 - Ground Floor I - Engineering - Heating Systems 01 - Heat Emitters

B

£0

15

0

0 0

0

2025

Medical Records: Heat emitters with low surface temperature covers in acceptable order.

03 - Grilles & Diffusers

C

£300

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£300

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£0

0

0

2 2

4

2010

0.022: 2No. Grilles require cleaning, but are in generally acceptable order. 0.021: 2No. Grilles require cleaning, but are in generally acceptable order. 0.058: 3No. Grilles require cleaning, but are in generally acceptable order.

02 - Main Switchgear

C

£5,000

0

0

3 3

9

2010

0.M01: Ottermill combined switchgear and distribution board requires replacement.

03 - Distribution Boards

B

£0

25

0

0 0

0

2035

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

Medical Records: Hager distribution board in acceptable order. 0.021: 6No. CAT II lights require replacement.

K - Engineering - Vent & Air Con

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.018: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.068: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.C05: 6No. surface fluorescent lights require replacement. 0.020: 2No. surface fluorescent lights require replacement. 0.064: 20No. Fluorescent downlighters will require upgrading within the maintenance schedule.

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£40,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£2,800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£2,400

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

0.069: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C04: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C01: 14No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C03: 2No. surface fluorescent lights require upgrading within the maintenance schedule. C.010: Surface fluorescent light requires upgrading within the maintenance schedule. Lecture Theatre C (072): 12No. Fluorescent downlighters will require upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

0.C08: 7No. surface fluorescent lights require upgrading within the maintenance schedule. 0.022: 6No. CAT II lights require upgrading within the maintenance schedule. 0.027: 2No. Surface fluorescent lights in acceptable order. Lecture Theatre B (071): Surface fluorescent lights in acceptable order. 0.066: Stage/theatre lights in acceptable order.

04 - Lighting Installation

B(C)

£1,400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

0.066: Surface fluorescent lights in acceptable order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

Medical Records: CAT II lights in acceptable order.

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

05 - Emergency Lighting

B(C)

£4,000

3

0

4 2

8

2013

0.M01: Emergency battery charging unit will require upgrading within the maintenance schedule.

05 - Emergency Lighting

B(C)

£400

4

0

4 2

8

2014

05 - Emergency Lighting

B(C)

£2,800

4

0

3 2

6

2014

05 - Emergency Lighting

B

£0

6

0

0 0

0

2016

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

Lecture Theatre C (072): 2No. emergency lights require upgrading within the maintenance schedule. 0.017: 14No. Batteries will require upgrading within the maintenance schedule. Lecture Theatre B (071): Emergency lights in acceptable order. 0.066: Emergency lights in acceptable order.

06 - Sockets/Switches

B(C)

£400

3

0

3 3

9

2013

Lecture Theatre C (072): Sockets and switches will require upgrading within the maintenance schedule.

08 - Comments

C

£100

0

0

2 2

4

2010

0.M01: Tidy cables.

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

0.C01: Fire alarm sounders in acceptable order. 0.C08: 3No. smoke detectors require upgrading within the maintenance schedule. 0.C04: Smoke detector requires upgrading within the maintenance schedule. 0.C01: 2No. Smoke detectors in acceptable order. Lecture Theatre B (071): Smoke detectors in acceptable order. Medical Records: Smoke detectors in acceptable order.

V - Engineering - Fire Alarms 01 - Sounders

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B(C)

£450

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

12

0

0 0

0

2022

04 - Lighting Installation

C

£800

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£1,000

4

0

2 2

4

2014

Location: -01 - Basement R - Engineering - Electrical

Generic Hospital Physical Condition Survey

1.011a: 4No. surface fluorescent lights require replacement. 1.012: Surface fluorescent light requires replacement. 1.012A: Surface fluorescent light requires replacement. 1.011: Surface fluorescent light requires replacement. 1.C02: 2No. surface fluorescent lights require replacement. 1.C01: 2No. surface fluorescent lights require replacement. 1.C03: Surface fluorescent light requires upgrading within the maintenance schedule. 1.008: 5No. surface fluorescent lights require upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Resuscitation - Offices: Surface fluorescent lights in acceptable order. Resuscitation - Offices: CAT II lights in acceptable order.

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

03 - Grilles & Diffusers

C

£150

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£450

0

0

2 2

4

2010

03 - Grilles & Diffusers

B

£0

18

0

0 0

0

2028

05 - Cooling Units

B

£0

8

0

0 0

0

2018

02 - Main Switchgear

C

£5,000

0

0

3 3

9

2010

1.M05: Combined switchgear and distribution board requires replacement.

02 - Main Switchgear

C

£5,000

0

0

3 3

9

2010

1.M01: Ottermill combined switchgear and distribution board requires replacement.

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

1.056: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading.

Location: 01 - First Floor K - Engineering - Vent & Air Con 1.002: Grill requires cleaning, but is in generally acceptable order. 1.089: 3No. Grilles require cleaning, but are in generally acceptable order. 1.082: Grilles/diffusers in acceptable order. 1.07: Daiken air conditioning unit in acceptable order.

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 1.017B: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.031: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.033C: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.034: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.035A: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.055: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.039: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.043: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.051: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.017A: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading.

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 1.055: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.042: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.063: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.061: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.06: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.062: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.066: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.067: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.072C: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.069: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading.

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£800

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 1.054: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.016A: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.037: 6No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.024: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.021: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.04: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.016D: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.044: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.016C: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.016B: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.025: Fluorescent light over visual display equipment is not suitable and requires upgrading.

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 1.026: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.027: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.03: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.079: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.045: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.019: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.046: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.044: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.S03: Surface fluorescent light requires replacement. 1.003: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.095: 4No. surface fluorescent lights require replacement. 1.023A: 6No. fluorescent lights over visual display equipment are not suitable and require upgrading.

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£800

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 1.018: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.029: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.028: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.074: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.078: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading.

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£800

0

0

2 2

4

2010

04 - Lighting Installation

C

£800

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£800

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

1.071: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.07: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.012A: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.072: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 1.075: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.C15: 14No. surface fluorescent lights require upgrading within the maintenance schedule. 1.S04: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 1.C14: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 1.094: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 1.005: Surface fluorescent light requires upgrading within the maintenance schedule. 1.C010: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 1.015: 12No. surface fluorescent lights require upgrading within the maintenance schedule. 1.007: Surface fluorescent light requires upgrading within the maintenance schedule. 1.C09: 7No. surface fluorescent lights require upgrading within the maintenance schedule. 1.C06: 3No. CAT II lights require upgrading within the maintenance schedule.

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£2,800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£2,400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 1.C04: 5No. CAT II lights require upgrading within the maintenance schedule. 1.053: CAT II light requires upgrading within the maintenance schedule. 1.C05: 19No. CAT II lights will require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£1,000

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£3,800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£2,200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

1.076: Surface fluorescent light requires upgrading within the maintenance schedule. 1.C07: 6No. CAT II lights require upgrading within the maintenance schedule. 1.C01: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 1.022: 7No. surface fluorescent lights require upgrading within the maintenance schedule. 1.C02: 11No. CAT II lights require upgrading within the maintenance schedule. 1.002: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 1.036: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 1.033: Surface fluorescent light requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£5,000

5

0

2 2

4

2015

08 - Comments

C

£100

0

0

2 2

4

2010

1.08: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 1.082: 25No. Surface fluorescent lights will require upgrading within the maintenance schedule. 1.M01: Tidy cables.

08 - Comments

C

£100

0

0

3 2

6

2010

1.M03: Replace trunking.

03 - Smoke Detectors

B(C)

£300

3

0

3 3

9

2013

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£600

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£300

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£300

4

0

3 3

9

2014

1.C15: 2No. smoke detectors require upgrading within the maintenance schedule. 1.08: Smoke detector requires upgrading within the maintenance schedule. 1.C01: Smoke detector requires upgrading within the maintenance schedule. 1.C02: 4No. smoke detectors require upgrading within the maintenance schedule. 1.076: Smoke detector requires upgrading within the maintenance schedule. 1.C04: 2No. smoke detectors require upgrading within the maintenance schedule. 1.C05: 2No. smoke detectors require upgrading within the maintenance schedule.

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

1.C07: 2No. smoke detectors require upgrading within the maintenance schedule. 1.C09: 2No. smoke detectors require upgrading within the maintenance schedule.

03 - Smoke Detectors

B(C)

£300

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£300

4

0

3 3

9

2014

03 - Grilles & Diffusers

C

£600

0

0

2 2

4

2010

05 - Cooling Units

C

£5,000

0

0

3 3

9

2010

C

£8,000

0

0

4 3 12

2010

2.M01: Ottermill control panel requires replacement.

02 - Main Switchgear

C

£2,000

0

0

3 3

9

2010

2.M11: Ottermill distribution board requires replacement.

02 - Main Switchgear

C

£5,000

0

0

3 3

9

2010

02 - Main Switchgear

C

£5,000

0

0

3 3

9

2010

2.M03: Combined switchgear and distribution board requires replacement. 2.M01: Combined switchgear and distribution board requires replacement.

Location: 02 - Second Floor K - Engineering - Vent & Air Con 2.118: 4No. Grilles require cleaning. 2.017: Sanyo A/C unit requires replacement.

P - Engineering - Main Plant 03 - Controls R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 2.M05: Combined switchgear and distribution board requires replacement. 2.C08: 11No. Fluorescent lights over visual display equipment are not suitable and require upgrading. 2.061: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.065: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.067: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.088: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.08: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.088A: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 2.036: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 2.04: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 2.041: 6No. fluorescent lights over visual display equipment are not suitable and require upgrading.

02 - Main Switchgear

C

£5,000

0

0

3 3

9

2010

04 - Lighting Installation

C

£2,200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£800

0

0

2 2

4

2010

04 - Lighting Installation

C

£800

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 2.05: 12No. Surface fluorescent lights over VDU equipment require replacing with suitable alternative. 2.C07: 15No. Fluorescent lights over visual display equipment are not suitable and require upgrading. 2.059: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.C10: 10No. Fluorescent lights over visual display equipment are not suitable and require upgrading. 2.071: 6No. fluorescent lights over visual display equipment are not suitable and require upgrading. 2.073: 6No. fluorescent lights over visual display equipment are not suitable and require upgrading. 2.009: 12No. Surface fluorescent lights over VDU equipment require replacing with suitable alternative. 2.096: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 2.081A: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 2.027c: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading.

04 - Lighting Installation

C

£2,400

0

0

2 2

4

2010

04 - Lighting Installation

C

£3,000

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£2,000

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

04 - Lighting Installation

C

£2,400

0

0

2 2

4

2010

04 - Lighting Installation

C

£800

0

0

2 2

4

2010

04 - Lighting Installation

C

£800

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 2.087: 8No. fluorescent lights over visual display equipment are not suitable and require upgrading. 2.C23: 7No. Fluorescent lights over visual display equipment are not suitable and require upgrading. 2.033: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 2.051A: 3No. fluorescent lights over visual display equipment are not suitable and require upgrading. 2.022: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.104: 2No. surface fluorescent lights require replacement. Merton Social Services: 6No. fluorescent lights over visual display equipment are not suitable and require upgrading. Rooms: 30, 31 & 32. 2.115: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. Rooms: 30, 31 & 32. 2.118: 8No. fluorescent lights over visual display equipment are not suitable and require upgrading. Rooms: 30, 31 & 32. 2.08: Fluorescent light over visual display equipment is not suitable and requires upgrading.

04 - Lighting Installation

C

£1,600

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£600

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

04 - Lighting Installation

C

£800

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,600

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 2.082: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.084: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.062: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.087: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.064: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.032: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.033: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.037: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.039: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.042: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.045: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.048: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.053A: Fluorescent light over visual display equipment is not suitable and requires upgrading.

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 2.053: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.058: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.046: Fluorescent light over visual display equipment is not suitable and requires upgrading. 2.S01: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 2.115: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 2.081A: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 2.075: Halogen downlights will require upgrading within the maintenance schedule. 2.C06: 2No. surface fluorescent lights require upgrading within the maintenance schedule. C.005: 13No. surface fluorescent lights require upgrading within the maintenance schedule. C.004: 8No. surface fluorescent lights require upgrading within the maintenance schedule. C.003: 13No. surface fluorescent lights require upgrading within the maintenance schedule. 2.088: Halogen downlights will require upgrading within the maintenance schedule.

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£300

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£2,600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£2,600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£150

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 2.C018: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 2.C17: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 2.111: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 2.C002: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 2.057: Surface fluorescent light requires upgrading within the maintenance schedule. 2.C021: Surface fluorescent light requires upgrading within the maintenance schedule. 2.C020: 7No. CAT II lights require upgrading within the maintenance schedule. 2.C009: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 2.M03: Light switch requires replacement.

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

06 - Sockets/Switches

C

£150

0

0

3 3

9

2010

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£450

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£300

5

0

3 3

9

2015

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

2.C021: Smoke detector requires upgrading within the maintenance schedule. C.005: 3No. smoke detectors require upgrading within the maintenance schedule. 2.C002: 2No. smoke detectors require upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

2.C23: 2No. smoke detectors require upgrading within the maintenance schedule. 2.115: Smoke detector requires upgrading within the maintenance schedule. 2.C08: Smoke detector requires upgrading within the maintenance schedule. 2.09: 2No. smoke detectors require upgrading within the maintenance schedule. 2.C17: Smoke detector requires upgrading within the maintenance schedule. 2.C020: 2No. smoke detectors require upgrading within the maintenance schedule. 2.C10: 2No. smoke detectors require upgrading within the maintenance schedule.

03 - Smoke Detectors

B(C)

£300

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£300

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£300

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£300

5

0

3 3

9

2015

B

£0

10

0

0 0

0

2020

3.C02: Pipework lagging in acceptable order.

B

£0

8

0

0 0

0

2018

Roof: Daiken VRV air con unit in acceptable order.

C

£5,000

0

0

4 3 12

2010

3.M01: Ottermill control panel requires replacement.

Location: 03 - Third Floor I - Engineering - Heating Systems 04 - Insulation K - Engineering - Vent & Air Con 05 - Cooling Units P - Engineering - Main Plant 03 - Controls

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Extract Fans

B

£0

7

0

0 0

0

2017

3.M01: AHU extract fans in acceptable order.

04 - Extract Fans

B

£0

7

0

0 0

0

2017

05 - AHUs

B

£0

10

0

0 0

0

2020

3.M03: Extract fans to WC in acceptable order. Lightwell: AHU in lightwell in acceptable order.

05 - AHUs

B

£0

10

0

0 0

0

2020

09 - Comments

N/A

£0

0

0

0 0

0

2010

B(C)

£400

2

0

2 2

4

2012

3.S01: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

B

£0

15

0

0 0

0

2025

All radiators where fitted are in acceptable order with low surface temperature covers.

B(C)

£500,000

4

3 3

9

2014

Although lifts were deemed to be in acceptable condition an allowance should be made for refurbishment works during the maintenance schedule.

Lightwell: Lennox AHU for Lecture Theatre F in acceptable order. 3.M03: No access to Lift Motor Room.

R - Engineering - Electrical 04 - Lighting Installation

Location: Whole Block I - Engineering - Heating Systems 01 - Heat Emitters

N - Engineering - Lifts 01 - Lifts

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. Block Total

Generic Hospital Physical Condition Survey

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£1,935,550.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Rheumatology: Redecoration required as part of a regular maintenance schedule. Rheumatology: Suspended ceiling. Rheumatology: Carpet will require replacing to circulation areas within the maintenance schedule. Rheumatology: Carpet to offices. Rheumatology: Linoleum to clinic rooms. Rheumatology: Clinical units. Rheumatology: Wash hand basin to clinic rooms. Rheumatology: Accessible WC.

Site : Generic Hospital - STG Block : Hotung Centre - HOT Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

C

£5,200

0

0

2 2

4

2010

02 - Ceiling

B

£0

20

0

0 0

0

2030

03 - Floor

B(C)

£3,680

5

0

2 3

6

2015

03 - Floor 03 - Floor

B B

£0 £0

6 10

0 0

0 0 0 0

0 0

2016 2020

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

15 15

0 0

0 0 0 0

0 0

2025 2025

08 - Fixed Units

B

£0

20

0

0 0

0

2030

B B

£0 £0

6 20

0 0

0 0 0 0

0 0

2016 2030

Major Plant: Carpet. Major Plant: Exposed steel frame in good decorative order.

B

£0

20

0

0 0

0

2030

Rheumatology: High performance membrane.

Location: 01 - First Floor C - Building - Internal Fabric 03 - Floor 12 - Comments

Location: Roof 01 D - Building - Roof 02a - Flat - Covering

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Rheumatology: Galvanised steel decking in good condition. Rheumatology: High performance membrane. Rheumatology: Aluminium. Rheumatology: Aluminium.

02b - Flat - Decking

B

£0

20

0

0 0

0

2030

02c - Flat - Flashing

B

£0

20

0

0 0

0

2030

02g - Flat - Guttering 02h - Flat - Down Rainwater Pipes

B B

£0 £0

15 15

0 0

0 0 0 0

0 0

2025 2025

01 - General Structure

B

£0

15

0

0 0

0

2025

01 - General Structure

B

£0

50

0

0 0

0

2060

06 - Comments

N/A

£0

0

0

0 0

0

2010

04 - Windows

B

£0

30

0

0 0

0

2040

06 - Doors

B

£0

20

0

0 0

0

2030

B

£0

8

0

0 0

0

2018

Remedial Action

Location: Whole Block A - Building - Physical Structure Rheumatology: Brick to ground floor section. Rheumatology: Aluminium glazed pyramid to steel frame. Rheumatology: Note: Ladder fixing points provided.

B - Building - External Fabric Rheumatology: Aluminium windows. Rheumatology: Aluminium entrance and exit doors.

Facet: 2 - Engineering Location: 00 - Ground Floor K - Engineering - Vent & Air Con 05 - Cooling Units

0.005: Daikin air conditioning in acceptable order.

P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 03 - Controls

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

9

0

0 0

0

2019

0.M01: VRV and fresh air control panel in acceptable order.

03 - Distribution Boards

C

£60

0

0

2 2

4

2010

0.M02: Replace trunking lids over distribution boards.

03 - Distribution Boards

B

£0

18

0

0 0

0

2028

0.M02: 4No. MEM distribution board in acceptable order.

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

0.003: Surface fluorescent light requires upgrading within the maintenance schedule. 0.004: Surface fluorescent light requires upgrading within the maintenance schedule. 0.001: Track display lighting in acceptable lighting.

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

0.005: CAT II lights in acceptable order.

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

0.001: Surface fluorescent lights in acceptable order. 0.005: Surface fluorescent lights in acceptable order.

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

20

0

0 0

0

2030

05 - Emergency Lighting

B

£0

12

0

0 0

0

2022

08 - Comments

N/A

£0

0

0

0 0

0

2010

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

05 - Fire Main/Zone Panel

B

£0

12

0

0 0

0

2022

0.M02: Surface fluorescent lights in acceptable order. 0.M02: 4No. MEM main isolators in acceptable order.

0.M02: Emergency lights in acceptable order. 0.M01: Server cupboard.

V - Engineering - Fire Alarms 0.005: Smoke detectors in acceptable order. 0.M02: Fire alarm main panel in acceptable order.

Location: 01 - First Floor R - Engineering - Electrical Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

Block Total

Generic Hospital Physical Condition Survey

Cost to B Rem Life Priority C L

B

£0

8

0

0 0

R

Year

Notes

Remedial Action

0

2018

1.001: CAT II lights in acceptable order.

£9,340.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Redecoration required within 5 year maintenance schedule Located to 0.001, 0.002, 0.003, 0.004, 0.005, 0.006, 0.009 and 0.010. Redecoration required within 5 year maintenance schedule. Plasterboard: Replace water damaged plasterwork - Located to 0.010. Suspended: Remove tiles and replace with new (Localised replacement) - Located to 0.001, 0.016 and 0.013. Suspended. Plasterboard. Vinyl: Need to replace vinyl tile flooring - Located to 0.009. Carpet: Need to replace contract quality carpet - Located to 0.001, 0.002, 0.003, 0.004, 0.006, 0.C01, 0.C03 and 0.C04. Carpet: Need to replace contract quality carpet - Located to 0.016 and 0.019. Vinyl: Need to replace slip resistant vinyl flooring - Located to 0.018 and 0.C07. Vinyl sheet.

Site : Generic Hospital - STG Block : Ingelby House - IGH Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

C

£2,400

0

0

2 2

4

2010

01 - Decorations

B(C)

£7,000

2

0

2 2

4

2012

02 - Ceiling

C

£500

0

0

2 2

4

2010

02 - Ceiling

C

£750

0

0

2 2

4

2010

02 - Ceiling 02 - Ceiling 03 - Floor

B B C

£0 £0 £500

10 20 0

0 0 0

0 0 0 0 2 3

0 0 6

2020 2030 2010

03 - Floor

B(C)

£4,800

1

0

2 3

6

2011

03 - Floor

B(C)

£2,400

3

0

2 3

6

2013

03 - Floor

B(C)

£1,150

5

0

2 3

6

2015

03 - Floor

B

£0

7

0

0 0

0

2017

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Slip resistant vinyl sheet. Brickwork (plastered): Replace water damaged plasterwork Located to 0.C06. Brickwork (plastered): Replace missing and damage plasterwork - Located to 0.C07.

03 - Floor 05 - Condition of internal walls

B C

£0 £400

7 0

0 0

0 0 2 3

0 6

2017 2010

05 - Condition of internal walls

C

£500

0

0

2 3

6

2010

05 - Condition of internal walls 05 - Condition of internal walls

B B

£0 £0

10 20

0 0

0 0 0 0

0 0

2020 2030

05 - Condition of internal walls 08 - Fixed Units

B B(C)

£0 £800

20 5

0 0

0 0 3 3

0 9

2030 2015

08 - Fixed Units

B(C)

£700

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£2,000

5

0

3 3

9

2015

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

7 7

0 0

0 0 0 0

0 0

2017 2017

08 - Fixed Units

B

£0

10

0

0 0

0

2020

01 - Decorations

C

£1,000

0

0

2 2

4

2010

01 - Decorations

B(C)

£8,400

2

0

2 2

4

2012

Remedial Action

Timber panelling. Fairfaced brickwork: Painted (brickwork). Brickwork (plastered). Sanitary fittings: Replace ceramic WC due to age and condition, 1No. Sanitary fittings: Replace ceramic sink due to age and condition, 1No. Kitchen facilities: : Replace with new due to age and condition, 0.005. Sanitary fittings: Ceramic WC. Sanitary fittings: Ceramic wash hand basin. Sanitary fittings: Belfast sink.

Location: 01 - First Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

Redecoration required within 5 year maintenance schedule Located to 1.011, 1.033, 1.021 ceiling and 1.0C1 ceiling. Redecoration required within 5 year maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Plasterboard: Replace water damaged plasterboard with new - Located to 1.030. Plasterboard. Suspended. Plasterboard. Carpet: Need to replace contract quality carpet - Located to 1.004, 1.005, 1.006. Carpet: Need to replace contract quality carpet - Located to 1.024, 1.007, 1.008, 1.022, 1.026, 1.025, 1.027. Carpet: Need to replace contract quality carpet - Located to 1.002 and 1.001. Vinyl: Need to replace vinyl sheet flooring - Located to circulation routes. Vinyl sheet. Vinyl: Slip resistant vinyl sheet. Brickwork (plastered): Make good water damaged plasterwork - Located to 1.033 and 1.030. Brickwork (plastered). Clinical units: Replace with new due to age and condition. Kitchen facilities: Replace kitchen units due to age and condition - Located to 1.029. Sanitary fittings: Replace ceramic WC due to age and condition 4No. Sanitary fittings: Replace ceramic sink due to age and condition 4No.

02 - Ceiling

C

£300

0

0

2 2

4

2010

02 - Ceiling 02 - Ceiling 02 - Ceiling 03 - Floor

B B B B(C)

£0 £0 £0 £1,800

10 15 20 1

0 0 0 0

0 0 0 2

0 0 0 3

0 0 0 6

2020 2025 2030 2011

03 - Floor

B(C)

£3,500

2

0

2 3

6

2012

03 - Floor

B(C)

£1,200

3

0

2 3

6

2013

03 - Floor

B(C)

£2,800

5

0

2 3

6

2015

03 - Floor 03 - Floor 05 - Condition of internal walls

B B C

£0 £0 £600

7 10 0

0 0 0

0 0 0 0 2 3

0 0 6

2017 2020 2010

05 - Condition of internal walls 08 - Fixed Units

B C

£0 £2,000

20 0

0 0

0 0 3 3

0 9

2030 2010

08 - Fixed Units

B(C)

£2,000

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£3,200

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£2,800

5

0

3 3

9

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Sanitary fittings: Replace and upgrade plastic bath (due to turnover of clients and more than normal usage) 4No. Kitchen facilities. Sanitary fittings: Belfast sink.

08 - Fixed Units

B(C)

£4,000

5

0

3 3

9

2015

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

7 10

0 0

0 0 0 0

0 0

2017 2020

01 - Decorations

B(C)

£9,300

3

0

2 2

4

2013

02 - Ceiling

C

£600

0

0

2 2

4

2010

02 - Ceiling 02 - Ceiling 02 - Ceiling 03 - Floor

B B B C

£0 £0 £0 £700

10 20 20 0

0 0 0 0

0 0 0 2

0 0 0 3

0 0 0 6

2020 2030 2030 2010

03 - Floor

B(C)

£2,600

3

0

2 3

6

2013

03 - Floor

B(C)

£800

5

0

2 3

6

2015

03 - Floor 05 - Condition of internal walls 05 - Condition of internal walls 08 - Fixed Units

B B B B(C)

£0 £0 £0 £10,000

7 10 20 1

0 0 0 0

0 0 0 3

0 0 0 3

0 0 0 9

2017 2020 2030 2011

08 - Fixed Units

B(C)

£2,000

1

0

3 3

9

2011

08 - Fixed Units

B

£0

7

0

0 0

0

2017

Remedial Action

Location: 02 - Second Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

Redecoration required within 5 year maintenance schedule. Suspended: Remove tiles and replace with new (10% to each room) to 2.000, 2.017, 2.011. Suspended. Suspended. Plasterboard. Carpet: Need to replace contract quality carpet - Located to 2.001. Carpet: Need to replace contract quality carpet - Located to circulation routes. Vinyl: Need to replace vinyl sheet flooring - Located to 2.002. Vinyl. Ceramic tiling. Brickwork (plastered). Clinical units: Replace clinical units due to age and condition Located to 2.017, 2.020, 2.021 & 2.031. Kitchen facilities: : Replace with new due to age and condition, 2.010. Sanitary fittings: Ceramic WC. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

7

0

0 0

0

2017

Sanitary fittings: Ceramic wash hand basin.

01 - Decorations

C

£9,300

0

0

2 2

4

2010

02 - Ceiling

C

£500

0

0

2 2

4

2010

02 - Ceiling 03 - Floor

B C

£0 £6,050

10 0

0 0

0 0 2 3

0 6

2020 2010

03 - Floor

B(C)

£1,350

1

0

2 3

6

2011

03 - Floor

B(C)

£6,750

3

0

2 3

6

2013

05 - Condition of internal walls

C

£400

0

0

2 3

6

2010

05 - Condition of internal walls 08 - Fixed Units

B B(C)

£0 £2,000

20 1

0 0

0 0 3 3

0 9

2030 2011

08 - Fixed Units

B(C)

£2,800

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£3,200

5

0

3 3

9

2015

Redecoration required within 5 year maintenance schedule. Suspended: Remove tiles and replace with new (10% of floor area). Suspended. Carpet: Need to replace contract quality carpet - Located to 3.010, 3.016, 3.017, 3.023, 3.022, 3.003, 3.004, 3.005, 3.006 and 3.007. Carpet: Need to replace contract quality carpet - Located to 3.009 and 3.019. Vinyl: Need to replace vinyl sheet flooring - Located to circulation routes, 3.002, 3.012, 3.014, 3.025 and 3.001. Brickwork (plastered): Make good water damaged plasterwork - Located to 3.012. Brickwork (plastered). Kitchen facilities: Replace kitchen units due to age and condition - Located to 3.011. Sanitary fittings: Replace ceramic sink due to age and condition, 4No. Sanitary fittings: Replace ceramic WC due to age and condition, 4No.

Location: 03 - Third Floor C - Building - Internal Fabric

Location: 04 - Fourth Floor Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Redecoration required within 5 year maintenance schedule. Suspended. Plasterboard. Carpet: Need to replace contract quality carpet - Located to flats circulation routes and bedrooms. Vinyl: Need to replace vinyl sheet flooring - Located to common circulation routes. Slip resistant vinyl sheet. Brickwork (plastered): Make good water plasterwork Located to 4.16 and 4.C09. Ceramic tiling. Brickwork (plastered). Kitchen facilities: Replace kitchen units due to age and condition - Located to all flats. Sanitary fittings: Sink unit Replace due to age and condition 4No. Sanitary fittings: Replace and upgrade plastic bath (due to turnover of clients and more than normal usage) 4No. Sanitary fittings: Low level cistern, Replace 8No. Sanitary fittings: Ceramic WC. Sanitary fittings: Ceramic sink. Sanitary fittings: Belfast sink.

C - Building - Internal Fabric 01 - Decorations

B(C)

£9,300

1

0

2 2

4

2011

02 - Ceiling 02 - Ceiling 03 - Floor

B B B(C)

£0 £0 £12,100

10 20 1

0 0 0

0 0 0 0 2 3

0 0 6

2020 2030 2011

03 - Floor

B(C)

£1,400

5

0

2 3

6

2015

03 - Floor 05 - Condition of internal walls

B C

£0 £600

7 0

0 0

0 0 2 3

0 6

2017 2010

05 - Condition of internal walls 05 - Condition of internal walls 08 - Fixed Units

B B B(C)

£0 £0 £28,000

7 20 3

0 0 0

0 0 0 0 3 3

0 0 9

2017 2030 2013

08 - Fixed Units

B(C)

£2,000

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£4,000

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£1,400

5

0

3 3

9

2015

08 - Fixed Units 08 - Fixed Units 08 - Fixed Units

B B B

£0 £0 £0

7 7 10

0 0 0

0 0 0 0 0 0

0 0 0

2017 2017 2020

Location: 05 - Fifth Floor C - Building - Internal Fabric Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Redecoration required within 5 year maintenance schedule Located to common circulation routes, flat 20 and flat 17. Redecoration required within 5 year maintenance schedule. Suspended: Remove tiles and replace with new (5% of floor area). Suspended. Plasterboard. Carpet: Need to replace contract quality carpet flats Located to circulation routes to flat 20. Carpet: Need to replace contract quality carpet - Located to bedrooms. Vinyl: Need to replace vinyl sheet flooring - Located to common circulation routes, flats kitchens and flat toilets. Vinyl: Need to replace slip resistant vinyl flooring - Located to 5.20-26. Slip resistant vinyl sheet. Ceramic tiling. Brickwork (plastered). Kitchen facilities: Replace kitchen units due to age and condition - Located to all flats. Sanitary fittings: Replace ceramic sink due to age and condition 4No. Sanitary fittings: Replace Low level cistern due to age and condition 4No.

01 - Decorations

C

£4,700

0

0

2 2

4

2010

01 - Decorations

B(C)

£4,700

2

0

2 2

4

2012

02 - Ceiling

C

£500

0

0

2 2

4

2010

02 - Ceiling 02 - Ceiling 03 - Floor

B B C

£0 £0 £750

10 20 0

0 0 0

0 0 0 0 2 3

0 0 6

2020 2030 2010

03 - Floor

B(C)

£9,300

2

0

2 3

6

2012

03 - Floor

B(C)

£4,500

3

0

2 3

6

2013

03 - Floor

B(C)

£800

5

0

2 3

6

2015

03 - Floor 05 - Condition of internal walls 05 - Condition of internal walls 08 - Fixed Units

B B B C

£0 £0 £0 £9,000

7 7 20 0

0 0 0 0

0 0 0 3

0 0 0 3

0 0 0 9

2017 2017 2030 2010

08 - Fixed Units

B(C)

£2,800

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£700

1

0

3 3

9

2011

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Sanitary fittings: Replace Sink unit due to age and condition 4No. Kitchen facilities: Replace kitchen units due to age and condition - Located to all flats. Sanitary fittings: Replace and upgrade plastic bath (due to turnover of clients and more than normal usage) 4No. Sanitary fittings: Ceramic WC. Sanitary fittings: Belfast sink.

08 - Fixed Units

B(C)

£3,000

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£3,000

3

0

3 3

9

2013

08 - Fixed Units

B(C)

£4,000

5

0

3 3

9

2015

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

7 10

0 0

0 0 0 0

0 0

2017 2020

01 - Decorations

B(C)

£9,300

3

0

2 2

4

2013

02 - Ceiling

C

£400

0

0

2 2

4

2010

02 - Ceiling

C

£600

0

0

2 2

4

2010

02 - Ceiling 02 - Ceiling 03 - Floor

B B B(C)

£0 £0 £1,850

7 20 1

0 0 0

0 0 0 0 2 3

0 0 6

2017 2030 2011

03 - Floor

B(C)

£7,400

3

0

2 3

6

2013

03 - Floor

B(C)

£2,900

5

0

2 3

6

2015

03 - Floor 03 - Floor

B B

£0 £0

7 7

0 0

0 0 0 0

0 0

2017 2017

Remedial Action

Location: 06 - Sixth Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

Redecoration required within 5 year maintenance schedule. Plasterboard: Make good plasterboard water damaged plasterwork - Located to 6.2203. Suspended: Replace with new (5% of floor area). Suspended. Plasterboard. Carpet: Need to replace contract quality carpet - Located to 20% of bedrooms. Carpet: Need to replace contract quality carpet - Located to 80% of bedrooms. Carpet: Need to replace contract quality carpet - Located to circulation routes. Quarry tiles. Vinyl.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Brickwork (plastered): Make good minor cracking and blown plaster to plasterwork - Located to 6.24-27. Brickwork (plastered): Make good impact damaged plasterwork - Located to 6.2203. Demountable: Timber panel. Ceramic tiling. Brickwork (plastered). Kitchen facilities: Replace kitchen units due to age and condition - Located to all flats. Sanitary fittings: Replace Low level cistern due to age and condition 6No. Sanitary fittings: Replace and upgrade plastic bath (due to turnover of clients and more than normal usage) 4No. Sanitary fittings: Ceramic wash hand basin. Sanitary fittings: Ceramic WC. Sanitary fittings: Belfast sink.

05 - Condition of internal walls

C

£500

0

0

2 3

6

2010

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls 05 - Condition of internal walls 05 - Condition of internal walls 08 - Fixed Units

B B B C

£0 £0 £0 £5,000

7 7 20 0

0 0 0 0

0 0 0 3

0 0 0 3

0 0 0 9

2017 2017 2030 2010

08 - Fixed Units

B(C)

£1,050

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£4,000

5

0

3 3

9

2015

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

7 10

0 0

0 0 0 0

0 0

2017 2020

01 - Decorations

B(C)

£9,300

2

0

2 2

4

2012

02 - Ceiling

C

£400

0

0

2 2

4

2010

02 - Ceiling

C

£500

0

0

2 2

4

2010

02 - Ceiling

B

£0

10

0

0 0

0

2020

Remedial Action

Location: 07 - Seventh Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

Redecoration required within 5 year maintenance schedule. Plasterboard: Make good water damaged plasterboard Located to 7.28-25. Suspended: Remove tiles and replace with new (5% of floor area). Suspended. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Plasterboard. Carpet: Need to replace contract quality carpet - Located to flat circulation routes and bedrooms. Vinyl: Need to replace vinyl sheet flooring - Located to common circulation routes. Slip resistant vinyl sheet. Vinyl sheet. Brickwork (plastered): Make good water damaged plasterwork - Located to 7.2603 and 7.25-18. Timber panel: Replace with new - Located to 7.26-04.

02 - Ceiling 03 - Floor

B B(C)

£0 £12,100

20 2

0 0

0 0 2 3

0 6

2030 2012

03 - Floor

B(C)

£1,400

5

0

2 3

6

2015

03 - Floor 03 - Floor 05 - Condition of internal walls

B B C

£0 £0 £600

7 7 0

0 0 0

0 0 0 0 2 3

0 0 6

2017 2017 2010

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls 05 - Condition of internal walls 08 - Fixed Units

B B C

£0 £0 £12,000

7 20 0

0 0 0

0 0 0 0 3 3

0 0 9

2017 2030 2010

08 - Fixed Units

B(C)

£1,000

5

0

3 3

9

2015

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

7 7

0 0

0 0 0 0

0 0

2017 2017

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

7 10

0 0

0 0 0 0

0 0

2017 2020

Remedial Action

Ceramic tiling. Brickwork (plastered). Kitchen facilities: Replace kitchen units due to age and condition - Located to all flats. Sanitary fittings: Replace and upgrade plastic bath (due to turnover of clients and more than normal usage) 4No. Sanitary fittings: Ceramic sink. Sanitary fittings: Ceramic wash hand basin. Sanitary fittings: Ceramic WC. Sanitary fittings: Belfast sink.

Location: 08 - Eighth Floor Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Redecoration required within 5 year maintenance schedule. Suspended: Remove tiles and replace with new (Localised replacement to flats). Suspended. Plasterboard. Carpet: Need to replace contract quality carpet - Located to flat circulation routes and bedrooms. Vinyl: Need to replace vinyl sheet flooring - Located to common circulation routes. Quarry tiles. Slip resistant vinyl sheet. Ceramic tiling. Timber panel. Brickwork (plastered). Sanitary fittings: Replace low level cistern to WCs due to age and condition 3No. Sanitary fittings: Replace ceramic sink due to age and condition, 3No. Kitchen facilities: Replace kitchen units due to age and condition - Located to all flats. Sanitary fittings: Replace and upgrade plastic bath (due to turnover of clients and more than normal usage) 4No. Sanitary fittings: Ceramic WC. Sanitary fittings: Ceramic sink. Sanitary fittings: Ceramic wash hand basin.

C - Building - Internal Fabric 01 - Decorations

B(C)

£9,300

3

0

2 2

4

2013

02 - Ceiling

C

£500

0

0

2 2

4

2010

02 - Ceiling 02 - Ceiling 03 - Floor

B B B(C)

£0 £0 £12,100

10 20 1

0 0 0

0 0 0 0 2 3

0 0 6

2020 2030 2011

03 - Floor

B(C)

£1,400

5

0

2 3

6

2015

03 - Floor 03 - Floor 05 - Condition of internal walls 05 - Condition of internal walls 05 - Condition of internal walls 08 - Fixed Units

B B B B B B(C)

£0 £0 £0 £0 £0 £2,400

7 7 7 10 20 1

0 0 0 0 0 0

0 0 0 0 0 3

0 0 0 0 0 3

0 0 0 0 0 9

2017 2017 2017 2020 2030 2011

08 - Fixed Units

B(C)

£2,100

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£8,000

2

0

3 3

9

2012

08 - Fixed Units

B(C)

£4,000

5

0

3 3

9

2015

08 - Fixed Units 08 - Fixed Units 08 - Fixed Units

B B B

£0 £0 £0

7 7 7

0 0 0

0 0 0 0 0 0

0 0 0

2017 2017 2017

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2020

Sanitary fittings: Belfast sink.

01 - Decorations

C

£500

0

0

2 2

4

2010

01 - Decorations

B(C)

£9,000

2

0

2 2

4

2012

02 - Ceiling 02 - Ceiling 03 - Floor

B B B(C)

£0 £0 £12,100

10 20 1

0 0 0

0 0 0 0 2 3

0 0 6

2020 2030 2011

03 - Floor

B(C)

£1,400

5

0

2 3

6

2015

B B B B

£0 £0 £0 £0

7 7 20 20

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2017 2017 2030 2030

08 - Fixed Units

B(C)

£4,000

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£24,000

5

0

3 3

9

2015

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

7 7

0 0

0 0 0 0

0 0

2017 2017

08 - Fixed Units

B

£0

10

0

0 0

0

2020

Redecoration required within 5 year maintenance schedule Located to flat 36 circulation routes. Redecoration required within 5 year maintenance schedule. Suspended. Plasterboard. Carpet: Need to replace contract quality carpet - Located to flats circulation routes and bedrooms. Vinyl: Need to replace vinyl sheet flooring - Located to common circulation routes. Slip resistant vinyl sheet. Ceramic tiling. Brickwork (plastered). Fairfaced brickwork: Painted (brickwork). Sanitary fittings: Replace and upgrade plastic bath (due to turnover of clients and more than normal usage) 4No. Kitchen facilities: Replace kitchen units due to age and condition - Located to all flats. Sanitary fittings: Ceramic WC. Sanitary fittings: Ceramic wash hand basin. Sanitary fittings: Belfast sink.

Location: 09 - Ninth Floor C - Building - Internal Fabric

03 - Floor 05 - Condition of internal walls 05 - Condition of internal walls 05 - Condition of internal walls

Location: 10 - Tenth Floor Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Redecoration required within 5 year maintenance schedule. Suspended: Remove tiles and replace with new (5% of floor area). Suspended. Plasterboard. Carpet: Need to replace contract quality carpet - Located to flat circulation routes and bedrooms. Vinyl: Need to replace vinyl sheet flooring - Located to common area circulation routes. Vinyl: Slip resistant vinyl sheet. Ceramic tiling: Remove and replace damaged tiling 3No. Located to 10.40-26. Brickwork (plastered): Brush off efflorescence - Located to 10.39-29. Ceramic tiling. Brickwork (plastered). Sanitary fittings: Replace and upgrade plastic bath (due to turnover of clients and more than normal usage) 4No. Kitchen facilities: Replace kitchen units due to age and condition - Located to all flats. Sanitary fittings: Ceramic WC. Sanitary fittings: Sink unit. Sanitary fittings: Ceramic wash hand basin. Sanitary fittings: Belfast sink.

C - Building - Internal Fabric 01 - Decorations

B(C)

£9,300

3

0

2 2

4

2013

02 - Ceiling

C

£1,250

0

0

2 2

4

2010

02 - Ceiling 02 - Ceiling 03 - Floor

B B B(C)

£0 £0 £11,520

10 20 3

0 0 0

0 0 0 0 2 3

0 0 6

2020 2030 2013

03 - Floor

B(C)

£1,150

5

0

2 3

6

2015

03 - Floor 05 - Condition of internal walls

B C

£0 £300

7 0

0 0

0 0 2 3

0 6

2017 2010

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls 05 - Condition of internal walls 08 - Fixed Units

B B B(C)

£0 £0 £4,000

7 20 5

0 0 0

0 0 0 0 3 3

0 0 9

2017 2030 2015

08 - Fixed Units

B(C)

£24,000

5

0

3 3

9

2015

08 - Fixed Units 08 - Fixed Units 08 - Fixed Units

B B B

£0 £0 £0

7 7 7

0 0 0

0 0 0 0 0 0

0 0 0

2017 2017 2017

08 - Fixed Units

B

£0

10

0

0 0

0

2020

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Redecoration required within 5 year maintenance schedule. Suspended: Replace with new (localised replacement). Suspended. Plasterboard. Carpet: Need to replace contract quality carpet - Located to bedrooms. Vinyl: Need to replace slip resistant vinyl flooring - Located to 11.43-30. Vinyl: Need to replace vinyl sheet flooring - Located to common area circulation routes and flat circulation routes. Ceramic tiling. Brickwork (plastered). Kitchen facilities: Replace kitchen units due to age and condition - Located to all flats. Sanitary fittings: Replace Ceramic sink due to age and condition 4No. Sanitary fittings: Replace and upgrade plastic bath (due to turnover of clients and more than normal usage) 4No. Sanitary fittings: Ceramic wash hand basin in acceptable condition. Sanitary fittings: Ceramic WC in acceptable condition. Sanitary fittings: Belfast sink.

Location: 11 - Eleventh Floor C - Building - Internal Fabric 01 - Decorations

B(C)

£9,300

1

0

2 2

4

2011

02 - Ceiling

C

£500

0

0

2 2

4

2010

02 - Ceiling 02 - Ceiling 03 - Floor

B B C

£0 £0 £8,000

10 20 0

0 0 0

0 0 0 0 2 3

0 0 6

2020 2030 2010

03 - Floor

B(C)

£400

5

0

2 3

6

2015

03 - Floor

B(C)

£3,400

5

0

2 3

6

2015

05 - Condition of internal walls 05 - Condition of internal walls 08 - Fixed Units

B B C

£0 £0 £12,000

7 20 0

0 0 0

0 0 0 0 3 3

0 0 9

2017 2030 2010

08 - Fixed Units

B(C)

£2,800

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£4,000

5

0

3 3

9

2015

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2020

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Redecoration required within 5 year maintenance schedule (20% of floor). Redecoration required within 5 year maintenance schedule (80% of floor). Plasterboard. Vinyl: Refix vinyl skirting with adhesive - Located to 12.47-30 and 12.46-04. Carpet: Need to replace contract quality carpet - Located to flats circulation routes and bedrooms. Vinyl: Need to replace vinyl sheet flooring common circulation routes. Slip resistant vinyl sheet. Ceramic tiling. Fairfaced brickwork: Painted (brickwork). Kitchen facilities: Replace kitchen units due to age and condition - Located to all flats. Sanitary fittings: Replace and upgrade plastic bath (due to turnover of clients and more than normal usage) 4No. Sanitary fittings: Ceramic WC in acceptable condition. Sanitary fittings: Ceramic wash hand basin in acceptable condition.

Location: 12 - Twelfth Floor C - Building - Internal Fabric 01 - Decorations

C

£1,900

0

0

2 2

4

2010

01 - Decorations

B(C)

£7,450

1

0

2 2

4

2011

02 - Ceiling 03 - Floor

B C

£0 £250

20 0

0 0

0 0 2 3

0 6

2030 2010

03 - Floor

B(C)

£11,520

1

0

2 3

6

2011

03 - Floor

B(C)

£1,120

5

0

2 3

6

2015

03 - Floor 05 - Condition of internal walls 05 - Condition of internal walls

B B B

£0 £0 £0

7 7 20

0 0 0

0 0 0 0 0 0

0 0 0

2017 2017 2030

08 - Fixed Units

C

£12,000

0

0

3 3

9

2010

08 - Fixed Units

B(C)

£4,000

5

0

3 3

9

2015

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

Location: 13 - Thirteenth Floor Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Redecoration required within 5 year maintenance schedule. Plasterboard: Make good water damaged plasterwork - Located to 13.50-05 and 13.49-15. Suspended: Remove tiles and replace with new (Localised replacement). Suspended. Plasterboard. Carpet: Need to replace contract quality carpet - Located to flat circulation routes and bedrooms. Vinyl: Need to replace vinyl sheet flooring - Located to common area circulation routes. Slip resistant vinyl sheet. Brickwork (plastered): Make good water damaged plasterwork - Located to 13.5130. Ceramic tiling. Fairfaced brickwork: Painted (brickwork). Brickwork (plastered). Kitchen facilities: Replace kitchen units due to age and condition - Located to all flats. Sanitary fittings: Low level cistern Replace 1No. Sanitary fittings: Replace ceramic sink due to age and condition 4No.

C - Building - Internal Fabric 01 - Decorations

B(C)

£9,300

3

0

2 2

4

2013

02 - Ceiling

C

£600

0

0

2 2

4

2010

02 - Ceiling

C

£600

0

0

2 2

4

2010

02 - Ceiling 02 - Ceiling 03 - Floor

B B B(C)

£0 £0 £11,520

10 20 1

0 0 0

0 0 0 0 2 3

0 0 6

2020 2030 2011

03 - Floor

B(C)

£1,120

5

0

2 3

6

2015

03 - Floor 05 - Condition of internal walls

B C

£0 £300

7 0

0 0

0 0 2 3

0 6

2017 2010

05 - Condition of internal walls 05 - Condition of internal walls

B B

£0 £0

7 20

0 0

0 0 0 0

0 0

2017 2030

05 - Condition of internal walls 08 - Fixed Units

B C

£0 £12,000

20 0

0 0

0 0 3 3

0 9

2030 2010

08 - Fixed Units

B(C)

£250

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£2,800

4

0

3 3

9

2014

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Sanitary fittings: Replace and upgrade plastic bath (due to turnover of clients and more than normal usage) 4No. Sanitary fittings: Ceramic wash hand basin in acceptable condition. Sanitary fittings: Ceramic WC in acceptable condition. Sanitary fittings: Belfast sink.

08 - Fixed Units

B(C)

£4,000

5

0

3 3

9

2015

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2020

B B B B B B

£0 £0 £0 £0 £0 £0

6 20 10 10 6 10

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

2016 2030 2020 2020 2016 2020

Asphalt. Woodwool. Aluminium. Brickwork. Integrated. Internal (assumed condition, due to no access).

02a - Flat - Covering

C

£21,000

0

0

4 4 16

2010

Asphalt: Asphalt roof covering requires renewal inclusive of making good the decking.

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering

B B B B

£0 £0 £0 £0

10 10 10 6

0 0 0 0

0 0 0 0

2020 2020 2020 2016

Woodwool. Aluminium. Brickwork. Integrated (replace with covering).

Location: Roof 01 D - Building - Roof 02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

0 0 0 0 0 0

Location: Roof 02 D - Building - Roof

Generic Hospital Physical Condition Survey

0 0 0 0

0 0 0 0

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02h - Flat - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2020

Internal (assumed condition, due to no access).

02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B B B

£0 £0 £0 £0 £0 £0

6 10 10 10 6 10

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

2016 2020 2020 2020 2016 2020

02j - Flat - Comments

N/A

£0

0

0

4 4 16

2010

Asphalt. Woodwool. Aluminium. Brickwork. Integrated. Internal (assumed condition, due to no access). No safe access, therefore assumed condition.

01 - General Structure

B

£0

50

0

0 0

0

2060

Brickwork: Generally sound.

02 - Foundations 03 - Ground Stability 04 - Chimneys

B B B

£0 £0 £0

50 50 20

0 0 0

0 0 0 0 0 0

0 0 0

2060 2060 2030

Generally sound. Generally sound. Steel flue.

B B B B B

£0 £0 £0 £0 £0

50 50 50 50 20

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2060 2060 2060 2060 2030

Brickwork. Brickwork. Brickwork. Brickwork. DPC.

Location: Roof 03 D - Building - Roof 0 0 0 0 0 0

Location: Whole Block A - Building - Physical Structure

B - Building - External Fabric 01a - Masonry - Cracking 01b - Masonry - Spalling 01c - Masonry - Pointing 01d - Masonry - Finish 03 - DPC

Generic Hospital Physical Condition Survey

0 0 0 0 0

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

04 - Windows

B(C)

£1,600,000

4

04 - Windows 06 - Doors

B C

£0 £350

06 - Doors

B

Remedial Action

0

4 3 12

2014

20 0

0 0

0 0 3 3

0 9

2030 2010

Aluminium - Single: Replace with new, windows approaching the end of expected life, damaged handles and offer poor insulation properties. Aluminium - Double. Softwood timber: Redecorate and make good 2No. to roof.

£0

10

0

0 0

0

2020

Aluminium.

B(C)

£105,000

4

0

3 3

9

2014

Lifts requires upgrading within the maintenance schedule.

03 - Calorifiers

B(C)

£7,000

5

0

3 3

9

2015

05 - Pressurisation Units

B(C)

£4,000

5

0

3 3

9

2015

0.007: 2No. calorifiers require upgrading within the maintenance schedule. 0.007: Pressurisation unit requires upgrading within the maintenance schedule.

08 - Generators

B

£0

15

0

0 0

0

2025

09 - Comments

C

£12,000

0

0

3 3

9

2010

Facet: 2 - Engineering Location: 00 - Ground Floor N - Engineering - Lifts 01 - Lifts O - Engineering - Main Plant

P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

0.020: Uninterruptable power supply generator in acceptable order. 0.008: Reports of room filling with steam and flooding. Repipe and insulate.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 09 - Comments

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£8,000

0

0

3 3

9

2010

0.008: Excessive heat in plant room, improve extraction/cooling.

02 - Main Switchgear

C

£6,500

0

0

3 3

9

2010

03 - Distribution Boards

C

£80

0

0

3 3

9

2010

03 - Distribution Boards

B(C)

£500

5

0

3 3

9

2015

03 - Distribution Boards

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B(C)

£800

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

0.015: Dorman Smith switchgear requires replacement. 0.015: Finger spaces in distribution board, make good. 0.013: MEM distribution board requires upgrading within the maintenance schedule. 0.015: Crabtree distribution board in acceptable order. 0.019: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.005: Surface fluorescent light requires upgrading within the maintenance schedule. 0.004: Surface fluorescent light requires upgrading within the maintenance schedule. 0.C07: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.006: 2No. CAT II lights require upgrading within the maintenance schedule. 0.003: 2No. CAT II lights require upgrading within the maintenance schedule. 0.002: 6No. CAT II lights require upgrading within the maintenance schedule.

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

0.001: 5No. surface fluorescent downlights require upgrading within the maintenance schedule. 0.C01: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.004: Emergency lights requires upgrading within the maintenance schedule. 0.015: Trunking cover is missing.

04 - Lighting Installation

B(C)

£1,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

05 - Emergency Lighting

B(C)

£200

5

0

4 2

8

2015

08 - Comments

C

£100

0

0

2 2

4

2010

B

£0

10

0

0 0

0

2020

0.002: Fire alarm sounders in acceptable order.

B(C)

£400

5

0

3 3

9

2015

1.011: Blending valve requires upgrading within the maintenance schedule.

04 - Extract Fans

B(C)

£400

2

0

3 2

6

2012

04 - Extract Fans

B(C)

£300

3

0

3 2

6

2013

1.033: Extract fan requires upgrading within the maintenance schedule. 1.012: Extract fan requires upgrading within the maintenance schedule.

03 - Distribution Boards

C

£800

0

0

3 3

9

2010

04 - Lighting Installation

C

£200

0

0

4 2

8

2010

V - Engineering - Fire Alarms 01 - Sounders

Location: 01 - First Floor M - Engineering - Hot/Cold Water 03 - Blending Valves

P - Engineering - Main Plant

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

1.C05: 2No. Dorman Smith distribution boards require replacement. 1.024: Fluorescent light over visual display equipment is not suitable and requires upgrading.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 1.002: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.021: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.022: Fluorescent light over visual display equipment is not suitable and requires upgrading. 1.001: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 1.C05: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 1.C01: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 1.029: Surface fluorescent light requires upgrading within the maintenance schedule. 1.010: Surface fluorescent light requires upgrading within the maintenance schedule. 1.003: 2No. CAT II lights require upgrading within the maintenance schedule. 1.011: Surface fluorescent light requires upgrading within the maintenance schedule. 1.C01: 2No. surface fluorescent lights require upgrading within the maintenance schedule. Surface fluorescent lights in acceptable order.

04 - Lighting Installation

C

£200

0

0

4 2

8

2010

04 - Lighting Installation

C

£200

0

0

4 2

8

2010

04 - Lighting Installation

C

£200

0

0

4 2

8

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

B(C)

£1,200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

1.029: Smoke detector requires upgrading within the maintenance schedule. 1.010: Smoke detector requires upgrading within the maintenance schedule. 1.C01: Smoke detector requires upgrading within the maintenance schedule.

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

B

£0

10

0

0 0

0

2020

2.030: AHU in acceptable order.

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

Corridors: Surface fluorescent lights in acceptable order. Offices: CAT II lights in acceptable order.

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

B(C)

£400

3

0

2 3

6

2013

3.013: Zip water heater requires upgrading within the maintenance schedule.

B

£0

10

0

0 0

0

2020

Lifts in acceptable order.

Location: 02 - Second Floor P - Engineering - Main Plant 05 - AHUs R - Engineering - Electrical

V - Engineering - Fire Alarms Offices: Smoke detectors in acceptable order. Corridors: Smoke detectors in acceptable order.

Location: 03 - Third Floor M - Engineering - Hot/Cold Water 01 - Local Water Heaters

N - Engineering - Lifts 01 - Lifts P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 3.001: Extract fan is in acceptable order (B7) however requires cleaning. 3.001: Extract fan requires cleaning. 3.011: Extract fan requires upgrading within the maintenance schedule.

04 - Extract Fans

C

£0

0

0

2 2

4

2010

04 - Extract Fans

C

£150

0

0

2 3

6

2010

04 - Extract Fans

B(C)

£300

2

0

2 3

6

2012

03 - Distribution Boards

B

£0

15

0

0 0

0

2025

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

Remedial Action

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

3.013: Hager distribution board in acceptable order. 3.011: Surface fluorescent light requires upgrading within the maintenance schedule. 3.048: Surface fluorescent light requires upgrading within the maintenance schedule. 3.C03: 5No. surface fluorescent downlights require upgrading within the maintenance schedule. 3.C01: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 3.C08: Surface fluorescent light requires upgrading within the maintenance schedule. 3.C07: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 3.C04: 5No. surface fluorescent downlights require upgrading within the maintenance schedule. 3.C05: 2No. surface fluorescent downlights require upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 3.C06: 6No. surface fluorescent lights require upgrading within the maintenance schedule. Surface fluorescent lights in acceptable order. Offices: CAT II lights in acceptable order.

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

01 - Sounders

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

Remedial Action

V - Engineering - Fire Alarms 3.C01: Fire alarm sounders in acceptable order. 3.C03: Smoke detectors in acceptable order. 3.C04: Smoke detectors in acceptable order. 3.C01: Smoke detectors in acceptable order.

Location: 04 - Fourth Floor I - Engineering - Heating Systems

Generic Hospital Physical Condition Survey

4.16-23: Steel panel radiators in acceptable order. 4.14-09: Steel panel radiators in acceptable order. 4.13-13: Steel panel radiators in acceptable order. 4.14-07: Steel panel radiators in acceptable order. 4.13-14: Steel panel radiators in acceptable order. 4.13-15: Steel panel radiators in acceptable order. 4.16-24: Steel panel radiators in acceptable order. 4.16-22: Steel panel radiators in acceptable order. 4.16-21: Steel panel radiators in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 4.15-35: Steel panel radiators in acceptable order. 4.15-34: Steel panel radiators in acceptable order. 4.15-32: Steel panel radiators in acceptable order. 4.14-08: Steel panel radiators in acceptable order. 4.14-06: Steel panel radiators in acceptable order. 4.15-33: Steel panel radiators in acceptable order. 4.13-12: Steel panel radiators in acceptable order.

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

Remedial Action

P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

4.14-08: Extract fan requires upgrading within the maintenance schedule. 4.14-06: Extract fan requires upgrading within the maintenance schedule. 4.14-09: Extract fan requires upgrading within the maintenance schedule. 4.13-12: Extract fan requires upgrading within the maintenance schedule. 4.13-13: Extract fan requires upgrading within the maintenance schedule. 4.13-14: Extract fan requires upgrading within the maintenance schedule. 4.13-15: Extract fan requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 4.15-35: Extract fan requires upgrading within the maintenance schedule. 4.15-34: Extract fan requires upgrading within the maintenance schedule. 4.15-33: Extract fan requires upgrading within the maintenance schedule. 4.15-32: Extract fan requires upgrading within the maintenance schedule. 4.14-07: Extract fan requires upgrading within the maintenance schedule. 4.16-23: Extract fan requires upgrading within the maintenance schedule. 4.16-21: Extract fan requires upgrading within the maintenance schedule. 4.16-22: Extract fan requires upgrading within the maintenance schedule. 4.16-24: Extract fan requires upgrading within the maintenance schedule.

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

03 - Distribution Boards

C

£400

0

0

3 3

9

2010

04 - Lighting Installation

B(C)

£1,200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

Remedial Action

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

4.16-20: Dorman Smith distribution board requires replacement. 4.C09: 6No. downlights require upgrading within the maintenance schedule. 4.15-35: Surface fluorescent light requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 4.14-08: Surface fluorescent light requires upgrading within the maintenance schedule. 4.13-12: Surface fluorescent light requires upgrading within the maintenance schedule. 4.13-14: Surface fluorescent light requires upgrading within the maintenance schedule. 4.13-15: Surface fluorescent light requires upgrading within the maintenance schedule. 4.15-32: Surface fluorescent light requires upgrading within the maintenance schedule. 4.14-07: Surface fluorescent light requires upgrading within the maintenance schedule. 4.15-34: Surface fluorescent light requires upgrading within the maintenance schedule. 4.14-09: Surface fluorescent light requires upgrading within the maintenance schedule. 4.16-21: Surface fluorescent light requires upgrading within the maintenance schedule. 4.16-22: Surface fluorescent light requires upgrading within the maintenance schedule. 4.16-23: Surface fluorescent light requires upgrading within the maintenance schedule. 4.16-24: Surface fluorescent light requires upgrading within the maintenance schedule. 4.15-33: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 4.13-13: Surface fluorescent light requires upgrading within the maintenance schedule. 4.14-06: Surface fluorescent light requires upgrading within the maintenance schedule. 4.14-09: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.16-22: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.14-07: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.14-06: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.15-33: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.15-34: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.16-21: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.15-32: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 4.16-23: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.13-12: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.13-15: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.13-14: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.13-13: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.16-24: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.15-35: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.14-08: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

4.16-23: Smoke detector requires upgrading within the maintenance schedule. 4.15-32: Smoke detector requires upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 4.15-34: Smoke detector requires upgrading within the maintenance schedule. 4.15-35: Smoke detector requires upgrading within the maintenance schedule. 4.15-33: Smoke detector requires upgrading within the maintenance schedule. 4.16-21: Smoke detector requires upgrading within the maintenance schedule. 4.16-22: Smoke detector requires upgrading within the maintenance schedule. 4.16-24: Smoke detector requires upgrading within the maintenance schedule. 4.13-15: Smoke detector requires upgrading within the maintenance schedule. 4.13-14: Smoke detector requires upgrading within the maintenance schedule. 4.13-13: Smoke detector requires upgrading within the maintenance schedule. 4.13-12: Smoke detector requires upgrading within the maintenance schedule. 4.14-09: Smoke detector requires upgrading within the maintenance schedule. 4.14-08: Smoke detector requires upgrading within the maintenance schedule. 4.14-07: Smoke detector requires upgrading within the maintenance schedule.

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 03 - Smoke Detectors

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£150

5

0

3 3

9

2015

4.14-06: Smoke detector requires upgrading within the maintenance schedule.

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£2,400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

5.18-03: Tungsten light requires replacement. 5.18-03: Tungsten light requires replacement. 5.17-16: Surface fluorescent light requires upgrading within the maintenance schedule. 5.18-08: Surface fluorescent light requires upgrading within the maintenance schedule. 5.18-06: Surface fluorescent light requires upgrading within the maintenance schedule. 5.C05: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.18-09: Surface fluorescent light requires upgrading within the maintenance schedule. 5.C01: 12No. surface fluorescent downlights require upgrading within the maintenance schedule. 5.C09: 7No. downlights require upgrading within the maintenance schedule. 5.20-27: Surface fluorescent light requires upgrading within the maintenance schedule. 5.20-23: Surface fluorescent light requires upgrading within the maintenance schedule.

Location: 05 - Fifth Floor R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 5.18-07: Surface fluorescent light requires upgrading within the maintenance schedule. 5.17-13: Surface fluorescent light requires upgrading within the maintenance schedule. 5.18-05: Surface fluorescent light requires upgrading within the maintenance schedule. 5.18-08: Surface fluorescent light requires upgrading within the maintenance schedule. 5.18-09: Surface fluorescent light requires upgrading within the maintenance schedule. 5.17-12: Surface fluorescent light requires upgrading within the maintenance schedule. 5.18-06: Surface fluorescent light requires upgrading within the maintenance schedule. 5.20-24: Surface fluorescent light requires upgrading within the maintenance schedule. 5.17-14: Surface fluorescent light requires upgrading within the maintenance schedule. 5.20-22: Surface fluorescent light requires upgrading within the maintenance schedule. 5.20-21: Surface fluorescent light requires upgrading within the maintenance schedule. 5.19-35: Surface fluorescent light requires upgrading within the maintenance schedule. 5.19-34: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 5.19-33: Surface fluorescent light requires upgrading within the maintenance schedule. 5.19-32: Surface fluorescent light requires upgrading within the maintenance schedule. 5.17-15: Surface fluorescent light requires upgrading within the maintenance schedule. 5.C01: Emergency lights in acceptable order. 5.18-05: Cooker cable, improve trunking. 5.17-16: Cooker cable, improve trunking.

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

05 - Emergency Lighting

B

£0

6

0

0 0

0

2016

08 - Comments

C

£80

0

0

3 3

9

2010

08 - Comments

C

£80

0

0

3 3

9

2010

01 - Sounders

B

£0

8

0

0 0

0

2018

02 - Call Points

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

5.C01: Fire alarm sounders in acceptable order. 5.C01: Fire alarm call points in acceptable order. 5.17-16: Smoke detector requires upgrading within the maintenance schedule. 5.18-08: Smoke detector requires upgrading within the maintenance schedule. 5.18-06: Smoke detector requires upgrading within the maintenance schedule. 5.18-09: Smoke detector requires upgrading within the maintenance schedule. 5.18-09: Smoke detectors in acceptable order. 5.18-07: Smoke detectors in acceptable order. 5.18-06: Smoke detectors in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 5.18-05: Smoke detectors in acceptable order. 5.18-08: Smoke detectors in acceptable order. 5.17-12: Smoke detectors in acceptable order. 5.17-14: Smoke detectors in acceptable order. 5.17-15: Smoke detectors in acceptable order. 5.20-24: Smoke detectors in acceptable order. 5.20-23: Smoke detectors in acceptable order. 5.20-22: Smoke detectors in acceptable order. 5.20-21: Smoke detectors in acceptable order. 5.19-35: Smoke detectors in acceptable order. 5.19-32: Smoke detectors in acceptable order. 5.19-33: Smoke detectors in acceptable order. 5.17-13: Smoke detectors in acceptable order. 5.19-34: Smoke detectors in acceptable order.

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

Remedial Action

Location: 06 - Sixth Floor I - Engineering - Heating Systems

Generic Hospital Physical Condition Survey

6.23-31: Steel panel radiators in acceptable order. 6.23-32: Steel panel radiators in acceptable order. 6.23-33: Steel panel radiators in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 6.23-34: Steel panel radiators in acceptable order. 6.22-09: Steel panel radiators in acceptable order. 6.21-15: Steel panel radiators in acceptable order. 6.22-08: Steel panel radiators in acceptable order. 6.23-35: Steel panel radiators in acceptable order. 6.24-25: Steel panel radiators in acceptable order. 6.24-24: Steel panel radiators in acceptable order. 6.24-23: Steel panel radiators in acceptable order. 6.24-21: Steel panel radiators in acceptable order. 6.22-07: Steel panel radiators in acceptable order. 6.22-06: Steel panel radiators in acceptable order. 6.22-05: Steel panel radiators in acceptable order. 6.21-14: Steel panel radiators in acceptable order. 6.21-12: Steel panel radiators in acceptable order. 6.21-13: Steel panel radiators in acceptable order. 6.24-22: Steel panel radiators in acceptable order.

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

B(C)

£400

3

0

2 3

6

2013

Remedial Action

P - Engineering - Main Plant 04 - Extract Fans

Generic Hospital Physical Condition Survey

6.22-36: Extract fans requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 6.22-37: Extract fans requires upgrading within the maintenance schedule. 6.22-38: Extract fans requires upgrading within the maintenance schedule. 6.21-10: Extract fans requires upgrading within the maintenance schedule. 6.21-39: Extract fans requires upgrading within the maintenance schedule. 6.21-40: Extract fans requires upgrading within the maintenance schedule. 6.21-17: Extract fans requires upgrading within the maintenance schedule. 6.23-44: Extract fans requires upgrading within the maintenance schedule. 6.22-04: Extract fans requires upgrading within the maintenance schedule. 6.23-28: Extract fans requires upgrading within the maintenance schedule. 6.24-20: Extract fans requires upgrading within the maintenance schedule. 6.24-43: Extract fans requires upgrading within the maintenance schedule. 6.24-41: Extract fans requires upgrading within the maintenance schedule. 6.24-42: Extract fans requires upgrading within the maintenance schedule.

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 6.24-26: Extract fans requires upgrading within the maintenance schedule. 6.21-41: Extract fans requires upgrading within the maintenance schedule. 6.23-30: Extract fans requires upgrading within the maintenance schedule. 6.22-02: Extract fans requires upgrading within the maintenance schedule.

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

03 - Distribution Boards

C

£1,000

0

0

3 3

9

2010

03 - Distribution Boards

B

£0

10

0

0 0

0

2020

03 - Distribution Boards

B

£0

10

0

0 0

0

2020

03 - Distribution Boards

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

Remedial Action

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

6.21-11: Dorman Smith distribution board requires replacement. 6.21-18: Crabtree Polestar distribution board in acceptable order. 6.22-03: Crabtree Polestar distribution board in acceptable order. 6.24-27: Crabtree Polestar distribution board in acceptable order. 6.23-31: Surface fluorescent light requires replacement. 6.24-23: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6.22-36: Surface fluorescent light requires upgrading within the maintenance schedule. 6.23-35: 2No. surface fluorescent lights require upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 6.23-34: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6.23-33: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6.23-32: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6.21-15: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6.21-12: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6.24-25: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6.24-24: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6.22-04: Surface fluorescent light requires upgrading within the maintenance schedule. 6.24-22: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6.24-21: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 6.22-08: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6.22-07: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6.22-06: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6.22-05: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6.21-14: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6.21-13: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6.24-20: Surface fluorescent light requires upgrading within the maintenance schedule. 6.21-15: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 6.22-09: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6.24-26: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 6.21-41: Surface fluorescent light requires upgrading within the maintenance schedule. 6.24-43: Surface fluorescent light requires upgrading within the maintenance schedule. 6.22-37: Surface fluorescent light requires upgrading within the maintenance schedule. 6.24-41: Surface fluorescent light requires upgrading within the maintenance schedule. 6.22-38: Surface fluorescent light requires upgrading within the maintenance schedule. 6.23-28: Surface fluorescent light requires upgrading within the maintenance schedule. 6.23-44: Surface fluorescent light requires upgrading within the maintenance schedule. 6.23-30: Surface fluorescent light requires upgrading within the maintenance schedule. 6.21-17: Surface fluorescent light requires upgrading within the maintenance schedule. 6.21-40: Surface fluorescent light requires upgrading within the maintenance schedule. 6.21-39: Surface fluorescent light requires upgrading within the maintenance schedule. 6.21-10: Surface fluorescent light requires upgrading within the maintenance schedule. 6.22-02: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 6.C01: 8No. halogen downlights require upgrading within the maintenance schedule. 6.24-42: Surface fluorescent light requires upgrading within the maintenance schedule. 6.21-18: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 6.22-03: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 6.24-27: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 6.C01: Emergency lights in acceptable order.

04 - Lighting Installation

B(C)

£480

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,000

5

0

2 2

4

2015

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

Remedial Action

V - Engineering - Fire Alarms 02 - Call Points

Generic Hospital Physical Condition Survey

6.C01: Fire alarm call points in acceptable order. 6.22-07: Smoke detector requires upgrading within the maintenance schedule. 6.23-32: Smoke detector requires upgrading within the maintenance schedule. 6.23-33: Smoke detector requires upgrading within the maintenance schedule. 6.23-34: Smoke detector requires upgrading within the maintenance schedule. 6.23-35: Smoke detector requires upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 6.22-09: Smoke detector requires upgrading within the maintenance schedule. 6.24-25: Smoke detector requires upgrading within the maintenance schedule. 6.24-24: Smoke detector requires upgrading within the maintenance schedule. 6.21-15: Smoke detector requires upgrading within the maintenance schedule. 6.24-21: Smoke detector requires upgrading within the maintenance schedule. 6.24-22: Smoke detector requires upgrading within the maintenance schedule. 6.22-06: Smoke detector requires upgrading within the maintenance schedule. 6.22-05: Smoke detector requires upgrading within the maintenance schedule. 6.21-14: Smoke detector requires upgrading within the maintenance schedule. 6.21-13: Smoke detector requires upgrading within the maintenance schedule. 6.21-12: Smoke detector requires upgrading within the maintenance schedule. 6.24-23: Smoke detector requires upgrading within the maintenance schedule. 6.22-08: Smoke detector requires upgrading within the maintenance schedule.

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 6.22-03: Smoke detectors in acceptable order. 6.21-18: Smoke detectors in acceptable order. 6.24-27: Smoke detectors in acceptable order. 6.C01: Smoke detectors in acceptable order.

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

Remedial Action

Location: 07 - Seventh Floor I - Engineering - Heating Systems

Generic Hospital Physical Condition Survey

7.27-33: Steel panel radiators in acceptable order. 7.27-34: Steel panel radiators in acceptable order. 7.27-35: Steel panel radiators in acceptable order. 7.27-32: Steel panel radiators in acceptable order. 7.28-21: Steel panel radiators in acceptable order. 7.25-14: Steel panel radiators in acceptable order. 7.25-13: Steel panel radiators in acceptable order. 7.25-12: Steel panel radiators in acceptable order. 7.26-09: Steel panel radiators in acceptable order. 7.26-08: Steel panel radiators in acceptable order. 7.26-17: Steel panel radiators in acceptable order. 7.26-06: Steel panel radiators in acceptable order. 7.28-24: Steel panel radiators in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 7.28-23: Steel panel radiators in acceptable order. 7.28-22: Steel panel radiators in acceptable order. 7.25-15: Steel panel radiators in acceptable order.

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

04 - Extract Fans

C

£400

0

0

2 3

6

2010

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

Remedial Action

P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

7.27-31: Extract fan requires replacement. 7.26-04: Extract fan requires upgrading within the maintenance schedule. 7.25-17: Extract fan requires upgrading within the maintenance schedule. 7.28-26: Extract fan requires upgrading within the maintenance schedule. 7.27-30: Extract fan requires upgrading within the maintenance schedule. 7.25-16: Extract fan requires upgrading within the maintenance schedule. 7.25-10: Extract fan requires upgrading within the maintenance schedule. 7.26-02: Extract fan requires upgrading within the maintenance schedule. 7.26-05: Extract fan requires upgrading within the maintenance schedule. 7.28-26: Extract fan requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 7.28-25: Extract fan requires upgrading within the maintenance schedule. 7.28-20: Extract fan requires upgrading within the maintenance schedule. 7.27-28: Extract fan requires upgrading within the maintenance schedule.

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

Remedial Action

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

7.C01: Tungsten uplighter requires replacement. 7.28-23: Surface fluorescent light requires upgrading within the maintenance schedule. 7.25-15: Surface fluorescent light requires upgrading within the maintenance schedule. 7.25-14: Surface fluorescent light requires upgrading within the maintenance schedule. 7.25-12: Surface fluorescent light requires upgrading within the maintenance schedule. 7.26-08: Surface fluorescent light requires upgrading within the maintenance schedule. 7.26-17: Surface fluorescent light requires upgrading within the maintenance schedule. 7.27-32: Surface fluorescent light requires upgrading within the maintenance schedule. 7.28-24: Surface fluorescent light requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 7.25-13: Surface fluorescent light requires upgrading within the maintenance schedule. 7.28-22: Surface fluorescent light requires upgrading within the maintenance schedule. 7.28-21: Surface fluorescent light requires upgrading within the maintenance schedule. 7.26-06: Surface fluorescent light requires upgrading within the maintenance schedule. 7.26-02: Surface fluorescent light requires upgrading within the maintenance schedule. 7.27-30: Surface fluorescent light requires upgrading within the maintenance schedule. 7.25-17: Surface fluorescent light requires upgrading within the maintenance schedule. 7.25-16: Surface fluorescent light requires upgrading within the maintenance schedule. 7.26-09: Surface fluorescent light requires upgrading within the maintenance schedule. 7.25-10: Surface fluorescent light requires upgrading within the maintenance schedule. 7.27-33: Surface fluorescent light requires upgrading within the maintenance schedule. 7.26-05: Surface fluorescent light requires upgrading within the maintenance schedule. 7.26-04: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 7.27-34: Surface fluorescent light requires upgrading within the maintenance schedule. 7.28-26: Surface fluorescent light requires upgrading within the maintenance schedule. 7.28-20: Surface fluorescent light requires upgrading within the maintenance schedule. 7.28-26: Surface fluorescent light requires upgrading within the maintenance schedule. 7.27-31: Surface fluorescent light requires upgrading within the maintenance schedule. 7.27-35: Surface fluorescent light requires upgrading within the maintenance schedule. 7.28-25: Surface fluorescent light requires upgrading within the maintenance schedule. 7.28-26: Surface fluorescent lights in acceptable order.

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

7.27-32: Smoke detector requires upgrading within the maintenance schedule. 7.25-12: Smoke detector requires upgrading within the maintenance schedule. 7.27-35: Smoke detector requires upgrading within the maintenance schedule. 7.27-33: Smoke detector requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 7.25-15: Smoke detector requires upgrading within the maintenance schedule. 7.25-14: Smoke detector requires upgrading within the maintenance schedule. 7.25-13: Smoke detector requires upgrading within the maintenance schedule. 7.28-23: Smoke detector requires upgrading within the maintenance schedule. 7.26-09: Smoke detector requires upgrading within the maintenance schedule. 7.28-21: Smoke detector requires upgrading within the maintenance schedule. 7.27-34: Smoke detector requires upgrading within the maintenance schedule. 7.28-22: Smoke detector requires upgrading within the maintenance schedule. 7.28-24: Smoke detector requires upgrading within the maintenance schedule. 7.26-06: Smoke detector requires upgrading within the maintenance schedule. 7.26-17: Smoke detector requires upgrading within the maintenance schedule. 7.26-08: Smoke detector requires upgrading within the maintenance schedule.

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

Remedial Action

Location: 08 - Eighth Floor Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

8.30-07: Steel panel radiators in acceptable order. 8.30-06: Steel panel radiators in acceptable order. 8.30-03: Steel panel radiators in acceptable order. 8.32-24: Steel panel radiators in acceptable order. 8.32-21: Steel panel radiators in acceptable order. 8.32-22: Steel panel radiators in acceptable order. 8.29-12: Steel panel radiators in acceptable order. 8.32-23: Steel panel radiators in acceptable order. 8.29-15: Steel panel radiators in acceptable order. 8.29-14: Steel panel radiators in acceptable order. 8.31-33: Steel panel radiators in acceptable order. 8.31-34: Steel panel radiators in acceptable order. 8.31-35: Steel panel radiators in acceptable order. 8.29-13: Steel panel radiators in acceptable order. 8.31-32: Steel panel radiators in acceptable order.

I - Engineering - Heating Systems 01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

B

£0

12

0

0 0

0

2022

R - Engineering - Electrical 03 - Distribution Boards

Generic Hospital Physical Condition Survey

8.30-03: Crabtree distribution board in acceptable order.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 8.C01: 16No. tungsten downlights require upgrading within the maintenance schedule. 8.35-29: 8No. surface fluorescent downlights require upgrading within the maintenance schedule. 8.30-03: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 8.32-25: Surface fluorescent light requires upgrading within the maintenance schedule. 8.29-17: Surface fluorescent light requires upgrading within the maintenance schedule. 8.29-13: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 8.29-14: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 8.29-15: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 8.30-04: Surface fluorescent light requires upgrading within the maintenance schedule. 8.32-26: Surface fluorescent light requires upgrading within the maintenance schedule. 8.32-37: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£3,200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£1,600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 8.32-20: Surface fluorescent light requires upgrading within the maintenance schedule. 8.31-28: Surface fluorescent light requires upgrading within the maintenance schedule. 8.31-38: Surface fluorescent light requires upgrading within the maintenance schedule. 8.31-32: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 8.29-10: Surface fluorescent light requires upgrading within the maintenance schedule. 8.31-31: Surface fluorescent light requires upgrading within the maintenance schedule. 8.31-33: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 8.29-36: Surface fluorescent light requires upgrading within the maintenance schedule. 8.32-22: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 8.31-34: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 8.31-35: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 8.29-12: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 8.32-21: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 8.32-23: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 8.32-24: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 8.30-07: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 8.30-06: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 8.C01: Emergency lights in acceptable order.

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B(C)

£300

3

0

3 3

9

2013

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

Remedial Action

V - Engineering - Fire Alarms 01 - Sounders

Generic Hospital Physical Condition Survey

8.C01: Fire alarm sounders in acceptable order. 8.30-03: 2No. smoke detectors require upgrading within the maintenance schedule. 8.29-13: Smoke detector requires upgrading within the maintenance schedule. 8.32-24: Smoke detector requires upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 8.31-32: Smoke detector requires upgrading within the maintenance schedule. 8.31-33: Smoke detector requires upgrading within the maintenance schedule. 8.32-21: Smoke detector requires upgrading within the maintenance schedule. 8.31-34: Smoke detector requires upgrading within the maintenance schedule. 8.29-15: Smoke detector requires upgrading within the maintenance schedule. 8.30-07: Smoke detector requires upgrading within the maintenance schedule. 8.30-06: Smoke detector requires upgrading within the maintenance schedule. 8.29-12: Smoke detector requires upgrading within the maintenance schedule. 8.32-23: Smoke detector requires upgrading within the maintenance schedule. 8.32-22: Smoke detector requires upgrading within the maintenance schedule. 8.31-35: Smoke detector requires upgrading within the maintenance schedule. 8.29-14: Smoke detector requires upgrading within the maintenance schedule. 8.32-25: Smoke detectors in acceptable order.

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 03 - Smoke Detectors

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

7

0

0 0

0

2017

8.C05: Smoke detectors in acceptable order.

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

9.33-13: Steel panel radiators in acceptable order. 9.34-06: Steel panel radiators in acceptable order. 9.34-07: Steel panel radiators in acceptable order. 9.34-08: Steel panel radiators in acceptable order. 9.34-09: Steel panel radiators in acceptable order. 9.35-32: Steel panel radiators in acceptable order. 9.33-12: Steel panel radiators in acceptable order. 9.36-24: Steel panel radiators in acceptable order. 9.33-14: Steel panel radiators in acceptable order. 9.33-15: Steel panel radiators in acceptable order. 9.35-33: Steel panel radiators in acceptable order. 9.35-34: Steel panel radiators in acceptable order. 9.35-35: Steel panel radiators in acceptable order. 9.36-21: Steel panel radiators in acceptable order. 9.36-22: Steel panel radiators in acceptable order. 9.36-23: Steel panel radiators in acceptable order.

Location: 09 - Ninth Floor I - Engineering - Heating Systems

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

9.35-28: Dorman Smith distribution board requires replacement. 9.34-05: 4No. halogen downlights require upgrading within the maintenance schedule. 9.36-27: Surface fluorescent light requires upgrading within the maintenance schedule. 9.36-26: Surface fluorescent light requires upgrading within the maintenance schedule. 9.33-15A: Surface fluorescent light requires upgrading within the maintenance schedule. 9.35-32: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 9.34-04: Surface fluorescent light requires upgrading within the maintenance schedule. 9.35-30: Surface fluorescent light requires upgrading within the maintenance schedule. 9.36-23: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 9.36-22: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 9.36-21: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

R - Engineering - Electrical 03 - Distribution Boards

C

£400

0

0

3 3

9

2010

04 - Lighting Installation

B(C)

£240

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 9.34-06: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 9.36-24A: Surface fluorescent light requires upgrading within the maintenance schedule. 9.34-03: Surface fluorescent light requires upgrading within the maintenance schedule. 9.35-35: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 9.35-34: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 9.C05: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 9.33-14A: Surface fluorescent light requires upgrading within the maintenance schedule. 9.36-24: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 9.33-17: Surface fluorescent light requires upgrading within the maintenance schedule. 9.34-07: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 9.33-15: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 9.33-14: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 9.34-07A: Surface fluorescent light requires upgrading within the maintenance schedule. 9.33-13: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 9.33-12: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 9.33-18: Surface fluorescent light requires upgrading within the maintenance schedule. 9.35-29: Surface fluorescent light requires upgrading within the maintenance schedule. 9.34-09: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 9.34-08: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 9.34-06A: Surface fluorescent light requires upgrading within the maintenance schedule. 9.35-33: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 9.C01: 6No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 9.36-23A: Surface fluorescent light requires upgrading within the maintenance schedule. 9.35-32A: Surface fluorescent light requires upgrading within the maintenance schedule. 9.35-33A: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

Remedial Action

V - Engineering - Fire Alarms 02 - Call Points

Generic Hospital Physical Condition Survey

9.C01: Fire alarm call points in acceptable order. 9.35-34: Smoke detector requires upgrading within the maintenance schedule. 9.34-07: Smoke detector requires upgrading within the maintenance schedule. 9.33-12: Smoke detector requires upgrading within the maintenance schedule. 9.34-06: Smoke detector requires upgrading within the maintenance schedule. 9.33-13: Smoke detector requires upgrading within the maintenance schedule. 9.34-08: Smoke detector requires upgrading within the maintenance schedule. 9.36-24: Smoke detector requires upgrading within the maintenance schedule. 9.33-15: Smoke detector requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 9.35-32: Smoke detector requires upgrading within the maintenance schedule. 9.34-09: Smoke detector requires upgrading within the maintenance schedule. 9.35-33: Smoke detector requires upgrading within the maintenance schedule. 9.33-14: Smoke detector requires upgrading within the maintenance schedule. 9.35-35: Smoke detector requires upgrading within the maintenance schedule. 9.36-21: Smoke detector requires upgrading within the maintenance schedule. 9.36-22: Smoke detector requires upgrading within the maintenance schedule. 9.36-23: Smoke detector requires upgrading within the maintenance schedule. 9.C01: Smoke detectors in acceptable order.

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

Remedial Action

Location: 10 - Tenth Floor I - Engineering - Heating Systems

Generic Hospital Physical Condition Survey

10.39-32: Steel panel radiators in acceptable order. 10.39-33: Steel panel radiators in acceptable order. 10.39-34: Steel panel radiators in acceptable order. 10.39-35: Steel panel radiators in acceptable order.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 10.40-24: Steel panel radiators in acceptable order. 10.37-15: Steel panel radiators in acceptable order. 10.40-23: Steel panel radiators in acceptable order. 10.40-22: Steel panel radiators in acceptable order. 10.40-21: Steel panel radiators in acceptable order. 10.37-14: Steel panel radiators in acceptable order. 10.37-13: Steel panel radiators in acceptable order. 10.37-12: Steel panel radiators in acceptable order. 10.38-09: Steel panel radiators in acceptable order. 10.38-08: Steel panel radiators in acceptable order. 10.38-06: Steel panel radiators in acceptable order. 10.38-07: Steel panel radiators in acceptable order.

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

03 - Distribution Boards

C

£400

0

0

3 3

9

2010

04 - Lighting Installation

B(C)

£240

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

Remedial Action

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

10.39-28: Dorman Smith distribution board requires replacement. 10.38-05: 4No. halogen downlights require upgrading within the maintenance schedule. 10.39-34A: Surface fluorescent light requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 10.40-22: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 10.37-12: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 10.37-13: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 10.37-15: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 10.39-33: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 10.39-34: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 10.38-09: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 10.40-21: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 10.37-14: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 10.40-23: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 10.40-24: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 10.C05: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 10.C01: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 10.38-04: Surface fluorescent light requires upgrading within the maintenance schedule. 10.40-22A: Surface fluorescent light requires upgrading within the maintenance schedule. 10.39-35: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 10.39-29: Surface fluorescent light requires upgrading within the maintenance schedule. 10.40-27: Surface fluorescent light requires upgrading within the maintenance schedule. 10.40-26: Surface fluorescent light requires upgrading within the maintenance schedule. 10.39-35A: Surface fluorescent light requires upgrading within the maintenance schedule. 10.39-32: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 10.39-30: Surface fluorescent light requires upgrading within the maintenance schedule. 10.38-08: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 10.37-18: Surface fluorescent light requires upgrading within the maintenance schedule. 10.37-17: Surface fluorescent light requires upgrading within the maintenance schedule. 10.38-06: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 10.37-12A: Surface fluorescent light requires upgrading within the maintenance schedule. 10.38-09A: Surface fluorescent light requires upgrading within the maintenance schedule. 10.38-08A: Surface fluorescent light requires upgrading within the maintenance schedule. 10.37-13A: Surface fluorescent light requires upgrading within the maintenance schedule. 10.38-03: Surface fluorescent light requires upgrading within the maintenance schedule. 10.38-07: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

B

£0

8

0

0 0

0

2018

Remedial Action

V - Engineering - Fire Alarms 02 - Call Points Generic Hospital Physical Condition Survey

10.C01: Fire alarm call points in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 10.39-34: Smoke detector requires upgrading within the maintenance schedule. 10.39-35: Smoke detector requires upgrading within the maintenance schedule. 10.40-21: Smoke detector requires upgrading within the maintenance schedule. 10.40-22: Smoke detector requires upgrading within the maintenance schedule. 10.40-24: Smoke detector requires upgrading within the maintenance schedule. 10.38-07: Smoke detector requires upgrading within the maintenance schedule. 10.39-33: Smoke detector requires upgrading within the maintenance schedule. 10.40-23: Smoke detector requires upgrading within the maintenance schedule. 10.38-06: Smoke detector requires upgrading within the maintenance schedule. 10.38-08: Smoke detector requires upgrading within the maintenance schedule. 10.37-12: Smoke detector requires upgrading within the maintenance schedule. 10.37-13: Smoke detector requires upgrading within the maintenance schedule. 10.37-14: Smoke detector requires upgrading within the maintenance schedule.

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 10.37-15: Smoke detector requires upgrading within the maintenance schedule. 10.38-09: Smoke detector requires upgrading within the maintenance schedule. 10.39-32: Smoke detector requires upgrading within the maintenance schedule. 10.C01: Smoke detectors in acceptable order.

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

Remedial Action

Location: 11 - Eleventh Floor I - Engineering - Heating Systems

Generic Hospital Physical Condition Survey

11.43-33: Steel panel radiators in acceptable order. 11.44-24: Steel panel radiators in acceptable order. 11.44-23: Steel panel radiators in acceptable order. 11.44-22: Steel panel radiators in acceptable order. 11.43-32: Steel panel radiators in acceptable order. 11.43-34: Steel panel radiators in acceptable order. 11.43-35: Steel panel radiators in acceptable order. 11.41-15: Steel panel radiators in acceptable order. 11.41-14: Steel panel radiators in acceptable order. 11.41-13: Steel panel radiators in acceptable order. 11.41-12: Steel panel radiators in acceptable order. 11.42-09: Steel panel radiators in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 11.42-08: Steel panel radiators in acceptable order. 11.42-07: Steel panel radiators in acceptable order. 11.42-06: Steel panel radiators in acceptable order. 11.41-13: Steel panel radiators in acceptable order. 11.44-21: Steel panel radiators in acceptable order.

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

04 - Extract Fans

B(C)

£400

3

0

3 2

6

2013

04 - Extract Fans

B(C)

£400

3

0

3 2

6

2013

04 - Extract Fans

B(C)

£400

3

0

3 2

6

2013

04 - Extract Fans

B(C)

£400

3

0

3 2

6

2013

04 - Extract Fans

B(C)

£400

3

0

3 2

6

2013

04 - Extract Fans

B(C)

£400

3

0

3 2

6

2013

04 - Extract Fans

B(C)

£400

3

0

3 2

6

2013

04 - Extract Fans

B(C)

£400

3

0

3 2

6

2013

Remedial Action

P - Engineering - Main Plant 11.43-29: Extract fan requires upgrading within the maintenance schedule. 11.43-26: Extract fan requires upgrading within the maintenance schedule. 11.42-04: Extract fan requires upgrading within the maintenance schedule. 11.42-03: Extract fan requires upgrading within the maintenance schedule. 11.41-18: Extract fan requires upgrading within the maintenance schedule. 11.41-17: Extract fan requires upgrading within the maintenance schedule. 11.43-27: Extract fan requires upgrading within the maintenance schedule. 11.43-30: Extract fan requires upgrading within the maintenance schedule.

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 11.42-02: Dorman Smith distribution board requires replacement. 11.41-13: Tungsten light requires replacement. 11.C01: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 11.43-35: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 11.44-27: Surface fluorescent light requires upgrading within the maintenance schedule. 11.43-30: Surface fluorescent light requires upgrading within the maintenance schedule. 11.44-24: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 11.44-23: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 11.44-22: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 11.44-21: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 11.43-32: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

03 - Distribution Boards

C

£400

0

0

3 3

9

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£400

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 11.42-03: Surface fluorescent light requires upgrading within the maintenance schedule. 11.43-34: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 11.44-26: Surface fluorescent light requires upgrading within the maintenance schedule. 11.41-15: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 11.41-14: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 11.41-13: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 11.41-12: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 11.42-09: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 11.42-08: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 11.42-07: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 11.42-06: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 11.43-33: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 11.42-04: Surface fluorescent light requires upgrading within the maintenance schedule. 11.41-18: Surface fluorescent light requires upgrading within the maintenance schedule. 11.41-17: Surface fluorescent light requires upgrading within the maintenance schedule. 11.43-29: Surface fluorescent light requires upgrading within the maintenance schedule. 11.C01: Emergency lights in acceptable order. 11.42-05: Improve trunking to cooker cable.

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

08 - Comments

C

£80

0

0

2 2

4

2010

01 - Sounders

B

£0

8

0

0 0

0

2018

02 - Call Points

B

£0

8

0

0 0

0

2018

B(C)

£150

5

0

3 2

6

2015

Remedial Action

V - Engineering - Fire Alarms

03 - Smoke Detectors

Generic Hospital Physical Condition Survey

11.C01: Fire alarm sounders in acceptable order. 11.C01: Fire alarm call points in acceptable order. 11.43-34: Smoke detector requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 11.43-33: Smoke detector requires upgrading within the maintenance schedule. 11.43-32: Smoke detector requires upgrading within the maintenance schedule. 11.44-21: Smoke detector requires upgrading within the maintenance schedule. 11.44-23: Smoke detector requires upgrading within the maintenance schedule. 11.41-13: Smoke detector requires upgrading within the maintenance schedule. 11.44-24: Smoke detector requires upgrading within the maintenance schedule. 11.44-22: Smoke detector requires upgrading within the maintenance schedule. 11.43-35: Smoke detector requires upgrading within the maintenance schedule. 11.41-14: Smoke detector requires upgrading within the maintenance schedule. 11.41-12: Smoke detector requires upgrading within the maintenance schedule. 11.42-09: Smoke detector requires upgrading within the maintenance schedule. 11.42-08: Smoke detector requires upgrading within the maintenance schedule. 11.42-07: Smoke detector requires upgrading within the maintenance schedule.

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 11.42-06: Smoke detector requires upgrading within the maintenance schedule. 11.41-13: Smoke detector requires upgrading within the maintenance schedule. 11.41-15: Smoke detector requires upgrading within the maintenance schedule.

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

Remedial Action

Location: 12 - Twelfth Floor I - Engineering - Heating Systems

Generic Hospital Physical Condition Survey

12.47-32: Steel panel radiators in acceptable order. 12.48-23: Steel panel radiators in acceptable order. 12.48-22: Steel panel radiators in acceptable order. 12.48-21: Steel panel radiators in acceptable order. 12.48-24: Steel panel radiators in acceptable order. 12.47-34: Steel panel radiators in acceptable order. 12.47-35: Steel panel radiators in acceptable order. 12.45-15: Steel panel radiators in acceptable order. 12.45-14: Steel panel radiators in acceptable order. 12.45-12: Steel panel radiators in acceptable order. 12.46-09: Steel panel radiators in acceptable order. 12.46-08: Steel panel radiators in acceptable order. 12.46-07: Steel panel radiators in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 12.46-06: Steel panel radiators in acceptable order. 12.45-13: Steel panel radiators in acceptable order. 12.45-13: Steel panel radiators in acceptable order. 12.47-33: Steel panel radiators in acceptable order.

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£400

3

0

2 3

6

2013

C

£400

0

0

3 3

9

2010

Remedial Action

P - Engineering - Main Plant 12.47-27: Extract fan requires upgrading within the maintenance schedule. 12.47-29: Extract fan requires upgrading within the maintenance schedule. 12.47-26: Extract fan requires upgrading within the maintenance schedule. 12.45-17: Extract fan requires upgrading within the maintenance schedule. 12.45-18: Extract fan requires upgrading within the maintenance schedule. 12.46-03: Extract fan requires upgrading within the maintenance schedule. 12.46-04: Extract fan requires upgrading within the maintenance schedule. 12.47-30: Extract fan requires upgrading within the maintenance schedule.

R - Engineering - Electrical 03 - Distribution Boards

Generic Hospital Physical Condition Survey

12.46-02: Dorman Smith distribution board requires replacement. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 12.45-13: Tungsten light requires replacement. 11.C01: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 12.47-33: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 12.48-26: Surface fluorescent light requires upgrading within the maintenance schedule. 12.48-27: Surface fluorescent light requires upgrading within the maintenance schedule. 12.47-30: Surface fluorescent light requires upgrading within the maintenance schedule. 12.47-29: Surface fluorescent light requires upgrading within the maintenance schedule. 12.45-17: Surface fluorescent light requires upgrading within the maintenance schedule. 12.45-18: Surface fluorescent light requires upgrading within the maintenance schedule. 12.46-03: Surface fluorescent light requires upgrading within the maintenance schedule. 12.46-04: Surface fluorescent light requires upgrading within the maintenance schedule. 12.48-23: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£400

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 12.48-22: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 12.47-32: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 12.48-24: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 12.47-34: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 12.47-35: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 12.45-15: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 12.45-14: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 12.45-13: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 12.45-12: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 12.46-09: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 12.46-08: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 12.46-07: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 12.46-06: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 12.48-21: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 11.C01: Emergency lights in acceptable order. 12.46-05: Improve trunking to cooker cable.

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

08 - Comments

C

£80

0

0

3 3

9

2010

01 - Sounders

B

£0

8

0

0 0

0

2018

02 - Call Points

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

12.C01: Fire alarm sounders in acceptable order. 11.C01: Fire alarm call points in acceptable order. 12.45-13: Smoke detector requires upgrading within the maintenance schedule. 12.46-06: Smoke detector requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 12.46-07: Smoke detector requires upgrading within the maintenance schedule. 12.46-08: Smoke detector requires upgrading within the maintenance schedule. 12.46-09: Smoke detector requires upgrading within the maintenance schedule. 12.45-12: Smoke detector requires upgrading within the maintenance schedule. 12.48-21: Smoke detector requires upgrading within the maintenance schedule. 12.45-14: Smoke detector requires upgrading within the maintenance schedule. 12.45-15: Smoke detector requires upgrading within the maintenance schedule. 12.47-35: Smoke detector requires upgrading within the maintenance schedule. 12.47-34: Smoke detector requires upgrading within the maintenance schedule. 12.47-33: Smoke detector requires upgrading within the maintenance schedule. 12.47-32: Smoke detector requires upgrading within the maintenance schedule. 12.48-24: Smoke detector requires upgrading within the maintenance schedule. 12.48-23: Smoke detector requires upgrading within the maintenance schedule.

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 12.48-22: Smoke detector requires upgrading within the maintenance schedule. 12.45-13: Smoke detector requires upgrading within the maintenance schedule.

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

Remedial Action

Location: 13 - Thirteenth Floor I - Engineering - Heating Systems

Generic Hospital Physical Condition Survey

13.49-13: Steel panel radiators in acceptable order. 13.52-23: Steel panel radiators in acceptable order. 13.52-24: Steel panel radiators in acceptable order. 13.52-22: Steel panel radiators in acceptable order. 13.51-32: Steel panel radiators in acceptable order. 13.51-33: Steel panel radiators in acceptable order. 13.49-15: Steel panel radiators in acceptable order. 13.51-34: Steel panel radiators in acceptable order. 13.49-14: Steel panel radiators in acceptable order. 13.52-21: Steel panel radiators in acceptable order. 13.50-06: Steel panel radiators in acceptable order. 13.50-07: Steel panel radiators in acceptable order. 13.50-08: Steel panel radiators in acceptable order. 13.50-09: Steel panel radiators in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 13.49-12: Steel panel radiators in acceptable order. 13.51-35: Steel panel radiators in acceptable order.

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

03 - Distribution Boards

C

£1,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£400

0

0

3 3

9

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

Remedial Action

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

13.49-11: Dorman Smith distribution board requires replacement. 13.50-02: Dorman Smith distribution board requires replacement. 13.50-05: Surface fluorescent light requires replacement. 13.51-29: Surface fluorescent light requires upgrading within the maintenance schedule. 13.50-04: Surface fluorescent light requires upgrading within the maintenance schedule. 13.50-03: Surface fluorescent light requires upgrading within the maintenance schedule. 11.49-17: Surface fluorescent light requires upgrading within the maintenance schedule. 13.52-27: Surface fluorescent light requires upgrading within the maintenance schedule. 13.52-26: Surface fluorescent light requires upgrading within the maintenance schedule. 11.49-18: Surface fluorescent light requires upgrading within the maintenance schedule. 13.51-33: Surface fluorescent light requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 13.51-30: Surface fluorescent light requires upgrading within the maintenance schedule. 13.50-06: Surface fluorescent light requires upgrading within the maintenance schedule. 13.50-07: Surface fluorescent light requires upgrading within the maintenance schedule. 13.50-08: Surface fluorescent light requires upgrading within the maintenance schedule. 13.50-09: Surface fluorescent light requires upgrading within the maintenance schedule. 13.49-12: Surface fluorescent light requires upgrading within the maintenance schedule. 13.49-13: Surface fluorescent light requires upgrading within the maintenance schedule. 13.49-14: Surface fluorescent light requires upgrading within the maintenance schedule. 13.51-32: Surface fluorescent light requires upgrading within the maintenance schedule. 13.C01: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 13.51-34: Surface fluorescent light requires upgrading within the maintenance schedule. 13.51-35: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 13.52.22: Surface fluorescent light requires upgrading within the maintenance schedule. 13.52.23: Surface fluorescent light requires upgrading within the maintenance schedule. 13.52.24: Surface fluorescent light requires upgrading within the maintenance schedule. 13.C05: 4No. surface fluorescent downlights require upgrading within the maintenance schedule. 13.49-14: Surface fluorescent light requires upgrading within the maintenance schedule. 13.52.21: Surface fluorescent light requires upgrading within the maintenance schedule. 13.C01: Emergency lights in acceptable order. 13.52-25: Fit correct trunking to cooker cable.

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

08 - Comments

C

£60

0

0

3 3

9

2010

01 - Sounders

B

£0

8

0

0 0

0

2018

02 - Call Points

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

13.C01: Fire alarm sounders in acceptable order. 13.C01: Fire alarm call points in acceptable order. 13.49-12: Smoke detector requires upgrading within the maintenance schedule. 13.50-08: Smoke detector requires upgrading within the maintenance schedule. 13.50-07: Smoke detector requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 13.52-22: Smoke detector requires upgrading within the maintenance schedule. 13.49-14: Smoke detector requires upgrading within the maintenance schedule. 13.49-15: Smoke detector requires upgrading within the maintenance schedule. 13.52-24: Smoke detector requires upgrading within the maintenance schedule. 13.52-23: Smoke detector requires upgrading within the maintenance schedule. 13.49-13: Smoke detector requires upgrading within the maintenance schedule. 13.51-35: Smoke detector requires upgrading within the maintenance schedule. 13.51-34: Smoke detector requires upgrading within the maintenance schedule. 13.51-33: Smoke detector requires upgrading within the maintenance schedule. 13.51-32: Smoke detector requires upgrading within the maintenance schedule. 13.50-06: Smoke detector requires upgrading within the maintenance schedule. 13.50-09: Smoke detector requires upgrading within the maintenance schedule. 13.52-21: Smoke detector requires upgrading within the maintenance schedule.

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 2

6

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: 14 - Fourteenth Floor M - Engineering - Hot/Cold Water 08 - Tanks & Bylaws

B

£0

15

0

0 0

0

2025

14.M01: Cold water tanks in acceptable order.

02 - Pumps

B

£0

7

0

0 0

0

2017

03 - Calorifiers

B(C)

£2,000

4

0

3 3

9

2014

14.M01: 4No. Grundfos variable speed heating pumps in acceptable order. 14.M01: 2No. calorifiers require upgrading within the maintenance schedule.

B

£0

12

0

0 0

0

2022

14.M01: Trend control panel in acceptable order.

03 - Distribution Boards

N/A

£0

0

0

0 0

0

2010

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

Small store cupboards at the end of corridors on floors 4, 5, 9, 10, 11, 12, 13. Some doors could not be opened as stored items had fallen against doors. Those which could be accessed had Dorman Smith fuse boards, all of which are C0 £400 and are itemised separately. It is suspected that the other cupboards are the same but we are unable to confirm. Offices: CAT II lights in acceptable order.

O - Engineering - Main Plant

P - Engineering - Main Plant 03 - Controls

Location: Whole Block R - Engineering - Electrical

Block Total

Generic Hospital Physical Condition Survey

£2,497,520.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Medical Equipment & Servicing/ Bridges Unit: Redecoration required inclusive of making good efflorescence under paint work to room 014. Clinical Effectiveness Dept: Redecorate required inclusive of making good blown plaster to rooms 028 and 029. Bereavement Services: Redecoration required as part of regular maintenance schedule to rooms 037, 038, 036, 035. Medical Equipment & Servicing/ Bridges Unit: Redecoration required as part of regular maintenance schedule. Overseas Patients Dept: Redecoration required as part of regular maintenance schedule to rooms 034, 033, 032. Central Booking: Redecoration required as part of regular maintenance schedule. Clinical Effectiveness Dept: Redecoration required as part of regular maintenance schedule.

Site : Generic Hospital - STG Block : Knightsbridge Wing - KNB Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

C

£500

0

0

2 2

4

2010

01 - Decorations

C

£975

0

0

2 2

4

2010

01 - Decorations

B(C)

£1,950

1

0

2 2

4

2011

01 - Decorations

B(C)

£39,000

1

0

2 2

4

2011

01 - Decorations

B(C)

£1,950

1

0

2 2

4

2011

01 - Decorations

B(C)

£7,800

2

0

2 2

4

2012

01 - Decorations

B(C)

£2,925

2

0

2 2

4

2012

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Compliance / Legal: Redecoration required as part of regular maintenance schedule. Buckland Ward: Redecoration required as part of regular maintenance schedule. Transport Clinic and Renal Offices: Redecoration required as part of regular maintenance schedule. Norman Tanner Unit: Redecoration required as part of regular maintenance schedule. Blood Pressure Units: Redecoration required as part of regular maintenance schedule. Haemodialysis Unit: Redecoration required as part of regular maintenance schedule. Manual Handling: Redecoration required as part of regular maintenance schedule, 0.51. Fountain Suite - Private Patients: Redecoration required as part of regular maintenance schedule. Fountain Suite: Redecoration required as part of regular maintenance schedule, 25. Plastic Dressing Clinic: Redecoration required as part of regular maintenance schedule.

01 - Decorations

B(C)

£1,950

2

0

2 2

4

2012

01 - Decorations

B(C)

£58,500

3

0

2 2

4

2013

01 - Decorations

B(C)

£7,800

3

0

2 2

4

2013

01 - Decorations

B(C)

£39,000

3

0

2 2

4

2013

01 - Decorations

B(C)

£1,950

3

0

2 2

4

2013

01 - Decorations

B(C)

£7,800

3

0

2 2

4

2013

01 - Decorations

B(C)

£1,950

3

0

2 2

4

2013

01 - Decorations

B(C)

£1,950

3

0

2 2

4

2013

01 - Decorations

B(C)

£1,950

3

0

2 2

4

2013

01 - Decorations

B(C)

£1,950

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Health and Safety: Redecoration required as part of regular maintenance schedule to rooms 037, 038, 036, 035. Gastro Office and Sewing Room: Redecoration required as part of regular maintenance schedule. Medical Equipment & Servicing/ Bridges Unit: Close boarded timber soffit requires replacement due to rotten timberwork.

01 - Decorations

B(C)

£3,900

3

0

2 2

4

2013

01 - Decorations

B(C)

£3,900

3

0

2 2

4

2013

02 - Ceiling

C

£1,000

0

0

2 2

4

2010

02 - Ceiling

C

£500

0

0

2 2

4

2010

Buckland Ward: Fibreboard ceiling, Need to make good and replace defective tiles where necessary due to damp penetration to corridor adjacent 021.

02 - Ceiling

B(C)

£500

2

0

2 2

4

2012

02 - Ceiling

B(C)

£6,000

5

0

2 2

4

2015

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

Clinical Effectiveness Dept: Plaster: make good damp patches. Norman Tanner Unit: Close boarded timber soffit requires replacement. Plastic Dressing Clinic: Suspended ceiling. Blood Pressure Units: Plaster ceiling. Fountain Suite - Private Patients: Suspended ceiling. Norman Tanner Unit: Suspended ceiling.

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Overseas Patients Dept: Suspended ceiling. Transport Clinic and Renal Offices: Plaster ceiling. Norman Tanner Unit: Artex. Medical Equipment & Servicing/ Bridges Unit: Plaster ceiling. Gastro Office and Sewing Room: Plaster ceiling. Health and Safety: Suspended ceiling. Manual Handling: Plaster ceiling. Plastic Dressing Clinic: Plaster ceiling. Norman Tanner Unit: Plaster ceiling. Fountain Suite: Suspended ceiling. Bereavement Services: Suspended ceiling. Clinical Effectiveness Dept: Suspended ceiling. Buckland Ward: Suspended ceiling. Compliance / Legal: Suspended ceiling. Haemodialysis Unit: Suspended ceiling. Buckland Ward: Plaster ceiling. Transport Clinic and Renal Offices: Suspended ceiling. Buckland Ward: Plastic soffit to 0.150. Medical Equipment & Servicing/ Bridges Unit: Vinyl sheet to stairs requires replacement.

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling 02 - Ceiling

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling 02 - Ceiling

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling 02 - Ceiling

B B

£0 £0

20 20

0 0

0 0 0 0

0 0

2030 2030

02 - Ceiling

B

£0

20

0

0 0

0

2030

03 - Floor

C

£2,950

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Health and Safety: Contract quality carpet requires replacement. Bereavement Services: Contract quality carpet to 037, 038, 036 and 035 require replacement. Norman Tanner Unit: Vinyl sheet requires replacement to corridor, 014, 013, 048 and 046. Central Booking: Contract quality carpet to the main room, 063, 062 and 061 requires replacement. Buckland Ward: Replace vinyl sheet to 0.33 and 0.017. Buckland Ward: Replace anti slip vinyl sheet to 045 and 046. Fountain Suite: Replace vinyl sheet. Medical Equipment & Servicing/ Bridges Unit: Vinyl sheet to corridor, 002 and 004 requires replacement. Medical Equipment & Servicing/ Bridges Unit: Contract quality carpet to 0.001, 002 and 014. Transport Clinic and Renal Offices: Replace contract quality carpet to: 0.95, 0.094, 0.091 and 0.092. Norman Tanner Unit: Contract quality carpet requires replacement to 026, 024, 023, 004. Fountain Suite - Private Patients: Contract quality carpet to 0.22.

03 - Floor

B(C)

£5,900

1

0

2 2

4

2011

03 - Floor

B(C)

£2,950

1

0

2 2

4

2011

03 - Floor

B(C)

£8,850

2

0

2 2

4

2012

03 - Floor

B(C)

£10,325

2

0

2 2

4

2012

03 - Floor

B(C)

£2,950

2

0

2 2

4

2012

03 - Floor

B(C)

£5,900

2

0

2 2

4

2012

03 - Floor

B(C)

£2,950

2

0

2 2

4

2012

03 - Floor

B(C)

£5,900

2

0

2 2

4

2012

03 - Floor

B(C)

£5,900

3

0

2 2

4

2013

03 - Floor

B(C)

£5,900

3

0

2 2

4

2013

03 - Floor

B(C)

£5,900

3

0

2 2

4

2013

03 - Floor

B(C)

£5,900

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Clinical Effectiveness Dept: Contract quality carpet to 031, 027, 028 and 029 requires replacement. Gastro Office and Sewing Room: Carpet tiles to 054, 047 and 053 require replacement. Compliance / Legal: Contract quality carpet to 024, 023 and 026. Overseas Patients Dept: Contract quality carpet to 034, 033 and 032 requires replacement. Haemodialysis Unit: Replace vinyl sheet to 113. Haemodialysis Unit: Vinyl sheet uneven screed to main room, 104. Blood Pressure Units: Vinyl sheet requires replacement. Transport Clinic and Renal Offices: Anti slip vinyl sheet requires replacing to corridor from Buckland Ward. Haemodialysis Unit: Anti slip vinyl sheet. Central Booking: Anti slip vinyl sheet. Norman Tanner Unit: Vinyl sheet. Norman Tanner Unit: Linoleum. Medical Equipment & Servicing/ Bridges Unit: Concrete floor. Buckland Ward: Vinyl sheet. Buckland Ward: Anti slip vinyl sheet.

03 - Floor

B(C)

£5,900

4

0

2 2

4

2014

03 - Floor

B(C)

£2,950

4

0

2 2

4

2014

03 - Floor

B(C)

£2,950

4

0

2 2

4

2014

03 - Floor

B(C)

£2,950

4

0

2 2

4

2014

03 - Floor

B(C)

£1,180

5

0

2 2

4

2015

03 - Floor

B(C)

£5,900

5

0

2 2

4

2015

03 - Floor

B(C)

£2,950

5

0

2 2

4

2015

03 - Floor

B(C)

£2,360

5

0

2 2

4

2015

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor 03 - Floor

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

03 - Floor 03 - Floor

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Gastro Office and Sewing Room: Vinyl sheet. Medical Equipment & Servicing/ Bridges Unit: Vinyl sheet. Plastic Dressing Clinic: Vinyl sheet. Manual Handling: Parquet flooring. Transport Clinic and Renal Offices: Vinyl sheet. Buckland Ward: Plaster coming away from wall where trunking is falling off. Make good to 0.66. Gastro Office and Sewing Room: Plasterboard Stud: Make good impact damage at entrance to department. Buckland Ward: Plasterboard stud: Minor cracking in bay 16 to room 0.57 make good. Buckland Ward: Plaster stud and plaster soffit make good damp to 023. Health and Safety: Plasterboard Stud: Make good damp to 041 behind filing cabinets. Buckland Ward: Replace ceramic tiles to 045. Norman Tanner Unit: Kitchen units to 017 require replacement. Norman Tanner Unit: WC require replacement to 048. Haemodialysis Unit: replace kitchen units to 113. Buckland Ward: Clinical cupboards to 0.031 require replacement.

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

05 - Condition of Internal Walls

C

£500

0

0

2 2

4

2010

05 - Condition of Internal Walls

C

£250

0

0

2 2

4

2010

05 - Condition of Internal Walls

C

£500

0

0

2 2

4

2010

05 - Condition of Internal Walls

C

£500

0

0

2 2

4

2010

05 - Condition of Internal Walls

C

£500

0

0

2 2

4

2010

05 - Condition of Internal Walls

B(C)

£500

2

0

2 2

4

2012

08 - Fixed Units

B(C)

£2,000

2

0

2 2

4

2012

08 - Fixed Units

B(C)

£500

2

0

2 2

4

2012

08 - Fixed Units

B(C)

£3,000

2

0

2 2

4

2012

08 - Fixed Units

B(C)

£3,000

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Buckland Ward: Replace door closer to 045. Transport Clinic and Renal Offices: Make good damage to door frame and vision panel to 091. Transport Clinic and Renal Offices: Oakleaf were informed of historical and on going water penetration recently made good to 091.

09 - Internal Doors

C

£150

0

0

2 2

4

2010

09 - Internal Doors

C

£500

0

0

2 2

4

2010

12 - Comments

C

£250

0

0

2 2

4

2010

01 - Decorations

C

£3,900

0

0

2 2

4

2010

01 - Decorations

C

£1,950

0

0

2 2

4

2010

01 - Decorations

B(C)

£39,000

2

0

2 2

4

2012

01 - Decorations

B(C)

£37,050

2

0

2 2

4

2012

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling 02 - Ceiling

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

Remedial Action

Location: 01 - First Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

Medical Physics: Redecoration required as part of regular maintenance schedule to rooms 1.27 and 1.07. Richmond Pharmacology: Redecoration required as part of regular maintenance schedule to room 112. Medical Physics: Redecoration required as part of regular maintenance schedule. Richmond Pharmacology: Redecoration required as part of regular maintenance schedule. Medical Physics: Suspended ceiling. Richmond Pharmacology: Plaster ceiling. Medical Physics: Plaster ceiling. Richmond Pharmacology: Suspended ceiling.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Medical Physics: Vinyl tile to corridors 1.01, 1.05, 1.06, 1.07, 1.25, 1.22 and 1.14 requires replacement. Medical Physics: Replace vinyl sheet to landing. Medical Physics: Vinyl sheet to 1.03, 1.30, 1.29, 1.04, 1.27, 1.26, 1.09, 1.10, 1.11, 1.16 and 1.17. Richmond Pharmacology: Contract quality carpet requires replacement to 1.007. 161. Medical Physics: Carpet tiles to 1.02, 1.24 and 1.23 requires replacement. Richmond Pharmacology: Anti slip vinyl sheet requires replacement to 1.06, 1.05, 1.18, 1.73. Medical Physics: Quarry tiles require replacing to 1.00A. Medical Physics: Contract quality carpet to 1.08, 1.21 and 1.12 requires replacement. Medical Physics: Anti slip vinyl sheet. Richmond Pharmacology: Vinyl sheet. Medical Physics: Vinyl sheet. Richmond Pharmacology: Plastered Brickwork: Make good minor damp to corner in room 105. Richmond Pharmacology: Plastered Brickwork: Make good minor damp to 1.17.

03 - Floor

C

£17,700

0

0

2 2

4

2010

03 - Floor

C

£5,900

0

0

2 2

4

2010

03 - Floor

B(C)

£38,350

1

0

2 2

4

2011

03 - Floor

B(C)

£2,950

3

0

2 2

4

2013

03 - Floor

B(C)

£2,950

4

0

2 2

4

2014

03 - Floor

B(C)

£2,950

5

0

2 2

4

2015

03 - Floor

B(C)

£5,900

5

0

2 2

4

2015

03 - Floor

B(C)

£5,900

5

0

2 2

4

2015

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor 05 - Condition of Internal Walls

B C

£0 £500

10 0

0 0

0 0 2 2

0 4

2020 2010

05 - Condition of Internal Walls

C

£500

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Richmond Pharmacology: Make good efflorescence to 1.11 (painted). Medical Physics: kitchen units require replacing to 1.15.

05 - Condition of Internal Walls

B(C)

£500

5

0

2 2

4

2015

08 - Fixed Units

C

£2,000

0

0

2 2

4

2010

04 - Windows

C

£65,200

0

0

4 3 12

2010

04 - Windows

B

£0

20

0

0 0

0

2030

06 - Doors

C

£1,600

0

0

3 3

9

2010

C

£1,500

0

0

4 4 16

2010

South Wing: Cast iron fire escape requires sand blasting and re painting.

04 - Windows

C

£21,600

0

0

4 3 12

2010

04 - Windows

C

£13,600

0

0

4 3 12

2010

06 - Doors

C

£1,600

0

0

3 3

2010

South Wing: Replace timber glazing and associated panels. Localised rot damage and in poor decorative order. South Wing: Replace 10No. Timber frames. Localised rot damage and in poor decorative order. Frames also offer poor insulating properties. South Wing: Replace 2No. sets of doors to basement plant.

Location: Elevation 01 B - Building - External Fabric South Wing: 46No. sliding sash windows in poor condition. Windows offer poor insulating properties with localised rot damage noted. North Wing: 9No. Aluminium sash in good condition. South Wing: Replace 2No. sets of doors to basement plant.

Location: Elevation 02 A - Building - Physical Structure 05 - External Fire Escape

B - Building - External Fabric

9

Location: Elevation 03 Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B - Building - External Fabric 04 - Windows

C

£64,200

0

0

4 3 12

2010

South Wing: 44No. sliding sash windows in poor condition. Windows offer poor insulating properties with localised rot damage noted.

01 - General Structure

C

£12,000

0

0

3 4 12

2010

06 - Comments

C

£1,600

0

0

3 2

6

2010

Replace polycarbonate clad walkway to elevation 4 fire exit. Asphalt to floor slab detached to corridor section. Localised spot repairs required.

02a - Cladding - Attachment 04 - Windows

C C

£1,200 £800

0 0

0 0

2 2 4 4 3 12

2010 2010

04 - Windows 06 - Doors

C C

£4,000 £800

0 0

0 0

4 3 12 3 3 9

2010 2010

06 - Doors

C

£1,600

0

0

3 3

2010

Location: Elevation 04 A - Building - Physical Structure

B - Building - External Fabric

9

Redecorate timber cladding. Replace 1No. Crittal steel frame, corrosion evident with frame in generally poor condition. Replace 5No. Timber frames. Replace boarded up door to undercroft.

Redecorate 1No. set of double exit doors.

Location: Elevation 05 B - Building - External Fabric

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Windows

C

£26,200

0

0

4 3 12

2010

North Wing: 16No. sliding sash windows in poor condition. Windows offer poor insulating properties with localised rot damage noted.

02g - Flat - Guttering

C

£2,500

0

0

4 4 16

2010

North Wing: Cast iron gutters, signs of failures to joints and in generally poor condition.

02h - Flat - Down Rainwater Pipes

B

£0

15

0

0 0

0

2025

North Wing: PVCU rainwater pipes.

C

£1,500

0

0

4 4 16

2010

North Wing: Cast iron fire escape requires sand blasting and re painting.

02a - Cladding - Attachment

C

£21,900

0

0

4 3 12

2010

North Wing: Replace timber cladding at first and second floor levels. Localised rot damage and in poor decorative order.

04 - Windows

C

£0

0

0

4 3 12

2010

North Wing: Replace timber frames; cost included to cladding section. Frames are located to timber infill.

D - Building - Roof

Location: Elevation 06 A - Building - Physical Structure 05 - External Fire Escape

B - Building - External Fabric

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Windows

C

£24,200

0

0

4 3 12

2010

North Wing: 14No. sliding sash windows in poor condition. Windows offer poor insulating properties with localised rot damage noted.

06 - Doors

C

£2,400

0

0

3 3

9

2010

North Wing: Replace 3No. doors including to basement.

02a - Cladding - Attachment

C

£320

0

0

2 2

4

2010

06 - Doors

C

£1,600

0

0

3 3

9

2010

North Wing: Redecorate timber cladding to extension. North Wing: Replace 2No. timber doors to basement.

05 - External Fire Escape

C

£2,000

0

0

5 4 20

2010

06 - Comments

C

£2,200

0

0

4 5 20

2010

06 - Comments

C

£0

0

0

2 2

4

2010

02a - Cladding - Attachment

C

£1,200

0

0

4 3 12

2010

02c - Cladding - Joints

C

£0

0

0

4 3 12

2010

04 - Windows

C

£8,000

0

0

4 3 12

2010

Location: Elevation 07 B - Building - External Fabric

Location: Elevation 08 A - Building - Physical Structure Re build rotten fire escape steps. Signs of standing water to plant room stairs. Cost allows for sump pump installation. Localised replacement of frame, has occurred with plywood inserts. No cost allocated.

B - Building - External Fabric

Generic Hospital Physical Condition Survey

Redecorate timber and concrete cladding. Bitumen repairs to the base of concrete cladding, Replace 10No. Timber frames. Localised rot damage and in poor decorative order. Frames also offer poor insulating properties. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Replace 4No. Timber frames. Localised rot damage and in poor decorative order. Frames also offer poor insulating properties. Replace 1No. Plant Room door.

04 - Windows

C

£3,200

0

0

4 3 12

2010

06 - Doors

C

£800

0

0

3 3

9

2010

C

£1,500

0

0

4 4 16

2010

Strip and redecorate fixed ladder.

02a - Cladding - Attachment 04 - Windows

C C

£1,300 £8,400

0 0

0 0

2 2 4 4 3 12

2010 2010

06 - Doors

C

£1,600

0

0

3 3

9

2010

Redecorate timber cladding. Replace 8No. Single glazed timber frames. Replace 1No. double fire exit door to court yard.

02a - Cladding - Attachment 04 - Windows

C C

£1,300 £16,200

0 0

0 0

2 2 4 4 3 12

2010 2010

06 - Doors

C

£1,600

0

0

3 3

9

2010

Redecorate timber cladding. Replace 17No. single glazed timber frames due to extensive rot. Replace double fire exit doors.

B B

£0 £0

10 20

0 0

0 0 0 0

0 0

2020 2030

Redecorate cladding. PVCU glazing in good order.

C

£2,400

0

0

2 2

4

2010

Redecorate timber cladding.

Location: Elevation 09 A - Building - Physical Structure 06 - Comments B - Building - External Fabric

Location: Elevation 10 B - Building - External Fabric

Location: Elevation 11 B - Building - External Fabric 02a - Cladding - Attachment 04 - Windows

Location: Elevation 12 B - Building - External Fabric 02a - Cladding - Attachment Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

20No. Softwood frames in poor condition. Replace timber exit door.

04 - Windows

C

£18,200

0

0

4 3 12

2010

06 - Doors

C

£800

0

0

3 3

9

2010

02a - Cladding - Attachment 04 - Windows

C C

£600 £4,000

0 0

0 0

2 2 4 4 3 12

2010 2010

Redecorate timber cladding. Replace 5No. Timber frames. Localised rot damage and in poor decorative order. Frames also offer poor insulating properties.

06 - Doors

B

£0

20

0

0 0

0

2030

Aluminium exit doors in acceptable condition.

02a - Cladding - Attachment

C

£500

0

0

4 3 12

2010

02b - Cladding - Cracking

C

£800

0

0

4 3 12

2010

04 - Windows

C

£7,600

0

0

4 3 12

2010

Replace rotten sections of cladding 5m2. Redecorate cladding (timber and concrete). Replace 7No. Timber and steel frames. Localised rot damage and in poor decorative order. Frames also offer poor insulating properties.

C

£1,500

0

0

2 2

2010

Location: Elevation 13 B - Building - External Fabric

Location: Elevation 14 B - Building - External Fabric

Location: Elevation 15 A - Building - Physical Structure 06 - Comments

Generic Hospital Physical Condition Survey

4

Exposed pipes to undercroft adj. footpath. Cost allows for removal as potential H and S risk.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 06 - Comments

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£800

0

0

3 2

6

2010

Asphalt to floor slab deteriorating, cost allows for spot repairs to concrete.

01a - Masonry - Cracking 01d - Masonry - Finish

C C

£800 £1,200

0 0

0 0

4 3 12 4 3 12

2010 2010

04 - Windows

C

£2,200

0

0

4 3 12

2010

Infill brick opening. Redecorate rendered finish to elevation 15. Redecorate timber frames. Localised rot damage and in poor decorative order. Frames also offer poor insulating properties.

B N/A

£0 £0

20 0

0 0

0 0 0 0

0 0

2030 2010

Blockwork in good order. Comment: Extensive overgrowth, limited access to elevation.

B B

£0 £0

20 20

0 0

0 0 0 0

0 0

2030 2030

PVCU cladding in good order. PVCU windows in good order.

B

£0

20

0

0 0

0

2030

Galvanised steel cladding in good order.

B - Building - External Fabric

Location: Elevation 15A A - Building - Physical Structure 01 - General Structure 06 - Comments

B - Building - External Fabric 02a - Cladding - Attachment 04 - Windows

Location: Elevation 16 B - Building - External Fabric 02a - Cladding - Attachment

Location: Elevation 17 A - Building - Physical Structure

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 01 - General Structure

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

N/A

£0

0

0

0 0

0

2010

No access at time of survey due to building work.

04 - Windows

C

£800

0

0

4 3 12

2010

04 - Windows

B

£0

10

0

0 0

0

2020

Replace 1No. Timber frame in good order. Localised rot damage and in poor decorative order. Frames also offer poor insulating properties. Single glazed aluminium windows in acceptable condition.

02a - Cladding - Attachment 04 - Windows

C C

£950 £2,400

0 0

0 0

2 2 4 4 3 12

2010 2010

04 - Windows

B

£0

20

0

0 0

0

2030

C

£0

0

0

2 2

4

2010

Location: Elevation 18 B - Building - External Fabric

Location: Elevation 19 B - Building - External Fabric Redecorate cladding. Replace 3No. Timber frames. Localised rot damage and in poor decorative order. Frames also offer poor insulating properties. PVCU glazing in good order.

Location: Elevation 20 A - Building - Physical Structure 06 - Comments

Crude finish to termination of former hospital corridor. No cost allocated.

B - Building - External Fabric

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02a - Cladding - Attachment

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£2,600

0

0

4 3 12

2010

Timber frames and cladding in generally poor condition, localised rot damaged with replacement required.

C C

£700 £11,200

0 0

0 0

2 2 4 4 3 12

2010 2010

Redecorate timber cladding. Replace 14No. Single glazed windows due to extensive rot damage. Localised rot damage and in poor decorative order. Frames also offer poor insulating properties.

C

£600

0

0

5 4 20

2010

Structural crack at basement level, cost allows for making good and monitoring.

02a - Cladding - Attachment 02d - Cladding - Finish

C C

£1,100 £600

0 0

0 0

2 2 2 2

4 4

2010 2010

Redecorate timber cladding. Replace rot damaged sections of cladding.

04 - Windows

C

£11,200

0

0

4 3 12

2010

Replace 14No. Single glazed windows. Localised rot damage and in poor decorative order. Frames also offer poor insulating properties.

Location: Elevation 21 B - Building - External Fabric 02a - Cladding - Attachment 04 - Windows

Location: Elevation 22 A - Building - Physical Structure 01 - General Structure

B - Building - External Fabric

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: Elevation 23 B - Building - External Fabric 01c - Masonry - Pointing 04 - Windows

C C

£500 £7,200

0 0

0 0

4 3 12 4 3 12

2010 2010

Repoint 8m2 of brickwork. Replace 9No. Single glazed windows. Localised rot damage and in poor decorative order. Frames also offer poor insulating properties.

01 - General Structure

B

£0

10

0

0 0

0

2020

Timber clad Plant Room.

02a - Flat - Covering

B

£0

20

0

0 0

0

2030

Zinc roof in good order, with joint repairs noted.

02g - Flat - Guttering

B(C)

£9,000

5

0

4 4 16

2015

02i - Flat - Skylights

B

£0

10

0

0 0

0

2020

Steel box gutters will require replacement during maintenance period. 34No. polycarbonate skylights.

B

£0

20

0

0 0

0

2030

PVCU clad Plant Room.

B

£0

20

0

0 0

0

2030

PVCU cladding in good order.

Location: Roof 01 A - Building - Physical Structure D - Building - Roof

Location: Roof 01A A - Building - Physical Structure 01 - General Structure B - Building - External Fabric 02a - Cladding - Attachment D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

02a - Flat - Covering

B

£0

20

0

0 0

0

2030

Mineral felt in good order.

02i - Flat - Skylights

B

£0

15

0

0 0

0

2025

1No. PVCU skylight.

B B B B

£0 £0 £0 £0

10 15 15 15

0 0 0 0

0 0 0 0

0 0 0 0

2020 2025 2025 2025

Mineral felt in good order. PVCU fascias. PVCU rain water goods. 3No. PVCU skylights.

01a - Attached - Covering

C

£14,000

0

0

4 3 12

2010

01a - Attached - Covering

C

£26,000

0

0

4 3 12

2010

01a - Attached - Covering 01d - Attached Verges/Fascias/Soffits 01e - Attached - Rafters 01f - Attached - Purlins 01h - Attached - Down Rainwater Pipes

B C

£0 £800

10 0

0 0

0 0 2 2

0 4

2020 2010

Pitched mineral felt roof, 60% requires replacement, appears to be installed over slate. 20% of mineral felt in good order to flat section of roof, remainder has been patched repaired with failures evident to seams. Solar reflective paint installed. Redecorate fascias.

B B C

£0 £0 £5,000

20 20 0

0 0 0

0 0 0 0 0 0 4 3 12

2030 2030 2010

Location: Roof 01B D - Building - Roof 02a - Flat - Covering 02e - Flat - Verges/Fascias/Soffits 02h - Flat - Down Rainwater Pipes 02i - Flat - Skylights

0 0 0 0

Location: Roof 02 D - Building - Roof

Generic Hospital Physical Condition Survey

Cast iron rain water goods in poor condition, replacement required along with associated rainwater goods.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 01h - Attached - Down Rainwater Pipes

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2020

PVCU rain water goods in good order.

02a - Flat - Covering

C

£96,000

0

0

4 4 16

2010

Mineral felt requires replacement. (approx 40 years old) with failures evident to seams and extensive wear.

02h - Flat - Down Rainwater Pipes 02i - Flat - Skylights

B B

£0 £0

10 15

0 0

0 0 0 0

0 0

2020 2025

PVCU rain water goods. 15No. PVCU skylights in acceptable condition.

01a - Attached - Covering

C

£48,000

0

0

4 3 12

2010

Pitched slate roof with several slipped slates ridge repairs visible with further works likely.

01c - Attached - Flashing

C

£500

0

0

3 3

9

2010

Replace steel cowling to chimney.

01d - Attached Verges/Fascias/Soffits 01e - Attached - Rafters 01h - Attached - Down Rainwater Pipes

B

£0

10

0

0 0

0

2020

B C

£0 £2,480

20 0

0 0

0 0 0 4 3 12

2030 2010

B

£0

10

0

0 0

2020

Location: Roof 03 D - Building - Roof

Location: Roof 04 D - Building - Roof

01h - Attached - Down Rainwater Pipes

Generic Hospital Physical Condition Survey

0

Replace cast iron rain water goods require replacement (40m). PVCU rainwater goods in acceptable condition.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Mineral felt in extremely poor condition with replacement works required. PVCU and cast iron rain water goods in poor condition.

Location: Roof 04A D - Building - Roof 02a - Flat - Covering

C

£800

0

0

4 4 16

2010

02h - Flat - Down Rainwater Pipes

C

£500

0

0

4 4 16

2010

Location: Roof 05 D - Building - Roof 01h - Attached - Down Rainwater Pipes 02a - Flat - Covering

B

£0

10

0

0 0

0

2020

PVCU rainwater goods in acceptable condition. Mineral felt requires replacement. (approx 40 years old) with failures evident to seams and extensive wear. Woodwool decking.

C

£19,200

0

0

4 4 16

2010

02b - Flat - Decking

B

£0

20

0

0 0

0

2030

B B

£0 £0

30 10

0 0

0 0 0 0

0 0

2040 2020

B

£0

20

0

0 0

0

2030

02a - Flat - Covering

C

£64,800

0

0

4 4 16

2010

Mineral felt requires replacement. (approx 40 years old) with failures evident to seams and extensive wear.

02b - Flat - Decking

B

£0

20

0

0 0

2030

Woodwool decking.

Location: Roof 06 D - Building - Roof 01a - Attached - Covering 01d - Attached Verges/Fascias/Soffits 01e - Attached - Rafters

Pitched slate recent overhaul.

Location: Roof 07 D - Building - Roof

Generic Hospital Physical Condition Survey

0

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02g - Flat - Guttering

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2020

PVCU rain water goods.

02a - Flat - Covering

C

£144,000

0

0

4 4 16

2010

South Wing: Slate roof in poor condition with numerous slipped tiles.

02a - Flat - Covering 02c - Flat - Flashing

B B

£0 £0

20 10

0 0

0 0 0 0

0 0

2030 2020

02g - Flat - Guttering

C

£5,000

0

0

4 4 16

2010

02h - Flat - Down Rainwater Pipes

C

£800

0

0

4 4 16

2010

Galvanised steel decking. South Wing: Lead flashing in acceptable condition. South Wing: Cast iron rain water good have failures to joints and in generally poor condition. South Wing: Cast iron rain water good have failures to joints and in generally poor condition.

02a - Flat - Covering

B

£0

15

0

0 0

0

2025

02b - Flat - Decking

B

£0

20

0

0 0

0

2030

02d - Flat - Parapets

C

£800

0

0

4 4 16

2010

Location: Roof 08 D - Building - Roof

Location: Roof 09 D - Building - Roof South Wing: Mineral felt, viewed from adjacent block. Appears in good order. South Wing: Reinforced concrete decking. Assumed condition. South Wing: Re seat brick coping to parapets.

Location: Roof 10 D - Building - Roof Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

North Wing: Mineral felt in acceptable condition. North Wing: Lead flashing appears in good order.

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

02b - Flat - Decking

B

£0

10

0

0 0

0

2020

02a - Flat - Covering

C

£48,000

0

0

4 4 16

2010

02b - Flat - Decking

B

£0

20

0

0 0

0

2030

02d - Flat - Parapets

C

£600

0

0

4 4 16

2010

02d - Flat - Parapets

B

£0

10

0

0 0

0

2020

01a - Attached - Covering

B

£0

15

0

0 0

0

2025

South Wing: Slate in generally acceptable condition.

01c - Attached - Flashing

B

£0

10

0

0 0

0

2020

01h - Attached - Down Rainwater Pipes

B

£0

10

0

0 0

0

2020

South Wing: Lead flashing in acceptable condition. South Wing: PVCU rainwater goods in acceptable condition.

Location: Roof 11 D - Building - Roof North Wing: Mineral felt is worn and likely prone to failure, cost allows for replacement. North Wing: Reinforced concrete decking. South Wing: Re seat brick coping to parapets. North Wing: Brick parapets and coping.

Location: Roof 12 D - Building - Roof

Location: Roof 14 D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01a - Attached - Covering

C

£144,000

0

0

4 3 12

2010

North Wing: Slate roof in poor condition with numerous slipped tiles.

01e - Attached - Rafters

B

£0

30

0

0 0

0

2040

01g - Attached - Guttering

C

£5,000

0

0

4 3 12

2010

01h - Attached - Down Rainwater Pipes

C

£800

0

0

4 3 12

2010

North Wing: Timber rafters, assumed to be in acceptable condition. North Wing: Cast iron rain water goods have failed with corrosion and leaks evident to joints. North Wing: Cast iron rain water goods have failed with corrosion and leaks evident to joints.

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

02b - Flat - Decking

B

£0

20

0

0 0

0

2030

02d - Flat - Parapets

C

£600

0

0

4 4 16

2010

02d - Flat - Parapets

B

£0

20

0

0 0

0

2030

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

02b - Flat - Decking

B

£0

10

0

0 0

0

2020

Location: Roof 15 D - Building - Roof South Wing: Mineral felt, viewed from adjacent block. Appears in good order. South Wing: Reinforced concrete decking. Assumed condition. South Wing: Re seat brick coping to parapets. North Wing: Brick parapets and coping.

Location: Roof 16 D - Building - Roof

Generic Hospital Physical Condition Survey

North Wing: Mineral felt in acceptable condition. North Wing: Lead flashing appears in good order.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

North Wing: Mineral felt is worn and likely prone to failure, cost allows for replacement. North Wing: Reinforced concrete decking. North Wing: Brick parapets and coping.

Location: Roof 17 D - Building - Roof 02a - Flat - Covering

C

£48,000

0

0

4 4 16

2010

02b - Flat - Decking

B

£0

20

0

0 0

0

2030

02d - Flat - Parapets

B

£0

10

0

0 0

0

2020

01a - Attached - Covering

B

£0

15

0

0 0

0

2025

South Wing: Slate in generally acceptable condition.

01c - Attached - Flashing

B

£0

10

0

0 0

0

2020

01h - Attached - Down Rainwater Pipes

B

£0

10

0

0 0

0

2020

South Wing: Lead flashing in acceptable condition. South Wing: PVCU rainwater goods in acceptable condition.

02a - Flat - Covering

C

£1,600

0

0

4 4 16

2010

02e - Flat - Verges/Fascias/Soffits

C

£200

0

0

4 4 16

2010

Location: Roof 18 D - Building - Roof

Location: Roof 19 D - Building - Roof North Wing: Mineral felt showing signs of deterioration with replacement works likely to be required. North Wing: Redecoration required.

Location: Whole Block A - Building - Physical Structure Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Brick chimneys in acceptable condition, cost allows for routine repairs. Basement and undercroft sealed with blockwork.

04 - Chimneys

B(C)

£5,000

3

0

3 3

9

2013

06 - Comments

B

£0

20

0

0 0

0

2030

01a - Masonry - Cracking

C

£5,000

0

0

4 3 12

2010

01a - Masonry - Cracking

B

£0

10

0

0 0

0

2020

01b - Masonry - Spalling 01c - Masonry - Pointing 09 - Comments

B B C

£0 £0 £20,000

10 10 0

0 0 0

0 0 0 0 0 0 4 3 12

2020 2020 2010

01 - Heat Emitters

C

£500

0

0

2 2

4

2010

01 - Heat Emitters

B

£0

6

0

0 0

0

2016

01 - Heat Emitters

B

£0

6

0

0 0

0

2016

01 - Heat Emitters

B

£0

9

0

0 0

0

2019

01 - Heat Emitters

B

£0

12

0

0 0

0

2022

01 - Heat Emitters

B

£0

18

0

0 0

0

2028

Remedial Action

B - Building - External Fabric Localised pointing and crack repair required; it will be prudent to carry works out alongside window replacement. Brickwork in generally acceptable condition.

Cast iron and PVCU soil pipes are corroded with bitumen repairs.

Facet: 2 - Engineering Location: 00 - Ground Floor I - Engineering - Heating Systems

Generic Hospital Physical Condition Survey

K6 0.16: Column radiator requires replacement. Haemodialysis Unit: Heat emitters with low surface temperature covers in acceptable order. Buckland Ward: Heat emitters with low surface temperature covers in acceptable order. Steel panel radiators in acceptable order. Renal Transplant: Steel panel radiators in acceptable order. Heat emitters with low surface temperature covers in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02 - Pipework

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£300

0

0

2 3

6

2010

K3 0.21: 5No. grilles/covers needed over heating pipes.

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

05 - Cooling Units

B(C)

£5,000

4

0

3 3

9

2014

05 - Cooling Units

B(C)

£5,000

4

0

3 3

9

2014

05 - Cooling Units

B(C)

£5,000

4

0

3 3

9

2014

KC 0.20: Grille/diffuser requires cleaning. KC 0.04: Mitsubishi air conditioning unit requires upgrading within the maintenance schedule. KC 0.03: Mitsubishi air conditioning unit requires upgrading within the maintenance schedule. KC 0.02: Mitsubishi air conditioning unit requires upgrading within the maintenance schedule.

05 - Cooling Units

B(C)

£5,000

4

0

3 3

9

2014

KC 0.05: Mitsubishi air conditioning unit requires upgrading within the maintenance schedule.

05 - Comments

B

£0

6

0

0 0

0

2016

05 - Comments

B

£0

8

0

0 0

0

2018

Corridor: Medical gases in acceptable order. Corridor: Medical gases in acceptable order.

03 - Blending Valves

C

£250

0

0

3 3

9

2010

03 - Blending Valves

C

£250

0

0

3 3

9

2010

03 - Blending Valves

B(C)

£400

5

0

3 3

9

2015

K - Engineering - Vent & Air Con

L - Engineering - Medical Gases

M - Engineering - Hot/Cold Water

Generic Hospital Physical Condition Survey

K4 0.50: Showers require removing. K4 0.49: Showers require removing. KC 0.10: Blending valve requires upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

O - Engineering - Main Plant 05 - Pressurisation Units

B

£0

10

0

0 0

0

2020

K3 0.39: Water softening/pressurisation equipment in acceptable order.

04 - Extract Fans

B(C)

£300

3

0

3 3

9

2013

04 - Extract Fans

B(C)

£400

4

0

3 3

9

2014

04 - Extract Fans

B(C)

£400

4

0

3 3

9

2014

04 - Extract Fans

B(C)

£400

4

0

3 3

9

2014

04 - Extract Fans

B(C)

£200

4

0

3 3

9

2014

09 - Comments

B

£0

10

0

0 0

0

2020

KC 0.11: Extract fan requires upgrading within the maintenance schedule. KC 0.16: Vent Axia extract fan requires upgrading within the maintenance schedule. KC 0.17: Vent Axia extract fan requires upgrading within the maintenance schedule. KC 0.18: Vent Axia extract fan requires upgrading within the maintenance schedule. K4 0.53: Extract fan requires upgrading within the maintenance schedule. 0.08: Water softening equipment in acceptable order.

02 - Main Switchgear

C

£1,800

0

0

3 3

9

2010

02 - Main Switchgear

B

£0

12

0

0 0

0

2022

03 - Distribution Boards

C

£2,400

0

0

3 3

9

2010

03 - Distribution Boards

B

£0

12

0

0 0

0

2022

03 - Distribution Boards

B

£0

12

0

0 0

0

2022

P - Engineering - Main Plant

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

KC 0.15: 3No. MEM unlockable switchgear require replacement. K40.22A: 11No. Ottermill switchgear in acceptable order. KC 0.15: 3No. MEM distribution board with rewirable fuses require replacement. K40.22A: Hager distribution board in acceptable order. K6 0.02: Hager distribution board in acceptable order.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

03 - Distribution Boards

B

£0

12

0

0 0

0

2022

Hager distribution board in acceptable order.

03 - Distribution Boards

B

£0

18

0

0 0

0

2028

03 - Distribution Boards

B

£0

18

0

0 0

0

2028

03 - Distribution Boards

B

£0

18

0

0 0

0

2028

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

K6 0.28: 3No. Hager distribution boards in acceptable order. K3 0.39: Hager distribution board in acceptable order. 0.034: Hager distribution board in acceptable order. Surface fluorescent light requires replacement. KC 0.10: Surface fluorescent light requires replacement. 0.044: Surface fluorescent light requires replacement. Surface fluorescent light requires replacement. 0.045: Surface fluorescent light requires replacement. 0.046: Surface fluorescent light requires replacement. KC 0.10: Tungsten light requires replacement. 0.038: Surface fluorescent light requires replacement. K4 0.50: 2No. tungsten lights require replacement. 0.04: Surface fluorescent light requires replacement. 0.09: 2No. medical lights require replacement.

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes K6 0.04: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K2 0.02: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K2 0.10: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K4 0.49: 2No. tungsten lights require replacement. K2 0.08: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K2 0.16: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K2 0.06: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K2 0.11: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K2 0.03: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K2 0.09: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading.

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes K2 0.01: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K2 0.15: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K2 0.13: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. KC 0.46: Tungsten light requires replacement. KC 0.14: Tungsten light requires replacement. KC 0.47: Tungsten light requires replacement. K2 0.04: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K6 0.02: Fluorescent light over visual display equipment is not suitable and requires upgrading. K2 0.24: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. KC 0.29: Fluorescent light over visual display equipment is not suitable and requires upgrading. K2 0.17: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading.

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes K2 0.18: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K6 0.01: Fluorescent light over visual display equipment is not suitable and requires upgrading. K2 0.21: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K2 0.20: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K4 0.54: Fluorescent light over visual display equipment is not suitable and requires upgrading. K2 0.19: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K2 0.23: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K2 0.12: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. K2 0.07: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.021: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading.

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.039: Surface fluorescent light requires replacement. K2 0.25: 2No. surface fluorescent lights require upgrading within the maintenance schedule. K2 0.22: 4No. surface fluorescent lights require upgrading within the maintenance schedule. K2 0.26: 2No. surface fluorescent lights require upgrading within the maintenance schedule. KC 0.25: 2No. surface fluorescent lights require upgrading within the maintenance schedule. Corridor: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 0.113: Surface fluorescent light requires upgrading within the maintenance schedule. K6 0.03: Surface fluorescent light requires upgrading within the maintenance schedule. KC 0.07: 7No. surface fluorescent lights require upgrading within the maintenance schedule. 0.023: 3No. surface fluorescent lights require upgrading within the maintenance schedule. K4 0.54: 12No. CAT II lights require upgrading within the maintenance schedule.

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£400

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£800

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£400

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£2,400

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes K3 0.16: 2No. surface fluorescent lights require upgrading within the maintenance schedule. K3 0.17: 2No. surface fluorescent lights require upgrading within the maintenance schedule. K4 0.51: 8No. surface fluorescent lights require upgrading within the maintenance schedule. KC 0.06: 4No. surface fluorescent lights require upgrading within the maintenance schedule. KC 0.09: 5No. surface fluorescent lights require upgrading within the maintenance schedule. KC 0.16: Surface fluorescent light requires upgrading within the maintenance schedule. KC 0.03: Surface fluorescent light requires upgrading within the maintenance schedule. K3 0.21: Surface fluorescent light requires upgrading within the maintenance schedule. K3 0.18: 2No. surface fluorescent lights require upgrading within the maintenance schedule. Corridor: 6No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,000

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes K3 0.14: 4No. surface fluorescent lights require upgrading within the maintenance schedule. K2 0.05: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.04: 2No. surface fluorescent lights require upgrading within the maintenance schedule. KC 0.08: 5No. surface fluorescent lights require upgrading within the maintenance schedule. KC 0.12: Surface fluorescent light requires upgrading within the maintenance schedule. KC 0.11: 4No. surface fluorescent lights require upgrading within the maintenance schedule. Corridor: 2No. surface fluorescent lights require upgrading within the maintenance schedule. KC 0.27: 5No. surface fluorescent lights require upgrading within the maintenance schedule. KC 0.25: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.032: 2No. CAT II lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes KC 0.26: 2No. surface fluorescent lights require upgrading within the maintenance schedule. Norman Tanner Unit - Offices: CAT II lights in acceptable order. Surface fluorescent lights in acceptable order.

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

05 - Emergency Lighting

B(C)

£200

3

0

4 2

8

2013

08 - Comments

C

£100

0

0

2 2

4

2010

B

£0

8

0

0 0

0

2018

Remedial Action

KC 0.14: CAT II lights in acceptable order. K2 0.14: 2No. surface fluorescent lights in acceptable order. Renal Transplant: CAT II lights in acceptable order. Surface fluorescent lights in acceptable order. K4 0.44: CAT II lights in acceptable order. Renal Transplant: Surface fluorescent lights in acceptable order. K3 0.39: Surface fluorescent lights in acceptable order. KC 0.09: Emergency lights requires upgrading within the maintenance schedule. K4 0.22A: Trunking requires replacement.

V - Engineering - Fire Alarms 01 - Sounders

Generic Hospital Physical Condition Survey

K4 0.53: Fire alarm sounders in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01 - Sounders

B

£0

15

0

0 0

0

2025

Fire alarm sounders in acceptable order.

02 - Call Points

B

£0

12

0

0 0

0

2022

Fire alarm call points in acceptable order.

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

05 - Fire Main/Zone Panel

B

£0

12

0

0 0

0

2022

Smoke detectors in acceptable order. Renal Transplant: Smoke detectors in acceptable order. KC 0.14: Smoke detectors in acceptable order. K4 0.44: Smoke detectors in acceptable order. Corridor: Smoke detectors in acceptable order. KC 0.10: Fire alarm main panel in acceptable order.

02 - Pumps

B

£0

7

0

0 0

0

2017

03 - Calorifiers

B

£0

7

0

0 0

0

2017

Location: -01 - Basement O - Engineering - Main Plant 1.005: DAB domestic hot water service pump in acceptable order. 1.005: Heatrae Sadia Megaflo Calorifier in acceptable order.

P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

1.026: 2No. batteries require upgrading within the maintenance schedule. 1.026: Generator in acceptable order.

08 - Generators

B(C)

£600

5

0

2 3

6

2015

08 - Generators

B

£0

20

0

0 0

0

2030

02 - Main Switchgear

C

£1,200

0

0

3 3

9

2010

03 - Distribution Boards

C

£800

0

0

3 3

9

2010

01 - Heat Emitters

C

£100

0

0

2 2

4

2010

01 - Heat Emitters

C

£100

0

0

2 2

4

2010

01 - Heat Emitters

B

£0

12

0

0 0

0

2022

B

£0

30

0

0 0

0

2040

Medical Physics/BioEngineering: Goods lift in acceptable order.

C

£300

0

0

2 3

6

2010

KC 1.15: Xpelair extract fan requires replacement.

03 - Distribution Boards

B

£0

12

0

0 0

0

2022

03 - Distribution Boards

B

£0

18

0

0 0

0

2028

03 - Distribution Boards

B

£0

18

0

0 0

0

2028

04 - Lighting Installation

C

£3,000

0

0

2 2

4

2010

KC 1.07: 2No. MEM distribution boards in acceptable order. KC 1.28: MEM distribution board in acceptable order. Richmond Pharmacy: Hager distribution board in acceptable order. KC 1.10: 15No. tungsten lights require replacement.

R - Engineering - Electrical 1.005: 4No. switchgear require replacement. 1.005: 2No. Hager distribution boards require replacement.

Location: 01 - First Floor I - Engineering - Heating Systems KC 1.15: Dimplex Electric heater requires removing. KC 1.28: Dimplex Electric heater requires removing. K3 1.07: Steel panel radiators in acceptable order.

N - Engineering - Lifts 01 - Lifts

P - Engineering - Main Plant 04 - Extract Fans R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes K3 1.09: 12No. medical lights require replacement. K3 1.08: 12No. medical lights require replacement. KC 1.14: 3No. surface fluorescent lights require upgrading within the maintenance schedule. KC 1.08: Surface fluorescent light requires upgrading within the maintenance schedule. KC 1.29: Surface fluorescent light requires upgrading within the maintenance schedule. KC 1.30: Surface fluorescent light requires upgrading within the maintenance schedule. KC 1.03: 3No. surface fluorescent lights require upgrading within the maintenance schedule. KC 1.11: 3No. surface fluorescent lights require upgrading within the maintenance schedule. KC 1.12: 6No. surface fluorescent lights require upgrading within the maintenance schedule. KC 1.17: Surface fluorescent light requires upgrading within the maintenance schedule. KC 1.16: Surface fluorescent light requires upgrading within the maintenance schedule. KC 1.09: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

C

£2,400

0

0

2 2

4

2010

04 - Lighting Installation

C

£2,400

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£600

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes KC 1.09: Surface fluorescent light requires upgrading within the maintenance schedule. KC 1.18: Surface fluorescent light requires upgrading within the maintenance schedule. KC 1.04: 4No. surface fluorescent lights require upgrading within the maintenance schedule. K3 1.18: Surface fluorescent light requires upgrading within the maintenance schedule. K3 1.07: Surface fluorescent light requires upgrading within the maintenance schedule. KC 1.26: 2No. CAT II lights require upgrading within the maintenance schedule. KC 1.24: 2No. CAT II lights require upgrading within the maintenance schedule. KC 1.23: 2No. CAT II lights require upgrading within the maintenance schedule. KC 1.22: 2No. CAT II lights require upgrading within the maintenance schedule. KC 1.14: 2No. CAT II lights require upgrading within the maintenance schedule. KC 1.06: 2No. CAT II lights require upgrading within the maintenance schedule. KC 1.05: 2No. CAT II lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes KC 1.07: 12No. CAT II lights require upgrading within the maintenance schedule. KC 1.02: 2No. CAT II lights require upgrading within the maintenance schedule. KC 1.27: 2No. CAT II lights require upgrading within the maintenance schedule. KC 1.12: 2No. CAT II lights require upgrading within the maintenance schedule. KC 1.10A: 4No. CAT II lights require upgrading within the maintenance schedule. KC 1.11: 4No. CAT II lights require upgrading within the maintenance schedule. KC 1.20: 4No. CAT II lights require upgrading within the maintenance schedule. KC 1.01: 4No. CAT II lights require upgrading within the maintenance schedule. Richmond Pharmacy: Surface fluorescent lights in acceptable order. Richmond Pharmacy: CAT II lights in acceptable order. KC 1.13: Emergency lights requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£2,400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

05 - Emergency Lighting

B(C)

£200

5

0

4 2

8

2015

01 - Sounders

B

£0

8

0

0 0

0

2018

02 - Call Points

B

£0

8

0

0 0

0

2018

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

KC 1.09: Fire alarm sounders in acceptable order. KC 1.09: Fire alarm call points in acceptable order.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes KC 1.13: Smoke detectors in acceptable order. Richmond Pharmacy: Smoke detectors in acceptable order.

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

B(C)

£200,000

5

3 3

9

2015

Remedial Action

Location: Whole Block N - Engineering - Lifts 01 - Lifts

Block Total

Generic Hospital Physical Condition Survey

Although lifts were deemed to be in acceptable condition an allowance should be made for refurbishment works during the maintenance schedule.

£1,883,315.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Clinic A HRT Clinic/Antenatal Outpatients: Redecoration required within 5 year maintenance schedule (Cost includes decanting). Estates Facilities: Redecoration required within 5 year maintenance schedule Located to 30% of area (cost includes decanting). Medical Services/Post Room: Redecoration required within 5 year maintenance schedule Located to circulation routes (Cost includes decanting). CAMHS: Redecoration required within 5 year maintenance schedule - Located to 5% of area (Cost includes decanting). Colposcopy and Gynaecology: Redecoration required within 5 year maintenance schedule (Cost includes decanting). Outpatients Appointments Medical Records: Redecoration required within 5 year maintenance schedule Located to 0.100-7 and 0.108-1 (Cost includes decanting).

Site : Generic Hospital - STG Block : Lanesborough Wing - LNS Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

C

£53,000

0

0

2 2

4

2010

01 - Decorations

C

£10,000

0

0

2 2

4

2010

01 - Decorations

C

£1,700

0

0

2 2

4

2010

01 - Decorations

C

£750

0

0

2 2

4

2010

01 - Decorations

C

£4,500

0

0

2 2

4

2010

01 - Decorations

C

£2,450

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Early Pregnancy/Antenatal/Blood Testing: Redecoration required within 5 year maintenance schedule (Cost includes decanting). Clinic C Rheumatology: Redecoration required within 5 year maintenance schedule Located to 10% (Cost includes decanting). MRU: Redecoration required within 5 year maintenance schedule - Located to circulation routes and 0.MR2. Pharmacy: Redecoration required within 5 year maintenance schedule Located to 10% of area (cost includes decanting). Service Corridor: Redecoration required within 5 year maintenance schedule. Scanning/X-Ray Dept: Redecoration required within 5 year maintenance schedule Located to 10% of area (cost includes decanting). Changing Rooms: Redecoration required within 5 year maintenance schedule. Medical Services/Post Room: Redecoration required within 5 year maintenance schedule Located to 3No. offices (Cost includes decanting).

01 - Decorations

C

£6,200

0

0

2 2

4

2010

01 - Decorations

C

£1,800

0

0

2 2

4

2010

01 - Decorations

C

£7,000

0

0

2 2

4

2010

01 - Decorations

C

£5,350

0

0

2 2

4

2010

01 - Decorations

C

£3,100

0

0

2 2

4

2010

01 - Decorations

C

£4,750

0

0

2 2

4

2010

01 - Decorations

C

£4,100

0

0

2 2

4

2010

01 - Decorations

B(C)

£2,400

1

0

2 2

4

2011

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Gynaecology: Redecoration required within 5 year maintenance schedule Located to 7.120, 7.191 and consultant rooms. Dermatology/Rheumatology: Redecoration required within 5 year maintenance schedule (Cost includes decanting). ENT & Audiology: Redecoration required within 5 year maintenance schedule (Cost includes decanting). Pharmacy: Redecoration required within 5 year maintenance schedule Located to 60% of area (cost includes decanting). Clinic C Rheumatology: Redecoration required within 5 year maintenance schedule Located to 90% (Cost includes decanting). Estates Facilities: Redecoration required within 5 year maintenance schedule Located to 70% of area (cost includes decanting). Scanning/X-Ray Dept: Redecoration required within 5 year maintenance schedule Located to 90% of area (cost includes decanting). Gynaecology: Redecoration required within 5 year maintenance schedule Located to circulation routes.

01 - Decorations

B(C)

£6,000

1

0

2 2

4

2011

01 - Decorations

B(C)

£13,000

1

0

2 2

4

2011

01 - Decorations

B(C)

£31,500

1

0

2 2

4

2011

01 - Decorations

B(C)

£32,000

1

0

2 2

4

2011

01 - Decorations

B(C)

£16,000

2

0

2 2

4

2012

01 - Decorations

B(C)

£23,250

2

0

2 2

4

2012

01 - Decorations

B(C)

£42,550

2

0

2 2

4

2012

01 - Decorations

B(C)

£5,050

2

0

2 2

4

2012

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Social Services: Redecoration required within 5 year maintenance schedule (Cost includes decanting). Dragons Children Centre: Redecoration required within 5 year maintenance schedule Located to common circulation routes. Linen Distribution: Redecoration required within 5 year maintenance schedule (Cost includes decanting). MRU: Redecoration required within 5 year maintenance schedule - Located to 60% of area. Quality Assurance Pharmacy: Redecoration required within 5 year maintenance schedule Located to 40% of area (cost includes decanting). Clinic B Skin Dept: Redecoration required within 5 year maintenance schedule (Cost includes decanting). Thomas Addison Unit: Redecoration required within 5 year maintenance schedule (Cost includes decanting). Children's Development Centre: Redecoration required within 5 year maintenance schedule Located to 20% (Cost includes decanting of the unit). CAMHS: Redecoration required within 5 year maintenance schedule - Located to 95% of area (Cost includes decanting).

01 - Decorations

B(C)

£3,950

2

0

2 2

4

2012

01 - Decorations

B(C)

£5,600

2

0

2 2

4

2012

01 - Decorations

B(C)

£14,250

2

0

2 2

4

2012

01 - Decorations

B(C)

£10,500

2

0

2 2

4

2012

01 - Decorations

B(C)

£5,550

2

0

2 2

4

2012

01 - Decorations

B(C)

£24,000

2

0

2 2

4

2012

01 - Decorations

B(C)

£33,000

3

0

2 2

4

2013

01 - Decorations

B(C)

£3,200

3

0

2 2

4

2013

01 - Decorations

B(C)

£20,750

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Pre-pack Pharmacy: Redecoration required within 5 year maintenance schedule (Cost includes decanting). Friends of St Georges: Redecoration required within 5 year maintenance schedule. CSSD: Redecoration required within 5 year maintenance schedule. Outpatients Appointments Medical Records: Redecoration required within 5 year maintenance schedule (Cost includes decanting). Moorfields: Redecoration required within 5 year maintenance schedule (Cost includes decanting). Domestic Services: Redecoration required within 5 year maintenance schedule (Cost includes decanting). Pharmacy: Redecoration required within 5 year maintenance schedule Located to 30% of area (cost includes decanting). Quality Assurance Pharmacy: Redecoration required within 5 year maintenance schedule Located to 60% of area (cost includes decanting). Dragons Children Centre: Redecoration required within 5 year maintenance schedule.

01 - Decorations

B(C)

£13,600

3

0

2 2

4

2013

01 - Decorations

B(C)

£800

3

0

2 2

4

2013

01 - Decorations

B(C)

£800

3

0

2 2

4

2013

01 - Decorations

B(C)

£13,900

3

0

2 2

4

2013

01 - Decorations

B(C)

£33,700

3

0

2 2

4

2013

01 - Decorations

B(C)

£7,500

3

0

2 2

4

2013

01 - Decorations

B(C)

£16,000

4

0

2 2

4

2014

01 - Decorations

B(C)

£8,300

4

0

2 2

4

2014

01 - Decorations

B(C)

£20,500

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Children's Development Centre: Redecoration required within 5 year maintenance schedule Located to 80% (Cost includes decanting of the unit). Main Catering Unit: Redecoration required within 5 year maintenance schedule (Cost includes decanting). Medical Services/Post Room: Redecoration required within 5 year maintenance schedule Located to 5No. Offices (Cost includes decanting).

01 - Decorations

B(C)

£12,800

5

0

2 2

4

2015

01 - Decorations

B(C)

£19,000

5

0

2 2

4

2015

01 - Decorations

B(C)

£3,950

5

0

2 2

4

2015

01 - Decorations 02 - Ceiling

B C

£0 £20,000

6 0

0 0

0 0 2 2

0 4

2016 2010

02 - Ceiling

C

£250

0

0

2 2

4

2010

02 - Ceiling

C

£600

0

0

2 2

4

2010

02 - Ceiling

C

£250

0

0

2 2

4

2010

02 - Ceiling

C

£29,500

0

0

2 2

4

2010

02 - Ceiling

C

£250

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

Estates Facilities: Suspended: Remove tiles and replace with new - Located to 30% of area. Moorfields: Suspended: Remove tiles and replace with new (Localised replacement) Located to 7.052. Moorfields: Suspended: Remove tiles and replace with new (Localised replacement) Located to 7.063A. CSSD: Suspended: Remove tiles and replace with new (Localised replacement). Quality Assurance Pharmacy: Suspended: Concealed grid Take down and replace with new to entire ceiling. Clinic C Rheumatology: Suspended: Replace with new Located to 7.093 (Localised replacement).

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Social Services: Suspended: Remove tiles and replace with new - Located to 0.001 and 0.002. Colposcopy and Gynaecology: Suspended: Oakleaf informed of ongoing water ingress issues, suggest further investigation Located to GYN2. Colposcopy and Gynaecology: Suspended: Replace with new Located to GYN3 (Localised replacement). Clinic A HRT Clinic/Antenatal Outpatients: Suspended: Concealed grid - Take down and replace with new to entire ceiling. Medical Services/Post Room: Suspended: Concealed grid Take down and replace with new to entire ceiling - Located to circulation routes. Scanning/X-Ray Dept: Suspended: Remove tiles and replace with new - Located to 30% of area. Changing Rooms: Suspended: Replace damaged tiles Located to 10%. Moorfields: Suspended: Suspended: Remove tiles and replace with new (Localised replacement) - Located to 7.061. Store/Loading area: Concrete soffit: Oakleaf informed of ongoing water ingress issues believed to be from the pipework.

02 - Ceiling

C

£4,200

0

0

2 2

4

2010

02 - Ceiling

C

£1,000

0

0

2 2

4

2010

02 - Ceiling

C

£250

0

0

2 2

4

2010

02 - Ceiling

C

£113,100

0

0

2 2

4

2010

02 - Ceiling

C

£3,600

0

0

2 2

4

2010

02 - Ceiling

C

£30,500

0

0

2 2

4

2010

02 - Ceiling

C

£250

0

0

2 2

4

2010

02 - Ceiling

C

£250

0

0

2 2

4

2010

02 - Ceiling

C

£0

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Domestic Services: Suspended: Remove tiles and replace with new - Located to 0.273. ENT & Audiology: Suspended: Remove tiles and replace with new (Localised replacement) Located to 7.005. Clinic B Skin Dept: Suspended: Remove tiles and replace with new - Located to 7.076 (Localised replacement). Outpatients Appointments Medical Records: Suspended: Remove tiles and replace with new 80%. Service Corridor: Suspended: Concealed grid - Take down and replace with new to entire ceiling. MRU: Suspended: Remove tiles and replace with new (Localised replacement) - Located to MRC3. CAMHS: Suspended: Remove tiles and replace with new 80%. Early Pregnancy/Antenatal/Blood Testing: Suspended: Concealed grid - Take down and replace with new to entire ceiling. Thomas Addison Unit: Suspended: Remove tiles and replace with new - Located to 30% of area. Pharmacy: Suspended: Remove tiles and replace with new 70%.

02 - Ceiling

C

£750

0

0

2 2

4

2010

02 - Ceiling

C

£300

0

0

2 2

4

2010

02 - Ceiling

C

£250

0

0

2 2

4

2010

02 - Ceiling

C

£28,000

0

0

2 2

4

2010

02 - Ceiling

C

£12,000

0

0

2 2

4

2010

02 - Ceiling

C

£400

0

0

2 2

4

2010

02 - Ceiling

C

£35,500

0

0

2 2

4

2010

02 - Ceiling

C

£13,200

0

0

2 2

4

2010

02 - Ceiling

C

£21,100

0

0

2 2

4

2010

02 - Ceiling

C

£34,500

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Main Catering Unit: Suspended: Remove tiles and replace with new - Located to 0.218, 0.219, 0.221 and 0.222. Male & Female Toilet Off Service Corridor: Suspended ceiling requires replacing. Outpatients Appointments Medical Records: Suspended: Replace with new (20% of floor area). ENT & Audiology: Suspended: Remove tiles and replace with new (Localised replacement) Located to 7.051. Domestic Services: Suspended: Remove tiles and replace with new 0.268A, 0.272, 0.274 and 0.271. Dermatology/Rheumatology: Suspended: Concealed grid Take down and replace with new to entire ceiling - Located to 90% of area. Social Services: Suspended: Remove tiles and replace with new - Located to 0.079, 0.079A and 0.078. CAMHS: Suspended. Changing Rooms: Suspended. Linen Distribution: Suspended. Linen Distribution: Concrete soffit. Pre-pack Pharmacy: Suspended. Main Catering Unit: Steel: Exposed. Moorfields: Plasterboard.

02 - Ceiling

C

£11,750

0

0

2 2

4

2010

02 - Ceiling

C

£7,000

0

0

2 2

4

2010

02 - Ceiling

B(C)

£7,000

3

0

2 2

4

2013

02 - Ceiling

B(C)

£300

5

0

2 2

4

2015

02 - Ceiling

B(C)

£7,500

5

0

2 2

4

2015

02 - Ceiling

B(C)

£25,000

5

0

2 2

4

2015

02 - Ceiling

B(C)

£4,200

5

0

2 2

4

2015

02 - Ceiling 02 - Ceiling 02 - Ceiling 02 - Ceiling

B B B B

£0 £0 £0 £0

7 10 15 15

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2017 2020 2025 2025

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling

B

£0

20

0

0 0

0

2030

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Clinic C Rheumatology: Vinyl: Need to replace vinyl tile flooring - Located to 60% of area. Thomas Addison Unit: Vinyl: Refix vinyl skirting with adhesive - Located to 0.239 and 0.240A. Early Pregnancy/Antenatal/Blood Testing: Carpet: Need to replace contract quality carpet Located to 0.075. Thomas Addison Unit: Vinyl: Need to replace vinyl sheet flooring 5%. Early Pregnancy/Antenatal/Blood Testing: Carpet: Need to replace contract quality carpet Located to 0.075A. Store/Loading area: Vinyl: Need to replace vinyl sheet flooring Located to 0.280. Medical Services/Post Room: Vinyl: Need to replace vinyl sheet flooring - Located to 0.S06. Medical Services/Post Room: Quarry tiles: Replace with new (Localised replacement) Located to toilets. Main Catering Unit: Quarry tiles: Replace localised damaged tiling - Located to 0.219 and 0.221. MRU: Carpet: Need to replace contract quality carpet - Located to 0.MR20.

03 - Floor

C

£10,600

0

0

2 3

6

2010

03 - Floor

C

£300

0

0

2 3

6

2010

03 - Floor

C

£400

0

0

2 3

6

2010

03 - Floor

C

£1,650

0

0

2 3

6

2010

03 - Floor

C

£600

0

0

2 3

6

2010

03 - Floor

C

£500

0

0

2 3

6

2010

03 - Floor

C

£840

0

0

2 3

6

2010

03 - Floor

C

£300

0

0

2 3

6

2010

03 - Floor

C

£300

0

0

2 3

6

2010

03 - Floor

C

£550

0

0

2 3

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Thomas Addison Unit: Carpet: Need to replace contract quality carpet - Located to 0.235. Clinic B Skin Dept: Vinyl: Need to replace vinyl tile flooring Located to 7.075, 7.072, 7.085, 7.073 and 7.080. Gynaecology: Carpet: Need to replace contract quality carpet Located to 7.119 and 7.116. Dermatology/Rheumatology: Carpet: Need to replace contract quality carpet - Located to 0.111A, 0.111C, 0.115, 0.115A and 0.112B. Estates Facilities: Concrete: Painted Concrete flooring requires redecorating and making good 10% of floor include making good minor cracking. Pharmacy: Vinyl: Need to replace vinyl sheet flooring Located to 0.169, 0.C24, 0.163 and 0.167A. Outpatients Appointments Medical Records: Vinyl: Need to replace vinyl sheet flooring, splitting and cracking to the edges - Located to 0.108-1. Pharmacy: Carpet: Need to replace contract quality carpet Located to 0.172, 0.171, and 0.168. Scanning/X-Ray Dept: Vinyl: Need to replace vinyl sheet flooring - Located to 0.C38 and 0.158.

03 - Floor

C

£650

0

0

2 3

6

2010

03 - Floor

C

£4,000

0

0

2 3

6

2010

03 - Floor

C

£1,550

0

0

2 3

6

2010

03 - Floor

C

£3,800

0

0

2 3

6

2010

03 - Floor

C

£1,000

0

0

2 3

6

2010

03 - Floor

C

£4,100

0

0

2 3

6

2010

03 - Floor

C

£2,200

0

0

2 3

6

2010

03 - Floor

C

£3,600

0

0

2 3

6

2010

03 - Floor

C

£1,250

0

0

2 3

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Clinic A HRT Clinic/Antenatal Outpatients: Vinyl: Need to replace vinyl sheet flooring Located to 0.016. Clinic A HRT Clinic/Antenatal Outpatients: Vinyl: Refix vinyl skirting with adhesive - Located to 0.026, 0.023 and 0.025. Store/Loading area: Vinyl: Need to replace vinyl sheet flooring Located to 0.278. CAMHS: Quarry tiles: Replace damaged tile, 1No. Store/Loading area: Concrete: Painted Concrete flooring requires redecorating and making good - Located to 0.275A. Outpatients Appointments Medical Records: Carpet: Need to replace contract quality carpet - Located to 0.C15, 0.104, 0.105 and 0.106. ENT & Audiology: Vinyl: Refix vinyl skirting with adhesive Located to waiting area. Domestic Services: Carpet: Need to replace contract quality carpet - Located to 0.274, 0.272 and 0.273. Gynaecology: Vinyl: Need to replace vinyl tile flooring Located to circulation routes. ENT & Audiology: Vinyl: Need to replace slip resistant vinyl flooring to 2No. ladies toilets.

03 - Floor

C

£1,000

0

0

2 3

6

2010

03 - Floor

C

£600

0

0

2 3

6

2010

03 - Floor

C

£1,000

0

0

2 3

6

2010

03 - Floor

C

£250

0

0

2 3

6

2010

03 - Floor

C

£900

0

0

2 3

6

2010

03 - Floor

C

£3,000

0

0

2 3

6

2010

03 - Floor

C

£300

0

0

2 3

6

2010

03 - Floor

C

£1,500

0

0

2 3

6

2010

03 - Floor

C

£5,050

0

0

2 3

6

2010

03 - Floor

C

£800

0

0

2 3

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Medical Services/Post Room: Vinyl: Need to replace vinyl sheet flooring - Located to 0.211 and 0.211A. CAMHS: Vinyl: Need to replace vinyl sheet flooring - Located to circulation routes. CAMHS: Carpet: Need to replace contract quality carpet Located to 0.032, 0.036, 0.038 and 0.040. Pharmacy: Vinyl: Need to replace vinyl sheet flooring Located to 0.C23, 0.193, 0.194, 0.164, 0.175, 0.176 and 0.176A. Pharmacy: Carpet: Need to replace contract quality carpet Located to 0.191A, 0.191 and 0.192. Clinic C Rheumatology: Carpet: Need to replace contract quality carpet - Located to 7.112, 7.111 and 7.092. Social Services: Carpet: Need to replace contract quality carpet - Located to 0.079, 0.079A and 0.078. ENT & Audiology: Carpet: Need to replace contract quality carpet - Located to 7.049A, 7.049 and 7.050. Domestic Services: Vinyl: Need to replace vinyl tile flooring 0.268A. Main Catering Unit: Vinyl: Need to replace vinyl sheet flooring Located to 0.218.

03 - Floor

B(C)

£750

1

0

2 3

6

2011

03 - Floor

B(C)

£2,800

1

0

2 3

6

2011

03 - Floor

B(C)

£3,600

1

0

2 3

6

2011

03 - Floor

B(C)

£9,600

1

0

2 3

6

2011

03 - Floor

B(C)

£2,200

1

0

2 3

6

2011

03 - Floor

B(C)

£3,400

1

0

2 3

6

2011

03 - Floor

B(C)

£1,700

1

0

2 3

6

2011

03 - Floor

B(C)

£1,200

1

0

2 3

6

2011

03 - Floor

B(C)

£600

1

0

2 3

6

2011

03 - Floor

B(C)

£1,100

1

0

2 3

6

2011

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Dermatology/Rheumatology: Vinyl: Need to replace vinyl sheet flooring - Located to circulation routes and 0.113. Estates Facilities: Vinyl: Need to replace vinyl sheet flooring Located to 0.243. Gynaecology: Carpet: Need to replace contract quality carpet Located to 7.120. Medical Services/Post Room: Carpet: Need to replace contract quality carpet - Located to 7No. offices. Quality Assurance Pharmacy: Carpet: Need to replace contract quality carpet - Located to 0.255. Thomas Addison Unit: Carpet: Need to replace contract quality carpet - Located to 5No. Offices. MRU: Carpet: Need to replace contract quality carpet - Located to 50% of area. Clinic A HRT Clinic/Antenatal Outpatients: Carpet: Need to replace contract quality carpet Located to 0.069. Scanning/X-Ray Dept: Carpet: Need to replace contract quality carpet - Located to 0.147. Clinic A HRT Clinic/Antenatal Outpatients: Vinyl: Need to replace vinyl sheet flooring Located to 60%.

03 - Floor

B(C)

£3,100

1

0

2 3

6

2011

03 - Floor

B(C)

£1,525

1

0

2 3

6

2011

03 - Floor

B(C)

£600

2

0

2 3

6

2012

03 - Floor

B(C)

£4,750

2

0

2 3

6

2012

03 - Floor

B(C)

£900

2

0

2 3

6

2012

03 - Floor

B(C)

£3,400

2

0

2 3

6

2012

03 - Floor

B(C)

£7,200

2

0

2 3

6

2012

03 - Floor

B(C)

£500

2

0

2 3

6

2012

03 - Floor

B(C)

£600

2

0

2 3

6

2012

03 - Floor

B(C)

£32,000

3

0

2 3

6

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Dermatology/Rheumatology: Carpet: Need to replace contract quality carpet - Located to 0.110, 0.111B, 0.112 and 0.114A. Outpatients Appointments Medical Records: Vinyl: Need to replace vinyl sheet flooring Located to day care. Moorfields: Carpet: Need to replace contract quality carpet Located to 7.063. CSSD: Vinyl: Need to replace vinyl sheet flooring. Outpatients Appointments Medical Records: Carpet: Need to replace contract quality carpet - Located to 0.102-7. Thomas Addison Unit: Vinyl: Need to replace vinyl sheet flooring - Located to 30% of area. Early Pregnancy/Antenatal/Blood Testing: Vinyl: Need to replace vinyl sheet flooring - Located to Early Pregnancy offices. CAMHS: Vinyl: Need to replace vinyl tile flooring - Located to 0.031, 0.033, 0.039, 0.041 and 0.043. Scanning/X-Ray Dept: Carpet: Need to replace contract quality carpet - Located to 0.120. Scanning/X-Ray Dept: Vinyl: Need to replace vinyl sheet flooring - Located to 20% of area.

03 - Floor

B(C)

£3,000

3

0

2 3

6

2013

03 - Floor

B(C)

£1,700

3

0

2 3

6

2013

03 - Floor

B(C)

£800

3

0

2 3

6

2013

03 - Floor

B(C)

£1,400

3

0

2 3

6

2013

03 - Floor

B(C)

£250

3

0

2 3

6

2013

03 - Floor

B(C)

£9,850

3

0

2 3

6

2013

03 - Floor

B(C)

£2,750

3

0

2 3

6

2013

03 - Floor

B(C)

£4,000

3

0

2 3

6

2013

03 - Floor

B(C)

£2,500

4

0

2 3

6

2014

03 - Floor

B(C)

£9,500

5

0

2 3

6

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Moorfields: Vinyl: Need to replace slip resistant vinyl flooring - Located to circulation routes. Clinic A HRT Clinic/Antenatal Outpatients: Vinyl: Need to replace slip resistant vinyl flooring - Located to 0.010. Clinic B Skin Dept: Vinyl: Need to replace vinyl sheet flooring Located to circulation routes. Quality Assurance Pharmacy: Vinyl: Need to replace slip resistant vinyl flooring. ENT & Audiology: Vinyl: Need to replace slip resistant vinyl flooring - Located to circulation routes. Outpatients Appointments Medical Records: Vinyl: Need to replace vinyl sheet flooring Located to 3No. Toilets. CAMHS: Carpet: Need to replace contract quality carpet Located to 0.048, 0.029, 0.028, 0.036B and 0.049. Early Pregnancy/Antenatal/Blood Testing: Vinyl: Need to replace vinyl sheet flooring - Located to 0.072. Colposcopy and Gynaecology: Vinyl: Need to replace vinyl sheet flooring - Located to circulation routes and consultant rooms. MRU: Vinyl: Need to replace vinyl sheet flooring - Located to 0.MR6 and 0.MR13.

03 - Floor

B(C)

£8,400

5

0

2 3

6

2015

03 - Floor

B(C)

£500

5

0

2 3

6

2015

03 - Floor

B(C)

£3,000

5

0

2 3

6

2015

03 - Floor

B(C)

£12,800

5

0

2 3

6

2015

03 - Floor

B(C)

£9,800

5

0

2 3

6

2015

03 - Floor

B(C)

£1,000

5

0

2 3

6

2015

03 - Floor

B(C)

£3,000

5

0

2 3

6

2015

03 - Floor

B(C)

£650

5

0

2 3

6

2015

03 - Floor

B(C)

£4,200

5

0

2 3

6

2015

03 - Floor

B(C)

£3,150

5

0

2 3

6

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Dragons Children Centre: Vinyl: Need to replace slip resistant vinyl flooring - Located to circulation routes. Colposcopy and Gynaecology: Vinyl: Need to replace slip resistant vinyl flooring - Located to GYN4. MRU: Carpet. Linen Distribution: Vinyl: Slip resistant vinyl sheet. Domestic Services: Vinyl: Slip resistant vinyl sheet. CAMHS: Vinyl: Slip resistant vinyl sheet. Domestic Services: Laminate. Medical Services/Post Room: Vinyl sheet - Located to circulation routes. Children's Development Centre: Vinyl: Slip resistant vinyl sheet. Dragons Children Centre: Vinyl sheet flooring. Medical Services/Post Room: Quarry tiles. Service Corridor: Concrete. Pre-pack Pharmacy: Vinyl: Slip resistant vinyl sheet. Pre-pack Pharmacy: Vinyl sheet. Pharmacy: Vinyl: Anti slip vinyl sheet. Clinic B Skin Dept: Brickwork (plastered): Make good damaged plasterwork - Located to where hose has been removed.

03 - Floor

B(C)

£5,600

5

0

2 3

6

2015

03 - Floor

B(C)

£250

5

0

2 3

6

2015

03 - Floor 03 - Floor

B B

£0 £0

6 7

0 0

0 0 0 0

0 0

2016 2017

03 - Floor

B

£0

7

0

0 0

0

2017

03 - Floor

B

£0

7

0

0 0

0

2017

03 - Floor 03 - Floor

B B

£0 £0

7 7

0 0

0 0 0 0

0 0

2017 2017

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor 03 - Floor

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

03 - Floor 03 - Floor

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Store/Loading area: Fairfaced blockwork: Water ingress issues to Kitchen area, believed to be caused by refrigerator units behind the wall, cost includes allowance for improving ventilation. Dragons Children Centre: Brickwork (plastered): Make good water damaged plasterwork - Located to waiting area. Scanning/X-Ray Dept: Brickwork (plastered): Make good damaged plasterwork to door surround - Located to 0.154 and 0.159A. Scanning/X-Ray Dept: Brickwork (plastered): Make good damaged plasterwork Located to 0.C38. Scanning/X-Ray Dept: Brickwork (plastered): Make good minor cracking - Located to 0.145. Pharmacy: Brickwork (plastered): Make good water damaged plasterwork - Located to 0.194. Scanning/X-Ray Dept: Brickwork (plastered): Make good water damaged and minor cracking - Located to 0.132. Early Pregnancy/Antenatal/Blood Testing: Brickwork (plastered): Make good water damaged plasterwork - Located to 0.073.

05 - Condition of internal walls

C

£1,000

0

0

2 3

6

2010

05 - Condition of internal walls

C

£400

0

0

2 3

6

2010

05 - Condition of internal walls

C

£600

0

0

2 3

6

2010

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls

C

£400

0

0

2 3

6

2010

05 - Condition of internal walls

C

£500

0

0

2 3

6

2010

05 - Condition of internal walls

C

£400

0

0

2 3

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Outpatients Appointments Medical Records: Brickwork (plastered): Make good minor cracking to plasterwork Located to 0.101 and 0.C15. Linen Distribution: Fairfaced blockwork: Renew section of internal wall, suggest installing safety edge prevention to minimise further damage. Clinic C Rheumatology: Brickwork (plastered): Make good minor cracking to plasterwork - Located to 7.C28. Service Corridor: Brickwork (plastered): Remove remains of the railing and make good damaged plasterwork to numerous locations. Outpatients Appointments Medical Records: Brickwork (plastered): Make good impact damaged plasterwork - Located to 0.104. Outpatients Appointments Medical Records: Brickwork (plastered): Make good blown plaster - Located to 0.099. CAMHS: Brickwork (plastered): Cut out and make good crack to plastered wall - Located to 0.036A. Service Corridor: Brickwork (plastered): Make good impact damaged plasterwork which has been caused by trolleys, suggest installing safety edge protection - Located to service corridors.

05 - Condition of internal walls

C

£500

0

0

2 3

6

2010

05 - Condition of internal walls

C

£1,200

0

0

2 3

6

2010

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls

C

£1,500

0

0

2 3

6

2010

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls

C

£400

0

0

2 3

6

2010

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls

C

£20,000

0

0

2 3

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Thomas Addison Unit: Brickwork (plastered): Make good damaged plasterwork Located to 0.234. ENT & Audiology: Brickwork (plastered): Make good damaged plasterwork to damaged plug socket. Medical Services/Post Room: Brickwork (plastered): Make good plasterwork to where hose has been removed - Located to 0.C44. Medical Services/Post Room: Brickwork (plastered): Make good blown plasterwork, water damaged plasterwork, efflorescence and cracking Located to 0.198 and 0.199. Male & Female Toilet Off Service Corridor: Ceramic tiling. Dragons Children Centre: Ceramic tiling. Domestic Services: Fairfaced blockwork: Painted. CAMHS: Brickwork (plastered). Main Catering Unit: Refrigerated panel. Pharmacy: Fairfaced blockwork. Medical Services/Post Room: Kitchen facilities: Replace kitchen units due to age and condition - Located to 0.211A. Pre-pack Pharmacy: Sanitary fittings: Ceramic sink - Oakleaf informed of ongoing drainage issues, constant odour, which was apparent at time of survey Located to 0.264 and 0.264A.

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls

C

£250

0

0

2 3

6

2010

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls

C

£600

0

0

2 3

6

2010

05 - Condition of internal walls

B

£0

7

0

0 0

0

2017

05 - Condition of internal walls

B

£0

15

0

0 0

0

2025

05 - Condition of internal walls

B

£0

15

0

0 0

0

2025

05 - Condition of internal walls 05 - Condition of internal walls

B B

£0 £0

20 20

0 0

0 0 0 0

0 0

2030 2030

05 - Condition of internal walls 08 - Fixed Units

B C

£0 £4,000

20 0

0 0

0 0 3 3

0 9

2030 2010

08 - Fixed Units

C

£500

0

0

3 3

9

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Domestic Services: Sanitary fittings: Sink unit Replace due to age and condition. Thomas Addison Unit: Sanitary fittings: Repair leaking ceramic WC 1No. - Located to 0.237. Linen Distribution: Kitchen facilities: Replace kitchen units due to age and condition. Store/Loading area: Kitchen facilities: Replace kitchen units due to age and condition. Pharmacy: Kitchen facilities: Replace kitchen units due to age and condition. Early Pregnancy/Antenatal/Blood Testing: Clinical units: Replace clinical units due to age and condition - Located to 0.073. Estates Facilities: Kitchen facilities: Replace kitchen units due to age and condition. Clinic C Rheumatology: Sanitary fittings: Replace sink unit due to age and condition, 1No. Clinic A HRT Clinic/Antenatal Outpatients: Clinical units: Replace clinical units due to age and condition - Located to 0.020 and 0.057. Colposcopy and Gynaecology: Sanitary fittings: Sink - Oakleaf informed of ongoing drainage issues, suggest further investigation - Located to GYN3 and GYN5.

08 - Fixed Units

C

£500

0

0

3 3

9

2010

08 - Fixed Units

C

£250

0

0

3 3

9

2010

08 - Fixed Units

C

£2,000

0

0

3 3

9

2010

08 - Fixed Units

C

£3,000

0

0

3 3

9

2010

08 - Fixed Units

C

£3,000

0

0

3 3

9

2010

08 - Fixed Units

C

£1,500

0

0

3 3

9

2010

08 - Fixed Units

C

£2,000

0

0

3 3

9

2010

08 - Fixed Units

C

£500

0

0

3 3

9

2010

08 - Fixed Units

C

£16,000

0

0

3 3

9

2010

08 - Fixed Units

C

£1,500

0

0

3 3

9

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Thomas Addison Unit: Kitchen facilities: Replace kitchen units due to age and condition. Thomas Addison Unit: Clinical units: Replace clinical units due to age and condition - Located to 0.240A. Outpatients Appointments Medical Records: Kitchen facilities: Replace kitchen units due to age and condition. Dermatology/Rheumatology: Kitchen facilities: Replace kitchen units due to age and condition - Located to 0.113. Quality Assurance Pharmacy: Kitchen facilities: Replace kitchen units due to age and condition. Quality Assurance Pharmacy: Clinical units: Replace clinical units due to age and condition. Social Services: Kitchen facilities: Replace kitchen units due to age and condition. Clinic C Rheumatology: Kitchen facilities: Replace kitchen units due to age and condition. Scanning/X-Ray Dept: Kitchen facilities: Replace kitchen units due to age and condition. MRU: Kitchen facilities: Replace kitchen units due to age and condition. Clinic B Skin Dept: Clinical units: Replace clinical units due to age and condition Located to 3 treatment rooms.

08 - Fixed Units

B(C)

£4,000

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£2,000

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£3,000

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£2,500

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£2,000

3

0

3 3

9

2013

08 - Fixed Units

B(C)

£50,000

3

0

3 3

9

2013

08 - Fixed Units

B(C)

£1,500

3

0

3 3

9

2013

08 - Fixed Units

B(C)

£1,000

3

0

3 3

9

2013

08 - Fixed Units

B(C)

£3,000

3

0

3 3

9

2013

08 - Fixed Units

B(C)

£2,000

3

0

3 3

9

2013

08 - Fixed Units

B(C)

£12,000

5

0

3 3

9

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Estates Facilities: Kitchen facilities: Replace kitchen units due to age and condition. Estates Facilities: Sanitary fittings: Replace ceramic wash hand basin due to age and condition, 4No. Changing Rooms: Sanitary fittings: Replace ceramic sink due to age and condition 5No. Clinic C Rheumatology: Sanitary fittings: Replace ceramic WC due to age and condition 2No. Clinic C Rheumatology: Sanitary fittings: Replace ceramic WHB due to age and condition 2No. Gynaecology: Kitchen facilities: Replace kitchen units due to age and condition - Located to 7.119. Clinic A HRT Clinic/Antenatal Outpatients: Sanitary fittings: Replace ceramic WHB due to age and condition 1No. Clinic A HRT Clinic/Antenatal Outpatients: Sanitary fittings: Replace ceramic WC due to age and condition 1No. Outpatients Appointments Medical Records: Fitted furniture: Replace floor units due to age and condition. Pharmacy: Sanitary fittings: Replace ceramic WHB due to age and condition 4No.

08 - Fixed Units

B(C)

£5,000

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£2,800

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£3,500

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£1,600

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£1,400

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£3,000

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£700

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£800

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£3,000

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£2,800

5

0

3 3

9

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Pharmacy: Sanitary fittings: Replace ceramic WC due to age and condition 3No. Scanning/X-Ray Dept: Clinical units: Replace clinical units due to age and condition Located to 0.146 / 0.153. Medical Services/Post Room: Sanitary fittings: Ceramic urinal. Medical Services/Post Room: Sanitary fittings: Ceramic WC. Male & Female Toilet Off Service Corridor: Sanitary fittings: Ceramic wash hand basin. Male & Female Toilet Off Service Corridor: Sanitary fittings: Ceramic WC. Medical Services/Post Room: Sanitary fittings: Ceramic wash hand basin. Male & Female Toilet Off Service Corridor: Sanitary fittings: Ceramic urinal. Pharmacy: Kitchen facilities. CAMHS: Sanitary fittings: Ceramic WC. Dragons Children Centre: Sanitary fittings: Ceramic wash hand basin. Dragons Children Centre: Sanitary fittings: Ceramic sink. Children's Development Centre: Kitchen facilities. Children's Development Centre: Sanitary fittings: Ceramic WC. Dragons Children Centre: Sanitary fittings: Ceramic WC.

08 - Fixed Units

B(C)

£2,400

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£10,000

5

0

3 3

9

2015

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

7 10

0 0

0 0 0 0

0 0

2017 2020

08 - Fixed Units

B

£0

10

0

0 0

0

2020

08 - Fixed Units

B

£0

10

0

0 0

0

2020

08 - Fixed Units

B

£0

10

0

0 0

0

2020

08 - Fixed Units

B

£0

10

0

0 0

0

2020

08 - Fixed Units

B

£0

10

0

0 0

0

2020

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Moorfields: Clinical units. CAMHS: Sanitary fittings: Ceramic sink. CAMHS: Kitchen facilities. Pre-pack Pharmacy: Kitchen facilities. Pre-pack Pharmacy: Sanitary fittings: Ceramic sink. CAMHS: Sanitary fittings: Ceramic wash hand basin. Children's Development Centre: Clinical units. Pharmacy: Sanitary fittings: Ceramic sink. Pharmacy: Clinical units. Moorfields: Sanitary fittings: Metal sluice.

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

08 - Fixed Units

B

£0

10

0

0 0

0

2020

08 - Fixed Units

B

£0

10

0

0 0

0

2020

08 - Fixed Units

B

£0

15

0

0 0

0

2025

08 - Fixed Units

B

£0

15

0

0 0

0

2025

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

15 20

0 0

0 0 0 0

0 0

2025 2030

01 - Decorations

C

£10,500

0

0

2 2

4

2010

01 - Decorations

B(C)

£39,000

1

0

2 2

4

2011

01 - Decorations

B(C)

£11,700

2

0

2 2

4

2012

01 - Decorations

B(C)

£11,700

2

0

2 2

4

2012

Remedial Action

Location: 01 - First Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

Theatres: Redecoration required within 5 year maintenance schedule Located to 30% (Cost includes decant of the ward). Dining/Coffee Lounge: Redecoration required as part of regular maintenance schedule. ENT: Redecoration required as part of regular maintenance schedule. Jungle Ward/Paediatric Day Case: Redecoration required as part of regular maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Doctors Common Room: Redecoration required as part of regular maintenance schedule. Function Room: Redecoration required as part of regular maintenance schedule. Neonatal Offices: Redecoration required as part of regular maintenance schedule. Wash Up Area: Redecoration required as part of regular maintenance schedule. Delivery Suite: Redecoration required as part of regular maintenance schedule. Neonatal Unit: Redecoration required as part of regular maintenance schedule. Circulation Routes: Redecoration required as part of regular maintenance schedule. Catering Offices: Redecoration required as part of regular maintenance schedule. Theatres: Redecoration required within 5 year maintenance schedule Located to 70% (Cost includes decant of the ward). HDU/Rainbow Suite: Redecoration required as part of regular maintenance schedule. Pharmacy Technical Services: Redecoration required as part of regular maintenance schedule.

01 - Decorations

B(C)

£11,700

2

0

2 2

4

2012

01 - Decorations

B(C)

£1,450

3

0

2 2

4

2013

01 - Decorations

B(C)

£15,600

3

0

2 2

4

2013

01 - Decorations

B(C)

£5,850

3

0

2 2

4

2013

01 - Decorations

B(C)

£39,000

3

0

2 2

4

2013

01 - Decorations

B(C)

£27,300

3

0

2 2

4

2013

01 - Decorations

B(C)

£43,500

3

0

2 2

4

2013

01 - Decorations

B(C)

£2,900

3

0

2 2

4

2013

01 - Decorations

B(C)

£24,500

3

0

2 2

4

2013

01 - Decorations

B(C)

£7,800

4

0

2 2

4

2014

01 - Decorations

B(C)

£19,500

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Dining Area: Redecoration required as part of regular maintenance schedule. Theatres: Plasterboard: Make good damaged plasterwork to 1.137. Theatres: Suspended: Concealed grid - Take down and replace with new to entire ceiling - Located to 1.C29, Circulation routes and 1.175. Circulation Routes: Suspended ceiling. Neonatal Offices: Artex. Dining/Coffee Lounge: Suspended ceiling. Dining/Coffee Lounge: Artex. Circulation Routes: Exposed galvanised steel soffit. Neonatal Offices: Suspended ceiling. Catering Offices: Suspended ceiling. Pharmacy Technical Services: Suspended ceiling (sealed). Jungle Ward/Paediatric Day Case: Suspended ceiling. Neonatal Unit: Suspended ceiling. Delivery Suite: Suspended ceiling. Function Room: Suspended ceiling. Doctors Common Room: Suspended ceiling. ENT: Suspended ceiling. Theatres: Suspended.

01 - Decorations

B(C)

£39,000

4

0

2 2

4

2014

02 - Ceiling

C

£300

0

0

2 2

4

2010

02 - Ceiling

C

£15,000

0

0

2 2

4

2010

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling 02 - Ceiling

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

02 - Ceiling 02 - Ceiling

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling 02 - Ceiling

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes HDU/Rainbow Suite: Suspended ceiling. Dining Area: Suspended ceiling. Wash Up Area: Suspended ceiling. Theatres: Plasterboard. Catering Offices: Vinyl tile requires replacement to: 1.036P, 0.34P, 0.32P, 0.30P, 0.35P. Theatres: Vinyl: Need to replace slip resistant vinyl flooring 10% of staff area. Theatres: Vinyl: Need to replace vinyl sheet flooring - Located to 1.C29, 1.140, Circulation routes and 1.175. Theatres: Vinyl: Refix vinyl sheet flooring banding Located to theatres. Delivery Suite: Vinyl sheet to 093 requires replacement. Dining/Coffee Lounge: Contract quality carpet requires replacement. Neonatal Unit: Vinyl sheet requires replacement to: 124 and 127. Neonatal Offices: Carpet tiles require replacement to 209, 211 and 212. ENT: Anti slip vinyl sheet requires replacement to: 308. Catering Offices: Contract quality carpet to 029P requires replacement.

02 - Ceiling

B

£0

15

0

0 0

0

2025

02 - Ceiling 02 - Ceiling

B B

£0 £0

20 20

0 0

0 0 0 0

0 0

2030 2030

02 - Ceiling 03 - Floor

B C

£0 £2,450

20 0

0 0

0 0 2 2

0 4

2030 2010

03 - Floor

C

£400

0

0

2 2

4

2010

03 - Floor

C

£10,500

0

0

2 2

4

2010

03 - Floor

C

£1,500

0

0

2 2

4

2010

03 - Floor

B(C)

£295

2

0

2 2

4

2012

03 - Floor

B(C)

£5,664

2

0

2 2

4

2012

03 - Floor

B(C)

£4,425

2

0

2 2

4

2012

03 - Floor

B(C)

£11,800

2

0

2 2

4

2012

03 - Floor

B(C)

£2,950

2

0

2 2

4

2012

03 - Floor

B(C)

£1,180

2

0

2 2

4

2012

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Doctors Common Room: Replace contract quality carpet to 22X, C14, C13, 16X, 15X, 14X, 13X, 13X, 11X, 27X, 26X, 25X, 24X, 23X and C14. Catering Offices: Vinyl sheet requires replacement to: 1.C43, 1.S06, 1.C44, 1.C45, 0.31PA, 0.33P, 0.40P. Neonatal Offices: Contract quality carpet to 213 and 214 requires replacement. Delivery Suite: Contract quality carpet to 077 requires replacement. Catering Offices: Contract quality carpet to 028P requires replacement. ENT: Contract quality carpet requires replacing to: C51, C52, C53, 307, 306, 304, 303, 302, 301, 305, 312, 312, 310, 313, 311. Circulation Routes: Vinyl sheet requires replacement. Delivery Suite: Linoleum to 238 and 240 requires replacement. Doctors Common Room: Replace anti slip vinyl sheet to: C12, 30X, 33X, 19X, 11XA and 36X. Delivery Suite: Anti slip vinyl sheet to 239 requires replacement. Neonatal Offices: Contract quality carpet to 205, 206, 208 requires replacement.

03 - Floor

B(C)

£11,800

3

0

2 2

4

2013

03 - Floor

B(C)

£14,700

3

0

2 2

4

2013

03 - Floor

B(C)

£2,950

3

0

2 2

4

2013

03 - Floor

B(C)

£1,180

3

0

2 2

4

2013

03 - Floor

B(C)

£1,180

4

0

2 2

4

2014

03 - Floor

B(C)

£14,750

4

0

2 2

4

2014

03 - Floor

B(C)

£73,500

4

0

2 2

4

2014

03 - Floor

B(C)

£2,950

5

0

2 2

4

2015

03 - Floor

B(C)

£5,900

5

0

2 2

4

2015

03 - Floor

B(C)

£1,180

5

0

2 2

4

2015

03 - Floor

B(C)

£11,800

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Catering Offices: Quarry tiles require replacing to: 031P and 033P. Theatres: Vinyl sheet. Neonatal Unit: Contract quality carpet. Neonatal Offices: Vinyl sheet. Jungle Ward/Paediatric Day Case: Vinyl sheet. Neonatal Offices: Anti slip vinyl sheet. Dining/Coffee Lounge: Concrete textured epoxy resin, 93P. Neonatal Unit: Linoleum. Neonatal Unit: Vinyl sheet. Dining/Coffee Lounge: Linoleum. Delivery Suite: Vinyl sheet. Delivery Suite: Linoleum. Dining/Coffee Lounge: Vinyl sheet. HDU/Rainbow Suite: Anti slip vinyl sheet. Pharmacy Technical Services: Anti slip vinyl sheet. Doctors Common Room: Anti slip vinyl sheet. Pharmacy Technical Services: Vinyl sheet. Dining Area: Laminate flooring. Dining Area: Anti slip vinyl sheet. Wash Up Area: Anti slip vinyl sheet. Function Room: Vinyl sheet. Circulation Routes: Anti slip vinyl sheet. HDU/Rainbow Suite: Vinyl sheet.

03 - Floor

B(C)

£2,640

5

0

2 2

4

2015

03 - Floor 03 - Floor

B B

£0 £0

7 8

0 0

0 0 0 0

0 0

2017 2018

03 - Floor 03 - Floor

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor 03 - Floor 03 - Floor 03 - Floor 03 - Floor 03 - Floor

B B B B B B

£0 £0 £0 £0 £0 £0

10 10 10 10 10 10

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

2020 2020 2020 2020 2020 2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor 03 - Floor 03 - Floor

B B B

£0 £0 £0

10 10 10

0 0 0

0 0 0 0 0 0

0 0 0

2020 2020 2020

03 - Floor 03 - Floor

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

03 - Floor

B

£0

10

0

0 0

0

2020

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Catering Offices: Anti slip vinyl sheet. Wash Up Area: Concrete floor. Dining Area: Vinyl tile. Dining Area: Brickwork (plastered): Impact damage to plastered brickwork to corner adjacent goods lift. Delivery Suite: Plastered blockwork: make good minor crack to wall adjacent to door. 1.C23. Theatres: Brickwork (plastered): Make good impact damaged plasterwork - Located to 1C29. Doctors Common Room: Ceramic tiles to 33X will require replacement. Theatres: Ceramic tiling. Theatres: Brickwork (plastered). Theatres: Kitchen facilities: Replace 12No handles and three doors. Theatres: Clinical units: Replace clinical units due to age and condition - Located to theatres. Doctors Common Room: Bath will require replacement (33X). ENT: Kitchen units to 308 require replacement. Doctors Common Room: Kitchen units to 11XA will require replacement. Jungle Ward/Paediatric Day Case: Small kitchen to 221 requires upgrading.

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor 03 - Floor 05 - Condition of Internal Walls

B B C

£0 £0 £250

18 20 0

0 0 0

0 0 0 0 2 2

0 0 4

2028 2030 2010

05 - Condition of Internal Walls

C

£500

0

0

2 2

4

2010

05 - Condition of internal walls

C

£500

0

0

2 2

4

2010

05 - Condition of Internal Walls

B(C)

£500

5

0

2 2

4

2015

05 - Condition of internal walls 05 - Condition of internal walls 08 - Fixed Units

B B C

£0 £0 £1,000

10 20 0

0 0 0

0 0 0 0 3 3

0 0 9

2020 2030 2010

08 - Fixed Units

B(C)

£20,000

1

0

2 2

4

2011

08 - Fixed Units

B(C)

£1,000

2

0

2 2

4

2012

08 - Fixed Units

B(C)

£2,000

3

0

2 2

4

2013

08 - Fixed Units

B(C)

£1,500

5

0

2 2

4

2015

08 - Fixed Units

B(C)

£1,500

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Neonatal Offices: Kitchen units require replacement to 207. Theatres: Sanitary fittings: Replace Ceramic wash hand basin due to age and condition 2No. Theatres: Sanitary fittings: Ceramic WC. Theatres: Kitchen facilities. Theatres: Sanitary fittings: Ceramic sluice. Pharmacy Technical Services: Clinical cupboards. Neonatal Unit: Kitchen units. Dining Area: Vinyl lined concertina doors to Hyde Park room. PICU: Undergoing refurbishment at time of survey. Haemodialysis Unit: Undergoing refurbishment at time of survey.

08 - Fixed Units

B(C)

£3,000

5

0

2 2

4

2015

08 - Fixed Units

B(C)

£1,400

5

0

3 3

9

2015

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

7 7

0 0

0 0 0 0

0 0

2017 2017

08 - Fixed Units

B

£0

10

0

0 0

0

2020

08 - Fixed Units 09 - Internal Doors

B B(C)

£0 £5,000

10 5

0 0

0 0 2 2

0 4

2020 2015

12 - Comments

N/A

£0

0

0

0 0

0

2010

12 - Comments

N/A

£0

0

0

0 0

0

2010

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling 03 - Floor

B C

£0 £5,900

20 0

0 0

0 0 2 2

0 4

2030 2010

03 - Floor 03 - Floor 05 - Condition of Internal Walls

B B C

£0 £0 £500

10 20 0

0 0 0

0 0 0 0 2 2

0 0 4

2020 2030 2010

Remedial Action

Location: 02 - Second Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

Plant Rooms: Suspended ceiling. Plant Rooms: Concrete soffit. Plant Rooms: Carpet to rear corridor adjacent archives (2.016) requires replacement. Plant Rooms: Vinyl sheet. Plant Rooms: Concrete floor. Plant Rooms: Vertical minor cracking to 2.C21, make good and monitor.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Plant Rooms: Minor stepped cracking, make good and monitor. 2.020, 2.M16, 2.C21. Plant Rooms: Water damage to corridor 2.C05 adjacent to 2.016. make good. Plant Rooms: Impact damage to plastered stud work requires making good. 2.C05.

05 - Condition of Internal Walls

C

£500

0

0

2 2

4

2010

05 - Condition of Internal Walls

C

£500

0

0

2 2

4

2010

05 - Condition of Internal Walls

C

£500

0

0

2 2

4

2010

01 - Decorations

C

£1,950

0

0

2 2

4

2010

01 - Decorations

B(C)

£27,300

2

0

2 2

4

2012

01 - Decorations

B(C)

£43,500

3

0

2 2

4

2013

01 - Decorations

B(C)

£27,300

3

0

2 2

4

2013

01 - Decorations

B(C)

£58,500

3

0

2 2

4

2013

Remedial Action

Location: 03 - Third Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

Heberden Ward: Redecoration required as part of regular maintenance schedule to rooms 3.132. Trevor Howell Ward & Day Unit: Redecoration required as part of regular maintenance schedule. Circulation Routes: Redecoration required as part of regular maintenance schedule. Thomas Young Ward: Redecoration required as part of regular maintenance schedule. Child Health inc Gynaecology & Obstetrics: Redecoration required as part of regular maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Heberden Ward: Redecoration required as part of regular maintenance schedule. Lady Youde Suite: Redecoration required as part of regular maintenance schedule. Child Health inc Gynaecology & Obstetrics: Damaged ceiling grid (concealed) replacement required. Lady Youde Suite: Suspended ceiling. Circulation Routes: Suspended ceiling. Child Health inc Gynaecology & Obstetrics: Suspended ceiling. Heberden Ward: Suspended ceiling. Trevor Howell Ward & Day Unit: Suspended ceiling. Thomas Young Ward: Suspended ceiling. Thomas Young Ward: Replace anti-slip vinyl sheet to 129 & 130 where stoppers have dragged. Heberden Ward: Anti slip vinyl sheet requires replacement to: 3.144, 3.138, 3.150, 3.154, 3.155 due to stopper scraping floor. Thomas Young Ward: Contract quality carpet near to nurses station requires replacement. Child Health inc Gynaecology & Obstetrics: Contract quality carpet requires replacement to: 101,099,070,070A.

01 - Decorations

B(C)

£35,100

3

0

2 2

4

2013

01 - Decorations

B(C)

£19,500

4

0

2 2

4

2014

02 - Ceiling

C

£1,000

0

0

2 2

4

2010

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

03 - Floor

C

£500

0

0

2 2

4

2010

03 - Floor

C

£2,500

0

0

2 2

4

2010

03 - Floor

C

£590

0

0

2 2

4

2010

03 - Floor

C

£11,800

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Child Health inc Gynaecology & Obstetrics: Vinyl tile to 3.100 requires replacement. Heberden Ward: Contract quality carpet behind nurses station requires replacement, 3.145. Heberden Ward: Anti slip vinyl sheet edging requires making good to: 3.028. Child Health inc Gynaecology & Obstetrics: Vinyl sheet to corridors requires replacement to: 093A, 093, 086, 083, 082, 076A, 076, 071, 069, 063, 062. Thomas Young Ward: Contract quality carpet to 3.117 and 124 requires replacement. Lady Youde Suite: Contract quality carpet to 3.210, 3.211, 3.203 & 3.208 requires replacement. Heberden Ward: Quarry tiles require replacing to 3.142. Thomas Young Ward: quarry tiles to 3.111 requires replacement. Child Health inc Gynaecology & Obstetrics: Contract quality carpet will require upgrading to: 102,098,094,096,095,092,087A, 081,080,075,074,075A,073,068 A,068B,072,067A,066,067,062A ,065,064,003. Child Health inc Gynaecology & Obstetrics: Quarry tiles to 3.104, 105, 088, 089 require replacement.

03 - Floor

C

£2,950

0

0

2 2

4

2010

03 - Floor

C

£590

0

0

2 2

4

2010

03 - Floor

C

£1,180

0

0

2 2

4

2010

03 - Floor

B(C)

£17,700

2

0

2 2

4

2012

03 - Floor

B(C)

£2,950

4

0

2 2

4

2014

03 - Floor

B(C)

£5,900

5

0

2 2

4

2015

03 - Floor

B(C)

£1,980

5

0

2 2

4

2015

03 - Floor

B(C)

£500

5

0

2 2

4

2015

03 - Floor

B(C)

£47,200

5

0

2 2

4

2015

03 - Floor

B(C)

£11,800

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Circulation Routes: Vinyl sheet requires replacement. Thomas Young Ward: Replace anti slip vinyl sheet to 106A. Heberden Ward: Contract quality carpet requires replacement to: 3.134, 3.022, 3.020, 3.016, 3.016A, 3.016B. Child Health inc Gynaecology & Obstetrics: Vinyl sheet. Trevor Howell Ward & Day Unit: Vinyl sheet. Child Health inc Gynaecology & Obstetrics: Anti slip vinyl sheet. Trevor Howell Ward & Day Unit: Linoleum. Trevor Howell Ward & Day Unit: Anti slip vinyl sheet. Heberden Ward: Anti slip vinyl sheet. Thomas Young Ward: Anti slip vinyl sheet. Lady Youde Suite: Anti slip vinyl sheet. Child Health inc Gynaecology & Obstetrics: Make good crack over door to 3.100. Lady Youde Suite: Make good damaged plaster work to WC. 3.218. Child Health inc Gynaecology & Obstetrics: Impact damage from door closer requires making good, 062. Child Health inc Gynaecology & Obstetrics: Impact damage to wall and door requires making good, 002.

03 - Floor

B(C)

£73,500

5

0

2 2

4

2015

03 - Floor

B(C)

£1,180

5

0

2 2

4

2015

03 - Floor

B(C)

£5,900

5

0

2 2

4

2015

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

05 - Condition of Internal Walls

C

£250

0

0

2 2

4

2010

05 - Condition of Internal Walls

C

£500

0

0

2 2

4

2010

05 - Condition of Internal Walls

C

£150

0

0

2 2

4

2010

05 - Condition of Internal Walls

C

£1,500

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Heberden Ward: Clinical cupboards to 3.147 require replacement. Child Health inc Gynaecology & Obstetrics: Wash hand basin to 104, 105, 088 & 089 requires replacement. Child Health inc Gynaecology & Obstetrics: WC to 104, 105, 088 & 089 requires replacement. Trevor Howell Ward & Day Unit: Kitchen units to staff room require replacement. Thomas Young Ward: Kick plate to doors missing to 105A & 131. Lady Youde Suite: Oakleaf were informed of a leak adjacent vent to 3.200.

08 - Fixed Units

C

£5,000

0

0

2 2

4

2010

08 - Fixed Units

B(C)

£2,000

3

0

2 2

4

2013

08 - Fixed Units

B(C)

£2,000

3

0

2 2

4

2013

08 - Fixed Units

B(C)

£3,000

4

0

2 2

4

2014

09 - Internal Doors

C

£250

0

0

2 2

4

2010

12 - Comments

C

£500

0

0

2 2

4

2010

01 - Decorations

C

£1,950

0

0

2 2

4

2010

01 - Decorations

C

£1,950

0

0

2 2

4

2010

01 - Decorations

C

£390

0

0

2 2

4

2010

01 - Decorations

B(C)

£43,500

1

0

2 2

4

2011

Remedial Action

Location: 04 - Fourth Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

Champneys Ward: Redecoration required as part of regular maintenance schedule to room 036. Foetal Medicine Unit: Redecoration required as part of regular maintenance schedule to room 020A. Gwillam Ward: Redecoration required as part of regular maintenance schedule to room 4.119. Circulation Routes: Redecoration required as part of regular maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Gynaecology Offices: Redecoration required as part of regular maintenance schedule. Dept of Urogynaecology/ Urodynamics: Redecoration required as part of regular maintenance schedule. Caesar Hawkins Ward: Redecoration required as part of regular maintenance schedule. Champneys Ward: Redecoration required as part of regular maintenance schedule. Carmen/Dakin Suite: Redecoration required as part of regular maintenance schedule. Foetal Medicine Unit: Redecoration required as part of regular maintenance schedule. Gwillam Ward: Redecoration required as part of regular maintenance schedule. Gwillam Ward: Suspended ceiling rusting, replace. Caesar Hawkins Ward: Resecure loose ceiling tiles to 088. Carmen/Dakin Suite: Suspended ceiling to 4.176 has loose tiles. Make good. Champneys Ward: Suspended ceiling. Circulation Routes: Suspended ceiling.

01 - Decorations

B(C)

£9,750

2

0

2 2

4

2012

01 - Decorations

B(C)

£11,700

2

0

2 2

4

2012

01 - Decorations

B(C)

£27,300

2

0

2 2

4

2012

01 - Decorations

B(C)

£31,200

2

0

2 2

4

2012

01 - Decorations

B(C)

£23,400

3

0

2 2

4

2013

01 - Decorations

B(C)

£23,400

3

0

2 2

4

2013

01 - Decorations

B(C)

£35,100

3

0

2 2

4

2013

02 - Ceiling

C

£3,600

0

0

2 2

4

2010

02 - Ceiling

C

£50

0

0

2 2

4

2010

02 - Ceiling

C

£150

0

0

2 2

4

2010

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Foetal Medicine Unit: Suspended ceiling. Carmen/Dakin Suite: Suspended ceiling. Dept of Urogynaecology/ Urodynamics: Suspended ceiling. Caesar Hawkins Ward: Suspended ceiling. Gwillam Ward: Suspended ceiling. Gynaecology Offices: Suspended ceiling. Gwillam Ward: 4.118 & 4.119 edging to vinyl sheet failing at door. Dept of Urogynaecology/ Urodynamics: Anti slip vinyl sheet coming away to door edge. Dept of Urogynaecology/ Urodynamics: Contract quality carpet requires replacement to: 009, 007, 005, 002, 004, 008. Foetal Medicine Unit: Vinyl sheet requires replacement to 020A. Champneys Ward: Contract quality carpet requires replacement to: 054 and 055. Champneys Ward: Vinyl tile to 018 requires replacement. Champneys Ward: Vinyl sheet requires replacement to 068A, 067 and 066. edging around window coming away.

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

03 - Floor

C

£500

0

0

2 2

4

2010

03 - Floor

C

£500

0

0

2 2

4

2010

03 - Floor

C

£5,900

0

0

2 2

4

2010

03 - Floor

C

£590

0

0

2 2

4

2010

03 - Floor

C

£2,950

0

0

2 2

4

2010

03 - Floor

C

£2,950

0

0

2 2

4

2010

03 - Floor

C

£5,900

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Caesar Hawkins Ward: Contract quality carpet requires replacement to, 068, 068a, 067, 066. Caesar Hawkins Ward: Vinyl sheet has damaged edging and requires replacement to room 078. Gwillam Ward: Anti slip vinyl sheet requires replacement to 4.112 due to door stopper scraping. Circulation Routes: Vinyl sheet requires replacement. Champneys Ward: Vinyl sheet requires replacement to: C.03, 064, 059, 056, 053 ,050, 049 ,C.034,048, 046, 043 , 040, 029, 044. Gynaecology Offices: Replace contract quality carpet to 107A, 107, 105, 104A, 103, 102, 099, 096. Dept of Urogynaecology/ Urodynamics: Vinyl sheet requires replacement to 1.6, C22, 010. Foetal Medicine Unit: Vinyl sheet to C.07 and C.02 requires replacement. Foetal Medicine Unit: Contract quality carpet to 178, 110, 181, 178A, 183, 188, 027, 021, 016 requires replacement. Champneys Ward: Anti slip vinyl sheet requires replacement to 004 and 003a.

03 - Floor

C

£2,950

0

0

2 2

4

2010

03 - Floor

C

£1,180

0

0

2 2

4

2010

03 - Floor

C

£500

0

0

2 2

4

2010

03 - Floor

B(C)

£88,500

2

0

2 2

4

2012

03 - Floor

B(C)

£29,500

2

0

2 2

4

2012

03 - Floor

B(C)

£12,980

2

0

2 2

4

2012

03 - Floor

B(C)

£5,900

2

0

2 2

4

2012

03 - Floor

B(C)

£8,850

3

0

2 2

4

2013

03 - Floor

B(C)

£14,750

3

0

2 2

4

2013

03 - Floor

B(C)

£2,950

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Caesar Hawkins Ward: Anti slip vinyl sheet requires replacement to. 084A, 088, 083A, 076. Caesar Hawkins Ward: Carpet tiles require replacement. Foetal Medicine Unit: Anti slip vinyl sheet to 179 and 182 requires replacement. Dept of Urogynaecology/ Urodynamics: Anti slip vinyl sheet requires replacement to 001. Gynaecology Offices: Replace anti slip vinyl sheet to: 108 & 106. Champneys Ward: Anti slip vinyl sheet. Gwillam Ward: Vinyl sheet. Champneys Ward: Vinyl sheet. Gwillam Ward: Linoleum. Caesar Hawkins Ward: Anti slip vinyl sheet. Foetal Medicine Unit: Vinyl sheet. Foetal Medicine Unit: Anti slip vinyl sheet. Caesar Hawkins Ward: Vinyl sheet. Carmen/Dakin Suite: Vinyl sheet. Carmen/Dakin Suite: Anti slip vinyl sheet. Gwillam Ward: Damp to low level adjacent 4.121. Gwillam Ward: Regrout ceramic wall tiles to 4.119.

03 - Floor

B(C)

£5,900

5

0

2 2

4

2015

03 - Floor

B(C)

£11,800

5

0

2 2

4

2015

03 - Floor

B(C)

£2,950

5

0

2 2

4

2015

03 - Floor

B(C)

£590

5

0

2 2

4

2015

03 - Floor

B(C)

£1,770

5

0

2 2

4

2015

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor 03 - Floor 03 - Floor 03 - Floor

B B B B

£0 £0 £0 £0

10 10 10 10

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2020 2020 2020 2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

05 - Condition of Internal Walls

C

£500

0

0

2 2

4

2010

05 - Condition of Internal Walls

C

£500

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Gwillam Ward: Make good cracking around door frame to 120. Gwillam Ward: Make good impact damage to corner. 4.139. Gwillam Ward: Clinical units to 4.149 require replacement. Gwillam Ward: Clinical units to 4.127 require replacement. Caesar Hawkins Ward: Replace kitchen units to 106. Dept of Urogynaecology/ Urodynamics: Clinical cupboard to 005 requires replacement. Gwillam Ward: Heavy door closer action to 4.M03. Adjust as necessary. Champneys Ward: Heavy metal door to M02 (M03) scraping across floor. Door requires rehanging.

05 - Condition of Internal Walls

C

£500

0

0

2 2

4

2010

05 - Condition of Internal Walls

C

£250

0

0

2 2

4

2010

08 - Fixed Units

C

£3,000

0

0

2 2

4

2010

08 - Fixed Units

C

£500

0

0

2 2

4

2010

08 - Fixed Units

B(C)

£3,000

5

0

2 2

4

2015

08 - Fixed Units

B(C)

£500

5

0

2 2

4

2015

09 - Internal Doors

C

£50

0

0

3 2

6

2010

09 - Internal Doors

C

£150

0

0

2 2

4

2010

01 - Decorations

C

£1,950

0

0

2 2

4

2010

01 - Decorations

C

£1,950

0

0

2 2

4

2010

01 - Decorations

B(C)

£19,500

2

0

2 2

4

2012

01 - Decorations

B(C)

£29,250

3

0

2 2

4

2013

Remedial Action

Location: 05 - Fifth Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

Nicholls Ward: Redecoration required inclusive of making good blown plaster and minor cracking to room 023A. Nicholls Ward: Redecoration required as part of regular maintenance schedule to 054. Fredrick Hewitt Ward: Redecoration required as part of regular maintenance schedule. Nicholls Ward: Redecoration required as part of regular maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Circulation Routes: Redecoration required as part of regular maintenance schedule. Snow Ward/ Ursula James Room: Redecoration required as part of regular maintenance schedule. Ocean Ward: Redecoration required as part of regular maintenance schedule. Duke Eldar Theatres/Ophthalmology: Redecoration required as part of regular maintenance schedule. Duke Eldar Ward: Redecoration required as part of regular maintenance schedule. Pinkney Ward: Redecoration required as part of regular maintenance schedule. Paediatric Offices: Redecoration required as part of regular maintenance schedule. Dalby Ward: Redecoration required as part of regular maintenance schedule. Fredrick Hewitt Ward: Make good loose tiles to 105. Paediatric Offices: Replace 4No. Water damaged or missing tiles to 016A. Duke Eldar Theatres/Ophthalmology: 1No. missing suspended ceiling tiles to both 117 and 118 require replacement.

01 - Decorations

B(C)

£43,500

3

0

2 2

4

2013

01 - Decorations

B(C)

£3,900

3

0

2 2

4

2013

01 - Decorations

B(C)

£7,800

3

0

2 2

4

2013

01 - Decorations

B(C)

£15,600

3

0

2 2

4

2013

01 - Decorations

B(C)

£19,500

3

0

2 2

4

2013

01 - Decorations

B(C)

£19,500

3

0

2 2

4

2013

01 - Decorations

B(C)

£7,800

4

0

2 2

4

2014

01 - Decorations

B(C)

£27,300

4

0

2 2

4

2014

02 - Ceiling

C

£150

0

0

2 2

4

2010

02 - Ceiling

C

£600

0

0

2 2

4

2010

02 - Ceiling

C

£300

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Snow Ward/ Ursula James Room: Suspended ceiling. Nicholls Ward: Suspended ceiling. Dalby Ward: Suspended ceiling. Duke Eldar Ward: Suspended ceiling. Duke Eldar Theatres/Ophthalmology: Suspended ceiling. Fredrick Hewitt Ward: Suspended ceiling. Circulation Routes: Suspended ceiling. Duke Eldar Theatres/Ophthalmology: Plaster ceiling. Paediatric Offices: Suspended ceiling. Pinkney Ward: Suspended ceiling. Ocean Ward: Suspended ceiling. Paediatric Offices: Suspended ceiling. Nicholls Ward: Suspended ceiling. Dalby Ward: Suspended ceiling. Duke Eldar Ward: Contract quality carpet to 137 requires replacement. Paediatric Offices: Vinyl sheet to C.02A requires replacing. Nicholls Ward: Anti slip vinyl sheet requires replacing due to edging to room 021.

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling 02 - Ceiling

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling 03 - Floor

B C

£0 £1,770

20 0

0 0

0 0 2 2

0 4

2030 2010

03 - Floor

C

£2,950

0

0

2 2

4

2010

03 - Floor

C

£500

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Fredrick Hewitt Ward: Anti slip vinyl sheet edging requires making good to room 094. Dalby Ward: Replace missing vinyl from decorative panels. Dalby Ward: Edging to vinyl sheet requires making good to 172 and 158. Dalby Ward: Contract quality carpet to 175 requires replacement. Paediatric Offices: Contract quality carpet to 16B and 018 requires replacement. Nicholls Ward: Vinyl sheet to 032 requires replacement. Duke Eldar Ward: Vinyl sheet to C.08, C10, 12, 145, 144, 143, 140, 134A, 132, 131 requires replacement. Paediatric Offices: Contract quality carpet requires replacing to 012, 012A and 016. Duke Eldar Ward: Anti slip vinyl sheet to 136, 135, 133 and 129 requires replacement. Duke Eldar Ward: Carpet tiles to 151, 149 and 134 requires replacement. Dalby Ward: Contract quality carpet to 174, 180 and 154 requires replacement. Nicholls Ward: Anti slip vinyl sheet requires replacement to 031, 051 and 056. Pinkney Ward: Vinyl sheet requires replacement to C23, C27, 073, 076A, 083A, 084.

03 - Floor

C

£1,180

0

0

2 2

4

2010

03 - Floor

C

£500

0

0

2 2

4

2010

03 - Floor

C

£1,000

0

0

2 2

4

2010

03 - Floor

C

£1,770

0

0

2 2

4

2010

03 - Floor

C

£2,360

0

0

2 2

4

2010

03 - Floor

B(C)

£590

1

0

2 2

4

2011

03 - Floor

B(C)

£17,700

2

0

2 2

4

2012

03 - Floor

B(C)

£5,900

2

0

2 2

4

2012

03 - Floor

B(C)

£5,900

2

0

2 2

4

2012

03 - Floor

B(C)

£2,950

2

0

2 2

4

2012

03 - Floor

B(C)

£2,950

3

0

2 2

4

2013

03 - Floor

B(C)

£2,950

3

0

2 2

4

2013

03 - Floor

B(C)

£17,700

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Snow Ward/ Ursula James Room: Contract quality carpet to 087 requires replacement. Duke Eldar Ward: Contract quality carpet requires replacement to 5.150, 146, 142 and 139. Circulation Routes: Vinyl sheet requires replacement. Duke Eldar Theatres/Ophthalmology: Vinyl sheet to 128, C14, C15, C17, 123, 118 and 117 requires replacing. Nicholls Ward: Contract quality carpet to 033, 034, 028, 026, 054 requires replacement. Paediatric Offices: Carpet to 001, 004 and 003 requires replacement. Paediatric Offices: Contract quality carpet requires replacing to 010, 010A and 011. Paediatric Offices: Vinyl sheet to C.02 requires replacing. Paediatric Offices: Quarry tiles to 013 and 014 require replacing. Duke Eldar Theatres/Ophthalmology: Quarry tiles to 118 and 117 require replacement. Duke Eldar Ward: Quarry tiles to 148 require replacement. Ocean Ward: Vinyl sheet. Duke Eldar Ward: Anti slip vinyl sheet. Paediatric Offices: Vinyl sheet.

03 - Floor

B(C)

£1,180

3

0

2 2

4

2013

03 - Floor

B(C)

£2,950

3

0

2 2

4

2013

03 - Floor

B(C)

£88,500

4

0

2 2

4

2014

03 - Floor

B(C)

£20,650

4

0

2 2

4

2014

03 - Floor

B(C)

£2,950

4

0

2 2

4

2014

03 - Floor

B(C)

£2,950

4

0

2 2

4

2014

03 - Floor

B(C)

£2,950

4

0

2 2

4

2014

03 - Floor

B(C)

£2,950

5

0

2 2

4

2015

03 - Floor

B(C)

£1,770

5

0

2 2

4

2015

03 - Floor

B(C)

£1,180

5

0

2 2

4

2015

03 - Floor

B(C)

£1,180

5

0

2 2

4

2015

03 - Floor 03 - Floor

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

03 - Floor

B

£0

10

0

0 0

0

2020

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Fredrick Hewitt Ward: Anti slip vinyl sheet. Fredrick Hewitt Ward: Vinyl sheet. Pinkney Ward: Vinyl sheet. Nicholls Ward: Quarry tiles. Nicholls Ward: Vinyl sheet. Nicholls Ward: Anti slip vinyl sheet. Dalby Ward: Quarry tiles. Dalby Ward: Vinyl sheet. Snow Ward/ Ursula James Room: Vinyl sheet. Duke Eldar Theatres/Ophthalmology: Contract quality carpet. Dalby Ward: Anti slip vinyl sheet. Duke Eldar Theatres/Ophthalmology: Anti slip vinyl sheet. Duke Eldar Ward: Plastered Brickwork: Extensive damp to external wall to 136 and 135. Duke Eldar Theatres/Ophthalmology: Plastered brickwork to 128 has minor cracking which requires making good. Duke Eldar Theatres/Ophthalmology: Ceramic tiles to 118 and 117 require replacement. Duke Eldar Ward: Replace kitchen units to 136, 135 and 129.

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor 03 - Floor 03 - Floor 03 - Floor

B B B B

£0 £0 £0 £0

10 10 10 10

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2020 2020 2020 2020

03 - Floor 03 - Floor 03 - Floor

B B B

£0 £0 £0

10 10 10

0 0 0

0 0 0 0 0 0

0 0 0

2020 2020 2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

05 - Condition of Internal Walls

C

£1,000

0

0

2 2

4

2010

05 - Condition of Internal Walls

C

£250

0

0

2 2

4

2010

05 - Condition of Internal Walls

B(C)

£500

2

0

2 2

4

2012

08 - Fixed Units

B(C)

£9,000

2

0

2 2

4

2012

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Nicholls Ward: 2No. baths require replacement to room 051. Nicholls Ward: 2No. sinks require replacement to room 051. Duke Eldar Ward: Replace door to 140. Paediatric Offices: Sliding door to 019 is impact damaged and requires replacement. Nicholls Ward: Adjust closer action to 021. Duke Eldar Theatres/Ophthalmology: Heavy door closer action. Adjust as necessary.

08 - Fixed Units

B(C)

£2,000

5

0

2 2

4

2015

08 - Fixed Units

B(C)

£1,000

5

0

2 2

4

2015

09 - Internal Doors

C

£1,200

0

0

2 2

4

2010

09 - Internal Doors

C

£3,000

0

0

2 2

4

2010

09 - Internal Doors

C

£150

0

0

3 2

6

2010

09 - Internal Doors

C

£150

0

0

2 2

4

2010

04 - Windows

B(C)

£50,400

3

0

3 3

9

2013

04 - Windows

B

£0

10

0

0 0

0

2020

B(C)

£38,250

3

0

3 3

9

2013

Remedial Action

Location: Elevation 01 B - Building - External Fabric Aluminium cased timber framed windows: Suggest overhauling windows to delay the need for replacement. Elevation 1 336m2. Aluminium - Double to the centrally located small courtyards adjacent Roofs 3, 4, 5 & 6 on Elevation 1.

Location: Elevation 02 B - Building - External Fabric 04 - Windows

Generic Hospital Physical Condition Survey

Aluminium cased timber framed windows: Suggest overhauling windows to delay the need for replacement. Elevation 2 255m2. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: Elevation 02 & 04 B - Building - External Fabric 01d - Masonry - Finish

B(C)

£2,000

5

0

2 2

4

2015

Brickwork: Remove ivy growths from corner of elevation 2 and 4 as it has the potential to cause issues with the mortar and brickwork.

04 - Windows

C

£8,000

0

0

3 3

9

2010

04 - Windows

B(C)

£9,000

3

0

3 3

9

2013

04 - Windows

B(C)

£385,600

5

0

3 2

6

2015

Softwood timber - Single to elevation 3 are in poor condition and replacement is thought to be required, 10m2. Aluminium cased timber framed windows: Suggest overhauling windows to delay the need for replacement. Elevation 3 60m2. Aluminium - Single: Replace with new to the rear link bridge on Elevation 3, 387m2. (Approximately half are located above the road therefore costs have been adjusted to allow for higher replacement costs of these windows).

B(C)

£36,300

3

0

3 3

9

2013

Location: Elevation 03 B - Building - External Fabric

Location: Elevation 04 B - Building - External Fabric 04 - Windows

Generic Hospital Physical Condition Survey

Aluminium cased timber framed windows: Suggest overhauling windows to delay the need for replacement. Elevation 4 242m2. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Aluminium - Single: Replace with new to the link corridor 2 on Elevation 4, 300m2. Aluminium - Single: Replace with new to the link corridor 1 on Elevation 4, 300m2.

04 - Windows

B(C)

£240,000

5

0

2 2

4

2015

04 - Windows

B(C)

£240,000

5

0

2 2

4

2015

B(C)

£88,650

3

0

3 3

9

2013

Aluminium cased timber framed windows: Suggest overhauling windows to delay the need for replacement. Elevation 5 591m2.

B(C)

£10,800

3

0

3 3

9

2013

Aluminium cased timber framed windows: Suggest overhauling windows to delay the need for replacement. Elevation 6 72m2.

B(C)

£114,600

3

0

3 3

9

2013

Aluminium cased timber framed windows: Suggest overhauling windows to delay the need for replacement. Elevation 7 764m2.

Location: Elevation 05 B - Building - External Fabric 04 - Windows

Location: Elevation 06 B - Building - External Fabric 04 - Windows

Location: Elevation 07 B - Building - External Fabric 04 - Windows

Location: Roof 01 D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

02a - Flat - Covering

B

£0

20

0

0 0

0

2030

High performance felt.

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall 02h - Flat - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

20 20 20 20 10

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2030 2030 2030 2030 2020

Steel decking. High performance felt. Galvanised steel. High performance felt. Internal down rainwater pipes.

02a - Flat - Covering

B(C)

£196,134

5

0

2 3

6

2015

Mineral felt with chippings: This roof is approaching the end of its natural life suggest replacement required with 5 years, 2022m2.

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall

B B B B(C)

£0 £0 £0 £0

20 10 10 5

0 0 0 0

0 0 0 2

0 0 0 3

0 0 0 6

2030 2020 2020 2015

02h - Flat - Down Rainwater pipes 02i - Flat - Skylights

B B(C)

£0 £500

10 5

0 0

0 0 2 3

0 6

2020 2015

02i - Flat - Skylights

B(C)

£2,500

5

0

2 3

6

2015

Steel decking. Lead. Galvanised steel. Mineral felt: Need to replace. Cost included. Internal down rainwater pipes. Lantern light: Need to replace 1No. small lantern light. Aluminium framed skylights: Need to replace 5No. skylights.

Location: Roof 02 D - Building - Roof

Location: Roof 03 D - Building - Roof Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

02a - Flat - Covering

B

£0

20

0

0 0

0

2030

High performance felt.

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall 02h - Flat - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

20 20 20 20 10

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2030 2030 2030 2030 2020

Steel decking. High performance felt. Galvanised steel. High performance felt. Internal down rainwater pipes.

02a - Flat - Covering

B

£0

20

0

0 0

0

2030

High performance felt.

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall 02h - Flat - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

20 20 20 20 10

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2030 2030 2030 2030 2020

Steel decking. High performance felt. Galvanised steel. High performance felt. Internal down rainwater pipes.

Location: Roof 04 D - Building - Roof

0 0 0 0 0

Location: Roof 05 D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

02a - Flat - Covering

B

£0

20

0

0 0

0

2030

High performance felt.

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall 02h - Flat - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

20 20 20 20 10

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2030 2030 2030 2030 2020

Steel decking. High performance felt. Galvanised steel. High performance felt. Internal down rainwater pipes.

02a - Flat - Covering

C

£4,000

0

0

3 4 12

2010

Asphalt: Hack up, prepare surface and relay asphalt roofing, 46m2.

02b - Flat - Decking 02c - Flat - Flashing 02e - Flat - Verges/Fascias/ Soffits 02f - Flat - Drainage Fall

B C B C

£0 £500 £0 £0

10 0 10 0

0 0 0 0

0 3 0 3

2020 2010 2020 2010

02g - Flat - Guttering 02h - Flat - Down Rainwater pipes 02i - Flat - Skylights

B B C

£0 £0 £1,000

10 10 0

0 0 0

0 0 0 0 2 2

Reinforced concrete. Mineral felt: Need to replace. Painted timber. Asphalt: Hack up, prepare surface and relay asphalt roofing. Cost included. PVCU. PVCU. Aluminium framed skylights: Need to replace 2No. pyramidal domes.

0 0 0 0 0

Location: Roof 06 D - Building - Roof

0 0 4 12 0 0 4 12

0 0 4

2020 2020 2010

Location: Roof 07 Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

D - Building - Roof 02a - Flat - Covering

B(C)

£2,000

5

0

2 2

4

2015

Mineral felt: Need to replace within the maintenance schedule, 15m2.

02b - Flat - Decking 02c - Flat - Flashing

B B(C)

£0 £0

10 5

0 0

0 0 2 2

0 4

2020 2015

02d - Flat - Parapets 02f - Flat - Drainage Fall

B B(C)

£0 £0

15 5

0 0

0 0 2 2

0 4

2025 2015

B

£0

10

0

0 0

0

2020

Steel decking. Mineral felt: Need to replace. Cost included. Galvanised steel. Mineral felt: Need to replace. Cost included. Internal down rainwater pipes.

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

High performance felt.

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B B B

£0 £0 £0 £0 £0 £0

20 10 10 10 10 10

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

2030 2020 2020 2020 2020 2020

Steel decking. High performance felt. Galvanised steel. High performance felt. PVCU. PVCU.

B

£0

10

0

0 0

0

2020

Profiled galvanised steel sheets.

02h - Flat - Down Rainwater pipes

Location: Roof 08 D - Building - Roof

Location: Roof 09 D - Building - Roof 02a - Flat - Covering Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B B B B B

£0 £0 £0 £0 £0 £0

20 10 10 10 10 10

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

2030 2020 2020 2020 2020 2020

Integrated insulation panels. High performance felt. Galvanised steel. High performance felt. PVCU. PVCU.

02a - Flat - Covering

B(C)

£9,409

2

0

3 3

9

2012

02b - Flat - Decking 02c - Flat - Flashing

B B(C)

£0 £0

10 2

0 0

0 0 3 3

0 9

2020 2012

02d - Flat - Parapets 02f - Flat - Drainage Fall

B B(C)

£0 £0

10 2

0 0

0 0 3 3

0 9

2020 2012

B

£0

10

0

0 0

0

2020

Mineral felt: Need to replace. Assumed condition, 97m2. Steel decking. Mineral felt: Need to replace. Cost included. Galvanised steel. Mineral felt: Need to replace. Cost included. Internal down rainwater pipes.

02a - Flat - Covering

C

£746,208

0

0

4 4 16

2010

Asphalt with concrete block paving and chippings: Heavy plant growths visibly deteriorating surface and cracked paving suggests complete replacement is required, 3588m2.

02b - Flat - Decking

C

£34,823

0

0

4 4 16

2010

Reinforced concrete: Suspect that some areas of concrete decking will require some making good, defective concrete and inspection of reinforcements to determine what damage has been caused to roughly 10% of the roof.

Location: Roof 10 D - Building - Roof

02h - Flat - Down Rainwater pipes

Location: Roof 11 D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Lead: Need to replace flashing to entire roof area as part of any roof works. Galvanised steel: Suggest that these may require replacement within the maintenance schedule. Lead: Need to replace lead to drainage falls and internal rainwater good covers. Internal down rainwater pipes: Suggest closer inspection required.

02c - Flat - Flashing

C

£31,600

0

0

4 4 16

2010

02d - Flat - Parapets

C

£36,000

0

0

2 3

6

2010

02f - Flat - Drainage Fall

C

£5,000

0

0

4 4 16

2010

02h - Flat - Down Rainwater pipes

C

£2,000

0

0

2 2

4

2010

02a - Flat - Covering

B(C)

£27,000

5

0

2 2

4

2015

High performance felt: Need to replace as it is approaching the end of its natural life, 225m2.

02b - Flat - Decking 02c - Flat - Flashing

B B(C)

£0 £0

10 5

0 0

0 0 2 2

0 4

2020 2015

02f - Flat - Drainage Fall

B(C)

£0

5

0

2 2

4

2015

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

Steel decking. High performance felt: Need to replace as it is approaching the end of its natural life. Cost included. High performance felt: Need to replace as it is approaching the end of its natural life. Cost included. PVCU. PVCU.

Location: Roof 12 D - Building - Roof

02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

Location: Roof 13 D - Building - Roof Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

High performance felt: Need to replace as it is approaching the end of its natural life, 10m2. Steel decking. High performance felt: Need to replace as it is approaching the end of its natural life. Cost included. High performance felt: Need to replace as it is approaching the end of its natural life. Cost included. PVCU. PVCU.

02a - Flat - Covering

B(C)

£1,200

5

0

2 2

4

2015

02b - Flat - Decking 02c - Flat - Flashing

B B(C)

£0 £0

10 5

0 0

0 0 2 2

0 4

2020 2015

02f - Flat - Drainage Fall

B(C)

£0

5

0

2 2

4

2015

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

02a - Flat - Covering

B(C)

£1,200

5

0

2 2

4

2015

02b - Flat - Decking 02c - Flat - Flashing

B B(C)

£0 £0

10 5

0 0

0 0 2 2

0 4

2020 2015

02f - Flat - Drainage Fall

B(C)

£0

5

0

2 2

4

2015

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

High performance felt: Need to replace as it is approaching the end of its natural life, 10m2. Steel decking. High performance felt: Need to replace as it is approaching the end of its natural life. Cost included. High performance felt: Need to replace as it is approaching the end of its natural life. Cost included. PVCU. PVCU.

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

Asphalt with chippings. Steel decking.

02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

Location: Roof 14 D - Building - Roof

02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

Location: Roof 15 D - Building - Roof 02a - Flat - Covering 02b - Flat - Decking Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall 02h - Flat - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B B B

£0 £0 £0 £0

10 10 10 10

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2020 2020 2020 2020

Lead. Galvanised steel. Lead. Internal down rainwater pipes.

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

Profiled galvanised steel sheets.

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B B B

£0 £0 £0 £0 £0 £0

20 10 10 10 10 10

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

2030 2020 2020 2020 2020 2020

Integrated insulation panels. High performance felt. Galvanised steel. High performance felt. PVCU. PVCU.

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

Asphalt: with chippings primarily located under Roof 16.

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall 02h - Flat - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

10 10 10 10 10

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2020 2020 2020 2020 2020

Steel decking. Lead. Galvanised steel. Lead. Internal down rainwater pipes.

Location: Roof 16 D - Building - Roof

Location: Roof 17 D - Building - Roof

Generic Hospital Physical Condition Survey

0 0 0 0 0

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Mineral felt: Need to replace. Assumed condition, 106m2. Steel decking. Mineral felt: Need to replace. Cost included. Galvanised steel. Mineral felt: Need to replace. Cost included. Internal down rainwater pipes.

Location: Roof 18 D - Building - Roof 02a - Flat - Covering

B(C)

£10,282

2

0

3 3

9

2012

02b - Flat - Decking 02c - Flat - Flashing

B B(C)

£0 £0

10 2

0 0

0 0 3 3

0 9

2020 2012

02d - Flat - Parapets 02f - Flat - Drainage Fall

B B(C)

£0 £0

10 2

0 0

0 0 3 3

0 9

2020 2012

B

£0

10

0

0 0

0

2020

02a - Flat - Covering

B(C)

£46,075

2

0

3 3

9

2012

Mineral felt: Need to replace. Assumed from visible sections, 475m2.

02b - Flat - Decking 02c - Flat - Flashing

B B(C)

£0 £0

10 2

0 0

0 0 3 3

0 9

2020 2012

02d - Flat - Parapets 02f - Flat - Drainage Fall

B B(C)

£0 £0

10 2

0 0

0 0 3 3

0 9

2020 2012

B

£0

10

0

0 0

0

2020

Steel decking. Mineral felt: Need to replace. Cost included. Galvanised steel. Mineral felt: Need to replace. Cost included. Internal down rainwater pipes.

02a - Flat - Covering

B(C)

£9,700

2

0

3 3

9

2012

02b - Flat - Decking

B

£0

10

0

0 0

0

2020

02h - Flat - Down Rainwater pipes

Location: Roof 19 D - Building - Roof

02h - Flat - Down Rainwater pipes

Location: Roof 20 D - Building - Roof

Generic Hospital Physical Condition Survey

Mineral felt: Need to replace. Assumed condition, 100m2. Steel decking. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

02c - Flat - Flashing

B(C)

£0

2

0

3 3

9

2012

02d - Flat - Parapets 02f - Flat - Drainage Fall

B B(C)

£0 £0

10 2

0 0

0 0 3 3

0 9

2020 2012

B

£0

10

0

0 0

0

2020

Mineral felt: Need to replace. Cost included. Galvanised steel. Mineral felt: Need to replace. Cost included. Internal down rainwater pipes.

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

Profiled galvanised steel sheets.

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B B B

£0 £0 £0 £0 £0 £0

20 10 10 10 10 10

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

2030 2020 2020 2020 2020 2020

Integrated insulation panels. High performance felt. Galvanised steel. High performance felt. PVCU. PVCU.

02a - Flat - Covering

B(C)

£22,320

5

0

2 2

4

2015

High performance felt: Need to replace as it is approaching the end of its natural life, 186m2.

02b - Flat - Decking

B

£0

10

0

0 0

0

2020

Steel decking.

02h - Flat - Down Rainwater pipes

Location: Roof 21 D - Building - Roof

Location: Roof 22 D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

High performance felt: Need to replace as it is approaching the end of its natural life. Cost included. High performance felt: Need to replace as it is approaching the end of its natural life. Cost included. PVCU. PVCU.

02c - Flat - Flashing

B(C)

£0

5

0

2 2

4

2015

02f - Flat - Drainage Fall

B(C)

£0

5

0

2 2

4

2015

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

02a - Flat - Covering

B(C)

£11,968

5

0

2 3

6

2015

Asphalt with chippings: Hack up, prepare surface and relay asphalt roofing, 88m2.

02b - Flat - Decking 02c - Flat - Flashing

B B(C)

£0 £1,100

10 5

0 0

0 0 2 3

0 6

2020 2015

02d - Flat - Parapets 02f - Flat - Drainage Fall

B B(C)

£0 £0

10 5

0 0

0 0 2 3

0 6

2020 2015

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

Reinforced concrete. Lead: Need to replace lead flashing. Galvanised steel. Asphalt: Hack up, prepare surface and relay asphalt roofing. Cost included. PVCU. PVCU.

02a - Flat - Covering

B(C)

£1,000

5

0

2 2

4

2015

02b - Flat - Decking

B

£0

10

0

0 0

0

2020

02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

Location: Roof 23 D - Building - Roof

02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

Location: Roof 24 D - Building - Roof

Generic Hospital Physical Condition Survey

Mineral felt: Need to replace within the maintenance schedule, 5m2. Steel decking. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

02c - Flat - Flashing

B(C)

£0

5

0

2 2

4

2015

02f - Flat - Drainage Fall

B(C)

£0

5

0

2 2

4

2015

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

Mineral felt: Need to replace. Cost included. Mineral felt: Need to replace. Cost included. PVCU. PVCU.

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

Asphalt with chippings.

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall 02h - Flat - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

10 10 10 10 10

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2020 2020 2020 2020 2020

Steel decking. Lead. Galvanised steel. Lead. Internal down rainwater pipes.

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

Profiled galvanised steel sheets.

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall

B B B B

£0 £0 £0 £0

20 10 10 10

0 0 0 0

0 0 0 0

0 0 0 0

2030 2020 2020 2020

Integrated insulation panels. High performance felt. Galvanised steel. High performance felt.

02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

Location: Roof 25 D - Building - Roof

Location: Roof 26 D - Building - Roof

Generic Hospital Physical Condition Survey

0 0 0 0

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

PVCU. PVCU.

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall 02h - Flat - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

10 10 10 10 10

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2020 2020 2020 2020 2020

Asphalt with chippings and timber decking primarily located under Roof 26. Steel decking. Lead. Galvanised steel. Lead. Internal down rainwater pipes.

02a - Flat - Covering

B(C)

£8,924

2

0

3 3

9

2012

02b - Flat - Decking 02c - Flat - Flashing

B B(C)

£0 £0

10 2

0 0

0 0 3 3

0 9

2020 2012

02d - Flat - Parapets 02f - Flat - Drainage Fall

B B(C)

£0 £0

10 2

0 0

0 0 3 3

0 9

2020 2012

B

£0

10

0

0 0

0

2020

C

£175,085

0

0

3 3

9

2010

Location: Roof 27 D - Building - Roof

Location: Roof 28 D - Building - Roof

02h - Flat - Down Rainwater pipes

Mineral felt: Need to replace. Assumed condition, 92m2. Steel decking. Mineral felt: Need to replace. Cost included. Galvanised steel. Mineral felt: Need to replace. Cost included. Internal down rainwater pipes.

Location: Roof 29 D - Building - Roof 02a - Flat - Covering

Generic Hospital Physical Condition Survey

Mineral felt with chippings: Need to replace due to tired and deteriorating surface, 1805m2.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Reinforced concrete. Lead: Need to replace lead flashing. Mineral felt: Need to replace. Cost included. Galvanised steel. Mineral felt: Need to replace. Cost included. Internal down rainwater pipes.

02b - Flat - Decking 02c - Flat - Flashing

B C

£0 £1,800

20 0

0 0

0 0 3 3

0 9

2030 2010

02c - Flat - Flashing

C

£0

0

0

3 3

9

2010

02d - Flat - Parapets 02f - Flat - Drainage Fall

B C

£0 £0

10 0

0 0

0 0 3 3

0 9

2020 2010

02h - Flat - Down Rainwater pipes

B

£0

10

0

0 0

0

2020

02a - Flat - Covering

C

£11,155

0

0

3 3

9

2010

Mineral felt with chippings: Need to replace due to tired and deteriorating surface, 115m2.

02b - Flat - Decking 02c - Flat - Flashing

B C

£0 £0

20 0

0 0

0 0 3 3

0 9

2030 2010

02d - Flat - Parapets 02f - Flat - Drainage Fall

B C

£0 £0

10 0

0 0

0 0 3 3

0 9

2020 2010

02h - Flat - Down Rainwater pipes

B

£0

10

0

0 0

0

2020

Steel decking. Mineral felt: Need to replace. Cost included. Galvanised steel. Mineral felt: Need to replace. Cost included. Internal down rainwater pipes.

C

£15,811

0

0

3 3

9

2010

Location: Roof 30 D - Building - Roof

Location: Roof 31 D - Building - Roof 02a - Flat - Covering

Generic Hospital Physical Condition Survey

Mineral felt with chippings: Need to replace due to tired and deteriorating surface, 163m2.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

02b - Flat - Decking 02c - Flat - Flashing

B C

£0 £0

20 0

0 0

0 0 3 3

0 9

2030 2010

02d - Flat - Parapets 02f - Flat - Drainage Fall

B C

£0 £0

10 0

0 0

0 0 3 3

0 9

2020 2010

02h - Flat - Down Rainwater pipes

B

£0

10

0

0 0

0

2020

Steel decking. Mineral felt: Need to replace. Cost included. Galvanised steel. Mineral felt: Need to replace. Cost included. Internal down rainwater pipes.

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

Mineral felt.

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall 02h - Flat - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

20 10 10 10 10

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2030 2020 2020 2020 2020

Steel decking. Mineral felt. Galvanised steel. Mineral felt. Internal down rainwater pipes.

02a - Flat - Covering

C

£169,728

0

0

3 3

9

2010

Asphalt with chippings: Hack up, prepare surface and relay asphalt roofing, 1248m2.

02b - Flat - Decking 02c - Flat - Flashing

B C

£0 £0

10 0

0 0

0 0 3 3

0 9

2020 2010

Reinforced concrete. Mineral felt: Need to replace. Cost included.

Location: Roof 32 D - Building - Roof

Location: Roof 33 D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

02c - Flat - Flashing

C

£1,500

0

0

3 3

9

2010

02d - Flat - Parapets 02f - Flat - Drainage Fall

B C

£0 £0

10 0

0 0

0 0 3 3

0 9

2020 2010

02h - Flat - Down Rainwater pipes

B

£0

10

0

0 0

0

2020

Lead: Need to replace lead flashing. Galvanised steel. Asphalt: Hack up, prepare surface and relay asphalt roofing. Cost included. Internal down rainwater pipes.

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

Mineral felt.

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall 02h - Flat - Down Rainwater pipes 02i - Flat - Skylights

B B B B B B

£0 £0 £0 £0 £0 £0

20 10 10 10 10 10

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

2030 2020 2020 2020 2020 2020

Steel decking. Mineral felt. Galvanised steel. Mineral felt. Internal down rainwater pipes. PVCU skylight.

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

Mineral felt.

02b - Flat - Decking 02c - Flat - Flashing

B B

£0 £0

20 10

0 0

0 0 0 0

0 0

2030 2020

Steel decking. Mineral felt.

Location: Roof 34 D - Building - Roof

Location: Roof 35 D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02d - Flat - Parapets 02f - Flat - Drainage Fall 02h - Flat - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B B

£0 £0 £0

10 10 10

0 0 0

0 0 0 0 0 0

0 0 0

2020 2020 2020

Galvanised steel. Mineral felt. Internal down rainwater pipes.

02d - Cladding - Finish

C

£49,000

0

0

3 3

9

2010

Profiled galvanised steel cladding: Redecorate and make good all 5No. clad plant rooms located to the roof to delay rust development which is already beginning to occur to the base of the cladding.

06 - Doors

C

£16,800

0

0

3 4 12

2010

Softwood timber: Need to replace 14No. doors to the roof top plant rooms.

01 - General Structure

B

£0

30

0

0 0

0

2040

Concrete frame: Generally sound.

02 - Foundations 03 - Ground Stability

B B

£0 £0

40 40

0 0

0 0 0 0

0 0

2050 2050

Generally sound.

B B B B

£0 £0 £0 £0

40 40 40 30

0 0 0 0

0 0 0 0

0 0 0 0

2050 2050 2050 2040

Brickwork. Brickwork. Brickwork. Profiled galvanised steel cladding.

Location: Roof Top Plant Rooms B - Building - External Fabric

Location: Whole Block A - Building - Physical Structure

B - Building - External Fabric 01a - Masonry - Cracking 01b - Masonry - Spalling 01c - Masonry - Pointing 02a - Cladding - Attachment

Generic Hospital Physical Condition Survey

0 0 0 0

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Profiled galvanised steel cladding. Profiled galvanised steel cladding. DPC. Mineral felt covered metal framed porch to main external entrance to the Lanesborough Wing.

02b - Cladding - Cracking

B

£0

30

0

0 0

0

2040

02c - Cladding - Joints

B

£0

30

0

0 0

0

2040

03 - DPC 08 - Porches

B B

£0 £0

20 10

0 0

0 0 0 0

0 0

2030 2020

01 - Heat Emitters

C

£2,400

0

0

2 2

4

2010

0.C48: 4No. radiant panels require replacement.

01 - Heat Emitters

C

£100

0

0

2 2

4

2010

Colposcopy: Dimplex electric heater requires removing.

01 - Heat Emitters

C

£1,000

0

0

2 2

4

2010

0.167: Fan control unit. Remove if not used £200. Replace if faulty £1000.

Facet: 2 - Engineering Location: 00 - Ground Floor I - Engineering - Heating Systems

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01 - Heat Emitters

B

£0

6

0

0 0

0

2016

Dragons Children Centre: Heat emitters with low surface temperature covers in acceptable order.

01 - Heat Emitters

B

£0

7

0

0 0

0

2017

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

12

0

0 0

0

2022

01 - Heat Emitters

B

£0

12

0

0 0

0

2022

01 - Heat Emitters

B

£0

15

0

0 0

0

2025

01 - Heat Emitters

B

£0

18

0

0 0

0

2028

01 - Heat Emitters

B

£0

20

0

0 0

0

2030

01 - Heat Emitters

B

£0

20

0

0 0

0

2030

01 - Heat Emitters

B

£0

20

0

0 0

0

2030

0.214: Radiant panels in acceptable order. Gynaecology: Steel panel radiators in acceptable order. Clinic Reception: Steel panel radiators in acceptable order. Rheumatology: Steel panel radiators in acceptable order. Moorfields: Heat emitters with low surface temperature covers in acceptable order. 0.209: Steel panel radiators in acceptable order. MRI Unit: Steel panel radiators in acceptable order. 0.25: Radiant panels in acceptable order. ENT & Audiology: Steel panel radiators in acceptable order. Child Development: Steel panel radiators in acceptable order. Child Development: Heat emitters with low surface temperature covers in acceptable order.

01 - Ductwork

C

£300

0

0

2 2

4

2010

01 - Ductwork

C

£400

0

0

2 2

4

2010

K - Engineering - Vent & Air Con

Generic Hospital Physical Condition Survey

7.049A & 7.049B: Very poor ventilation, cost to investigate. Moorfields: Investigate poor ventilation. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 7.115: Grille/diffuser requires cleaning. 0.01: Grille/diffuser requires cleaning. 0.02: Grille/diffuser requires cleaning. 0.171: Grilles/diffusers are blocked off.

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

N/A

£0

0

0

0 0

0

2010

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£150

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£300

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£150

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£500

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£200

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£200

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

0.026: Grille/diffuser requires cleaning. 0.025: Grille/diffuser requires cleaning. 0.211: Grille/diffuser requires cleaning. 0.001: Grille/diffuser requires cleaning. Corridor: Grille/diffuser requires cleaning. 0.051: Grille/diffuser requires cleaning. 0.078: Grille/diffuser requires cleaning. Dermatology & Hypertension Clinic: Grille/diffuser requires cleaning. 0.133: Grille/diffuser requires cleaning. 0.C59: 5No. grilles/diffusers require cleaning. 0.099: 2No. grilles/diffusers require cleaning. 0.C58: 2No. grilles/diffusers require cleaning. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.243: 2No. grilles/diffusers require cleaning. 0.228D: 2No. grilles/diffusers require cleaning. 0.102: Grille/diffuser requires cleaning. 0.C38: 2No. grilles/diffusers require cleaning. 0.103: Grille/diffuser requires cleaning. 0.145: Grille/diffuser requires cleaning. 0.C53: 2No. grilles/diffusers require replacement.

03 - Grilles & Diffusers

C

£200

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£200

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£200

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£800

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£1,000

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£200

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£100

0

0

4 2

8

2010

03 - Grilles & Diffusers

C

£400

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£200

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

0.228: 10No. grilles/diffusers require cleaning. 0.132: Grille/diffuser requires cleaning. 0.199: 2No. grilles/diffusers require cleaning. 0.222: Grille/diffuser requires cleaning. 0.272: Grille/diffuser requires cleaning. 0.C48: Grille requires replacing.

0.219: 2No. grilles/diffusers require cleaning. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.038: Grille/diffuser requires replacement. 0.049: Grille/diffuser requires replacement. 0.072: 2No. grilles/diffusers require cleaning. 7.064: Grilles/diffusers in acceptable order. 0.164: Grilles/diffusers in acceptable order. 0.C58: Grilles/diffusers in acceptable order. 7.115: Grilles/diffusers in acceptable order. 0.099: 2No. grilles/diffusers in acceptable order. Dermatology & Hypertension Clinic: Grilles/diffusers in acceptable order. Haematology/Oncology: Grilles/diffusers in acceptable order. 0.199: 2No. grilles/diffusers in acceptable order. 0.272: Grilles/diffusers in acceptable order. 0.228: Grilles/diffusers in acceptable order. 0.104: Grilles/diffusers in acceptable order. Clinic Reception: Grilles/diffusers in acceptable order. Dragons Children Centre: Grilles/diffusers in acceptable order. MRI Unit: Grilles/diffusers in acceptable order.

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£400

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£200

0

0

2 2

4

2010

03 - Grilles & Diffusers

B

£0

8

0

0 0

0

2018

03 - Grilles & Diffusers

B

£0

8

0

0 0

0

2018

03 - Grilles & Diffusers

B

£0

8

0

0 0

0

2018

03 - Grilles & Diffusers

B

£0

8

0

0 0

0

2018

03 - Grilles & Diffusers

B

£0

10

0

0 0

0

2020

03 - Grilles & Diffusers

B

£0

10

0

0 0

0

2020

03 - Grilles & Diffusers

B

£0

10

0

0 0

0

2020

03 - Grilles & Diffusers

B

£0

10

0

0 0

0

2020

03 - Grilles & Diffusers

B

£0

10

0

0 0

0

2020

03 - Grilles & Diffusers

B

£0

10

0

0 0

0

2020

03 - Grilles & Diffusers

B

£0

10

0

0 0

0

2020

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Scanning: Grilles/diffusers in acceptable order. Moorfields: Grilles/diffusers in acceptable order. 0/021A: Grilles/diffusers in acceptable order. Friends of St Georges: Grilles/diffusers in acceptable order. 0.264: Grilles/diffusers in acceptable order. Child Development: Grilles/diffusers in acceptable order. 0.066: Mitsubishi cassette unit is leaking. 0.172: IMI cassette unit requires replacement. 0.164: IMI cassette unit requires upgrading within the maintenance schedule. Pharmacy QA Lab: Daikin cassette unit in acceptable order. Pharmacy Pre-Pack: Daikin cassette unit in acceptable order. Friends of St Georges: Daikin cassette unit in acceptable order. Colposcopy: Mitsubishi cassette unit in acceptable order.

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

03 - Grilles & Diffusers

B

£0

25

0

0 0

0

2035

05 - Cooling Units

C

£1,500

0

0

3 3

9

2010

05 - Cooling Units

C

£4,000

0

0

3 3

9

2010

05 - Cooling Units

B(C)

£4,000

2

0

3 3

9

2012

05 - Cooling Units

B

£0

8

0

0 0

0

2018

05 - Cooling Units

B

£0

8

0

0 0

0

2018

05 - Cooling Units

B

£0

10

0

0 0

0

2020

05 - Cooling Units

B

£0

10

0

0 0

0

2020

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes MRI Unit: Toshiba cassette unit in acceptable order. Child Development: Daikin cassette unit in acceptable order. Scanning: IMI cassette unit in acceptable order. Pharmacy: Daikin cassette unit in acceptable order. Scanning: Daikin cassette unit in acceptable order.

05 - Cooling Units

B

£0

10

0

0 0

0

2020

05 - Cooling Units

B

£0

12

0

0 0

0

2022

05 - Cooling Units

B

£0

15

0

0 0

0

2025

05 - Cooling Units

B

£0

15

0

0 0

0

2025

05 - Cooling Units

B

£0

18

0

0 0

0

2028

05 - Comments

B

£0

6

0

0 0

0

2016

05 - Comments

B

£0

7

0

0 0

0

2017

05 - Comments

B

£0

8

0

0 0

0

2018

01 - Local Water Heaters

B(C)

£600

5

0

2 3

6

2015

01 - Local Water Heaters

B(C)

£400

5

0

2 3

6

2015

03 - Blending Valves

C

£250

0

0

2 2

4

2010

03 - Blending Valves

C

£250

0

0

3 3

9

2010

03 - Blending Valves

C

£250

0

0

2 2

4

2010

Remedial Action

L - Engineering - Medical Gases MRI Unit: Medical gases in acceptable order. Scanning: Medical gases in acceptable order. Dragons Children Centre: Medical gases in acceptable order.

M - Engineering - Hot/Cold Water

Generic Hospital Physical Condition Survey

0.194: Zip water heater requires upgrading within the maintenance schedule. 0.246: ZIP water heater requires upgrading within the maintenance schedule. 0.174: Remove unused shower.

0.281A: Shower requires removing. 0.228E: Shower requires removing. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

0.128: 2No. unused showers require removing. Colposcopy: Blending valves in acceptable order. Rheumatology: Blending valves in acceptable order. 0.C01: Fire hose reel requires removal as it poses risk of legionella.

03 - Blending Valves

C

£500

0

0

2 2

4

2010

03 - Blending Valves

B

£0

6

0

0 0

0

2016

03 - Blending Valves

B

£0

8

0

0 0

0

2018

06 - Hose Reels

C

£400

0

0

3 3

9

2010

B B

£0 £0

6 9

0 0

0 0 0 0

0 0

2016 2019

0.LW1: Lift in acceptable order. 0.LW8: Goods lift in acceptable order.

02 - Pumps

B

£0

7

0

0 0

0

2017

03 - Calorifiers

B

£0

15

0

0 0

0

2025

0.288: Domestic hot water service booster pump in acceptable order. 0.288: Calorifier in acceptable order.

03 - Controls

B

£0

7

0

0 0

0

2017

03 - Controls

B

£0

8

0

0 0

0

2018

03 - Controls

B

£0

12

0

0 0

0

2022

03 - Controls

B

£0

15

0

0 0

0

2025

N - Engineering - Lifts 01 - Lifts 01 - Lifts O - Engineering - Main Plant

P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

Rheumatology: Theatre extract control panel in acceptable order. 0.C39: Air vacuum controls to blood test areas in acceptable order. 0.200: Control panel in acceptable order. Moorfields: Trend control panel in acceptable order.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Extract Fans

C

£1,600

0

0

3 2

6

2010

Colposcopy: 4No. Vent Axia extract fans require replacement.

04 - Extract Fans

B(C)

£300

2

0

3 3

9

2012

08 - Generators

B

£0

18

0

0 0

0

2028

Blood Testing: Xpelair extract fan requires upgrading within the maintenance schedule. 0.200: 3No. diesel generators in acceptable order.

02 - Main Switchgear 02 - Main Switchgear

C B

£400 £0

0 18

0 0

2 2 0 0

4 0

2010 2028

0.M04: Wiring requires tidying. 0.216: MEM switchgear in acceptable order.

03 - Distribution Boards

C

£5,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£8,000

0

0

3 3

9

2010

0/005: Dorman Smith distribution board requires replacement. It was observed that isolation mats were present. 0.C55: Ottermill combined switchgear and distribution board requires replacement.

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

03 - Distribution Boards

C

£12,000

0

0

3 2

6

2010

0.249: Ottermill combined switchgear and distribution board requires replacement.

03 - Distribution Boards

C

£8,000

0

0

3 3

9

2010

0.M01: Ottermill combined switchgear and distribution board requires replacement.

03 - Distribution Boards

C

£8,000

0

0

3 3

9

2010

03 - Distribution Boards

B(C)

£3,000

3

0

3 3

9

2013

03 - Distribution Boards

B

£0

8

0

0 0

0

2018

03 - Distribution Boards

B

£0

10

0

0 0

0

2020

03 - Distribution Boards

B

£0

16

0

0 0

0

2026

03 - Distribution Boards

B

£0

18

0

0 0

0

2028

03 - Distribution Boards

B

£0

18

0

0 0

0

2028

03 - Distribution Boards

B

£0

18

0

0 0

0

2028

03 - Distribution Boards

B

£0

18

0

0 0

0

2028

0.M02: Dorman Smith combined distribution board switchgear requires replacement. It has been noted that mats are fitted. 0.M04: Dorman Smith distribution board requires upgrading within the maintenance schedule. 0.167A: Crabtree distribution board in acceptable order. 7.098: Distribution board in acceptable order. 0.C50: MEM distribution board in acceptable order. Portacabin A: Merlin distribution board in acceptable order. 0.264: Hager distribution board in acceptable order. 0.C55: Hager distribution board in acceptable order. 0.25: Hager distribution board in acceptable order.

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 7.062A: 3No. Hager distribution boards in acceptable order. Pharmacy Pre-Pack: Hager distribution board in acceptable order. 0.C13: CAT II light is missing it's diffuser. 0.243: 3No. surface fluorescent lights require replacement. 0.242: Surface fluorescent light requires replacement. 0.245: Surface fluorescent light requires replacement. 0.100/7: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.C48: 13No. surface fluorescent lights require replacement.

03 - Distribution Boards

B

£0

20

0

0 0

0

2030

03 - Distribution Boards

B

£0

20

0

0 0

0

2030

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£600

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£2,600

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

0.171: 6No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.166: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0.173: Tungsten light requires replacement.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.192: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.1: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.C54: 5No. surface fluorescent lights require replacement. 0.207: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0.208: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0.002: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0.079A: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0.001: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 7.112: Surface fluorescent light requires replacement. 0.288: Surface fluorescent light requires replacement. 0.158: Fluorescent light over visual display equipment is not suitable and requires upgrading. 3.048: Tungsten light requires replacement. 0.C50: 4No. surface fluorescent lights require replacement. 0.206: Fluorescent light over visual display equipment is not suitable and requires upgrading.

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£1,000

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£800

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£800

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.047: Tungsten light requires replacement. 0.079: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 7.C40: Surface fluorescent light requires replacement. 0.131: Tungsten light requires replacement. 0.198: 2No. tungsten lights require replacement. 0.199: 2No. surface fluorescent lights require replacement. 0.C53: 7No. surface fluorescent lights require replacement. 0.029: Fluorescent light over visual display equipment is not suitable and requires upgrading. 7.11: Fluorescent light over visual display equipment is not suitable and requires upgrading. 7.111C: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0.134: Tungsten light requires replacement. 0.044: Tungsten light requires replacement. 0.C42: 2No. surface fluorescent lights require replacement. 0.036B: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading.

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,400

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Lighting Installation

C

£10,400

0

0

2 2

4

2010

0.C43: 52No. surface fluorescent lights require replacement.

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£800

0

0

3 2

6

2010

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

0.191A: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.191: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.193: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.168: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.172: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0.059: Examination light requires upgrading within the maintenance schedule. 0.C61A: Surface fluorescent light requires upgrading within the maintenance schedule. 0.05: Examination light requires upgrading within the maintenance schedule. 0.C60: Surface fluorescent light requires upgrading within the maintenance schedule.

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.051: Examination light requires upgrading within the maintenance schedule. 7.C41: 7No. surface fluorescent lights require upgrading within the maintenance schedule. 0.056: Examination light requires upgrading within the maintenance schedule. 0.167A: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 0.MR17: Surface fluorescent light requires upgrading within the maintenance schedule. 0.MR16: Surface fluorescent light requires upgrading within the maintenance schedule. 0.MR20: 6No. surface fluorescent lights require upgrading within the maintenance schedule. MRI Unit: 14No. surface fluorescent lights require upgrading within the maintenance schedule. 0.S01: Surface fluorescent light requires upgrading within the maintenance schedule. 7.C21 : 11No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C01A: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£1,400

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£1,000

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£1,200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£2,800

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£2,200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.037: 3No. halogen spotlights require upgrading within the maintenance schedule. 0.C03: 2No. halogen spotlights require upgrading within the maintenance schedule. 7.042: Exam/central light requires upgrading within the maintenance schedule. 0.S03: Surface fluorescent light requires upgrading within the maintenance schedule. 0.MR18: Surface fluorescent light requires upgrading within the maintenance schedule. 0.248: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 7.076: 21No. surface fluorescent lights require upgrading within the maintenance schedule. 0.145: Surface fluorescent light requires upgrading within the maintenance schedule. 0.157: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 7.09: Examination light requires upgrading within the maintenance schedule. 7.08: Surface fluorescent light requires upgrading within the maintenance schedule. 0.284: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£180

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£120

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£1,000

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£4,200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.C43: 10No. surface fluorescent lights require upgrading within the maintenance schedule. 0.282: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 7.097: Operating theatre lights requires upgrading within the maintenance schedule. 0.247: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.253: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.246: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C59: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C58: 8No. surface fluorescent lights require upgrading within the maintenance schedule. 0.214: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C24: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 0.285: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 0.240A: Surface fluorescent downlights requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£2,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,000

3

0

2 3

6

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.221: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.215: 3No. floodlights require upgrading within the maintenance schedule. 0.219: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.240A: Surface fluorescent light requires upgrading within the maintenance schedule. 0.261: Surface fluorescent light requires upgrading within the maintenance schedule. 0.211: Surface fluorescent light requires upgrading within the maintenance schedule. 7.073: Surface fluorescent light requires upgrading within the maintenance schedule. 0.198: Surface fluorescent light requires upgrading within the maintenance schedule. 0.053: Surface fluorescent light requires upgrading within the maintenance schedule. 0.128: 7No. surface fluorescent lights require upgrading within the maintenance schedule. 0.035: Surface fluorescent light requires upgrading within the maintenance schedule. 0.202A: 2No. CAT II lights require upgrading within the maintenance schedule. 0.027: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£450

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.C17: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0/029: 7No. surface fluorescent lights require upgrading within the maintenance schedule. 0.074A: Surface fluorescent light requires upgrading within the maintenance schedule. 0.174: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

0.075: Surface fluorescent light requires upgrading within the maintenance schedule. 0.072: CAT II light requires upgrading within the maintenance schedule. Blood Testing: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.073: Surface fluorescent light requires upgrading within the maintenance schedule. 0.071: Surface fluorescent light requires upgrading within the maintenance schedule. 7.113: Surface fluorescent light requires upgrading within the maintenance schedule. 0.107: 4No. surface fluorescent lights require upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.105: 4No. CAT II lights require upgrading within the maintenance schedule. 0.275: 2No. CAT II lights require upgrading within the maintenance schedule. 0.C15: 3No. CAT II lights require upgrading within the maintenance schedule. 0.218: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.036A: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.274: 2No. CAT II lights require upgrading within the maintenance schedule. Medical Gas Storage: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 0.272: 4No. CAT II lights require upgrading within the maintenance schedule. 7.115: 5No. CAT II lights require upgrading within the maintenance schedule. 0.276: 12No. surface fluorescent lights require upgrading within the maintenance schedule. 0.104: 2No. CAT II lights require upgrading within the maintenance schedule. 7.051: 2No. CAT II lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,000

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£2,400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.042: Surface fluorescent light requires upgrading within the maintenance schedule. 0.108: 2No. CAT II lights require upgrading within the maintenance schedule. 7.1: Surface fluorescent light requires upgrading within the maintenance schedule. Moorfields: 29No. surface fluorescent downlights require upgrading within the maintenance schedule. 7.107: Surface fluorescent light requires upgrading within the maintenance schedule. 7.109: Surface fluorescent light requires upgrading within the maintenance schedule. 7.108: Surface fluorescent light requires upgrading within the maintenance schedule. 7.106: Surface fluorescent light requires upgrading within the maintenance schedule. 7.104: Surface fluorescent light requires upgrading within the maintenance schedule. 7.105: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 7.102: Surface fluorescent light requires upgrading within the maintenance schedule. Corridor: 6No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£5,800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 7.101: Surface fluorescent light requires upgrading within the maintenance schedule. 7.199: Surface fluorescent light requires upgrading within the maintenance schedule. 0.204: 2No. CAT II lights require upgrading within the maintenance schedule. 0.202: 2No. CAT II lights require upgrading within the maintenance schedule. 0.C62: 4No. surface fluorescent downlights require upgrading within the maintenance schedule. 0.C64: 5No. surface fluorescent downlights require upgrading within the maintenance schedule. 7.103: Surface fluorescent light requires upgrading within the maintenance schedule. 0.164: 6No. surface fluorescent lights require upgrading within the maintenance schedule. MRI Unit: 18No. surface fluorescent lights require upgrading within the maintenance schedule. 0.163: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C29: Surface fluorescent light requires upgrading within the maintenance schedule. 0.176: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,000

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£3,600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.176A: Surface fluorescent light requires upgrading within the maintenance schedule. 0.C25: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.216: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.278: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 7.084: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.175: 6No. surface fluorescent lights require upgrading within the maintenance schedule. Clinic Reception: 11No. surface fluorescent lights require upgrading within the maintenance schedule. 0.MR15: 8No. surface fluorescent lights require upgrading within the maintenance schedule. 0.033: Surface fluorescent light requires upgrading within the maintenance schedule. 0.048: Surface fluorescent light requires upgrading within the maintenance schedule. 0.244: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.045: 3No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£2,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£600

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 7.083: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 0.S01: Surface fluorescent light requires upgrading within the maintenance schedule. 0.C55: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 0.S02: Surface fluorescent light requires upgrading within the maintenance schedule. 0.S03: Surface fluorescent light requires upgrading within the maintenance schedule. 0.S04: Surface fluorescent light requires upgrading within the maintenance schedule. 0.222: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.225: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C01A: 9No. surface fluorescent lights require upgrading within the maintenance schedule. Eye Clinic: 15No. surface fluorescent lights require upgrading within the maintenance schedule. 0.287: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 0.C55D: 6No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£3,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.275A: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 0.271: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 0.281: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 7.11: 2No. CAT II lights require upgrading within the maintenance schedule. 0.167: Surface fluorescent light requires upgrading within the maintenance schedule. 0.228A: 4No. CAT II lights require upgrading within the maintenance schedule. 7.076: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.228B: 4No. CAT II lights require upgrading within the maintenance schedule. 0.228D: 4No. CAT II lights require upgrading within the maintenance schedule. 0.228E: 8No. CAT II lights require upgrading within the maintenance schedule. 0.228: 15No. surface fluorescent lights require upgrading within the maintenance schedule. 0.228C: 2No. CAT II lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£3,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.194: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0.173: 4No. surface fluorescent lights require upgrading within the maintenance schedule. Corridor: 4No. surface fluorescent lights require upgrading within the maintenance schedule. Pharmacy QA Lab: CAT II lights in acceptable order. Haematology/Oncology: Surface fluorescent lights in acceptable order. Surface fluorescent lights in acceptable order. Haematology/Oncology: CAT II lights in acceptable order. 0.209: CAT II lights in acceptable order. Scanning: Surface fluorescent lights in acceptable order. ENT & Audiology: Surface fluorescent lights in acceptable order. Dragons Children Centre: Medical examination lights in acceptable order. Dragons Children Centre: CAT II lights in acceptable order. Pharmacy QA Lab: Surface fluorescent lights in acceptable order. MRI Unit: Surface fluorescent lights in acceptable order. Dermatology & Hypertension Clinic: CAT II lights in acceptable order.

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Gynaecology: CAT II lights in acceptable order. Pharmacy Pre-Pack: CAT II lights in acceptable order. 0.214: CAT II lights in acceptable order. Rheumatology: Surface fluorescent lights in acceptable order. 7.107: CAT II lights in acceptable order. 0/021A: CAT II lights in acceptable order. Laundry In/Out: CAT II lights in acceptable order. ENT & Audiology: CAT II lights in acceptable order. Dragons Children Centre: Surface fluorescent lights in acceptable order. Surface fluorescent downlights in acceptable order. Dragons Children Centre: Downlights in acceptable order. Surface fluorescent lights in acceptable order. MRI Unit: CAT II lights in acceptable order. Clinic Reception: Surface fluorescent lights in acceptable order. Domestic Services Hospital Stores: Surface fluorescent lights in acceptable order. Catering Stores: Surface fluorescent lights in acceptable order.

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Pharmacy Pre-Pack: Surface fluorescent lights in acceptable order. 0.209: CAT II lights in acceptable order. Post Room: Surface fluorescent lights in acceptable order. Estates: CAT II lights in acceptable order. Moorfields: CAT II lights in acceptable order. Colposcopy: CAT II lights in acceptable order. Friends of St Georges: Surface fluorescent lights in acceptable order. Pharmacy: Surface fluorescent lights in acceptable order. Eye Clinic: CAT II lights in acceptable order. Pharmacy: Surface fluorescent lights in acceptable order. CAT II lights in acceptable order. Surface fluorescent lights in acceptable order. Portacabin A: Surface fluorescent lights in acceptable order. Pharmacy: CAT II lights in acceptable order. Scanning: CAT II lights in acceptable order. Surface fluorescent lights in acceptable order. 7.053A: Operating theatre lights in acceptable order.

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2022

04 - Lighting Installation

B

£0

12

0

0 0

0

2022

04 - Lighting Installation

B

£0

12

0

0 0

0

2022

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Child Development: Surface fluorescent lights in acceptable order. Child Development: CAT II lights in acceptable order. 0.C54: 3No. emergency lights require upgrading within the maintenance schedule. 0.C59: Emergency lights requires upgrading within the maintenance schedule. 0.282: Emergency lights requires upgrading within the maintenance schedule. 0.C58: 2No. emergency lights require upgrading within the maintenance schedule. 0.C15: Emergency lights requires upgrading within the maintenance schedule. 0.099: Emergency lights requires upgrading within the maintenance schedule. 0.C53: 3No. emergency lights require upgrading within the maintenance schedule. Medical Gas Storage: Emergency lights requires upgrading within the maintenance schedule. Clinic Reception: Emergency lights in acceptable order. MRI Unit: Emergency lights in acceptable order. 0/021A: Emergency lights in acceptable order. Portacabin A: Emergency lights in acceptable order.

04 - Lighting Installation

B

£0

13

0

0 0

0

2023

04 - Lighting Installation

B

£0

13

0

0 0

0

2023

05 - Emergency Lighting

B(C)

£600

3

0

4 2

8

2013

05 - Emergency Lighting

B(C)

£200

3

0

4 2

8

2013

05 - Emergency Lighting

B(C)

£200

3

0

4 2

8

2013

05 - Emergency Lighting

B(C)

£400

4

0

2 2

4

2014

05 - Emergency Lighting

B(C)

£200

4

0

2 2

4

2014

05 - Emergency Lighting

B(C)

£200

4

0

2 2

4

2014

05 - Emergency Lighting

B(C)

£600

4

0

4 2

8

2014

05 - Emergency Lighting

B(C)

£200

5

0

4 2

8

2015

05 - Emergency Lighting

B

£0

6

0

0 0

0

2016

05 - Emergency Lighting

B

£0

6

0

0 0

0

2016

05 - Emergency Lighting

B

£0

8

0

0 0

0

2018

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Pharmacy: Emergency lights in acceptable order. Corridors: Emergency lights in acceptable order. 7/040: Additional sockets are required. 0.C50: Sockets and switches in acceptable order. 0.171: Correctly fix trunking.

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

12

0

0 0

0

2022

06 - Sockets/Switches

C

£200

0

0

2 2

4

2010

06 - Sockets/Switches

B

£0

8

0

0 0

0

2018

08 - Comments

C

£50

0

0

2 2

4

2010

08 - Comments

C

£200

0

0

2 2

4

2010

0.C24: Wiring needs tidying or improving.

08 - Comments

C

£100

0

0

2 2

4

2010

0.M04: Refit trunking and fused spur.

08 - Comments

B

£0

6

0

0 0

0

2016

08 - Comments

B

£0

7

0

0 0

0

2017

ENT & Audiology: Door entry buttons in acceptable order. Dragons Children Centre: Door entry buttons in acceptable order.

B

£0

8

0

0 0

0

2018

V - Engineering - Fire Alarms 01 - Sounders

Generic Hospital Physical Condition Survey

0/021A: Fire alarm sounders in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Dermatology & Hypertension Clinic: Fire alarm sounders in acceptable order. 0.C58: Fire alarm sounders in acceptable order. 0.209: Fire alarm sounders in acceptable order. ENT & Audiology: Fire alarm sounders in acceptable order. 0.C43: Fire alarm sounders in acceptable order. Pharmacy Pre-Pack: Fire alarm sounders in acceptable order. Medical Gas Storage: Fire alarm sounders in acceptable order. Fire alarm sounders in acceptable order. 0.C50: Fire alarm sounders in acceptable order. Pharmacy QA Lab: Fire alarm sounders in acceptable order. Dragons Children Centre: Fire alarm sounders in acceptable order. Rheumatology: Fire alarm sounders in acceptable order. Pharmacy: Fire alarm sounders in acceptable order. Haematology/Oncology: Fire alarm sounders in acceptable order. MRI Unit: Fire alarm sounders in acceptable order. Portacabin A: Fire alarm sounders in acceptable order. Moorfields: Fire alarm sounders in acceptable order.

01 - Sounders

B

£0

8

0

0 0

0

2018

01 - Sounders

B

£0

8

0

0 0

0

2018

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

12

0

0 0

0

2022

01 - Sounders

B

£0

15

0

0 0

0

2025

01 - Sounders

B

£0

16

0

0 0

0

2026

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Child Development: Fire alarm sounders in acceptable order. Scanning: Fire alarm sounders in acceptable order. 0.C53: Fire alarm call point requires upgrading within the maintenance schedule. 0.209: Fire alarm call points in acceptable order. Pharmacy Pre-Pack: Fire alarm call points in acceptable order. 0.C43: Fire alarm call points in acceptable order. ENT & Audiology: Fire alarm call points in acceptable order. Haematology/Oncology: Fire alarm call points in acceptable order. Medical Gas Storage: Fire alarm call points in acceptable order. Clinic Reception: Fire alarm call points in acceptable order. 0.214: Fire alarm call points in acceptable order. 0.C59: Fire alarm call points in acceptable order. Scanning: Fire alarm call points in acceptable order. MRI Unit: Fire alarm call points in acceptable order. Moorfields: Fire alarm call points in acceptable order. Portacabin A: Fire alarm call points in acceptable order. 0.143: Smoke detector is covered.

01 - Sounders

B

£0

18

0

0 0

0

2028

01 - Sounders

B

£0

18

0

0 0

0

2028

02 - Call Points

B(C)

£150

5

0

3 3

9

2015

02 - Call Points

B

£0

7

0

0 0

0

2017

02 - Call Points

B

£0

7

0

0 0

0

2017

02 - Call Points

B

£0

7

0

0 0

0

2017

02 - Call Points

B

£0

7

0

0 0

0

2017

02 - Call Points

B

£0

7

0

0 0

0

2017

02 - Call Points

B

£0

8

0

0 0

0

2018

02 - Call Points

B

£0

8

0

0 0

0

2018

02 - Call Points

B

£0

8

0

0 0

0

2018

02 - Call Points

B

£0

8

0

0 0

0

2018

02 - Call Points

B

£0

10

0

0 0

0

2020

02 - Call Points

B

£0

10

0

0 0

0

2020

02 - Call Points

B

£0

12

0

0 0

0

2022

02 - Call Points

B

£0

12

0

0 0

0

2022

03 - Smoke Detectors

C

£100

0

0

3 3

9

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 7.C21 : Smoke detector requires upgrading within the maintenance schedule. Medical Gas Storage: 2No. smoke detectors require upgrading within the maintenance schedule. 7.112A: 3No. smoke detectors require upgrading within the maintenance schedule. Moorfields: Smoke detectors in acceptable order. ENT & Audiology: Smoke detectors in acceptable order. MRI Unit: Smoke detectors in acceptable order. 0.214: Smoke detectors in acceptable order. Pharmacy QA Lab: Smoke detectors in acceptable order. Gynaecology: Smoke detectors in acceptable order. Eye Clinic: Smoke detectors in acceptable order. Dragons Children Centre: Smoke detectors in acceptable order. 0.S02: Smoke detectors in acceptable order. 0.S01: Smoke detectors in acceptable order. Colposcopy: Smoke detectors in acceptable order. Rheumatology: Smoke detectors in acceptable order. Smoke detectors in acceptable order.

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£300

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£450

5

0

3 3

9

2015

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Corridors: Smoke detectors in acceptable order. Blood Testing: Smoke detectors in acceptable order. 0.S03: Smoke detectors in acceptable order. 0.S04: Smoke detectors in acceptable order. 0.275A: Smoke detectors in acceptable order. Clinic Reception: Smoke detectors in acceptable order. 0.214: Smoke detectors in acceptable order. 0.264: Smoke detectors in acceptable order. 0.C28: Smoke detectors in acceptable order. Pharmacy: Smoke detectors in acceptable order. Child Development: Smoke detectors in acceptable order. 0.C18: Fire alarm main panel in acceptable order. Rheumatology: Fire alarm battery cubicle in acceptable order.

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

12

0

0 0

0

2022

05 - Fire Main/Zone Panel

B

£0

10

0

0 0

0

2020

06 - Comments

B

£0

7

0

0 0

0

2017

05 - Nurse Call

B

£0

6

0

0 0

0

2016

05 - Nurse Call

B

£0

6

0

0 0

0

2016

05 - Nurse Call

B

£0

8

0

0 0

0

2018

05 - Nurse Call

B

£0

8

0

0 0

0

2018

Remedial Action

W - Engineering - Telecoms

Generic Hospital Physical Condition Survey

Dermatology & Hypertension Clinic: Panic alarm in acceptable order. Dragons Children Centre: Emergency panic alarm/nurse call in acceptable order. ENT & Audiology: Panic alarm in acceptable order. Scanning: Panic alarm in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Child Development: Panic alarm in acceptable order. Corridors: CCTV in acceptable order.

05 - Nurse Call

B

£0

10

0

0 0

0

2020

06 - Comments

B

£0

7

0

0 0

0

2017

01 - Heat Emitters

B

£0

7

0

0 0

0

2017

01 - Heat Emitters

B

£0

7

0

0 0

0

2017

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

Remedial Action

Location: 01 - First Floor I - Engineering - Heating Systems

Generic Hospital Physical Condition Survey

1.036: High efficiency radiators with low surface temperature covers in acceptable order. Dining/Coffee Lounge: High efficiency radiators with low surface temperature covers in acceptable order. 1.035: High efficiency radiators with low surface temperature covers in acceptable order. 1.028: High efficiency radiators with low surface temperature covers in acceptable order. Neonatal Ward Unit: High efficiency radiators with low surface temperature covers in acceptable order. 1.030: High efficiency radiators with low surface temperature covers in acceptable order. Doctors Common Room: High efficiency radiators with low surface temperature covers in acceptable order. 1.034: High efficiency radiators with low surface temperature covers in acceptable order. 1.032: High efficiency radiators with low surface temperature covers in acceptable order.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Neonatal Ward Unit: High efficiency radiators in acceptable order. Toilets Area: Steel panel radiators in acceptable order. Dining/Coffee Lounge: High efficiency radiators in acceptable order. Delivery Suite: Steel panel radiators in acceptable order. 1.C22: High efficiency radiators with low surface temperature covers in acceptable order. Delivery Suite: High efficiency radiators with low surface temperature covers in acceptable order.

01 - Heat Emitters

B

£0

15

0

0 0

0

2025

01 - Heat Emitters

B

£0

15

0

0 0

0

2025

01 - Heat Emitters

B

£0

15

0

0 0

0

2025

01 - Heat Emitters

B

£0

15

0

0 0

0

2025

01 - Heat Emitters

B

£0

20

0

0 0

0

2030

01 - Heat Emitters

B

£0

20

0

0 0

0

2030

03 - Grilles & Diffusers

C

£1,050

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£1,050

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£450

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£450

0

0

2 2

4

2010

03 - Grilles & Diffusers 03 - Grilles & Diffusers

C C

£150 £1,800

0 0

0 0

2 2 2 2

4 4

2010 2010

03 - Grilles & Diffusers

C

£600

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£900

0

0

2 2

4

2010

Remedial Action

K - Engineering - Vent & Air Con

Generic Hospital Physical Condition Survey

Delivery Suite: 7No. grilles require cleaning. Neonatal Ward Unit: 7No. grilles require cleaning. TSSU Unit: 3No. grilles require cleaning. C05: 3No. grilles require cleaning. C04: Grille requires cleaning. Catering: 12No. grilles require cleaning. C03: 4No. grilles require cleaning. Doctors Common Room: 6No. grilles require cleaning.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

03 - Grilles & Diffusers

C

£600

0

0

2 2

4

2010

Prep & Kitchen: Kitchen hood no longer in use and requires removal.

03 - Grilles & Diffusers

B(C)

£300

4

0

2 2

4

2014

03 - Grilles & Diffusers

B

£0

7

0

0 0

0

2017

03 - Grilles & Diffusers

B

£0

7

0

0 0

0

2017

03 - Grilles & Diffusers

B

£0

7

0

0 0

0

2017

03 - Grilles & Diffusers

B

£0

10

0

0 0

0

2020

03 - Grilles & Diffusers

B

£0

10

0

0 0

0

2020

03 - Grilles & Diffusers

B

£0

11

0

0 0

0

2021

03 - Grilles & Diffusers

B

£0

11

0

0 0

0

2021

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

18

0

0 0

0

2028

1.C29: 9No. grilles/diffusers require cleaning within the maintenance schedule.. Display/Cashier Area: Grease filters in acceptable order. Doctors Common Room: Grilles/diffusers in acceptable order. Kitchen/Wash-up Area: Grease filters in acceptable order. 1.137: Grilles/diffusers in acceptable order. 1.142: Grilles/diffusers in acceptable order. Neonatal Ward Unit: Grilles/diffusers in acceptable order. Toilets Area: Grilles/diffusers in acceptable order. Paediatric: Grilles/diffusers in acceptable order. TSSU Unit: Grilles/diffusers in acceptable order. Neonatal Ward Unit: Grilles/diffusers in acceptable order. Kitchen Stores: Grilles/diffusers in acceptable order. TSSU Unit: Grilles/diffusers in acceptable order.

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Pharmacy Technical Services: Grilles/diffusers in acceptable order. Dining/Coffee Lounge: Grilles/diffusers in acceptable order. Display/Cashier Area: Kitchen hood in acceptable order. Kitchen/Wash-up Area: Kitchen hood in acceptable order. Catering: Grilles/diffusers in acceptable order. Kitchen Stores: Kitchen hood in acceptable order. Display/Cashier Area: Grilles/diffusers in acceptable order. Kitchen/Wash-up Area: Grilles/diffusers in acceptable order. Delivery Suite: Grilles/diffusers in acceptable order. Function Room: Grilles/diffusers in acceptable order. 122a: Air conditioning in acceptable order. 119: Air conditioning in acceptable order. 254: Air conditioning in acceptable order. Pharmacy Technical Services: Air conditioning in acceptable order. Function Room: Air conditioning in acceptable order.

03 - Grilles & Diffusers

B

£0

18

0

0 0

0

2028

03 - Grilles & Diffusers

B

£0

18

0

0 0

0

2028

03 - Grilles & Diffusers

B

£0

18

0

0 0

0

2028

03 - Grilles & Diffusers

B

£0

18

0

0 0

0

2028

03 - Grilles & Diffusers

B

£0

18

0

0 0

0

2028

03 - Grilles & Diffusers

B

£0

18

0

0 0

0

2028

03 - Grilles & Diffusers

B

£0

19

0

0 0

0

2029

03 - Grilles & Diffusers

B

£0

19

0

0 0

0

2029

03 - Grilles & Diffusers

B

£0

20

0

0 0

0

2030

03 - Grilles & Diffusers

B

£0

20

0

0 0

0

2030

05 - Cooling Units

B

£0

6

0

0 0

0

2016

05 - Cooling Units

B

£0

8

0

0 0

0

2018

05 - Cooling Units

B

£0

8

0

0 0

0

2018

05 - Cooling Units

B

£0

9

0

0 0

0

2019

05 - Cooling Units

B

£0

9

0

0 0

0

2019

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 06 - Pipework

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£500

0

0

2 3

6

2010

Prep & Kitchen: Deadleg requires removal.

B

£0

6

0

0 0

0

2016

1.C33: Medical gases in acceptable order.

01 - Local Water Heaters

B

£0

7

0

0 0

0

2017

01 - Local Water Heaters

B

£0

9

0

0 0

0

2019

03 - Blending Valves

C

£750

0

0

3 3

9

2010

03 - Blending Valves

B

£0

8

0

0 0

0

2018

06 - Hose Reels

C

£600

0

0

2 3

6

2010

06 - Hose Reels

C

£600

0

0

2 3

6

2010

06 - Hose Reels

C

£600

0

0

2 3

6

2010

06 - Hose Reels

C

£600

0

0

2 3

6

2010

06 - Hose Reels

C

£600

0

0

2 3

6

2010

Neonatal Ward Unit: Zip hydroboil water heater in acceptable order. Delivery Suite: Zip water heater in acceptable order. Doctors Common Room: Blending valve requires replacement. Neonatal Ward Unit: Blending valves in acceptable order. C02: Fire hose reel requires removal as it poses risk of legionella. C22: Fire hose reel requires removal as it poses risk of legionella. Neonatal Ward Unit: Fire hose reel requires removal as it poses risk of legionella. C24: Fire hose reel requires removal as it poses risk of legionella. C09: Fire hose reel requires removal as it poses risk of legionella.

L - Engineering - Medical Gases 05 - Comments M - Engineering - Hot/Cold Water

N - Engineering - Lifts Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C48: Lift being refurbished at time of survey. C08: Lifts in acceptable order. Pharmacy Technical Services: Lift 300kg in acceptable order.

01 - Lifts

N/A

£0

0

0

0 0

0

2010

01 - Lifts 01 - Lifts

B B

£0 £0

14 18

0 0

0 0 0 0

0 0

2024 2028

B

£0

10

0

0 0

0

2020

Pharmacy Technical Services: Air conditioning supply and extract in acceptable order.

03 - Distribution Boards

B

£0

12

0

0 0

0

2022

03 - Distribution Boards

B

£0

12

0

0 0

0

2022

03 - Distribution Boards

B

£0

15

0

0 0

0

2025

03 - Distribution Boards

B

£0

15

0

0 0

0

2025

03 - Distribution Boards

B

£0

18

0

0 0

0

2028

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,000

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,400

0

0

2 2

4

2010

04 - Lighting Installation

C

£600

0

0

2 2

4

2010

013: Mini circuit breakers in acceptable order. Neonatal Ward Unit: Fuse boards in acceptable order. Kitchen Stores: Mini circuit breakers in acceptable order. Neonatal Ward Unit: Mini circuit breakers in acceptable order. Function Room: Mini circuit breakers in acceptable order. 1.131: 6No. surface fluorescent lights require replacement. 1.136: 6No. surface fluorescent lights require replacement. 1.141: 6No. surface fluorescent lights require replacement. 1.C36: 2No. surface fluorescent lights require replacement. 1.175: 5No. surface fluorescent lights require replacement. C03: 6No. surface fluorescent lights require replacement. C05: 7No. surface fluorescent lights require replacement. C04: 3No. surface fluorescent lights require replacement.

P - Engineering - Main Plant 04 - Extract Fans

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 102: Surface fluorescent light requires replacement. 211: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 210: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 208: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 127: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. C27: 3No. surface fluorescent lights require replacement. C26: 3No. surface fluorescent lights require replacement. Sister Office: 3No. fluorescent lights over visual display equipment are not suitable and require upgrading. Neonatal Ward Unit: 3No. fluorescent lights over visual display equipment are not suitable and require upgrading. C24: 4No. surface fluorescent lights require replacement. 087: Surface fluorescent light requires replacement. 028: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading.

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£800

0

0

3 2

6

2010

04 - Lighting Installation

C

£800

0

0

3 2

6

2010

04 - Lighting Installation

C

£800

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£600

0

0

2 2

4

2010

04 - Lighting Installation

C

£600

0

0

2 2

4

2010

04 - Lighting Installation

C

£600

0

0

3 2

6

2010

04 - Lighting Installation

C

£600

0

0

3 2

6

2010

04 - Lighting Installation

C

£800

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 096: 3No. tungsten lights require replacement. Delivery Suite: Fluorescent light over visual display equipment is not suitable and requires upgrading. Delivery Suite: 3No. tungsten lights require replacement. C20: 3No. surface fluorescent lights require replacement. 036: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 035: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 034: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 032: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 030: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 093: Surface fluorescent light requires replacement. 1.204: Surface fluorescent light requires upgrading within the maintenance schedule. 1.131: 4No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

C

£600

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£600

0

0

2 2

4

2010

04 - Lighting Installation

C

£600

0

0

2 2

4

2010

04 - Lighting Installation

C

£800

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£800

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£800

2

0

2 2

4

2012

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 1.136: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 1.141: 4No. surface fluorescent lights require upgrading within the maintenance schedule. Delivery Suite: 5No. tungsten lights require upgrading within the maintenance schedule. 1.C35: Surface fluorescent light requires upgrading within the maintenance schedule. 1.C34: Surface fluorescent light requires upgrading within the maintenance schedule. 1.198: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 1.196: 7No. surface fluorescent lights require upgrading within the maintenance schedule. 1.C33: 7No. surface fluorescent lights require upgrading within the maintenance schedule. Toilets Area: 2No. surface fluorescent lights require upgrading within the maintenance schedule. Dining/Coffee Lounge: 67No. tungsten downlights require upgrading within the maintenance schedule. Neonatal Ward Unit: 11No. tungsten lights require upgrading within the maintenance schedule. 107: 4No. tungsten lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£800

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£800

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£1,000

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£13,400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£2,200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Kitchen/Wash-up Area: 17No. tungsten downlights require upgrading within the maintenance schedule. Display/Cashier Area: 67No. tungsten downlights require upgrading within the maintenance schedule. Dining/Coffee Lounge: 68No. tungsten lights require upgrading within the maintenance schedule. 1.S01: Surface fluorescent light requires upgrading within the maintenance schedule. 1.133: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 1.129: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 1.138: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 1.13: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 1.S03: Surface fluorescent light requires upgrading within the maintenance schedule. 1.S02: Surface fluorescent light requires upgrading within the maintenance schedule. 1.134: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 1.139: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£3,400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£13,400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£13,600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 1.142: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 1.137: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 1.S04: Surface fluorescent light requires upgrading within the maintenance schedule. 1.C29: 8No. surface fluorescent lights require upgrading within the maintenance schedule. Function Room: 50No. surface fluorescent downlights require upgrading within the maintenance schedule. 1.141: Operating theatre lights in acceptable order. 1.131: Operating theatre lights in acceptable order. 1.136: Operating theatre lights in acceptable order. Paediatric: Surface fluorescent lights in acceptable order. Prep & Kitchen: Surface fluorescent lights in acceptable order. TSSU Unit: Surface fluorescent lights in acceptable order. Catering: Surface fluorescent lights in acceptable order. Toilets Area: Surface fluorescent lights in acceptable order. Doctors Common Room: Surface fluorescent lights in acceptable order.

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£10,000

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Dining/Coffee Lounge: Surface fluorescent lights in acceptable order. 013: Surface fluorescent lights in acceptable order. Doctors Common Room: CAT II lights in acceptable order. Neonatal Ward Unit: Surface fluorescent lights in acceptable order. Delivery Suite: Surface fluorescent lights in acceptable order. Kitchen Stores: Surface fluorescent lights in acceptable order. Paediatric: CAT II lights in acceptable order. TSSU Unit: CAT II lights in acceptable order. C11: Surface fluorescent lights in acceptable order. C10: Surface fluorescent lights in acceptable order. C07: Surface fluorescent lights in acceptable order. Catering: Surface fluorescent lights in acceptable order. Function Room: Surface fluorescent lights in acceptable order. Neonatal Ward Unit: CAT II lights in acceptable order. Catering: CAT II lights in acceptable order. Pharmacy Technical Services: CAT II lights in acceptable order.

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Dining/Coffee Lounge: Surface fluorescent lights in acceptable order. Display/Cashier Area: Surface fluorescent lights in acceptable order. Kitchen/Wash-up Area: Surface fluorescent lights in acceptable order. Pharmacy Technical Services: Surface fluorescent lights in acceptable order. Delivery Suite: CAT II lights in acceptable order. Paediatric: Emergency lights in acceptable order. Doctors Common Room: Emergency lights in acceptable order. Neonatal Ward Unit: Emergency lights in acceptable order. Doctors Common Room: Emergency lights in acceptable order. Dining/Coffee Lounge: Emergency lights in acceptable order. Prep & Kitchen: Emergency lights in acceptable order. C10: Emergency lights in acceptable order. C11: Emergency lights in acceptable order. Dining/Coffee Lounge: Emergency lights in acceptable order. Kitchen Stores: Emergency lights in acceptable order.

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

04 - Lighting Installation

B

£0

12

0

0 0

0

2022

05 - Emergency Lighting

B

£0

6

0

0 0

0

2016

05 - Emergency Lighting

B

£0

6

0

0 0

0

2016

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Delivery Suite: Emergency lights in acceptable order. Kitchen/Wash-up Area: Emergency lights in acceptable order. Display/Cashier Area: Emergency lights in acceptable order. Catering: Emergency lights in acceptable order. Function Room: Emergency lights in acceptable order. Paediatric: Sockets and switches in acceptable order. Function Room: Sockets and switches in acceptable order. Dining/Coffee Lounge: Sockets and switches in acceptable order. Neonatal Ward Unit: Sockets and switches in acceptable order. Pharmacy Technical Services: Sockets and switches in acceptable order. Display/Cashier Area: Sockets and switches in acceptable order. Paediatric: Emergency door release in acceptable order. Doctors Common Room: Emergency door release in acceptable order. Dining/Coffee Lounge: Emergency door release in acceptable order. Neonatal Ward Unit: Emergency door release in acceptable order.

05 - Emergency Lighting

B

£0

10

0

0 0

0

2020

05 - Emergency Lighting

B

£0

11

0

0 0

0

2021

05 - Emergency Lighting

B

£0

11

0

0 0

0

2021

05 - Emergency Lighting

B

£0

11

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2022

06 - Sockets/Switches

B

£0

7

0

0 0

0

2017

06 - Sockets/Switches

B

£0

8

0

0 0

0

2018

06 - Sockets/Switches

B

£0

9

0

0 0

0

2019

06 - Sockets/Switches

B

£0

9

0

0 0

0

2019

06 - Sockets/Switches

B

£0

9

0

0 0

0

2019

06 - Sockets/Switches

B

£0

12

0

0 0

0

2022

08 - Comments

B

£0

7

0

0 0

0

2017

08 - Comments

B

£0

7

0

0 0

0

2017

08 - Comments

B

£0

8

0

0 0

0

2018

08 - Comments

B

£0

9

0

0 0

0

2019

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Pharmacy Technical Services: Emergency door release in acceptable order. Delivery Suite: Emergency door release in acceptable order.

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

7

0

0 0

0

2017

01 - Sounders

B

£0

7

0

0 0

0

2017

01 - Sounders

B

£0

7

0

0 0

0

2017

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

11

0

0 0

0

2021

01 - Sounders

B

£0

12

0

0 0

0

2022

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

C05: Fire alarm sounders in acceptable order. Toilets Area: Fire alarm sounders in acceptable order. Doctors Common Room: Fire alarm sounders in acceptable order. C11: Fire alarm sounders in acceptable order. Neonatal Ward Unit: Fire alarm sounders in acceptable order. 1.C33: Fire alarm sounders in acceptable order. 013: Fire alarm sounders in acceptable order. Pharmacy Technical Services: Fire alarm sounders in acceptable order. Delivery Suite: Fire alarm sounders in acceptable order. Function Room: Fire alarm sounders in acceptable order. Dining/Coffee Lounge: Fire alarm sounders in acceptable order. Dining/Coffee Lounge: Fire alarm sounders in acceptable order. Kitchen Stores: Fire alarm sounders in acceptable order.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Display/Cashier Area: Fire alarm sounders in acceptable order. Kitchen/Wash-up Area: Fire alarm sounders in acceptable order. Catering: Fire alarm sounders in acceptable order. Paediatric: Fire alarm call points in acceptable order. Dining/Coffee Lounge: Fire alarm call points in acceptable order. C10: Fire alarm call points in acceptable order. Neonatal Ward Unit: Fire alarm call points in acceptable order. Doctors Common Room: Fire alarm call points in acceptable order. Pharmacy Technical Services: Fire alarm call points in acceptable order. C22: Fire alarm call points in acceptable order. Delivery Suite: Fire alarm call points in acceptable order. Catering: Fire alarm call points in acceptable order. Kitchen/Wash-up Area: Fire alarm call points in acceptable order. Display/Cashier Area: Fire alarm call points in acceptable order. 1.C33: Smoke detectors in acceptable order.

01 - Sounders

B

£0

16

0

0 0

0

2026

01 - Sounders

B

£0

16

0

0 0

0

2026

01 - Sounders

B

£0

16

0

0 0

0

2026

02 - Call Points

B

£0

7

0

0 0

0

2017

02 - Call Points

B

£0

8

0

0 0

0

2018

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

10

0

0 0

0

2020

02 - Call Points

B

£0

10

0

0 0

0

2020

02 - Call Points

B

£0

10

0

0 0

0

2020

02 - Call Points

B

£0

16

0

0 0

0

2026

02 - Call Points

B

£0

16

0

0 0

0

2026

02 - Call Points

B

£0

16

0

0 0

0

2026

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Doctors Common Room: Smoke detectors in acceptable order. Prep & Kitchen: Smoke detectors in acceptable order. Toilets Area: Smoke detectors in acceptable order. 1.S01: Smoke detectors in acceptable order. 1.S02: Smoke detectors in acceptable order. 1.S03: Smoke detectors in acceptable order. 1.S04: Smoke detectors in acceptable order. Paediatric: Smoke detectors in acceptable order. Neonatal Ward Unit: Smoke detectors in acceptable order. 013: Smoke detectors in acceptable order. Dining/Coffee Lounge: Smoke detectors in acceptable order. TSSU Unit: Smoke detectors in acceptable order. Function Room: Smoke detectors in acceptable order. C07: Smoke detectors in acceptable order. C10: Smoke detectors in acceptable order. C11: Smoke detectors in acceptable order. Delivery Suite: Smoke detectors in acceptable order. Kitchen/Wash-up Area: Smoke detectors in acceptable order.

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

11

0

0 0

0

2021

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

030: Smoke detectors in acceptable order. 028: Smoke detectors in acceptable order. Display/Cashier Area: Smoke detectors in acceptable order. Pharmacy Technical Services: Smoke detectors in acceptable order. Catering: Smoke detectors in acceptable order. Dining/Coffee Lounge: Smoke detectors in acceptable order.

03 - Smoke Detectors

B

£0

11

0

0 0

0

2021

03 - Smoke Detectors

B

£0

11

0

0 0

0

2021

03 - Smoke Detectors

B

£0

11

0

0 0

0

2021

03 - Smoke Detectors

B

£0

11

0

0 0

0

2021

03 - Smoke Detectors

B

£0

11

0

0 0

0

2021

03 - Smoke Detectors

B

£0

16

0

0 0

0

2026

B

£0

12

0

0 0

0

2022

Delivery Suite: Nurse call system in acceptable order.

04 - Insulation

B(C)

£8,000

3

0

4 3 12

2013

04 - Insulation

B(C)

£2,000

4

0

2 2

4

2014

04 - Insulation

B(C)

£3,000

5

0

2 2

4

2015

04 - Insulation

B

£0

7

0

0 0

0

2017

04 - Insulation

B

£0

8

0

0 0

0

2018

04 - Insulation

B

£0

9

0

0 0

0

2019

2.026: Lagging to steam pipes requires upgrading within the maintenance schedule. 2/020: Pipework lagging requires upgrading within the maintenance schedule. 2.C25: Pipework lagging requires upgrading within the maintenance schedule. 2.C21: Pipework lagging in acceptable order. 2.M06: Pipework lagging in acceptable order. 2.M12: Pipework lagging in acceptable order.

W - Engineering - Telecoms 05 - Nurse Call

Location: 02 - Second Floor I - Engineering - Heating Systems

K - Engineering - Vent & Air Con

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

2.M20: Operating theatre supply fans/ducting in acceptable order. 2.M18: Medical Vacuum equipment in acceptable order. 2/020: Ducting in acceptable order.

01 - Ductwork

B

£0

7

0

0 0

0

2017

01 - Ductwork

B

£0

12

0

0 0

0

2022

01 - Ductwork

B

£0

15

0

0 0

0

2025

02 - Pumps

B

£0

7

0

0 0

0

2017

02 - Pumps

B

£0

7

0

0 0

0

2017

03 - Calorifiers

B

£0

8

0

0 0

0

2018

03 - Controls

B(C)

£10,000

4

0

3 3

9

2014

2.M06: Ottermill AHU/Extract control panel requires upgrading within the maintenance schedule.

03 - Controls

B

£0

15

0

0 0

0

2025

03 - Controls

B

£0

18

0

0 0

0

2028

04 - Extract Fans

B(C)

£8,000

5

0

2 2

4

2015

05 - AHUs

B(C)

£30,000

5

0

4 3 12

2015

05 - AHUs

B

£0

7

0

0 0

2017

2.C21: 4No. Searle data centre condensers in acceptable order. 2.M12: Ottermill AHU control not in use, now 'Trend' control panel in acceptable order. 2.M17: Renal/Neonatal extract requires upgrading within the maintenance schedule. 2.M12: AHU requires upgrading within the maintenance schedule. 2.M21: 4No. large extract AHU in acceptable order.

O - Engineering - Main Plant 2.M14: 10No. Pullen heating pumps in acceptable order. 2.M14: 2No. large Pullon hot water service pumps in acceptable order. 2.M14: Horizontal calorifier and pumps in acceptable order.

P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

0

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 2.M02: AHU in acceptable order. 2.001: Neonatal supply AHU in acceptable order. 2.M13: AHU in acceptable order. 2.M06: Woods AHU serving paediatric ICU in acceptable order. 2.212: Carrier Holland AHU in acceptable order. 2.M03: AHUs in acceptable order. 2.M09: AHU in acceptable order. 2.M21A: 9No. small compressors in acceptable order. 2.M14: 2No. domestic hot water service cross pleat heat exchangers in acceptable order. 2.M14: 3No. heating cross pleat heat exchangers in acceptable order.

05 - AHUs

B

£0

7

0

0 0

0

2017

05 - AHUs

B

£0

8

0

0 0

0

2018

05 - AHUs

B

£0

8

0

0 0

0

2018

05 - AHUs

B

£0

8

0

0 0

0

2018

05 - AHUs

B

£0

12

0

0 0

0

2022

05 - AHUs

B

£0

18

0

0 0

0

2028

05 - AHUs

B

£0

20

0

0 0

0

2030

09 - Comments

B

£0

6

0

0 0

0

2016

09 - Comments

B

£0

15

0

0 0

0

2025

09 - Comments

B

£0

15

0

0 0

0

2025

03 - Distribution Boards

C

£1,900

0

0

3 2

6

2010

03 - Distribution Boards

C

£1,900

0

0

3 2

6

2010

03 - Distribution Boards

C

£1,900

0

0

3 2

6

2010

03 - Distribution Boards

C

£8,000

0

0

3 3

9

2010

Remedial Action

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

2.C25: 3No. Ottermill distribution boards require replacement. 2.C08: 3No. Ottermill distribution boards require replacement. 2.C18: 3No. Ottermill distribution boards require replacement. 2.M13: Ottermill combined switchgear and distribution board requires replacement.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 2.M02: Ottermill combined switchgear and distribution board requires replacement. 2.M11: Ottermill combined switchgear and distribution board requires replacement. 2/020: Hager distribution board in acceptable order. C03: 2No. surface fluorescent lights require upgrading within the maintenance schedule. C04: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 2.S02: Surface fluorescent light requires upgrading within the maintenance schedule. 2.S04: Surface fluorescent light requires upgrading within the maintenance schedule. 2.S03: Surface fluorescent light requires upgrading within the maintenance schedule. 2.S01: Surface fluorescent light requires upgrading within the maintenance schedule. 2.028: 4No. surface fluorescent downlights require upgrading within the maintenance schedule. Surface fluorescent lights in acceptable order. Surface fluorescent lights in acceptable order. Uninterruptable power supply panel in acceptable order. Trunking in acceptable order.

03 - Distribution Boards

C

£8,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£8,000

0

0

3 3

9

2010

03 - Distribution Boards

B

£0

20

0

0 0

0

2030

04 - Lighting Installation

B(C)

£400

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

05 - Emergency Lighting

B

£0

18

0

0 0

0

2028

08 - Comments

B

£0

15

0

0 0

0

2025

Remedial Action

V - Engineering - Fire Alarms Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

2.C27: Fire alarm call points in acceptable order. 2.S03: Smoke detectors in acceptable order. 2.S04: Smoke detectors in acceptable order. 2.S01: Smoke detectors in acceptable order. 2.S02: Smoke detectors in acceptable order.

02 - Call Points

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

12

0

0 0

0

2022

01 - Heat Emitters

B

£0

12

0

0 0

0

2022

B

£0

6

0

0 0

0

2016

Trevor Howell Ward: Medical gases in acceptable order.

04 - Extract Fans

B(C)

£400

4

0

3 3

9

2014

04 - Extract Fans

B(C)

£400

5

0

3 3

9

2015

3.147: Vent Axia extract fan requires upgrading within the maintenance schedule. 3.048: Vent Axia extract fan requires upgrading within the maintenance schedule.

C

£8,000

0

0

3 3

9

2010

Location: 03 - Third Floor I - Engineering - Heating Systems 3.C13: Heat emitters with low surface temperature covers in acceptable order. 3.217: Heat emitters with low surface temperature covers in acceptable order. 3.C21: Heat emitters with low surface temperature covers in acceptable order.

L - Engineering - Medical Gases 05 - Comments P - Engineering - Main Plant

R - Engineering - Electrical 03 - Distribution Boards

Generic Hospital Physical Condition Survey

3.M04: Ottermill combined switchgear and distribution board requires replacement. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 3.M01: Ottermill combined switchgear and distribution board requires replacement. 3.202A: Ottermill combined switchgear and distribution board requires replacement. 3.071: Ottermill distribution board requires replacement. 3.M05: Ottermill combined switchgear and distribution board requires replacement. 3.M01: Ottermill combined switchgear and distribution board requires replacement. 3.214A: 2No. MEM distribution boards in acceptable order. 3.111: Surface fluorescent light requires replacement. 3.104: Tungsten light requires replacement. 3.105: Tungsten light requires replacement. 3.088: 2No. tungsten lights require replacement. 3.121: Surface fluorescent light requires upgrading within the maintenance schedule. 3.089: Surface fluorescent light requires upgrading within the maintenance schedule. 3.137: 2No. CAT II lights require upgrading within the maintenance schedule. 3.091: Surface fluorescent light requires upgrading within the maintenance schedule. 3.21: 4No. surface fluorescent lights require upgrading within the maintenance schedule.

03 - Distribution Boards

C

£8,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£8,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£400

0

0

3 3

9

2010

03 - Distribution Boards

C

£8,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£8,000

0

0

3 3

9

2010

03 - Distribution Boards

B

£0

18

0

0 0

0

2028

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 3.018: Surface fluorescent light requires upgrading within the maintenance schedule. 3.146: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 3.158: Surface fluorescent light requires upgrading within the maintenance schedule. 3.017: Surface fluorescent light requires upgrading within the maintenance schedule. 3.106A: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 3.125: Surface fluorescent light requires upgrading within the maintenance schedule. 3.C06: 8No. surface fluorescent lights require upgrading within the maintenance schedule. 3.116: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 3.118: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 3.123: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 3.132: Surface fluorescent light requires upgrading within the maintenance schedule. 3.145: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 3.C04: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 3.151: Surface fluorescent light requires upgrading within the maintenance schedule. 3.C03: 13No. surface fluorescent lights require upgrading within the maintenance schedule. 3.157: Surface fluorescent light requires upgrading within the maintenance schedule. 3.147: Surface fluorescent light requires upgrading within the maintenance schedule. 3.048: Surface fluorescent light requires upgrading within the maintenance schedule. 3.S01: Surface fluorescent light requires upgrading within the maintenance schedule. 3.S02: Surface fluorescent light requires upgrading within the maintenance schedule. 3.C17: 18No. surface fluorescent lights require upgrading within the maintenance schedule. 3.S03: Surface fluorescent light requires upgrading within the maintenance schedule. 3.S04: Surface fluorescent light requires upgrading within the maintenance schedule. 3.2: 6No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£2,600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£3,600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 3.C21: Surface fluorescent light requires upgrading within the maintenance schedule. 3.C22: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 3.C23: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 3.C20: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 3.C24: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 3.028: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 3.C15: 18No. surface fluorescent lights require upgrading within the maintenance schedule. 3.016: 4No. CAT II lights in acceptable order. Obstetrics and Gynaecology: CAT II lights in acceptable order in all offices and rooms. Geriatric Medicine: CAT II lights in acceptable order. 3.2: Emergency lights in acceptable order.

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£3,600

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

01 - Sounders

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

3.C06: Fire alarm sounders in acceptable order. 3.016: Smoke detectors in acceptable order. 3.S01: Smoke detectors in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 3.S04: Smoke detectors in acceptable order. 3.S03: Smoke detectors in acceptable order. 3.S02: Smoke detectors in acceptable order. Geriatric Medicine: Smoke detectors in acceptable order.

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

12

0

0 0

0

2022

01 - Heat Emitters

B

£0

12

0

0 0

0

2022

01 - Heat Emitters

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

05 - Cooling Units

B

£0

12

0

0 0

0

2022

02 - Valve Boxes/Locks

B(C)

£800

3

0

2 3

6

2013

05 - Comments

B(C)

£800

5

0

3 3

9

2015

Remedial Action

Location: 04 - Fourth Floor I - Engineering - Heating Systems Urodynamic Unit: Fan convectors in acceptable order. Caesar Hawkins Ward: Heat emitters with low surface temperature covers in acceptable order. 4.149: Steel panel radiators in acceptable order. Carmen/Dakin Suite: Heat emitters with low surface temperature covers in acceptable order.

K - Engineering - Vent & Air Con 4.108: Grille/diffuser requires cleaning. Foetal Medicine Unit: Mitsubishi cassette unit in acceptable order.

L - Engineering - Medical Gases

Generic Hospital Physical Condition Survey

4.C21: Medical gas valves requires upgrading within the maintenance schedule. 4.C15: Medical gases requires upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Foetal Medicine Unit: Medical gases in acceptable order. 4.C07: Medical gases in acceptable order.

05 - Comments

B

£0

7

0

0 0

0

2017

05 - Comments

B

£0

7

0

0 0

0

2017

03 - Blending Valves

C

£250

0

0

2 3

6

2010

03 - Blending Valves

B(C)

£750

5

0

3 3

9

2015

03 - Blending Valves

B

£0

6

0

0 0

0

2016

06 - Hose Reels

C

£400

0

0

2 2

4

2010

04 - Extract Fans

C

£750

0

0

2 2

4

2010

04 - Extract Fans

B(C)

£400

3

0

3 3

9

2013

04 - Extract Fans

B(C)

£400

5

0

2 2

4

2015

02 - Main Switchgear

C

£8,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£8,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£8,000

0

0

3 2

6

2010

03 - Distribution Boards

C

£8,000

0

0

3 3

9

2010

Remedial Action

M - Engineering - Hot/Cold Water 4.109: Shower requires removing. 4.106: Blending valve requires upgrading within the maintenance schedule. 4.149: Blending valves in acceptable order. 4.C27: Fire hose reel requires removal as it poses risk of legionella.

P - Engineering - Main Plant 4.176: Extract fan requires replacement. Urodynamic Unit: Extract fans requires upgrading within the maintenance schedule. 4.142: Vent Axia requires upgrading within the maintenance schedule.

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

4.M02: Ottermill combined switchgear and distribution board requires replacement. 4.M04: Ottermill combined switchgear and distribution board requires replacement. 4.M01: Ottermill combined switchgear and distribution board requires replacement. 4.M03: Ottermill combined switchgear and distribution board requires replacement. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 4.157: Surface fluorescent light requires replacement. 4.125: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 4.77: Medical exam light requires replacement. 4.86: Medical exam light requires replacement. 4.016: Fluorescent light over visual display equipment is not suitable and requires upgrading. 4.014: Surface fluorescent light requires replacement. 4.87: Fluorescent light over visual display equipment is not suitable and requires upgrading. 4.162: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 4.176: 2No. surface fluorescent lights require replacement. 4.93: 4No. medical exam lights require replacement. 4.9: 4No. medical exam lights require replacement. 4.82: 4No. medical exam lights require replacement. 4.015: Tungsten light requires replacement. 4.165: Fluorescent light over visual display equipment is not suitable and requires upgrading. 4.79: 4No. medical exam lights require replacement.

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£600

0

0

2 2

4

2010

04 - Lighting Installation

C

£600

0

0

2 2

4

2010

04 - Lighting Installation

C

£600

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£600

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 4.047: Fluorescent light over visual display equipment is not suitable and requires upgrading. 4.169: Fluorescent light over visual display equipment is not suitable and requires upgrading. 4.054: Fluorescent light over visual display equipment is not suitable and requires upgrading. 4.055: Fluorescent light over visual display equipment is not suitable and requires upgrading. 4.134: Fluorescent light over visual display equipment is not suitable and requires upgrading. 4.008: Fluorescent light over visual display equipment is not suitable and requires upgrading. 4.103: Fluorescent light over visual display equipment is not suitable and requires upgrading. 4.105: Fluorescent light over visual display equipment is not suitable and requires upgrading. 4.128: Fluorescent light over visual display equipment is not suitable and requires upgrading. 4.138: Surface fluorescent light requires replacement. 4.007: Fluorescent light over visual display equipment is not suitable and requires upgrading. 4.143: Tungsten light requires replacement. 4.004: Fluorescent light over visual display equipment is not suitable and requires upgrading.

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 3

6

2010

04 - Lighting Installation

C

£200

0

0

2 3

6

2010

04 - Lighting Installation

C

£200

0

0

2 3

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 3

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 3

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 4.005: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 4.102: Surface fluorescent light requires upgrading within the maintenance schedule. 4.061: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.079: Surface fluorescent light requires upgrading within the maintenance schedule. 4.68A: CAT II light requires upgrading within the maintenance schedule. 4.67: CAT II light requires upgrading within the maintenance schedule. 4.036: Surface fluorescent light requires upgrading within the maintenance schedule. 4.051: Surface fluorescent light requires upgrading within the maintenance schedule. 4.042A: Surface fluorescent light requires upgrading within the maintenance schedule. 4.089: Surface fluorescent light requires upgrading within the maintenance schedule. 4.66: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.035: 2No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

C

£400

0

0

2 3

6

2010

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 4.68: 2No. CAT II lights require upgrading within the maintenance schedule. 4.177: Surface fluorescent light requires upgrading within the maintenance schedule. 4.029: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 4.042: Surface fluorescent light requires upgrading within the maintenance schedule. 4.076: Surface fluorescent light requires upgrading within the maintenance schedule. 4.075: Surface fluorescent light requires upgrading within the maintenance schedule. 4.075: Surface fluorescent light requires upgrading within the maintenance schedule. 4.073: Surface fluorescent light requires upgrading within the maintenance schedule. 4.085: Surface fluorescent light requires upgrading within the maintenance schedule. 4.062: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.002: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.13: Surface fluorescent light requires upgrading within the maintenance schedule. 4.C36: 8No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,600

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 4.C29: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 4.C33: 9No. surface fluorescent lights require upgrading within the maintenance schedule. 4.049: Surface fluorescent light requires upgrading within the maintenance schedule. 4.05: Surface fluorescent light requires upgrading within the maintenance schedule. 4.94: 2No. CAT II lights require upgrading within the maintenance schedule. 4.157: Surface fluorescent light requires upgrading within the maintenance schedule. 4.053: Surface fluorescent light requires upgrading within the maintenance schedule. 4.04: Surface fluorescent light requires upgrading within the maintenance schedule. 4.052: Surface fluorescent light requires upgrading within the maintenance schedule. 4.08: Surface fluorescent light requires upgrading within the maintenance schedule. 4.149: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.081: Surface fluorescent light requires upgrading within the maintenance schedule. 4.086: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 4.092: Surface fluorescent light requires upgrading within the maintenance schedule. 4.187: Surface fluorescent light requires upgrading within the maintenance schedule. 4.186: Surface fluorescent light requires upgrading within the maintenance schedule. 4.136: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.92: CAT II light requires upgrading within the maintenance schedule. 4.158: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.107A: 3No. CAT II lights require upgrading within the maintenance schedule. 4.106: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.107: 3No. CAT II lights require upgrading within the maintenance schedule. 4.104: 3No. CAT II lights require upgrading within the maintenance schedule. 4.104A: 3No. CAT II lights require upgrading within the maintenance schedule. 4.099: 3No. CAT II lights require upgrading within the maintenance schedule. 4.144: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

3 2

6

2014

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 4.C16: Surface fluorescent light requires upgrading within the maintenance schedule. 4.119: Surface fluorescent light requires upgrading within the maintenance schedule. 4.096: 3No. CAT II lights require upgrading within the maintenance schedule. 4.006: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.S01: Surface fluorescent light requires upgrading within the maintenance schedule. 4.137: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 4.126: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 4.064: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 4.114: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 4.14: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 4.109: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.163: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 4.S02: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 4.S03: Surface fluorescent light requires upgrading within the maintenance schedule. 4.S04: Surface fluorescent light requires upgrading within the maintenance schedule. 4.036: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 4.059: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 4.112: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 4.145: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 4.82: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 4.16: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 4.9: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 4.79: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 4.C27: 7No. surface fluorescent lights require upgrading within the maintenance schedule. 4.021: CAT II light requires upgrading within the maintenance schedule. 4.C34: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 4.93: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 4.C24: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 4.182: Surface fluorescent light requires upgrading within the maintenance schedule. 4.C19: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.108: Surface fluorescent light requires upgrading within the maintenance schedule. 4.133: Surface fluorescent light requires upgrading within the maintenance schedule. 4.005: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.01: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 4.C23: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 4.123: Surface fluorescent light requires upgrading within the maintenance schedule. Gwillam Ward: Surface fluorescent lights in acceptable order. Gwillam Ward: Surface fluorescent lights in acceptable order. Urodynamic Unit: Emergency lights in acceptable order.

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

05 - Emergency Lighting

B

£0

6

0

0 0

0

2016

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 4.C13: Door entry button requires replacement. 4.M03: Replace trunking covers.

08 - Comments

C

£150

0

0

2 2

4

2010

08 - Comments

C

£100

0

0

2 2

4

2010

01 - Sounders

B

£0

10

0

0 0

0

2020

02 - Call Points

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

12

0

0 0

0

2022

05 - Nurse Call

B

£0

7

0

0 0

0

2017

05 - Nurse Call

B

£0

8

0

0 0

0

2018

Remedial Action

V - Engineering - Fire Alarms 4.C23: Fire alarm sounders in acceptable order. Caesar Hawkins Ward: Fire alarm call points in acceptable order. 4.68: Smoke detectors in acceptable order. 4.C23: Smoke detectors in acceptable order. 4.S03: Smoke detectors in acceptable order. 4.S01: Smoke detectors in acceptable order. Urodynamic Unit: Smoke detectors in acceptable order. 4.S02: Smoke detectors in acceptable order. 4.S04: Smoke detectors in acceptable order. Gwillam Ward: Smoke detectors in acceptable order. Carmen/Dakin Suite: Smoke detectors in acceptable order. 4.C34: Smoke detectors in acceptable order.

W - Engineering - Telecoms Carmen/Dakin Suite: Nurse call system in acceptable order. 4.C36: Nurse call system in acceptable order.

Location: 05 - Fifth Floor Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

5.C17: 4No. grilles/diffusers require upgrading within the maintenance schedule. Duke Eldar Ward: Grilles/diffusers in acceptable order.

K - Engineering - Vent & Air Con 03 - Grilles & Diffusers

B(C)

£800

4

0

2 2

4

2014

03 - Grilles & Diffusers

B

£0

8

0

0 0

0

2018

05 - Comments

B

£0

6

0

0 0

0

2016

05 - Comments

B

£0

6

0

0 0

0

2016

05 - Comments

B

£0

7

0

0 0

0

2017

02 - Pipework

C

£500

0

0

3 3

9

2010

5.051: Room is not used as a bathroom, remove water supply.

06 - Hose Reels

C

£600

0

0

2 3

6

2010

06 - Hose Reels

C

£400

0

0

2 3

6

2010

5.C14: Fire hose reel requires removal as it poses risk of legionella. 5.C21: Fire hose reel requires removal as it poses risk of legionella.

B(C)

£300

3

0

3 3

9

2013

5.159: Extract fan requires upgrading within the maintenance schedule.

C

£8,000

0

0

3 3

9

2010

5.M01: Ottermill combined switchgear and distribution board requires replacement.

L - Engineering - Medical Gases 5.C14: Medical gases in acceptable order. 5.C07: Medical gases in acceptable order. 5.C21: Medical gases in acceptable order.

M - Engineering - Hot/Cold Water

P - Engineering - Main Plant 04 - Extract Fans

R - Engineering - Electrical 03 - Distribution Boards

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 5.M02: Ottermill combined switchgear and distribution board requires replacement. 5.M04: Ottermill combined switchgear and distribution board requires replacement. 5.011: Fluorescent light over visual display equipment is not suitable and requires upgrading. 5.07: Fluorescent light over visual display equipment is not suitable and requires upgrading. 5.102: Surface fluorescent light requires replacement. 5.071: Fluorescent light over visual display equipment is not suitable and requires upgrading. 5.03: Tungsten light requires replacement. 5.032: Tungsten light requires replacement. 5.014: Tungsten light requires replacement. 5.131: Medical exam light requires replacement. 5.134: Medical exam light requires replacement. 5.145: 4No. medical exam lights require replacement. 5.084: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 5.001: Fluorescent light over visual display equipment is not suitable and requires upgrading.

03 - Distribution Boards

C

£8,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£8,000

0

0

3 3

9

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£800

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 5.008: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 5.C04: Fluorescent light over visual display equipment is not suitable and requires upgrading. 5.013: 2No. tungsten lights require replacement. 5.012A: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 5.047: Fluorescent light over visual display equipment is not suitable and requires upgrading. 5.102: Tungsten light requires replacement. 5.163: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 5.006: Fluorescent light over visual display equipment is not suitable and requires upgrading. 5.139: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 5.174: Fluorescent light over visual display equipment is not suitable and requires upgrading. 5.136: 2No. surface fluorescent lights require replacement. 5.036: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

C

£800

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 5.042: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.044: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.045: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.143: Surface fluorescent light requires upgrading within the maintenance schedule. 5.C07: 10No. surface fluorescent lights require upgrading within the maintenance schedule. 5.C04: 19No. surface fluorescent lights require upgrading within the maintenance schedule. 5.178: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.177A: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.159: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.118: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.135: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.14: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£2,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£3,800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 5.117: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.018: Surface fluorescent light requires upgrading within the maintenance schedule. 5.C30: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 5.112: Surface fluorescent light requires upgrading within the maintenance schedule. 5.16: Surface fluorescent light requires upgrading within the maintenance schedule. 5.177: Surface fluorescent light requires upgrading within the maintenance schedule. 5.077: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.079b: Surface fluorescent light requires upgrading within the maintenance schedule. 5.083A: Surface fluorescent light requires upgrading within the maintenance schedule. 5.062: Surface fluorescent light requires upgrading within the maintenance schedule. 5.085: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.085A: Surface fluorescent light requires upgrading within the maintenance schedule. 5.073: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 5.079: Surface fluorescent light requires upgrading within the maintenance schedule. 5.066: Surface fluorescent light requires upgrading within the maintenance schedule. 5.066a: Surface fluorescent light requires upgrading within the maintenance schedule. 5.065: Surface fluorescent light requires upgrading within the maintenance schedule. 5.065a: Surface fluorescent light requires upgrading within the maintenance schedule. 5.068a: Surface fluorescent light requires upgrading within the maintenance schedule. 5.062a: Surface fluorescent light requires upgrading within the maintenance schedule. 5.068: Surface fluorescent light requires upgrading within the maintenance schedule. 5.076: Surface fluorescent light requires upgrading within the maintenance schedule. 5.076a: Surface fluorescent light requires upgrading within the maintenance schedule. 5.080A: Surface fluorescent light requires upgrading within the maintenance schedule. 5.08: Surface fluorescent light requires upgrading within the maintenance schedule. 5.C27: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 5.C20: Surface fluorescent light requires upgrading within the maintenance schedule. 5.C26: Surface fluorescent light requires upgrading within the maintenance schedule. 5.078b: Surface fluorescent light requires upgrading within the maintenance schedule. 5.082a: Surface fluorescent light requires upgrading within the maintenance schedule. 5.082: Surface fluorescent light requires upgrading within the maintenance schedule. 5.082b: Surface fluorescent light requires upgrading within the maintenance schedule. 5.081B: Surface fluorescent light requires upgrading within the maintenance schedule. 5.081: Surface fluorescent light requires upgrading within the maintenance schedule. 5.C25: Surface fluorescent light requires upgrading within the maintenance schedule. 5.079a: Surface fluorescent light requires upgrading within the maintenance schedule. 5.083: Surface fluorescent light requires upgrading within the maintenance schedule. 5.078: Surface fluorescent light requires upgrading within the maintenance schedule. 5.078a: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 5.075: Surface fluorescent light requires upgrading within the maintenance schedule. 5.C24: Surface fluorescent light requires upgrading within the maintenance schedule. 5.072: Surface fluorescent light requires upgrading within the maintenance schedule. 5.072a: Surface fluorescent light requires upgrading within the maintenance schedule. 5.081a: Surface fluorescent light requires upgrading within the maintenance schedule. 5.031: Surface fluorescent light requires upgrading within the maintenance schedule. 5.131: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.133: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.137: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.051: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.035: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 5.038: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 5.05: 6No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 5.03: Surface fluorescent light requires upgrading within the maintenance schedule. 5.134: Surface fluorescent light requires upgrading within the maintenance schedule. 5.046: Surface fluorescent light requires upgrading within the maintenance schedule. 5.047: Surface fluorescent light requires upgrading within the maintenance schedule. 5.042: Surface fluorescent light requires upgrading within the maintenance schedule. 5.111: 2No. operating theatre lights require upgrading within the maintenance schedule. 5.022: Surface fluorescent light requires upgrading within the maintenance schedule. 5.128: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 5.075a: Surface fluorescent light requires upgrading within the maintenance schedule. 5.124: 2No. operating theatre lights require upgrading within the maintenance schedule. 5.C17: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 5.114: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 5.C14: 6No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£6,000

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£6,000

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 5.115: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 5.C10: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.17: Surface fluorescent light requires upgrading within the maintenance schedule. 5.157A: Surface fluorescent light requires upgrading within the maintenance schedule. 5.145: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.166: Surface fluorescent light requires upgrading within the maintenance schedule. 5.107: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 5.1: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.101: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 1.108: Surface fluorescent light requires upgrading within the maintenance schedule. 5.106: Surface fluorescent light requires upgrading within the maintenance schedule. 5.105: Surface fluorescent light requires upgrading within the maintenance schedule. 5.104: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 5.103: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 5.S04: Surface fluorescent light requires upgrading within the maintenance schedule. 5.164: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 5.S03: Surface fluorescent light requires upgrading within the maintenance schedule. 5.165: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 5.102A: Surface fluorescent light requires upgrading within the maintenance schedule. 5.S02: Surface fluorescent light requires upgrading within the maintenance schedule. 5.S01: Surface fluorescent light requires upgrading within the maintenance schedule. 5.169: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 5.156: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.173: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 5.158: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 5.037: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 5.C18: 13No. surface fluorescent lights require upgrading within the maintenance schedule. 5.099: Surface fluorescent light requires upgrading within the maintenance schedule. 5.123: Surface fluorescent light requires upgrading within the maintenance schedule. 5.012: 4No. CAT II lights require upgrading within the maintenance schedule. 5.111: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 5.001: 7No. CAT II lights require upgrading within the maintenance schedule. 5.C23: 10No. surface fluorescent lights require upgrading within the maintenance schedule. 5.037A: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 5.C34: 11No. surface fluorescent lights require upgrading within the maintenance schedule. 5.097: Surface fluorescent light requires upgrading within the maintenance schedule. 5.096: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£2,600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

3 2

6

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£2,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£2,200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 5.094: Surface fluorescent light requires upgrading within the maintenance schedule. 5.098: Surface fluorescent light requires upgrading within the maintenance schedule. 5.124: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 5.095: Surface fluorescent light requires upgrading within the maintenance schedule. 5.093: Surface fluorescent light requires upgrading within the maintenance schedule. 5.091: Surface fluorescent light requires upgrading within the maintenance schedule. 5/090: Surface fluorescent light requires upgrading within the maintenance schedule. 5.089: Surface fluorescent light requires upgrading within the maintenance schedule. 5.092: Surface fluorescent light requires upgrading within the maintenance schedule. 5.153: Surface fluorescent light requires upgrading within the maintenance schedule. 5.C08: 13No. surface fluorescent lights require upgrading within the maintenance schedule. 5.114: Operating theatre lights in acceptable order. 5.115: Operating theatre lights in acceptable order.

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£2,600

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

5.C07: Fire alarm call points in acceptable order. 5.C04: Fire alarm call points in acceptable order. 5.0C34: Smoke detectors in acceptable order. 5.S04: Smoke detectors in acceptable order. 5.S01: Smoke detectors in acceptable order. 5.S02: Smoke detectors in acceptable order. 5.S03: Smoke detectors in acceptable order.

V - Engineering - Fire Alarms 02 - Call Points

B

£0

8

0

0 0

0

2018

02 - Call Points

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

6

0

0 0

0

2016

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

02 - Pipework

C

£25,000

0

0

2 2

4

2010

02 - Pipework

C

£30,000

0

0

2 2

4

2010

02 - Pipework

B

£0

7

0

0 0

0

2017

04 - Insulation

C

£10,000

0

0

2 2

4

2010

04 - Insulation

B(C)

£35,000

4

0

2 2

4

2014

Location: 06 - Sixth Floor I - Engineering - Heating Systems Plant Room 1: Pipework and lagging requires replacement. Plant Room 4: Pipework and lagging requires replacement. Plant Room 5: Pipework in acceptable order. Plant Room 5: Plant Room pipework insulation requires replacement. Plant Room 1: External ductwork and lagging requires upgrading within the maintenance schedule.

K - Engineering - Vent & Air Con

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01 - Ductwork

B(C)

£50,000

4

0

4 3 12

2014

Plant Room 3/4: 2No. Plant Room ductwork is old and requires upgrading within the maintenance schedule.

01 - Ductwork

B(C)

£10,000

5

0

4 3 12

2015

01 - Ductwork

B(C)

£20,000

5

0

2 2

4

2015

03 - Grilles & Diffusers

B(C)

£90,000

2

0

2 2

4

2012

03 - Grilles & Diffusers

B(C)

£115,000

3

0

3 2

6

2013

Plant Room 5: Plant Room ductwork requires upgrading within the maintenance schedule. Plant Room 2: Plant Room ductwork requires upgrading within the maintenance schedule. Plant Room 1: Ward and General Area supply plenum requires upgrading within the maintenance schedule. Plant Room 3: Ward and general area supply requires upgrading within the maintenance schedule.

C

£100,000

0

0

3 3

9

2010

Plant Room 5: Sectional galvanised unlagged tanks require replacement.

01 - Lifts

B

£0

8

0

0 0

0

2018

01 - Lifts

B

£0

8

0

0 0

0

2018

Lift Plant Room 1A: Lift motor in acceptable order. Plant Room 3A: Lift motor in acceptable order.

M - Engineering - Hot/Cold Water 08 - Tanks & Bylaws

N - Engineering - Lifts

O - Engineering - Main Plant Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Plant Room 5: 2No. chiller pumps require upgrading within the maintenance schedule. Plant Room 5: Water Pulpress 2000 pressurisation unit requires upgrading within the maintenance schedule. Plant Room 3/4: Chilled water pressurisation unit in acceptable order.

02 - Pumps

B(C)

£20,000

4

0

3 3

9

2014

05 - Pressurisation Units

B(C)

£3,000

5

0

3 3

9

2015

05 - Pressurisation Units

B

£0

10

0

0 0

0

2020

01 - Cooling Plant

C

£500

0

0

3 3

9

2010

01 - Cooling Plant

C

£500

0

0

3 3

9

2010

01 - Cooling Plant

C

£2,000

0

0

3 3

9

2010

01 - Cooling Plant

C

£100

0

0

3 3

9

2010

01 - Cooling Plant

B(C)

£3,000

2

0

3 3

9

2012

01 - Cooling Plant

B(C)

£60,000

5

0

3 3

9

2015

01 - Cooling Plant

B(C)

£9,000

5

0

3 3

9

2015

01 - Cooling Plant

B

£0

10

0

0 0

0

2020

01 - Cooling Plant

B

£0

15

0

0 0

0

2025

01 - Cooling Plant

B

£0

20

0

0 0

0

2030

Remedial Action

P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

Plant Room 2/3: Mitsubishi ACC requires bonding correctly. Plant Room 2/3: Daikin ACC requires bonding correctly. Plant Room 2/3: 4No. Hitachi ACC require bonding correctly. Plant Room 2: 2No. Hitachi ACC not bonded, requires bonding. Plant Room 1: Old IMI ACC split requires upgrading within the maintenance schedule. Plant Room 5B: 2No. York chillers require upgrading within the maintenance schedule. Air cooling condenser requires upgrading within the maintenance schedule. Plant Room 2: Aire dale (frame not bonded) cooling plant in acceptable order. Plant Room 3/4: Chiller in acceptable order. Plant Room 1: Stulz Cyber cooling plant in acceptable order.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Plant Room 1: Control panel requires replacement. Plant Room 4: Control panel requires replacement. Plant Room 5B: Control panel requires replacement. Plant Room 5: Ottermill control panel including mains power requires replacement. Plant Room 3: Control panel requires replacement. Lift Plant Room 1A: Control panel requires replacement. Plant Room 2: Control panel requires replacement. Plant Room 3A: Control panel requires replacement. Plant Room 4: Control panel in acceptable order. Plant Room 5: Control panel in acceptable order. Plant Room 5D: Lift motor and mat control panel in acceptable order. Plant Room 1: Control panel in acceptable order. Plant Room 5A: Wall fan requires replacement. Plant Room 4: Toilet extract requires replacement. Plant Room 4: Pinckney lobby extract requires replacement. Plant Room 4: Ward and general area extracts require replacement. Plant Room 1: 2No. Nu-Aire units in the Dirty Utility require replacement.

03 - Controls

C

£75,000

0

0

4 3 12

2010

03 - Controls

C

£75,000

0

0

4 3 12

2010

03 - Controls

C

£70,000

0

0

4 3 12

2010

03 - Controls

C

£90,000

0

0

3 3

9

2010

03 - Controls

C

£90,000

0

0

4 3 12

2010

03 - Controls

C

£10,000

0

0

4 3 12

2010

03 - Controls

C

£60,000

0

0

4 3 12

2010

03 - Controls

C

£25,000

0

0

4 3 12

2010

03 - Controls

B

£0

6

0

0 0

0

2016

03 - Controls

B

£0

8

0

0 0

0

2018

03 - Controls

B

£0

8

0

0 0

0

2018

03 - Controls

B

£0

10

0

0 0

0

2020

04 - Extract Fans

C

£750

0

0

2 3

6

2010

04 - Extract Fans

C

£25,000

0

0

2 2

4

2010

04 - Extract Fans

C

£10,000

0

0

2 3

6

2010

04 - Extract Fans

C

£25,000

0

0

2 3

6

2010

04 - Extract Fans

C

£10,000

0

0

2 3

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Plant Room 1: Clean extract fan AME21 is corroded and requires upgrading within the maintenance schedule. Plant Room 3: Ward and general area extract requires upgrading within the maintenance schedule. Plant Room 3: Toilet upper floor extract requires upgrading within the maintenance schedule. Plant Room 3: Kitchen extract requires upgrading within the maintenance schedule. Plant Room 1: 3No. Scirrocco Centrifugal fans require upgrading within the maintenance schedule. Plant Room 5: Ward and general area extract requires upgrading within the maintenance schedule. Plant Room 1: Kitchen extract requires upgrading within the maintenance schedule. Plant Room 5: Extract AME 8 requires upgrading within the maintenance schedule. Plant Room 4: 4No. Centrifugal fans Scirrocco M series require upgrading within the maintenance schedule. Plant Room 2: 4No. fume extracts require upgrading within the maintenance schedule.

04 - Extract Fans

B(C)

£5,000

2

0

2 2

4

2012

04 - Extract Fans

B(C)

£60,000

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£20,000

3

0

2 2

4

2013

04 - Extract Fans

B(C)

£15,000

3

0

2 3

6

2013

04 - Extract Fans

B(C)

£15,000

4

0

2 3

6

2014

04 - Extract Fans

B(C)

£200,000

4

0

2 3

6

2014

04 - Extract Fans

B(C)

£3,000

5

0

2 3

6

2015

04 - Extract Fans

B(C)

£10,000

5

0

2 2

4

2015

04 - Extract Fans

B(C)

£32,000

5

0

2 3

6

2015

04 - Extract Fans

B(C)

£20,000

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Plant Room 2: General areas extract AME 2 requires upgrading within the maintenance schedule. Plant Room 2: Toilet extract EF1 & EF2 require upgrading within the maintenance schedule. Plant Room 2: Scirrocco large extract fans (EF1 & EF2) in Kitchen require upgrading within the maintenance schedule. Fume extract fans in acceptable order. Plant Room 5: Ward and General Area supply is old and requires replacement. Plant Room 3/4: 2No. air handling unit in Ward and General Area has corroded and require replacement. Plant Room 1: Air handling unit requires replacement. Plant Room 1: Air handling unit AMS 31 in the Ophthalmology department has corroded through on base and requires upgrading within the maintenance schedule. Plant Room 3/4: Pinckney air handling unit isolation supply in acceptable order. Plant Room 1: Supply vent 214 in acceptable order. Plant Room 3/4: Access panel to Plant Room has fell off which will allow for pigeon infestation. Plant Room 1: Upper door is open inviting pigeons.

04 - Extract Fans

B(C)

£15,000

5

0

2 3

6

2015

04 - Extract Fans

B(C)

£25,000

5

0

2 2

4

2015

04 - Extract Fans

B(C)

£40,000

5

0

2 3

6

2015

04 - Extract Fans

B

£0

10

0

0 0

0

2020

05 - AHUs

C

£350,000

0

0

2 3

6

2010

05 - AHUs

C

£20,000

0

0

4 3 12

2010

05 - AHUs

C

£10,000

0

0

4 3 12

2010

05 - AHUs

B(C)

£25,000

2

0

4 3 12

2012

05 - AHUs

B

£0

10

0

0 0

0

2020

05 - AHUs

B

£0

10

0

0 0

0

2020

09 - Comments

N/A

£0

0

0

0 0

0

2010

09 - Comments

N/A

£0

0

0

0 0

0

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 09 - Comments

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£20,000

4

0

3 3

9

2014

Plant Room 1: Vacuum plant requires upgrading within the maintenance schedule.

02 - Main Switchgear

C

£250

0

0

3 3

9

2010

02 - Main Switchgear

C

£1,250

0

0

2 2

4

2010

02 - Main Switchgear

B(C)

£25,000

4

0

3 3

9

2014

02 - Main Switchgear

B(C)

£25,000

4

0

3 3

9

2014

Plant Room 5D: Ottermill isolator requires replacement. Plant Room 5A: 5No. isolators require replacement. Plant Room 4: Old switchgear requires upgrading within the maintenance schedule. Plant Room 1: Old switchgear requires upgrading within the maintenance schedule.

02 - Main Switchgear

B(C)

£25,000

4

0

3 3

9

2014

02 - Main Switchgear

B(C)

£25,000

4

0

3 3

9

2014

02 - Main Switchgear

B(C)

£25,000

5

0

3 3

9

2015

02 - Main Switchgear

B

£0

30

0

0 0

0

2040

03 - Distribution Boards

C

£2,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£6,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£1,500

0

0

3 3

9

2010

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

Plant Room 2: Old switchgear requires upgrading within the maintenance schedule. Plant Room 3: Old switchgear requires upgrading within the maintenance schedule. Plant Room 5: Ottermill switchgear is tired and requires upgrading within the maintenance schedule. Plant Room 3/4: Hager switchgear in acceptable order. Plant Room 4: Distribution board requires replacement. Plant Room 2: 3No. distribution boards require replacement. Plant Room 1: Distribution board requires replacement.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Plant Room 5D: Mini circuit breaker requires upgrading within the maintenance schedule. Plant Room 5: Chilton distribution board with Bakerlite breakers requires upgrading within the maintenance schedule. Plant Room 3/4: Chilton distribution board with Bakerlite breakers requires upgrading within the maintenance schedule. Plant Room 1: Chilton distribution board with Bakerlite breakers requires upgrading within the maintenance schedule. Plant Room 2: Chilton distribution board with Bakerlite breakers requires upgrading within the maintenance schedule. Plant Room 3/4: Ottermill distribution board in acceptable order. Plant Room 3: Hager distribution boards in acceptable order. Plant Room 2: 6No. surface fluorescent lights require replacement. Plant Room 4: 6No. surface fluorescent lights require replacement.

03 - Distribution Boards

B(C)

£1,500

4

0

3 3

9

2014

03 - Distribution Boards

B(C)

£4,500

4

0

3 3

9

2014

03 - Distribution Boards

B(C)

£500

4

0

3 3

9

2014

03 - Distribution Boards

B(C)

£500

4

0

3 3

9

2014

03 - Distribution Boards

B(C)

£500

4

0

3 3

9

2014

03 - Distribution Boards

B

£0

10

0

0 0

0

2020

03 - Distribution Boards

B

£0

19

0

0 0

0

2029

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 08 - Comments

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£2,000

0

0

3 2

6

2010

Plant Room 1: D/C batteries require replacement.

01 - Sounders

C

£150

0

0

3 3

9

2010

Plant Room 2: Fire alarm sounder requires replacement.

01 - Sounders

C

£150

0

0

3 3

9

2010

01 - Sounders

C

£150

0

0

3 3

9

2010

01 - Sounders

C

£300

0

0

3 3

9

2010

02 - Call Points

C

£300

0

0

3 3

9

2010

02 - Call Points

C

£150

0

0

3 3

9

2010

02 - Call Points

C

£150

0

0

3 3

9

2010

02 - Call Points

B(C)

£150

3

0

3 3

9

2013

Plant Room 3: Fire alarm sounder requires replacement. Plant Room 4: Fire alarm sounder requires replacement. Plant Room 1: 2No. fire alarm sounders require replacement. Plant Room 1: 2No. fire alarm call points require replacement. Plant Room 2: Fire alarm call point requires replacement. Plant Room 4: Fire alarm call point requires replacement. Plant Room 3: Fire alarm call point requires upgrading within the maintenance schedule.

B(C)

£200

5

0

2 2

4

2015

V - Engineering - Fire Alarms

Location: Roof R - Engineering - Electrical 04 - Lighting Installation

Generic Hospital Physical Condition Survey

6.S01: Surface fluorescent light requires upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£200

5

0

2 2

4

2015

6.S02: Surface fluorescent light requires upgrading within the maintenance schedule.

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

6.S02: Smoke detectors in acceptable order. 6.S01: Smoke detectors in acceptable order.

B

£0

8

0

0 0

0

2018

Natural convectors in acceptable order.

B(C)

£600,000

3

0

3 3

9

2013

Generally throughout Lanesborough the ventilation was considered to be poor and considerable investment is required within the maintenance schedule. Approximately £600,000 should be budgeted for.

B(C)

£1,250,000

3

0

3 3

9

2013

Lifts already in place and in acceptable order, works are to be carried out to enable the lift to stop at the second floor; new swipe card technology will also be installed at the same time.

B(C)

£1,500,000

3

0

3 3

9

2013

Although some areas have newer fire alarm call points, sounders and detectors; a full refurbishment is recommended to all 5 floors within the maintenance schedule.

V - Engineering - Fire Alarms

Location: Whole Block I - Engineering - Heating Systems 01 - Heat Emitters K - Engineering - Vent & Air Con 07 - Comments

N - Engineering - Lifts 01 - Lifts

V - Engineering - Fire Alarms 06 - Comments

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. Block Total

Generic Hospital Physical Condition Survey

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£12,264,681.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Staff Change: Redecoration required within 5 year maintenance schedule. Staff Change: Suspended: Remove tiles and replace with new (Localised replacement) Located to M.001. Staff Change: Suspended. Staff Change: Vinyl: Need to replace vinyl sheet flooring Located to stairs. Staff Change: Vinyl: Need to replace vinyl sheet flooring Located to common circulation routes. Staff Change: Slip resistant vinyl sheet. Staff Change: Quarry tiles. Staff Change: Ceramic tiling: Remove and replace damaged tiling - Located to M.011. Staff Change: Timber panel: Replace a missing panel Located to M0.011. Staff Change: Ceramic tiling. Staff Change: Brickwork (plastered).

Site : Generic Hospital - STG Block : Maxillo Facial Dental Unit - MXF Facet: 1 - Building Location: 0.5 - Mezzanine C - Building - Internal Fabric 01 - Decorations

B(C)

£11,500

1

0

2 2

4

2011

02 - Ceiling

C

£300

0

0

2 2

4

2010

02 - Ceiling 03 - Floor

B C

£0 £2,000

15 0

0 0

0 0 2 3

0 6

2025 2010

03 - Floor

B(C)

£3,100

5

0

2 3

6

2015

03 - Floor

B

£0

7

0

0 0

0

2017

03 - Floor 05 - Condition of internal walls

B C

£0 £300

10 0

0 0

0 0 2 3

0 6

2020 2010

05 - Condition of internal walls

C

£250

0

0

2 3

6

2010

05 - Condition of internal walls 05 - Condition of internal walls

B B

£0 £0

10 20

0 0

0 0 0 0

0 0

2020 2030

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Staff Change: Sanitary fittings: Ceramic WC cistern problems throughout the floor, suggest further investigation, cost includes some replacement. Staff Change: Kitchen facilities: Replace kitchen units due to age and condition - Located to M009. Staff Change: Sanitary fittings: Ceramic wash hand basin. Staff Change: Sanitary fittings: Ceramic WC. Staff Change: Sanitary fittings: Ceramic sink.

08 - Fixed Units

C

£2,000

0

0

3 3

9

2010

08 - Fixed Units

C

£3,000

0

0

3 3

9

2010

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

01 - Decorations

B(C)

£4,650

1

0

2 2

4

2011

01 - Decorations

B(C)

£56,000

3

0

2 2

4

2013

02 - Ceiling 02 - Ceiling 03 - Floor

B B B(C)

£0 £0 £3,200

20 20 1

0 0 0

0 0 0 0 2 3

0 0 6

2030 2030 2011

03 - Floor

B(C)

£2,400

2

0

2 3

6

2012

Remedial Action

Location: 00 - Ground Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

Theatres: Redecoration required within 5 year maintenance schedule Located to circulation routes. Theatres: Redecoration required within 5 year maintenance schedule Located to hand unit, theatres and wards (cost includes decanting of the wards). Theatres: Suspended. Theatres: Plasterboard. Theatres: Vinyl: Need to replace vinyl sheet flooring - Located to theatre 2 and 4. Theatres: Carpet: Need to replace contract quality carpet Located to 0.015, 0.008, 0.C08 and 0.057.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Theatres: Vinyl: Need to replace vinyl sheet flooring - Located to theatre 5 and circulation routes. Theatres: Vinyl: Need to replace vinyl sheet flooring - Located to theatre 1. Theatres: Slip resistant vinyl sheet. Theatres: Vinyl sheet. Theatres: Brickwork (plastered): Make good impact damaged plasterwork - Located to 0.050C. Theatres: Ceramic tiling: Remove and replace damaged tiling 1No. - Located to 0.022. Theatres: Ceramic tiling. Theatres: Brickwork (plastered). Theatres: Kitchen facilities: Replace with new. Theatres: Clinical units: Replace clinical units to each theatre. Theatres: Sanitary fittings: Ceramic wash hand basin. Theatres: Sanitary fittings: Ceramic WC. Theatres: Sanitary fittings: Ceramic sink. Theatres: Sanitary fittings: Metal sluice.

03 - Floor

B(C)

£4,000

3

0

2 3

6

2013

03 - Floor

B(C)

£1,600

5

0

2 3

6

2015

03 - Floor

B

£0

7

0

0 0

0

2017

03 - Floor 05 - Condition of internal walls

B C

£0 £300

7 0

0 0

0 0 2 3

0 6

2017 2010

05 - Condition of internal walls

C

£250

0

0

2 3

6

2010

05 - Condition of internal walls 05 - Condition of internal walls 08 - Fixed Units

B B B(C)

£0 £0 £2,000

10 20 1

0 0 0

0 0 0 0 3 3

0 0 9

2020 2030 2011

08 - Fixed Units

B(C)

£2,000

5

0

3 3

9

2015

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

20

0

0 0

0

2030

B(C)

£10,100

1

0

2 2

4

2011

Remedial Action

Location: 01 - First Floor C - Building - Internal Fabric 01 - Decorations

Generic Hospital Physical Condition Survey

Theatres: Redecoration required within 5 year maintenance schedule Located to waiting areas. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Theatres: Redecoration required within 5 year maintenance schedule. Theatres: Suspended: Remove tiles and replace with new (Localised replacement) Located to 1.071. Theatres: Suspended. Theatres: Carpet: Need to replace contract quality carpet Located to 25% of floor area. Theatres: Vinyl: Need to replace vinyl sheet flooring - Located to 60% of the floor area. Theatres: Vinyl sheet. Theatres: Quarry tiles. Theatres: Brickwork (plastered): Make good impact damaged plasterwork - Located to 1.047. Theatres: Ceramic tiling. Theatres: Brickwork (plastered). Theatres: Kitchen facilities: Replace kitchen units due to age and condition - Located to 1.020. Theatres: Clinical units: Replace damaged and worn units to treatment areas 19No. Theatres: Sanitary fittings: Ceramic urinal. Theatres: Sanitary fittings: Ceramic sink. Theatres: Sanitary fittings: Ceramic WC. Theatres: Sanitary fittings: Ceramic wash hand basin.

01 - Decorations

B(C)

£30,250

3

0

2 2

4

2013

02 - Ceiling

C

£250

0

0

2 2

4

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £15,600

15 1

0 0

0 0 2 3

0 6

2025 2011

03 - Floor

B(C)

£44,000

5

0

2 3

6

2015

03 - Floor 03 - Floor 05 - Condition of internal walls

B B C

£0 £0 £300

7 15 0

0 0 0

0 0 0 0 2 3

0 0 6

2017 2025 2010

05 - Condition of internal walls 05 - Condition of internal walls 08 - Fixed Units

B B C

£0 £0 £3,000

10 20 0

0 0 0

0 0 0 0 3 3

0 0 9

2020 2030 2010

08 - Fixed Units

C

£88,000

0

0

3 3

9

2010

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

Remedial Action

Location: 02 - Second Floor Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Labs/Stores: Redecoration required within 5 year maintenance schedule. Labs/Stores: Suspended. Labs/Stores: Carpet: Need to replace contract quality carpet Located to 2.011, 2.009, 2.013 and 2.012. Labs/Stores: Carpet: Need to replace contract quality carpet Located to 2.010. Labs/Stores: Vinyl: Need to replace vinyl sheet flooring Located to common circulation routes. Labs/Stores: Vinyl: Need to replace slip resistant vinyl flooring - Located to 2.007. Labs/Stores: Slip resistant vinyl sheet. Labs/Stores: Concrete (solid floor). Labs/Stores: Brickwork (plastered): Make good water and impact damaged plasterwork - Located to 2.006. Labs/Stores: Ceramic tiling. Labs/Stores: Fairfaced blockwork. Labs/Stores: Brickwork (plastered). Labs/Stores: Sanitary fittings: Ceramic sink. Labs/Stores: Sanitary fittings: Ceramic wash hand basin. Labs/Stores: Sanitary fittings: Ceramic WC.

C - Building - Internal Fabric 01 - Decorations

B(C)

£10,000

2

0

2 2

4

2012

02 - Ceiling 03 - Floor

B C

£0 £2,900

10 0

0 0

0 0 2 3

0 6

2020 2010

03 - Floor

B(C)

£600

3

0

2 3

6

2013

03 - Floor

B(C)

£3,100

5

0

2 3

6

2015

03 - Floor

B(C)

£350

5

0

2 3

6

2015

03 - Floor

B

£0

7

0

0 0

0

2017

03 - Floor

B

£0

20

0

0 0

0

2030

05 - Condition of internal walls

C

£500

0

0

2 3

6

2010

05 - Condition of internal walls 05 - Condition of internal walls

B B

£0 £0

10 20

0 0

0 0 0 0

0 0

2020 2030

05 - Condition of internal walls

B

£0

20

0

0 0

0

2030

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: Plant Room B - Building - External Fabric 01a - Masonry - Cracking

C

£400

0

0

4 3 12

2010

Brickwork: Need to make good crack above door to Plant Room.

06 - Doors

C

£1,000

0

0

3 3

9

2010

Softwood timber: Need to replace 1No. - Located to access to roof from the Plant Room.

02a - Flat - Covering

C

£78,750

0

0

4 4 16

2010

Mineral felt: Need to replace with new due to blistering and deterioration of the felt, suggest replacement is tied with plant replacement due to potential issues of fitting roof covering.

02b - Flat - Decking 02c - Flat - Flashing

B C

£0 £0

10 0

0 0

0 0 0 4 4 16

2020 2010

02g - Flat - Guttering

C

£0

0

0

4 4 16

2010

02h - Flat - Down Rainwater pipes

B

£0

10

0

0 0

2020

Reinforced concrete. Mineral felt: Need to replace (cost included in covering). Integrated (cost included in covering). Internal (assumed condition, due to no access).

Location: Roof 01 D - Building - Roof

0

Location: Roof 02 Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Asphalt: Asphalt roof covering requires renewal inclusive of making good the decking areas blistering, cracking and splitting. Reinforced concrete. Integrated (cost included in covering). Internal (assumed condition, due to no access).

D - Building - Roof 02a - Flat - Covering

C

£15,650

0

0

4 4 16

2010

02b - Flat - Decking 02g - Flat - Guttering

B C

£0 £0

10 0

0 0

0 0 0 4 4 16

2020 2010

02h - Flat - Down Rainwater pipes

B

£0

10

0

0 0

0

2020

B B B B B

£0 £0 £0 £0 £0

15 15 15 15 10

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2025 2025 2025 2025 2020

Single ply membrane. Reinforced concrete. Single ply membrane. Integrated. Internal (assumed condition, due to no access).

02a - Flat - Covering

B

£0

15

0

0 0

0

2025

02b - Flat - Decking 02c - Flat - Flashing 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B

£0 £0 £0 £0

15 15 15 10

0 0 0 0

0 0 0 0

0 0 0 0

2025 2025 2025 2020

Mineral felt: Covered with pebbles. Reinforced concrete. Mineral felt. Integrated. Internal (assumed condition, due to no access).

Location: Roof 03 D - Building - Roof 02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

Location: Roof 04 D - Building - Roof

0 0 0 0

Location: Roof 05 D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Asphalt: Asphalt roof covering requires renewal inclusive of making good the decking (no access, assumed condition). Reinforced concrete. Concrete: Make good section of concrete soffit to all elevations.

02a - Flat - Covering

B(C)

£8,300

5

0

4 4 16

2015

02b - Flat - Decking 02e - Flat - Verges/Fascias/ Soffits

B C

£0 £2,000

10 0

0 0

0 0 0 4 4 16

2020 2010

02g - Flat - Guttering

B(C)

£0

5

0

4 4 16

2015

B

£0

10

0

0 0

0

2020

01 - General Structure

B

£0

50

0

0 0

0

2060

Brickwork: Generally sound.

02 - Foundations 03 - Ground Stability 04 - Chimneys 05 - External Fire Escape

B B B B(C)

£0 £0 £0 £250

50 50 10 5

0 0 0 0

0 0 0 4

0 0 0 0 0 0 4 16

2060 2060 2020 2015

Generally sound. Generally sound. Steel flue. Metal: Redecorate complete.

B B B B

£0 £0 £0 £0

50 50 20 50

0 0 0 0

0 0 0 0

0 0 0 0

2060 2060 2030 2060

Brickwork. Brickwork. Render. Brickwork.

02h - Flat - Down Rainwater pipes

Integrated (cost included in covering). Internal (Assumed condition, due to no access).

Location: Whole Block A - Building - Physical Structure

B - Building - External Fabric 01b - Masonry - Spalling 01c - Masonry - Pointing 01d - Masonry - Finish 01d - Masonry - Finish Generic Hospital Physical Condition Survey

0 0 0 0

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

PVCU panelling. PVCU panelling. PVCU panelling. PVCU panelling. DPC. Aluminium - Double. Steel: Redecorate and make good 1No to access to rear roof. Aluminium.

02a - Cladding - Attachment 02b - Cladding - Cracking 02c - Cladding - Joints 02d - Cladding - Finish 03 - DPC 04 - Windows 06 - Doors

B B B B B B C

£0 £0 £0 £0 £0 £0 £175

20 20 20 20 10 15 0

0 0 0 0 0 0 0

0 0 0 0 0 0 3

0 0 0 0 0 0 3

0 0 0 0 0 0 9

2030 2030 2030 2030 2020 2025 2010

06 - Doors

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

B

£0

7

0

0 0

0

2017

Smoke detectors in acceptable order.

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

15

0

0 0

0

2025

Reception Area: Fan convectors in acceptable order. Reception Area: Heat emitters with low surface temperature covers in acceptable order. Radiant panels in acceptable order.

Facet: 2 - Engineering Location: 0.5 - Mezzanine R - Engineering - Electrical CAT II lights in acceptable order. Surface fluorescent lights in acceptable order. Emergency lights in acceptable order.

V - Engineering - Fire Alarms 03 - Smoke Detectors

Location: 00 - Ground Floor I - Engineering - Heating Systems

K - Engineering - Vent & Air Con

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Reception Area: Diffusers in acceptable order. Reception Area: Air conditioning cassette unit in acceptable order. Reception Area: Air conditioning split system units in acceptable order.

03 - Grilles & Diffusers

B

£0

10

0

0 0

0

2020

05 - Cooling Units

B

£0

10

0

0 0

0

2020

05 - Cooling Units

B

£0

10

0

0 0

0

2020

B

£0

8

0

0 0

0

2018

Hand Unit: Medical gases in acceptable order.

04 - Extract Fans

B

£0

10

0

0 0

0

2020

09 - Comments

B

£0

7

0

0 0

0

2017

09 - Comments

B

£0

10

0

0 0

0

2020

Disabled Toilet: Extract fan to disabled toilet in acceptable order. 0.M05: 2No. compressors are noisy but in acceptable order. 0.M04: Air/oil receiver in acceptable order.

03 - Distribution Boards

C

£100

0

0

3 3

9

2010

03 - Distribution Boards

B

£0

12

0

0 0

0

2022

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

L - Engineering - Medical Gases 05 - Comments P - Engineering - Main Plant

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

0.M02: Distribution board has finger spaces. 0.M02: Merlin distribution board in acceptable order. 0.036: Surface fluorescent light requires upgrading within the maintenance schedule. 0.077: Tungsten light requires upgrading within the maintenance schedule. 0.075: 2No. tungsten lights require upgrading within the maintenance schedule. 0.074: 3No. tungsten lights require upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.073: 2No. tungsten lights require upgrading within the maintenance schedule. Rear of Reception: 7No. surface fluorescent downlights require upgrading within the maintenance schedule. Reception Area: 5No. wall lights require upgrading within the maintenance schedule. Reception Area: 64No. surface fluorescent downlights require upgrading within the maintenance schedule. Reception Area: 5No. CAT II lights require upgrading within the maintenance schedule. Reception Area: 47No. recessed fluorescent lights require upgrading within the maintenance schedule. Reception Area: 4No. high bay lights require upgrading within the maintenance schedule. 0.023: Surface fluorescent lights in acceptable order. 0.024: Surface fluorescent lights in acceptable order. Theatres - Reception: Surface fluorescent downlights in acceptable order. 0.024: Light pod in acceptable order. 0.023: Light pod in acceptable order. Hand Unit : Surface fluorescent downlights in acceptable order.

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£12,800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£9,400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£1,600

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 05 - Emergency Lighting

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£1,400

5

0

4 2

8

2015

Reception Area: 7No. emergency lights require upgrading within the maintenance schedule.

01 - Sounders

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

05 - Fire Main/Zone Panel

B

£0

10

0

0 0

0

2020

Theatres: Fire alarm sounders in acceptable order. Theatres - Reception: Smoke detectors in acceptable order. Theatres - Reception: Smoke detectors in acceptable order. Reception Area: Conquest fire alarm main panel in acceptable order.

B

£0

12

0

0 0

0

2022

X-Ray: Grilles/diffusers in acceptable order.

N/A

£0

0

0

0 0

0

2010

Fire hoses fitted although probably dry riser.

03 - Distribution Boards

B

£0

15

0

0 0

0

2025

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

1.058: Merlin Gerin distribution board in acceptable order. 1.038: 2No. surface fluorescent lights require upgrading within the maintenance schedule. X-Ray: Surface fluorescent downlights in acceptable order. CAT II lights in acceptable order. X-Ray: Surface fluorescent lights in acceptable order. Surface fluorescent lights in acceptable order.

V - Engineering - Fire Alarms

Location: 01 - First Floor K - Engineering - Vent & Air Con 03 - Grilles & Diffusers M - Engineering - Hot/Cold Water 06 - Hose Reels R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 05 - Emergency Lighting

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

9

0

0 0

0

2019

Emergency lights in acceptable order.

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

Smoke detectors in acceptable order. X-Ray: Smoke detectors in acceptable order.

B

£0

8

0

0 0

0

2018

Roof Plant: Pipework and lagging in acceptable order.

01 - Ductwork

C

£1,000

0

0

2 2

4

2010

01 - Ductwork

B

£0

10

0

0 0

0

2020

04 - Insulation

C

£15,000

0

0

2 2

4

2010

Roof Plant: Conference room lagging requires replacement. Roof Plant: Ductwork in acceptable order. Roof Plant: Lagging requires replacement.

B

£0

10

0

0 0

0

2020

Roof Plant: 3No. Water tanks in acceptable order.

01 - Cooling Plant

B

£0

6

0

0 0

0

2016

01 - Cooling Plant

B

£0

8

0

0 0

0

2018

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

9

0

0 0

0

2019

05 - AHUs

C

£6,000

0

0

3 3

9

2010

Roof Plant: 4No. VRV Daikin 15.4kg chiller units in acceptable order. Roof Plant: 2No. Chillers in acceptable order. Roof Plant: Conference room extract in acceptable order. Roof Plant: Extract fan in acceptable order. Roof Plant: Condenser requires replacement.

V - Engineering - Fire Alarms

Location: 02 - Second Floor I - Engineering - Heating Systems 02 - Pipework K - Engineering - Vent & Air Con

M - Engineering - Hot/Cold Water 08 - Tanks & Bylaws P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Roof Plant: Lagging requires placement. Roof Plant: Condenser in acceptable order. Roof Plant: AHU 1 extract in acceptable order. Roof Plant: AHU 1 supply in acceptable order. Roof Plant: Extract A in acceptable order. Roof Plant: AHU 8 supply and extract in acceptable order. Roof Plant: Extract B in acceptable order. Roof Plant: Theatre 1 & 2 extract AHU 7 in acceptable order. Roof Plant: Theatre 1 & 2 extract AHU 7 in acceptable order. Roof Plant: Theatre 5 extract AHU 6 in acceptable order. Roof Plant: Theatre 5 supply AHU 7 in acceptable order. Roof Plant: Theatre 3 & 4 supply and extract AHU 5 in acceptable order. Roof Plant: TSSU supply AHU 4 in acceptable order. Roof Plant: TSSU extract in acceptable order.

05 - AHUs

C

£2,500

0

0

2 2

4

2010

05 - AHUs

B

£0

6

0

0 0

0

2016

05 - AHUs

B

£0

7

0

0 0

0

2017

05 - AHUs

B

£0

7

0

0 0

0

2017

05 - AHUs

B

£0

8

0

0 0

0

2018

05 - AHUs

B

£0

8

0

0 0

0

2018

05 - AHUs

B

£0

9

0

0 0

0

2019

05 - AHUs

B

£0

10

0

0 0

0

2020

05 - AHUs

B

£0

10

0

0 0

0

2020

05 - AHUs

B

£0

10

0

0 0

0

2020

05 - AHUs

B

£0

10

0

0 0

0

2020

05 - AHUs

B

£0

10

0

0 0

0

2020

05 - AHUs

B

£0

12

0

0 0

0

2022

05 - AHUs

B

£0

12

0

0 0

0

2022

C

£600

0

0

3 2

6

2010

Remedial Action

R - Engineering - Electrical 04 - Lighting Installation

Generic Hospital Physical Condition Survey

004: 3No. fluorescent lights over visual display equipment are not suitable and require upgrading.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

2.011B: 5No. surface fluorescent lights require upgrading within the maintenance schedule. Roof Plant: Emergency lights requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£1,000

2

0

2 2

4

2012

05 - Emergency Lighting

B(C)

£200

3

0

4 2

8

2013

01 - Sounders

B(C)

£150

4

0

3 3

9

2014

02 - Call Points

B(C)

£150

3

0

3 3

9

2013

02 - Pipework

C

£400

0

0

3 2

6

2010

04 - Insulation

C

£1,000

0

0

2 2

4

2010

C

£6,000

0

0

3 3

9

2010

Plant: External IMI split system has no covers.

B

£0

20

0

0 0

0

2030

Plant: 3No. water tanks in acceptable order.

04 - Extract Fans

B

£0

6

0

0 0

0

2016

04 - Extract Fans

B

£0

10

0

0 0

0

2020

05 - AHUs

B

£0

10

0

0 0

0

2020

Plant: External Conference Room extract in acceptable order. Plant: TSSU extract in acceptable order. Plant: External supply AHU in acceptable order.

V - Engineering - Fire Alarms Roof Plant: Fire alarm sounder requires upgrading within the maintenance schedule. Roof Plant: Fire alarm call point requires upgrading within the maintenance schedule.

Location: 03 - Third Floor I - Engineering - Heating Systems Plant: Unsupported/damaged pipework to roof of Maxillo Facial requires making good. Plant: External lagging requires replacement.

K - Engineering - Vent & Air Con 05 - Cooling Units M - Engineering - Hot/Cold Water 08 - Tanks & Bylaws P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

4

2012

Corridor: 5No. surface fluorescent lights require upgrading within the maintenance schedule.

R - Engineering - Electrical 04 - Lighting Installation

Block Total

Generic Hospital Physical Condition Survey

B(C)

£1,000

2

0

2 2

£480,225.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Training: Redecoration required within 5 year maintenance schedule. Training: Suspended: Localised replacement 0.006/0.007/0.C01. Training: Carpet: Need to replace contract quality carpet Located to 0.009, 0.003, 0.002 and 0.001. Training: Vinyl: Slip resistant vinyl sheet. Training: Vinyl sheet. Training: Plasterboard stud. Training: Kitchen facilities: Replace kitchen units due to age and condition - Located to 0.007. Training: Sanitary fittings: Ceramic sink. Training: Sanitary fittings: Ceramic WC.

Site : Generic Hospital - STG Block : Portacabin 1 - P01 Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

B(C)

£11,400

1

0

2 2

4

2011

02 - Ceiling

B

£0

10

0

0 0

0

2020

03 - Floor

B(C)

£11,100

1

0

2 3

6

2011

03 - Floor

B

£0

7

0

0 0

0

2017

B B B(C)

£0 £0 £4,000

7 10 5

0 0 0

0 0 0 0 3 3

0 0 9

2017 2020 2015

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

B

£0

10

0

0 0

0

2020

03 - Floor 05 - Condition of internal walls 08 - Fixed Units

Location: External F - Building - External Works 05 - Miscellaneous

Training: Ramp: Brick and concrete in good condition.

Location: Rear Elevation Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B - Building - External Fabric 02d - Cladding - Finish

C

£250

0

0

4 3 12

2010

Training: Vinyl coated metal sheet: Remove vegetation Located to rear elevation.

02a - Flat - Covering 02b - Flat - Decking 02g - Flat - Guttering

B B C

£0 £0 £300

10 10 0

0 0 0

0 0 0 0 0 0 4 4 16

2020 2020 2010

02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B C

£0 £0

6 0

0 0

0 0 0 4 4 16

2016 2010

02h - Flat - Down Rainwater pipes

B

£0

6

0

0 0

0

2016

Training: Mineral felt. Training: Plywood. Training: PVCU: Clear gutters, outlets etc (<2 storey). Training: PVCU. Training: PVCU: Clear downwater pipes, outlets etc (<2 storey). Cost included in guttering. Training: PVCU.

01 - General Structure

B

£0

10

0

0 0

0

2020

Training: Portacabin: Generally sound.

02 - Foundations

B

£0

10

0

0 0

0

2020

Training: Generally sound.

B

£0

10

0

0 0

0

2020

Training: Vinyl coated metal sheet.

Location: Roof 01 D - Building - Roof

Location: Whole Block A - Building - Physical Structure

B - Building - External Fabric 02d - Cladding - Finish Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 04 - Windows 06 - Doors

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

Training: Aluminium - Double. Training: Aluminium.

B

£0

12

0

0 0

0

2022

0.C02: Steel panel radiators in acceptable order.

05 - Cooling Units

B(C)

£4,000

5

0

4 3 12

2015

05 - Cooling Units

B(C)

£4,000

5

0

4 3 12

2015

05 - Cooling Units

B(C)

£4,000

5

0

4 3 12

2015

07 - Comments

C

£150

0

0

3 3

9

2010

0.004: Fujitsu air conditioning unit will require upgrading within the maintenance schedule. 0.003: Fujitsu air conditioning unit will require upgrading within the maintenance schedule. 0.001: Fujitsu air conditioning unit will require upgrading within the maintenance schedule. Remove plant growth to air conditioning units.

B(C)

£300

2

0

2 3

6

2012

Facet: 2 - Engineering Location: 00 - Ground Floor I - Engineering - Heating Systems 01 - Heat Emitters K - Engineering - Vent & Air Con

M - Engineering - Hot/Cold Water 01 - Local Water Heaters

0.012: Santon water heater will require upgrading within the maintenance schedule.

O - Engineering - Main Plant

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heating Boilers

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£3,000

5

0

3 3

9

2015

0.007: Vaillant combi boiler will require upgrading within the maintenance schedule.

04 - Extract Fans

B(C)

£150

3

0

2 3

6

2013

0.013: Extract fan requires upgrading within the maintenance schedule.

04 - Extract Fans

B

£0

6

0

0 0

0

2016

0.014: Extract fan in acceptable order.

03 - Distribution Boards

B

£0

12

0

0 0

0

2022

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

0.007: 2No. Merlin Gerin distribution board in acceptable order. 0.013: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£600

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

P - Engineering - Main Plant

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

0.014: Surface fluorescent light requires upgrading within the maintenance schedule. 0.C02: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 0.004: 2No. CAT II lights in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 05 - Emergency Lighting

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£200

5

0

3 3

9

2015

0.C02: Emergency lights requires upgrading within the maintenance schedule.

B

£0

7

0

0 0

0

2017

0.C02: Fire alarm main panel in acceptable order.

V - Engineering - Fire Alarms 05 - Fire Main/Zone Panel Block Total

Generic Hospital Physical Condition Survey

£43,850.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Transformation Team: Redecoration required within 5 year maintenance schedule. Transformation Team: Timber. Transformation Team: Carpet: Need to replace contract quality carpet - Located to portacabin 3, 30%. Transformation Team: Carpet: Need to replace contract quality carpet - Located to portacabin 3, 50%. Transformation Team: Carpet: Need to replace contract quality carpet 0.008, 0.006, 0.007. Transformation Team: Vinyl: Need to replace vinyl sheet flooring - Located to 0.011. Transformation Team: Carpet: Need to replace contract quality carpet - Located to 0.002, 0.003, 0.004, 0.005, 0.009 and 0.010. Transformation Team: Vinyl: Need to replace vinyl sheet flooring - Located to portacabin 3, 0.C01. Transformation Team: Vinyl: Need to replace vinyl sheet flooring - Located to 0.013.

Site : Generic Hospital - STG Block : Portacabin 2 - P02 Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

B(C)

£6,820

1

0

2 2

4

2011

02 - Ceiling 03 - Floor

B C

£0 £1,100

10 0

0 0

0 0 2 3

0 6

2020 2010

03 - Floor

B(C)

£1,850

1

0

2 3

6

2011

03 - Floor

B(C)

£1,300

1

0

2 3

6

2011

03 - Floor

B(C)

£525

2

0

2 3

6

2012

03 - Floor

B(C)

£7,400

3

0

2 3

6

2013

03 - Floor

B(C)

£850

5

0

2 3

6

2015

03 - Floor

B(C)

£300

5

0

2 3

6

2015

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Transformation Team: Plasterboard stud. Transformation Team: Timber panel. Transformation Team: Kitchen facilities: Replace kitchen units due to age and condition. Transformation Team: Sanitary fittings: Replace ceramic WC due to age and condition 3No. Transformation Team: Sanitary fittings: Replace Sink unit due to age and condition- Located to portacabin 3, 0.002. Transformation Team: Sanitary fittings: Replace ceramic WHB due to age and condition 4No. Transformation Team: Sanitary fittings: Replace ceramic urinal due to age and condition 2No.

05 - Condition of internal walls

B

£0

7

0

0 0

0

2017

05 - Condition of internal walls

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B(C)

£2,000

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£2,400

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£500

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£2,800

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£1,200

5

0

3 3

9

2015

02a - Flat - Covering

B

£0

7

0

0 0

0

2017

02g - Flat - Guttering

B(C)

£600

5

0

4 4 16

2015

02h - Flat - Down Rainwater pipes

B(C)

£200

5

0

4 4 16

2015

Remedial Action

Location: Roof 01 D - Building - Roof Transformation Team: Mineral felt inacceptable condition. Transformation Team: PVCU: Replace complete. Transformation Team: PVCU: Replace complete.

Location: Whole Block A - Building - Physical Structure

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01 - General Structure

B

£0

7

0

0 0

0

2017

Transformation Team: Portacabin: Generally sound.

02 - Foundations

B

£0

7

0

0 0

0

2017

Transformation Team: Generally sound.

02d - Cladding - Finish

B

£0

7

0

0 0

0

2017

04 - Windows

C

£250

0

0

4 3 12

2010

04 - Windows

B

£0

7

0

0 0

0

2017

06 - Doors

C

£175

0

0

3 3

9

2010

Transformation Team: Vinyl coated metal sheet. Transformation Team: Softwood timber - Double: Redecorate and make good 2No. windows. Transformation Team: Aluminium - Double. Transformation Team: Softwood timber: Redecorate and make good 1No.

01 - Heat Emitters

C

£30

0

0

2 2

4

2010

01 - Heat Emitters

C

£30

0

0

2 2

4

2010

01 - Heat Emitters

B(C)

£200

2

0

2 2

4

2012

B - Building - External Fabric

Facet: 2 - Engineering Location: 00 - Ground Floor I - Engineering - Heating Systems

Generic Hospital Physical Condition Survey

0.012: Remove consort electric fan heater. 0.013: Remove consort electric fan heater.

C.01: Consort heater will require upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

0.004: Hager distribution board in acceptable order. 0.013: Surface fluorescent light requires upgrading within the maintenance schedule. 0.012: Surface fluorescent light requires upgrading within the maintenance schedule. 0.008: 2No. CAT II lights require upgrading within the maintenance schedule. 0.001: CAT II light requires upgrading within the maintenance schedule. 0.007: CAT II light requires upgrading within the maintenance schedule. 0.006: CAT II light requires upgrading within the maintenance schedule. 0.005: 17No. CAT II lights will require upgrading within the maintenance schedule. C.02: CAT II light requires upgrading within the maintenance schedule. 0.003: CAT II light requires upgrading within the maintenance schedule. 0.004: CAT II light requires upgrading within the maintenance schedule. 0.011: CAT II light requires upgrading within the maintenance schedule.

R - Engineering - Electrical 03 - Distribution Boards

B

£0

12

0

0 0

0

2022

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£3,400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

0.010: CAT II light requires upgrading within the maintenance schedule. 0.002: CAT II light requires upgrading within the maintenance schedule. 0.009: 2No. CAT II lights require upgrading within the maintenance schedule. C.01: 3No. CAT II lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£600

5

0

2 2

4

2015

05 - Emergency Lighting

B(C)

£400

3

0

4 2

8

2013

C.01: 2No. emergency lights require upgrading within the maintenance schedule.

05 - Emergency Lighting

B(C)

£200

5

0

4 2

8

2015

0.011: Emergency lights requires upgrading within the maintenance schedule.

03 - Smoke Detectors

B(C)

£150

3

0

3 3

9

2013

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

0.011: Smoke detector requires upgrading within the maintenance schedule. 0.008: Smoke detector requires upgrading within the maintenance schedule. 0.007: Smoke detector requires upgrading within the maintenance schedule.

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.010: Smoke detector requires upgrading within the maintenance schedule. 0.006: Smoke detector requires upgrading within the maintenance schedule. 0.001: Smoke detector requires upgrading within the maintenance schedule. 0.009: Smoke detector requires upgrading within the maintenance schedule.

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

Block Total

Generic Hospital Physical Condition Survey

Remedial Action

£39,180.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Generic Hospital - STG Block : Portacabin 3 - P03 Facet: 1 - Building Location: Whole Block A - Building - Physical Structure N/A

£0

0

0

0 0

0

2010

Included with P02.

B

£0

8

0

0 0

0

2018

0.001: Daikin air conditioning unit in acceptable order.

03 - Distribution Boards

B

£0

15

0

0 0

0

2025

04 - Lighting Installation

B(C)

£1,200

2

0

2 2

4

2012

0.005: Merlin distribution board in acceptable order. 0.001: 6No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

06 - Comments

Facet: 2 - Engineering Location: 00 - Ground Floor K - Engineering - Vent & Air Con 05 - Cooling Units R - Engineering - Electrical

Generic Hospital Physical Condition Survey

0.C01: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.003: 3No. CAT II lights require upgrading within the maintenance schedule. 0.004: 2No. CAT II lights require upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.002: CAT II light requires upgrading within the maintenance schedule. 0.C01: Emergency lights in acceptable order.

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

05 - Emergency Lighting

B

£0

6

0

0 0

0

2016

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B(C)

£150

3

0

3 3

9

2013

03 - Smoke Detectors

B(C)

£150

3

0

3 3

9

2013

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

B

£0

7

0

0 0

0

2017

Remedial Action

V - Engineering - Fire Alarms 02 - Call Points

05 - Fire Main/Zone Panel Block Total

Generic Hospital Physical Condition Survey

0.C01: Fire alarm call points in acceptable order. 0.003: Smoke detector requires upgrading within the maintenance schedule. 0.004: Smoke detector requires upgrading within the maintenance schedule.

0.C01: Smoke detector requires upgrading within the maintenance schedule. 0.C01: Fire alarm main panel in acceptable order.

£3,250.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Generic Hospital - STG Block : Portacabin 4 - P04 Facet: 1 - Building Location: Whole Block A - Building - Physical Structure C

£60,000

0

0

4 4 16

2010

Portacabin: The building is in poor condition and is considered beyond the end of its economic life, roof and guttering have been replaced to extend life. Cost allows for a replacement to be built in the same location.

B(C)

£350

3

0

3 3

9

2013

0.006: Extract fan requires upgrading within the maintenance schedule.

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

0.006: Surface fluorescent light requires replacement. 0.004: 4No. CAT II lights require upgrading within the maintenance schedule.

01 - General Structure

Facet: 2 - Engineering Location: 00 - Ground Floor P - Engineering - Main Plant 04 - Extract Fans

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

0.C01: 4No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

05 - Emergency Lighting

B(C)

£200

4

0

4 2

8

2014

0.006: 2No. CAT II lights require upgrading within the maintenance schedule. 0.007: Surface fluorescent light requires upgrading within the maintenance schedule. 0.002: Surface fluorescent light requires upgrading within the maintenance schedule. 0.010: 2No. CAT II lights require upgrading within the maintenance schedule. 0.009: 2No. CAT II lights require upgrading within the maintenance schedule. 0.004: Emergency lights requires upgrading within the maintenance schedule.

Block Total

Generic Hospital Physical Condition Survey

£63,950.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Generic Hospital - STG Block : Portacabin 5 - P05 Facet: 1 - Building Location: Whole Block A - Building - Physical Structure N/A

£0

0

0

0 0

0

2010

Included with P04.

B(C)

£5,000

4

0

3 3

9

2014

Fujitsu air conditioning unit will require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£800

2

0

2 2

4

2012

4No. surface fluorescent lights require upgrading within the maintenance schedule.

05 - Emergency Lighting

B(C)

£200

3

0

4 2

8

2013

Emergency lights requires upgrading within the maintenance schedule.

C

£150

0

0

3 2

6

2010

Fire alarm wiring requires tidying.

06 - Comments

Facet: 2 - Engineering Location: 00 - Ground Floor K - Engineering - Vent & Air Con 05 - Cooling Units

R - Engineering - Electrical

V - Engineering - Fire Alarms 06 - Comments

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. Block Total

Generic Hospital Physical Condition Survey

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£6,150.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Generic Hospital - STG Block : Portacabin 6 - P06 Facet: 1 - Building Location: Whole Block A - Building - Physical Structure C

£80,000

0

0

4 4 16

2010

Unison: Portacabin: The building is in poor condition and is considered beyond the end of its economic life. Cost allows for a replacement to be built in the same location.

01 - Incoming Cable

C

£30

0

0

2 2

4

2010

0.001: Attach incoming cable to wall securely.

03 - Distribution Boards

B

£0

8

0

0 0

0

2018

0.001: Wylex distribution board in acceptable order.

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

0.001: 4No. Surface fluorescent lights in acceptable order.

01 - General Structure

Facet: 2 - Engineering Location: 00 - Ground Floor R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. Block Total

Generic Hospital Physical Condition Survey

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£80,030.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Renal Offices: Redecoration required as part of regular maintenance schedule to room 019. Renal Offices: Redecoration required as part of regular maintenance schedule. Renal Offices: Suspended ceiling. Renal Offices: Plaster ceiling. Renal Offices: Carpet tiles require replacement to corridor adjacent stairs, 023, 004, 003, 002, 001, 1.023,1.027,1.024,1.025, 1.026. Renal Offices: Contract quality carpet requires replacement to: 14, 15, 12, 16, 11, 10, 17, 18,19, 08, 20,07, 21, 06, 022, 024 and stairs. Renal Offices: Anti slip vinyl sheet. Renal Offices: Replace door to 026 - damage at base. Renal Offices: Investigation required due to gap in floorboards beneath carpet tiles to centre of corridor on first floor.

Site : Generic Hospital - STG Block : Portacabin 10 - P10 Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

C

£780

0

0

2 2

4

2010

01 - Decorations

B(C)

£19,500

2

0

2 2

4

2012

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling 03 - Floor

B C

£0 £5,900

10 0

0 0

0 0 2 2

0 4

2020 2010

03 - Floor

B(C)

£23,600

4

0

2 2

4

2014

03 - Floor

B

£0

10

0

0 0

0

2020

09 - Internal Doors

C

£1,200

0

0

2 2

4

2010

12 - Comments

C

£1,000

0

0

3 2

6

2010

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 12 - Comments

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£1,000

0

0

2 2

4

2010

Renal Offices: Suspected rotten floor beneath carpet to corridor outside 0.26 suggest further investigation required.

02a - Flat - Covering

C

£20,000

0

0

4 4 16

2010

02b - Flat - Decking 02c - Flat - Flashing

B C

£0 £0

20 0

0 0

0 0 0 4 4 16

2030 2010

02f - Flat - Drainage Fall

C

£0

0

0

4 4 16

2010

02g - Flat - Guttering 02h - Flat - Down Rainwater pipes 02i - Flat - Skylights

B B C

£0 £0 £2,500

10 10 0

0 0 0

0 0 0 0 0 0 3 4 12

2020 2020 2010

Renal: Mineral felt: Need to replace Renal: Steel decking. Renal: Mineral felt: Need to replace. Cost included. Renal: Mineral felt: Need to replace. Cost included. Renal: PVCU: Renal: PVCU: Renal: GWPP: Need to replace Georgian wired glass skylights as part of overall roof replacement 5No.

01 - General Structure

B

£0

20

0

0 0

0

2030

02 - Foundations 03 - Ground Stability

B B

£0 £0

20 20

0 0

0 0 0 0

0 0

2030 2030

02a - Cladding - Attachment

B

£0

20

0

0 0

0

2030

02b - Cladding - Cracking

B

£0

20

0

0 0

0

2030

02c - Cladding - Joints

B

£0

20

0

0 0

0

2030

02d - Cladding - Finish

B

£0

20

0

0 0

0

2030

Location: Roof 01 D - Building - Roof

Location: Whole Block A - Building - Physical Structure Renal: Prefabricated steel frame: Generally sound. Renal: Generally sound.

B - Building - External Fabric

Generic Hospital Physical Condition Survey

Renal: Vinyl coated metal cladding panels. Renal: Vinyl coated metal cladding panels. Renal: Vinyl coated metal cladding panels. Renal: Vinyl coated metal cladding panels. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 03 - DPC 04 - Windows 06 - Doors

B B B Block Total

Generic Hospital Physical Condition Survey

Cost to B Rem Life Priority C L £0 £0 £0

20 10 10

0 0 0

0 0 0 0 0 0

R

Year

Notes

Remedial Action

0 0 0

2030 2020 2020

Renal: DPC. Renal: Aluminium - Double. Renal: Softwood timber.

£75,480.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Finance: Redecoration required within 5 year maintenance schedule. Finance: Plasterboard. Finance: Carpet: Need to replace contract quality carpet Located to circulation routes and 0.005, 0.007, 0.006, 0.008, 1.005, 1.006, 1.009, 1.011 and 1.010. Finance: Vinyl: Need to replace vinyl sheet flooring - Located to 0.003, 0.002, 1.001, 1.003, 1.C01 and 1.004. Finance: Plasterboard stud. Finance: Sanitary fittings: Ceramic WC Replace 6No. due to age and condition. Finance: Sanitary fittings: Ceramic wash hand basin Replace 7No. due to age and condition. Finance: Sanitary fittings: Ceramic urinal.

Site : Generic Hospital - STG Block : Portacabin 11 - P11 Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

C

£14,500

0

0

2 2

4

2010

02 - Ceiling 03 - Floor

B B(C)

£0 £17,600

10 1

0 0

0 0 2 3

0 6

2020 2011

03 - Floor

B(C)

£1,750

5

0

2 3

6

2015

05 - Condition of internal walls 08 - Fixed Units

B B(C)

£0 £4,800

10 5

0 0

0 0 3 3

0 9

2020 2015

08 - Fixed Units

B(C)

£4,900

5

0

3 3

9

2015

08 - Fixed Units

B

£0

7

0

0 0

0

2017

B

£0

10

0

0 0

0

2020

Location: Roof 01 D - Building - Roof 01a - Attached - Covering Generic Hospital Physical Condition Survey

Finance: Galvanised metal sheet. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Finance: PVCU: Clear gutters, outlets etc (<2 storey). Finance: PVCU: Need to replace complete. Finance: PVCU: Need to replace section. Finance: PVCU: Clear downwater pipes, outlets etc (<2 storey). Finance: PVCU: Need to replace complete.

01g - Attached - Guttering

C

£300

0

0

4 3 12

2010

01g - Attached - Guttering

B(C)

£2,000

5

0

4 3 12

2015

01h - Attached - Down Rainwater pipes 01h - Attached - Down Rainwater pipes

C

£250

0

0

4 3 12

2010

C

£100

0

0

4 3 12

2010

01h - Attached - Down Rainwater pipes

B(C)

£1,000

5

0

4 3 12

2015

01 - General Structure

B

£0

10

0

0 0

0

2020

Finance: Portacabin: Generally sound.

02 - Foundations 05 - External Fire Escape

B B

£0 £0

10 6

0 0

0 0 0 0

0 0

2020 2016

Finance: Generally sound. Finance: Metal in acceptable condition.

02d - Cladding - Finish

B

£0

10

0

0 0

0

2020

04 - Windows 06 - Doors

B B

£0 £0

7 7

0 0

0 0 0 0

0 0

2017 2017

Finance: Vinyl coated metal sheet. Finance: Aluminium - Double. Finance: Aluminium.

Location: Whole Block A - Building - Physical Structure

B - Building - External Fabric

Facet: 2 - Engineering Location: 00 - Ground Floor O - Engineering - Main Plant

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heating Boilers

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£800

3

0

3 3

9

2013

0.003: Potterton Suprima Boiler will require upgrading within the maintenance schedule.

03 - Distribution Boards

B

£0

8

0

0 0

0

2018

03 - Distribution Boards

B

£0

8

0

0 0

0

2018

03 - Distribution Boards

B

£0

12

0

0 0

0

2022

0.007: 3No. Hager distribution boards in acceptable order. Hager distribution board in acceptable order. Merlin distribution board in acceptable order.

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£2,400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£600

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

0.002: Surface fluorescent light requires upgrading within the maintenance schedule. 0.003: Surface fluorescent light requires upgrading within the maintenance schedule. 0.008: 12No. CAT II lights require upgrading within the maintenance schedule. Corridor: 3No. CAT II lights require upgrading within the maintenance schedule. 0.004: CAT II light requires upgrading within the maintenance schedule. Corridor: Surface fluorescent lights will require upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.001: Surface fluorescent light requires upgrading within the maintenance schedule. 0.005A: 4No. CAT II lights require upgrading within the maintenance schedule. 0.006: 2No. CAT II lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

01 - Sounders

B(C)

£150

2

0

3 3

9

2012

02 - Call Points

B

£0

7

0

0 0

0

2017

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

Remedial Action

0.007: 4No. CAT II lights require upgrading within the maintenance schedule. 0.005: 4No. CAT II lights require upgrading within the maintenance schedule. 1.S01: 2No. Emergency lights in acceptable order. 0.002: Emergency lights in acceptable order.

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

Corridor: Fire alarm sounder requires upgrading within the maintenance schedule. Corridor: Fire alarm call points in acceptable order. 0.005: Smoke detector requires upgrading within the maintenance schedule. 0.004: Smoke detector requires upgrading within the maintenance schedule. 0.005A: Smoke detector requires upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

0.006: Smoke detector requires upgrading within the maintenance schedule. 0.007: Smoke detector requires upgrading within the maintenance schedule. 0.008: 2No. smoke detectors require upgrading within the maintenance schedule. 0.003: Smoke detector requires upgrading within the maintenance schedule.

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£300

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

B

£0

10

0

0 0

0

2020

1.001: Steel panel radiators in acceptable order.

C

£5,000

0

0

3 3

9

2010

1.009: IMI A/C unit requires replacement.

01 - Heating Boilers

B(C)

£800

3

0

3 3

9

2013

1.003: Potterton Suprima Boiler will require upgrading within the maintenance schedule.

03 - Calorifiers

B(C)

£600

5

0

3 3

9

2015

1.002: Pre-Lagged copper calorifier will require upgrading within the maintenance schedule.

Location: 01 - First Floor I - Engineering - Heating Systems 01 - Heat Emitters K - Engineering - Vent & Air Con 05 - Cooling Units O - Engineering - Main Plant

P - Engineering - Main Plant Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 04 - Extract Fans

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£300

3

0

2 3

6

2013

1.003: Extract fan requires upgrading within the maintenance schedule.

03 - Distribution Boards

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

1.003: Hager distribution board in acceptable order. 1.003: 2No. tungsten lights require replacement.

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£2,000

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£2,000

5

0

2 2

4

2015

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

1.009: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 1.S01: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 1.001: CAT II light requires upgrading within the maintenance schedule. 1.005: 10No. CAT II lights will require upgrading within the maintenance schedule. 1.007: CAT II light requires upgrading within the maintenance schedule. 1.006: 2No. CAT II lights require upgrading within the maintenance schedule. 1.009: 10No. CAT II lights will require upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 1.011: 2No. CAT II lights require upgrading within the maintenance schedule. 1.003: CAT II light requires upgrading within the maintenance schedule. 1.010: 2No. CAT II lights require upgrading within the maintenance schedule. 1.009: Emergency lights in acceptable order. There is no light switch at the top of the stairs to switch the stairs light on. Install light switch. 1.007: The server room is excessively hot.

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

06 - Sockets/Switches

C

£250

0

0

4 3 12

2010

08 - Comments

N/A

£0

0

0

0 0

0

2010

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

03 - Smoke Detectors

B(C)

£150

5

0

3 3

9

2015

Remedial Action

V - Engineering - Fire Alarms

Block Total

Generic Hospital Physical Condition Survey

1.005: Smoke detector requires upgrading within the maintenance schedule. 1.010: Smoke detector requires upgrading within the maintenance schedule. 1.011: Smoke detector requires upgrading within the maintenance schedule. 1.009: Smoke detector requires upgrading within the maintenance schedule. 1.007: Smoke detector requires upgrading within the maintenance schedule. 1.006: Smoke detector requires upgrading within the maintenance schedule.

£71,000.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

MRI Unit: General: Redecoration required within 5 year maintenance schedule Located to 0.003. MRI Unit: General: Redecoration required within 5 year maintenance schedule Located 0.001, 0.002 and 0.004. MRI Unit: Plasterboard. MRI Unit: Carpet: Need to replace contract quality carpet Located to 0.003 and 0.004. MRI Unit: Plasterboard stud: Need to make good water damaged - Located to 0.003. MRI Unit: Plasterboard stud.

Site : Generic Hospital - STG Block : Portacabin 12 - P12 Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

C

£250

0

0

2 2

4

2010

01 - Decorations

B(C)

£1,250

2

0

2 2

4

2012

02 - Ceiling 03 - Floor

B B(C)

£0 £1,500

7 1

0 0

0 0 2 3

0 6

2017 2011

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls

B

£0

7

0

0 0

0

2017

C

£600

0

0

4 3 12

2010

MRI Unit: Ramp: Replace timber ramp, water and impact damaged.

B B

£0 £0

15 15

0 0

0 0 0 0

2025 2025

MRI Unit: Mineral felt. MRI Unit: Plywood.

Location: External F - Building - External Works 05 - Miscellaneous

Location: Roof 01 D - Building - Roof 02a - Flat - Covering 02b - Flat - Decking

Generic Hospital Physical Condition Survey

0 0

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

MRI Unit: PVCU: Need to replace complete. MRI Unit: PVCU: Need to replace complete.

02g - Flat - Guttering

B(C)

£450

5

0

4 4 16

2015

02h - Flat - Down Rainwater pipes

B(C)

£150

5

0

4 4 16

2015

01 - General Structure

B

£0

7

0

0 0

0

2017

MRI Unit: Portacabin: Generally sound.

02 - Foundations

B

£0

7

0

0 0

0

2017

MRI Unit: Generally sound.

02d - Cladding - Finish

B

£0

7

0

0 0

0

2017

04 - Windows 06 - Doors

B C

£0 £350

7 0

0 0

0 0 3 3

0 9

2017 2010

MRI Unit: Softwood timber boarding: Rendered. MRI Unit: Aluminium - Double. MRI Unit: Softwood timber: Redecorate and make good 2No.

01 - Heat Emitters

B(C)

£400

4

0

2 2

4

2014

01 - Heat Emitters

B(C)

£400

4

0

2 2

4

2014

B

£0

12

0

0 0

0

2022

Location: Whole Block A - Building - Physical Structure

B - Building - External Fabric

Facet: 2 - Engineering Location: 00 - Ground Floor I - Engineering - Heating Systems 0.004: Dimplex electric heater will require upgrading within the maintenance schedule. 0.001: Dimplex electric heater will require upgrading within the maintenance schedule.

R - Engineering - Electrical 03 - Distribution Boards

Generic Hospital Physical Condition Survey

0.004: MEM D distribution board in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.003: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 0.006: Surface fluorescent lights in acceptable order. 0.001: Surface fluorescent lights in acceptable order. 0.003: Emergency lights requires upgrading within the maintenance schedule. 0.001: Emergency lights in acceptable order.

04 - Lighting Installation

B(C)

£400

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

05 - Emergency Lighting

B(C)

£200

5

0

4 2

8

2015

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

Block Total

Generic Hospital Physical Condition Survey

Remedial Action

£6,250.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Estates Offices: Redecoration required as part of regular maintenance schedule. Estates Offices: 3No. ceiling tile to 008 is water damaged. Estates Offices: 1No. ceiling tile to 002 is water damaged. Estates Offices: Suspended ceiling. Estates Offices: Contract quality carpet requires replacing. Estates Offices: Carpet tiles require replacement to 011 and 015. Estates Offices: Vinyl sheet to corridors requires replacement. Estates Offices: Kitchen units require replacement to 008. Estates Offices: WC requires replacement, 002. Estates Offices: Wash hand basin requires replacement, 002. Estates Offices: 3No. cubicles, 003. Estates Offices: 3No. urinals, 003. Estates Offices: 3No. wash hand basins, 003.

Site : Generic Hospital - STG Block : Portacabin 16 - P16 Facet: 1 - Building Location: 02 - Second Floor C - Building - Internal Fabric 01 - Decorations

B(C)

£27,300

2

0

2 2

4

2012

02 - Ceiling

C

£400

0

0

2 2

4

2010

02 - Ceiling

C

£150

0

0

2 2

4

2010

02 - Ceiling

B

£0

10

0

0 0

0

2020

03 - Floor

B(C)

£29,500

2

0

2 2

4

2012

03 - Floor

B(C)

£2,950

3

0

2 2

4

2013

03 - Floor

B(C)

£11,800

5

0

2 2

4

2015

08 - Fixed Units

B(C)

£3,000

2

0

2 2

4

2012

08 - Fixed Units

B(C)

£500

5

0

2 2

4

2015

08 - Fixed Units

B(C)

£500

5

0

2 2

4

2015

08 - Fixed Units

B

£0

10

0

0 0

0

2020

08 - Fixed Units

B

£0

10

0

0 0

0

2020

08 - Fixed Units

B

£0

10

0

0 0

0

2020

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2020

Estates Offices: 3No. WC, 003.

B B B B B B

£0 £0 £0 £0 £0 £0

10 20 10 10 10 10

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0

2020 2030 2020 2020 2020 2020

Estates: Mineral felt. Estates: Steel decking. Estates: Mineral felt. Estates: Mineral felt. Estates: Mineral felt. Estates: Internal down rainwater pipes.

01 - General Structure

B

£0

20

0

0 0

0

2030

Estates: Prefabricated steel frame: Generally sound.

02 - Foundations 03 - Ground Stability

B B

£0 £0

20 20

0 0

0 0 0 0

0 0

2030 2030

Estates: Generally sound.

02a - Cladding - Attachment

B

£0

20

0

0 0

0

2030

02b - Cladding - Cracking

B

£0

20

0

0 0

0

2030

02c - Cladding - Joints

B

£0

20

0

0 0

0

2030

02d - Cladding - Finish

B

£0

20

0

0 0

0

2030

03 - DPC 04 - Windows 06 - Doors

B B B

£0 £0 £0

20 10 10

0 0 0

0 0 0 0 0 0

0 0 0

2030 2020 2020

Estates: Vinyl coated metal cladding panels. Estates: Vinyl coated metal cladding panels. Estates: Vinyl coated metal cladding panels. Estates: Vinyl coated metal cladding panels. Estates: DPC. Estates: Aluminium - Double. Estates: Softwood timber.

Location: Roof 01 D - Building - Roof 02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02f - Flat - Drainage Fall 02h - Flat - Down Rainwater pipes

Location: Whole Block A - Building - Physical Structure

B - Building - External Fabric

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Steel panel radiators in acceptable order. Heat emitters with low surface temperature covers in acceptable order.

Facet: 2 - Engineering Location: 02 - Second Floor I - Engineering - Heating Systems 01 - Heat Emitters

B

£0

12

0

0 0

0

2022

01 - Heat Emitters

B

£0

15

0

0 0

0

2025

B

£0

7

0

0 0

0

2017

2.008: Zip water heater in acceptable order.

B(C)

£250

4

0

3 3

9

2014

Extract fan requires upgrading within the maintenance schedule.

03 - Distribution Boards

B

£0

12

0

0 0

0

2022

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

2.001: MEM distribution board in acceptable order. 2.009: Surface fluorescent light requires upgrading within the maintenance schedule. 2.C01: Surface fluorescent light requires upgrading within the maintenance schedule. 2.008: Surface fluorescent light requires upgrading within the maintenance schedule. 2.007: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 2.003: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 2.005: CAT II lights in acceptable order.

M - Engineering - Hot/Cold Water 01 - Local Water Heaters P - Engineering - Main Plant 04 - Extract Fans

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 04 - Lighting Installation

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

7

0

0 0

0

2017

Surface fluorescent lights in acceptable order.

01 - Sounders

B

£0

10

0

0 0

0

2020

02 - Call Points

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

7

0

0 0

0

2017

2.C01: Fire alarm sounders in acceptable order. 2.C01: Fire alarm call points in acceptable order. 2.005: Smoke detectors in acceptable order.

V - Engineering - Fire Alarms

Block Total

Generic Hospital Physical Condition Survey

£78,150.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Retinal Screening – Thomas Addison: Redecoration required within 5 year maintenance schedule. Retinal Screening – Thomas Addison: Artex. Retinal Screening – Thomas Addison: Carpet: Need to replace contract quality carpet Located to offices. Retinal Screening – Thomas Addison: Plasterboard stud.

Site : Generic Hospital - STG Block : Portacabin 17 - P17 Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

B(C)

£1,200

5

0

2 2

4

2015

02 - Ceiling

B

£0

10

0

0 0

0

2020

03 - Floor

B(C)

£1,900

5

0

2 3

6

2015

B

£0

10

0

0 0

0

2020

02a - Flat - Covering

B

£0

20

0

0 0

0

2030

02g - Flat - Guttering

B

£0

10

0

0 0

0

2020

02h - Flat - Down Rainwater pipes

B

£0

10

0

0 0

0

2020

05 - Condition of internal walls

Location: Roof 01 D - Building - Roof Retinal Screening – Thomas Addison: Metal sheet in reasonable condition. Retinal Screening – Thomas Addison: Integrated. Retinal Screening – Thomas Addison: Integrated.

Location: Whole Block A - Building - Physical Structure

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01 - General Structure

B

£0

20

0

0 0

0

2030

Retinal Screening – Thomas Addison: Portacabin: Generally sound.

02 - Foundations

B

£0

20

0

0 0

0

2030

Retinal Screening – Thomas Addison: Generally sound.

02d - Cladding - Finish

B

£0

20

0

0 0

0

2030

04 - Windows

B

£0

20

0

0 0

0

2030

06 - Doors

B

£0

10

0

0 0

0

2020

Retinal Screening – Thomas Addison: Vinyl coated metal sheet. Retinal Screening – Thomas Addison: Aluminium: Double. Retinal Screening – Thomas Addison: Softwood Timber.

B(C)

£400

4

0

2 2

4

2014

Dimplex electric heater will require upgrading within the maintenance schedule.

B

£0

12

0

0 0

0

2022

Cooling unit in acceptable order.

B

£0

10

0

0 0

0

2020

CAT II lights in acceptable order.

B - Building - External Fabric

Facet: 2 - Engineering Location: 00 - Ground Floor I - Engineering - Heating Systems 01 - Heat Emitters

K - Engineering - Vent & Air Con 05 - Cooling Units R - Engineering - Electrical 04 - Lighting Installation

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. Block Total

Generic Hospital Physical Condition Survey

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£3,500.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Generic Hospital - STG Block : Portacabin 18 - P18 Facet: 1 - Building Location: Whole Block A - Building - Physical Structure N/A

£0

0

0

0 0

0

2010

Included with P06.

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

0.008: Surface fluorescent light requires upgrading within the maintenance schedule. 0.004: CAT II light requires upgrading within the maintenance schedule. 0.003: 2No. CAT II lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£1,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

06 - Comments

Facet: 2 - Engineering Location: 00 - Ground Floor R - Engineering - Electrical

0.001: 5No. CAT II lights require upgrading within the maintenance schedule. 0.002: CAT II light requires upgrading within the maintenance schedule. 0.C01: 3No. surface fluorescent lights require upgrading within the maintenance schedule.

V - Engineering - Fire Alarms Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.001: Smoke detector requires replacement. 0.004: Smoke detector requires replacement.

03 - Smoke Detectors

C

£150

0

0

3 3

9

2010

03 - Smoke Detectors

C

£150

0

0

3 3

9

2010

£40,000

0

0

4 4 16

2010

Block Total

Remedial Action

£2,900.00

Site : Generic Hospital - STG Block : Portacabin 19 - P19 Facet: 1 - Building Location: Whole Block A - Building - Physical Structure 01 - General Structure

Block Total

Generic Hospital Physical Condition Survey

C

Portacabin: The building is in poor condition and is considered beyond the end of its economic life. Cost allows for a replacement to be built in the same location.

£40,000.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Retinal Screening – Thomas Addison: Redecoration required within 5 year maintenance schedule - Located to 0.004. Retinal Screening – Thomas Addison: Redecoration required within 5 year maintenance schedule - Located to 0.001. Retinal Screening – Thomas Addison: Redecoration required within 5 year maintenance schedule - Located to 0.002 and 0.003. Retinal Screening – Thomas Addison: Suspended. Retinal Screening – Thomas Addison: Carpet: Need to replace contract quality carpet 0.001. Retinal Screening – Thomas Addison: Carpet: Need to replace contract quality carpet 0.004, 0.002. Retinal Screening – Thomas Addison: Carpet: Need to replace contract quality carpet 0.003. Retinal Screening – Thomas Addison: Plasterboard stud.

Site : Generic Hospital - STG Block : Portacabin 20 - P20 Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

C

£400

0

0

2 2

4

2010

01 - Decorations

B(C)

£600

1

0

2 2

4

2011

01 - Decorations

B(C)

£700

3

0

2 2

4

2013

02 - Ceiling

B

£0

15

0

0 0

0

2025

03 - Floor

B(C)

£525

1

0

2 3

6

2011

03 - Floor

B(C)

£600

2

0

2 3

6

2012

03 - Floor

B(C)

£550

4

0

2 3

6

2014

B

£0

10

0

0 0

0

2020

05 - Condition of internal walls

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Location: Roof 01 D - Building - Roof 02a - Flat - Covering

B

£0

20

0

0 0

0

2030

Retinal Screening – Thomas Addison: Metal sheet in reasonable condition.

01 - General Structure

B

£0

20

0

0 0

0

2030

Retinal Screening – Thomas Addison: Portacabin: Generally sound.

02 - Foundations

B

£0

20

0

0 0

0

2030

Retinal Screening – Thomas Addison: Generally sound.

02d - Cladding - Finish

B

£0

20

0

0 0

0

2030

04 - Windows

B

£0

20

0

0 0

0

2030

06 - Doors

B

£0

20

0

0 0

0

2030

Retinal Screening – Thomas Addison: Vinyl coated metal sheet. Retinal Screening – Thomas Addison: Aluminium - Double. Retinal Screening – Thomas Addison: Aluminium.

B

£0

6

0

0 0

0

2016

Fujitsu air conditioning unit in acceptable order.

B

£0

12

0

0 0

0

2022

Hager distribution board in acceptable order.

Location: Whole Block A - Building - Physical Structure

B - Building - External Fabric

Facet: 2 - Engineering Location: 00 - Ground Floor K - Engineering - Vent & Air Con 05 - Cooling Units R - Engineering - Electrical 03 - Distribution Boards

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes CAT II lights in acceptable order. Surface fluorescent lights in acceptable order.

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

Block Total

Generic Hospital Physical Condition Survey

Remedial Action

£3,375.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Generic Hospital - STG Block : Portacabin 21 - P21 Facet: 1 - Building Location: Whole Block A - Building - Physical Structure 01 - General Structure

C

£80,000

0

0

4 4 16

2010

Medical Management: Portacabin: The building is in poor condition and is considered beyond the end of its economic life, roof and guttering have been replaced to extend life. Cost allows for a replacement to be built in the same location.

B

£0

7

0

0 0

0

2017

Electric heaters in acceptable order.

B

£0

7

0

0 0

0

2017

1.005: Heatrae Sadia water heater in acceptable order.

B(C)

£200

3

0

2 3

6

2013

0.005: Extract fan requires upgrading within the maintenance schedule.

Facet: 2 - Engineering Location: 00 - Ground Floor I - Engineering - Heating Systems 01 - Heat Emitters M - Engineering - Hot/Cold Water 01 - Local Water Heaters P - Engineering - Main Plant 04 - Extract Fans

R - Engineering - Electrical Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0.001: Hager distribution board in acceptable order. 0.C001: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 0.005: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 1.005: 2No. surface fluorescent lights require upgrading within the maintenance schedule. 6No. CAT II lights require upgrading within the maintenance schedule. Office lights: CAT II lights in acceptable order.

03 - Distribution Boards

B

£0

12

0

0 0

0

2022

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,200

4

0

2 2

4

2014

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

02 - Call Points

B

£0

7

0

0 0

0

2017

02 - Call Points

B

£0

7

0

0 0

0

2017

Remedial Action

V - Engineering - Fire Alarms

Block Total

Generic Hospital Physical Condition Survey

0.C001: Fire alarm sounders in acceptable order. Fire alarm sounders in acceptable order. Fire alarm call points in acceptable order. 0.C001: Fire alarm call points in acceptable order.

£83,400.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Training for Mitie & Staff Rest Area: Redecoration required within 5 year maintenance schedule. Training for Mitie & Staff Rest Area: Plasterboard. Training for Mitie & Staff Rest Area: Vinyl: Need to replace vinyl sheet flooring - Located to 0.002. Training for Mitie & Staff Rest Area: Vinyl: Need to replace vinyl sheet flooring - Located to 0.001.

Site : Generic Hospital - STG Block : Portacabin 22 - P22 Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

C

£1,300

0

0

2 2

4

2010

02 - Ceiling

B

£0

10

0

0 0

0

2020

03 - Floor

C

£350

0

0

2 3

6

2010

03 - Floor

B(C)

£2,000

5

0

2 3

6

2015

B

£0

10

0

0 0

0

2020

Location: Roof 01 D - Building - Roof 02a - Flat - Covering

Training for Mitie & Staff Rest Area: Single ply membrane.

Location: Whole Block A - Building - Physical Structure

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01 - General Structure

B

£0

10

0

0 0

0

2020

Training for Mitie & Staff Rest Area: Portacabin: Generally sound.

02 - Foundations

B

£0

10

0

0 0

0

2020

Training for Mitie & Staff Rest Area: Generally sound.

02d - Cladding - Finish

B

£0

10

0

0 0

0

2020

04 - Windows

B

£0

10

0

0 0

0

2020

06 - Doors

B

£0

7

0

0 0

0

2017

Training for Mitie & Staff Rest Area: Vinyl coated metal sheet. Training for Mitie & Staff Rest Area: Aluminium: Double. Training for Mitie & Staff Rest Area: Softwood Timber.

B(C)

£400

5

0

2 2

4

2015

0.001: Electric heater will require upgrading within the maintenance schedule.

C

£600

0

0

2 3

6

2010

0.002: 2No. Extract fans require replacement.

03 - Distribution Boards

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B(C)

£200

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£1,000

4

0

2 2

4

2014

0.001: Wylex distribution board in acceptable order. 0.002: Surface fluorescent light requires upgrading within the maintenance schedule. 0.001: 5No. CAT II lights require upgrading within the maintenance schedule.

B - Building - External Fabric

Facet: 2 - Engineering Location: 00 - Ground Floor I - Engineering - Heating Systems 01 - Heat Emitters

P - Engineering - Main Plant 04 - Extract Fans R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. Block Total

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

£5,850.00

Site : Generic Hospital - STG Block : Portacabin 23 - P23 Facet: 1 - Building Location: Whole Block A - Building - Physical Structure 01 - General Structure

B

£0

10

0

0 0

0

2020

Portacabin: Generally sound (No access gained, used as storage only so condition assumed to be acceptable).

N/A

£0

0

0

0 0

0

2010

Estates storage, no M&E.

Facet: 2 - Engineering Location: 00 - Ground Floor R - Engineering - Electrical 08 - Comments Block Total

Generic Hospital Physical Condition Survey

£0.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Site : Generic Hospital - STG Block : Staff Social Club - SSC Facet: 1 - Building Location: Roof 01 D - Building - Roof 02a - Flat - Covering 02c - Flat - Flashing 02g - Flat - Guttering

B B B

£0 £0 £0

10 10 6

0 0 0

0 0 0 0 0 0

0 0 0

2020 2020 2016

Profiled metal sheet. Aluminium. Box gutters.

B B B N/A

£0 £0 £0 £0

50 50 50 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2060 2060 2060 2010

Brickwork: Generally sound. Generally sound. Generally sound. This building has been stripped back to its shell and is now used for storage.

B B B B B B B

£0 £0 £0 £0 £0 £0 £0

50 50 50 50 20 6 10

0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

2060 2060 2060 2060 2030 2016 2020

Brickwork. Brickwork. Brickwork. Brickwork. DPC. Aluminium - Single. Aluminium.

Location: Whole Block A - Building - Physical Structure 01 - General Structure 02 - Foundations 03 - Ground Stability 06 - Comments

B - Building - External Fabric 01a - Masonry - Cracking 01b - Masonry - Spalling 01c - Masonry - Pointing 01d - Masonry - Finish 03 - DPC 04 - Windows 06 - Doors

Facet: 2 - Engineering Location: Whole Block P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 09 - Comments

N/A

Block Total

Generic Hospital Physical Condition Survey

Cost to B Rem Life Priority C L £0

0

0

0 0

R

Year

Notes

Remedial Action

0

2010

This building has been stripped of all useable Mechanical and Electrical items.

£0.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Tarmac: Need to relay potholed surface adjacent rear of Lanesborough parking/store area, 1600m2. Tarmac: Need to relay potholed surface adjacent to the entrance to Lanesborough Wing, 1500m2. Loose surfaced gravel and tarmac: Need to replace roughly 75% of surface area to Car Park 1 due to the loose surfaced gravel which could be considered a potential trip hazard, 6500m2. Tarmac: Resurface Car Park in front of Lanesborough Wing within the maintenance schedule, 1700m2. Brick paviors. Poured concrete surface to stores. Tarmac. Concrete block paving. Concrete bollards: Need to replace 2No. cracked concrete bollards adjacent to the Hand Unit.

Site : Generic Hospital - STG Block : External Grounds - STE Facet: 1 - Building Location: External Grounds F - Building - External Works 01 - Roads

C

£174,400

0

0

3 3

9

2010

01 - Roads

C

£163,500

0

0

3 3

9

2010

02 - Car Parks

C

£174,400

0

0

4 3 12

2010

02 - Car Parks

B(C)

£185,300

5

0

2 3

6

2015

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

B B B(C)

£0 £0 £500

10 10 3

0 0 0

0 0 0 0 2 3

0 0 6

2020 2020 2013

03 - Paths 03 - Paths 03 - Paths 03 - Paths 05 - Miscellaneous

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 05 - Miscellaneous

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

10

0

0 0

0

2020

Timber framed profiled glass fibre covered way leading to rear entrance to Knightsbridge Wing.

01 - Fences

B

£0

20

0

0 0

0

2030

01 - Fences 02 - Walls

B C

£0 £500

20 0

0 0

0 0 2 3

0 6

2030 2010

02 - Walls

B

£0

20

0

0 0

0

2030

Galvanised steel palisade fencing. Wrought iron fencing. Brick retaining walls: Need to make good extensive cracking located to the rear of Grosvenor Wing. Brick retaining walls.

G - Building - Gardens

Block Total

Generic Hospital Physical Condition Survey

£698,600.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Occupational Therapy: Redecoration required as part of regular maintenance schedule to rooms 145, 139, 108, 109A, 107 and 106. Fracture & Orthopaedic Clinic: Redecoration required to damp to rooms 718, 719 and C61. Occupational Therapy: Redecorate and make good damp to room C40. Blood Testing: Redecoration required as part of regular maintenance schedule to rooms 383. Circulation Routes: Redecoration required as part of regular maintenance schedule to rooms C06 and C04. X-Ray: Redecoration required as part of regular maintenance schedule. Blood Testing: Redecoration required as part of regular maintenance schedule. Clinical Decisions Unit: Redecoration required as part of regular maintenance schedule.

Site : Generic Hospital - STG Block : St James Wing - STJ Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

C

£7,800

0

0

2 2

4

2010

01 - Decorations

C

£5,850

0

0

2 2

4

2010

01 - Decorations

C

£500

0

0

2 2

4

2010

01 - Decorations

C

£780

0

0

2 2

4

2010

01 - Decorations

C

£3,900

0

0

2 2

4

2010

01 - Decorations

B(C)

£78,000

2

0

2 2

4

2012

01 - Decorations

B(C)

£2,964

2

0

2 2

4

2012

01 - Decorations

B(C)

£5,850

2

0

2 2

4

2012

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Pharmacy: Redecoration required as part of regular maintenance schedule. Clinic 2: Redecoration required as part of regular maintenance schedule. Clinic 4/ Outpatients Corridor: Redecoration required as part of regular maintenance schedule. Circulation Routes: Redecoration required as part of regular maintenance schedule. Richmond Ward: Redecoration required as part of regular maintenance schedule. Orthotics: Redecoration required as part of regular maintenance schedule. Chapel: Redecoration required as part of regular maintenance schedule. Fracture & Orthopaedic Clinic: Redecoration required as part of regular maintenance schedule. Clinic 1: Redecoration required as part of regular maintenance schedule. Stoma Care: Redecoration required as part of regular maintenance schedule to rooms 382. Clinic 3: Redecoration required as part of regular maintenance schedule.

01 - Decorations

B(C)

£2,730

3

0

2 2

4

2013

01 - Decorations

B(C)

£1,950

3

0

2 2

4

2013

01 - Decorations

B(C)

£1,950

3

0

2 2

4

2013

01 - Decorations

B(C)

£39,000

3

0

2 2

4

2013

01 - Decorations

B(C)

£27,300

3

0

2 2

4

2013

01 - Decorations

B(C)

£1,560

3

0

2 2

4

2013

01 - Decorations

B(C)

£7,800

3

0

2 2

4

2013

01 - Decorations

B(C)

£15,600

3

0

2 2

4

2013

01 - Decorations

B(C)

£7,800

3

0

2 2

4

2013

01 - Decorations

B(C)

£780

3

0

2 2

4

2013

01 - Decorations

B(C)

£9,750

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes A&E: Redecoration required as part of regular maintenance schedule. Occupational Therapy: Redecoration required as part of regular maintenance schedule. Redecoration required as part of regular maintenance schedule. Outpatients Corridor: Redecoration required as part of regular maintenance schedule. Circulation Routes: Suspended ceiling requires replacement to C06. A&E: Suspended ceiling. Stoma Care: Suspended ceiling. X-Ray: Suspended ceiling. Clinic 3: Suspended ceiling. Fracture & Orthopaedic Clinic: Suspended ceiling. Clinic 2: Suspended ceiling. Chapel: Suspended ceiling. Clinic 1: Suspended ceiling. Orthotics: Suspended ceiling. Circulation Routes: Suspended ceiling. Clinic 4/ Outpatients Corridor: Suspended ceiling. Blood Testing: Suspended ceiling. Pharmacy: Suspended ceiling. Occupational Therapy: Plaster ceiling.

01 - Decorations

B(C)

£66,300

3

0

2 2

4

2013

01 - Decorations

B(C)

£70,200

3

0

2 2

4

2013

01 - Decorations

B(C)

£19,500

5

0

2 2

4

2015

01 - Decorations

B(C)

£19,500

5

0

2 2

4

2015

02 - Ceiling

B(C)

£6,000

5

0

2 2

4

2015

02 - Ceiling 02 - Ceiling 02 - Ceiling 02 - Ceiling 02 - Ceiling

B B B B B

£0 £0 £0 £0 £0

10 10 10 10 10

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2020 2020 2020 2020 2020

02 - Ceiling 02 - Ceiling 02 - Ceiling 02 - Ceiling 02 - Ceiling

B B B B B

£0 £0 £0 £0 £0

10 10 10 10 10

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2020 2020 2020 2020 2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling 02 - Ceiling

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Clinical Decisions Unit: Suspended ceiling. Occupational Therapy: Suspended ceiling. Outpatients Corridor: Suspended ceiling. Richmond Ward: Suspended ceiling. Occupational Therapy: Exposed galvanised steel soffit. Richmond Ward: Suspended ceiling. Suspended ceiling. Occupational Therapy: Vinyl tiles require replacement to C40. Pharmacy: Anti slip vinyl sheet requires replacement 302 and 303. Fracture & Orthopaedic Clinic: Vinyl sheet split in floor seal, 709B. X-Ray: Vinyl tile to c34, c33, 250, 249, 239, 236, 235, 230, 229, 220, 225, 211, 210 requires replacement. Clinic 3: Vinyl tiles require replacement to 341. X-Ray: Contract quality carpet to: 232, 227, 226 requires replacement. Richmond Ward: Vinyl sheet requires replacement to damaged section around hatch cover, 507. Clinic 4/ Outpatients Corridor: Contract quality carpet requires replacement to 330.

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

10

0

0 0

0

2020

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling 03 - Floor

B C

£0 £2,950

20 0

0 0

0 0 2 2

0 4

2030 2010

03 - Floor

C

£1,180

0

0

2 2

4

2010

03 - Floor

C

£500

0

0

2 2

4

2010

03 - Floor

C

£59,000

0

0

2 2

4

2010

03 - Floor

C

£2,950

0

0

2 2

4

2010

03 - Floor

C

£11,800

0

0

2 2

4

2010

03 - Floor

C

£2,950

0

0

2 2

4

2010

03 - Floor

C

£1,180

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes A&E: Vinyl sheet requires replacement to C58, G20, G82, G47, G48, G49 and C80. A&E: Vinyl tile requires replacement to: C63 and C64. Outpatients Corridor: Vinyl sheet to C49, C48, C42, 301 requires replacement. Occupational Therapy: Carpet requires replacement to 144, 152, 153, 154, C22, 156, 139, 157 158, 134, 159, 160, 161, 107A and 152. Circulation Routes: Vinyl tiles to C06 and C04 requires replacement. Pharmacy: Vinyl tile to 302 requires replacement. Occupational Therapy: Replace vinyl tile to 119, c20, c19, 125, 135, 136, 140, 147, 149, 151, c25, c24, 155, c23, c21. Clinical Decisions Unit: Replace vinyl sheet to G77 and G76. Clinic 1: Vinyl sheet requires replacement to 325 and 324. Chapel: Carpet tiles to 407 require replacement. Clinic 3: Contract quality carpet requires replacement to 341. X-Ray: Vinyl sheet to C36, 245, 256, 244, 233, 213 requires replacement. Blood Testing: Vinyl sheet requires replacement to 373. Clinic 3: Vinyl sheet requires replacement to 339.

03 - Floor

C

£35,400

0

0

2 2

4

2010

03 - Floor

C

£5,900

0

0

2 2

4

2010

03 - Floor

C

£26,550

0

0

2 2

4

2010

03 - Floor

C

£11,800

0

0

2 2

4

2010

03 - Floor

C

£5,900

0

0

2 2

4

2010

03 - Floor

C

£2,950

0

0

2 2

4

2010

03 - Floor

B(C)

£70,800

2

0

2 2

4

2012

03 - Floor

B(C)

£2,950

2

0

2 2

4

2012

03 - Floor

B(C)

£1,950

2

0

2 2

4

2012

03 - Floor

B(C)

£1,180

2

0

2 2

4

2012

03 - Floor

B(C)

£2,950

2

0

2 2

4

2012

03 - Floor

B(C)

£17,700

2

0

2 2

4

2012

03 - Floor

B(C)

£1,180

2

0

2 2

4

2012

03 - Floor

B(C)

£2,950

2

0

2 2

4

2012

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Occupational Therapy: Vinyl sheet to 145 requires replacement. Stoma Care: Contract quality carpet requires replacement. Chapel: Contract quality carpet requires replacement to 406, 404, 402, 401, 407, 408, 409. A&E: Replace carpet to G40 and G70. Occupational Therapy: Contract quality carpet to:128A, 128, 127, 129, 130, 137 requires replacement. X-Ray: Contract quality carpet to: 240, 239, 238, 239, 236, 235, 230, 229, 228, 225, 211, 210 requires replacement. Occupational Therapy: Anti slip vinyl sheet requires replacement to: 138, 140, 142, 141, 148. Outpatients Corridor: Vinyl sheet requires replacement to C50. A&E: Replace linoleum to 64A and G104. Circulation Routes: Vinyl sheet requires replacement. Richmond Ward: Anti slip vinyl sheet requires replacement to 526 and 504. A&E: vinyl tile requires replacement to C76, G53, G44 G55A, G56, G104, G103 and C72. Clinic 4/ Outpatients Corridor: Contract quality carpet requires replacement to 331 and 334.

03 - Floor

B(C)

£2,950

2

0

2 2

4

2012

03 - Floor

B(C)

£1,180

3

0

2 2

4

2013

03 - Floor

B(C)

£10,620

3

0

2 2

4

2013

03 - Floor

B(C)

£2,950

4

0

2 2

4

2014

03 - Floor

B(C)

£11,800

4

0

2 2

4

2014

03 - Floor

B(C)

£29,500

5

0

2 2

4

2015

03 - Floor

B(C)

£5,900

5

0

2 2

4

2015

03 - Floor

B(C)

£2,950

5

0

2 2

4

2015

03 - Floor

B(C)

£5,900

5

0

2 2

4

2015

03 - Floor

B(C)

£5,900

5

0

2 2

4

2015

03 - Floor

B(C)

£2,950

5

0

2 2

4

2015

03 - Floor

B(C)

£41,300

5

0

2 2

4

2015

03 - Floor

B(C)

£1,770

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Richmond Ward: Contract quality carpet. Clinical Decisions Unit: Vinyl sheet. Richmond Ward: Anti slip vinyl sheet. Occupational Therapy: Anti slip vinyl tiles. Occupational Therapy: Anti slip vinyl sheet. Clinical Decisions Unit: Anti slip vinyl sheet. Occupational Therapy: Quarry tiles. Orthotics: Vinyl sheet. Clinic 1: Vinyl sheet. Clinic 3: Anti slip vinyl sheet. Clinic 3: Vinyl sheet. Clinic 2: Anti slip vinyl sheet. Clinic 2: Vinyl sheet. Richmond Ward: Vinyl sheet. A&E: Vinyl sheet. Blood Testing: Vinyl sheet. A&E: Vinyl sheet. Occupational Therapy: Sprung timber floor. A&E: Anti slip vinyl sheet. Fracture & Orthopaedic Clinic: Vinyl sheet. X-Ray: Vinyl sheet. A&E: Concrete floor. Fracture & Orthopaedic Clinic: Anti slip vinyl sheet. Blood Testing: Anti slip vinyl sheet. Vinyl sheet.

03 - Floor

B

£0

8

0

0 0

0

2018

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor 03 - Floor 03 - Floor 03 - Floor 03 - Floor 03 - Floor 03 - Floor 03 - Floor 03 - Floor 03 - Floor 03 - Floor

B B B B B B B B B B B

£0 £0 £0 £0 £0 £0 £0 £0 £0 £0 £0

10 10 10 10 10 10 10 10 10 10 10

0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0

2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020

03 - Floor 03 - Floor

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

03 - Floor 03 - Floor 03 - Floor

B B B

£0 £0 £0

10 10 10

0 0 0

0 0 0 0 0 0

0 0 0

2020 2020 2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor

B

£0

15

0

0 0

0

2025

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Anti slip vinyl sheet. Occupational Therapy: Ceramic tiles to 106 require replacement. Richmond Ward: Protective dado rail to wall broken, C51. Occupational Therapy: Impact damage at low level to stud wall, 152. Making good required. Occupational Therapy: Fairfaced brickwork. Richmond Ward: Replace shower tray to 509. Clinical Decisions Unit: Kitchen units to G77 require replacement. Clinic 3: Clinical cupboards to 337 require replacement. X-Ray: Kitchen units to 212 require replacement. A&E: Replace clinical cupboards to G52. Occupational Therapy: replace kitchen units to 146. Occupational Therapy: Clinical cupboards to 138 require replacement. Clinic 2: Replace clinical cupboards to 370. X-Ray: Skirting board to C38 missing. X-Ray: CCTV survey of drainage to 217 suggested as Oakleaf were informed of potential issues.

03 - Floor 05 - Condition of Internal Walls

B C

£0 £250

15 0

0 0

0 0 2 2

0 4

2025 2010

05 - Condition of Internal Walls

C

£500

0

0

2 2

4

2010

05 - Condition of Internal Walls

C

£250

0

0

2 2

4

2010

05 - Condition of Internal Walls

B

£0

20

0

0 0

0

2030

08 - Fixed Units

C

£500

0

0

2 2

4

2010

08 - Fixed Units

C

£3,000

0

0

2 2

4

2010

08 - Fixed Units

B(C)

£2,000

2

0

2 2

4

2012

08 - Fixed Units

B(C)

£2,000

2

0

2 2

4

2012

08 - Fixed Units

B(C)

£5,000

2

0

2 2

4

2012

08 - Fixed Units

B(C)

£3,000

5

0

2 2

4

2015

08 - Fixed Units

B(C)

£3,000

5

0

2 2

4

2015

08 - Fixed Units

B(C)

£1,000

5

0

2 2

4

2015

12 - Comments

C

£500

0

0

2 2

4

2010

12 - Comments

C

£1,000

0

0

2 2

4

2010

Remedial Action

Location: 01 - First Floor C - Building - Internal Fabric Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Theatres: Redecoration required as part of regular maintenance schedule to roomsC20 and C21. Theatres: Redecoration required as part of regular maintenance schedule. Calvert: Redecoration required as part of regular maintenance schedule. A&E Offices: Redecoration required as part of regular maintenance schedule. Circulation Routes: Redecoration required as part of regular maintenance schedule. Theatre Sterile Services Dept (TSSU): Redecoration required as part of regular maintenance schedule. Endoscopy Unit: Redecoration required as part of regular maintenance schedule. General Intensive Care (ITU): Redecoration required as part of regular maintenance schedule. Redecoration required as part of regular maintenance schedule. General Intensive Care (ITU): 2No. water damaged ceiling tiles to 413. General Intensive Care (ITU): 3No. water damaged ceiling tiles to 415. Circulation Routes: Suspended ceiling.

01 - Decorations

C

£3,900

0

0

2 2

4

2010

01 - Decorations

B(C)

£58,500

1

0

2 2

4

2011

01 - Decorations

B(C)

£25,350

1

0

2 2

4

2011

01 - Decorations

B(C)

£9,750

3

0

2 2

4

2013

01 - Decorations

B(C)

£39,000

3

0

2 2

4

2013

01 - Decorations

B(C)

£23,400

3

0

2 2

4

2013

01 - Decorations

B(C)

£60,450

4

0

2 2

4

2014

01 - Decorations

B(C)

£39,000

4

0

2 2

4

2014

01 - Decorations

B(C)

£19,500

5

0

2 2

4

2015

02 - Ceiling

C

£300

0

0

2 2

4

2010

02 - Ceiling

C

£450

0

0

2 2

4

2010

02 - Ceiling

B

£0

10

0

0 0

0

2020

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Calvert: Plaster ceiling. Calvert: Suspended ceiling. Theatres: Plaster ceiling. General Intensive Care (ITU): Suspended ceiling. Suspended ceiling. Theatre Sterile Services Dept (TSSU): Suspended ceiling. Theatre Sterile Services Dept (TSSU): Suspended ceiling (concealed grid). Circulation Routes: Concrete soffit. A&E Offices: Plasterboard. A&E Offices: Suspended ceiling. Endoscopy Unit: Suspended ceiling. Circulation Routes: Vinyl tile requires replacement to goods lift area. Theatres: Vinyl tiles require replacement to 106, 100, 155. Theatres: Vinyl sheet requires replacement to 104, C09, C14, C20, C21, C25 and 210. Theatre Sterile Services Dept (TSSU): Replace contract quality carpet to 1.201. General Intensive Care (ITU): Contract quality carpet to 408, 415, 416, 417, 504, 510 and 413 requires replacement. Calvert: linoleum to 614 requires replacement. Calvert: Contract quality carpet to 613 requires replacement. A&E Offices: Contract quality carpet requires replacement.

02 - Ceiling 02 - Ceiling 02 - Ceiling 02 - Ceiling

B B B B

£0 £0 £0 £0

10 10 10 20

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2020 2020 2020 2030

02 - Ceiling 02 - Ceiling

B B

£0 £0

20 20

0 0

0 0 0 0

0 0

2030 2030

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling

B

£0

20

0

0 0

0

2030

02 - Ceiling 02 - Ceiling 02 - Ceiling

B B B

£0 £0 £0

20 20 20

0 0 0

0 0 0 0 0 0

0 0 0

2030 2030 2030

03 - Floor

C

£1,770

0

0

2 2

4

2010

03 - Floor

C

£2,950

0

0

2 2

4

2010

03 - Floor

B(C)

£29,500

2

0

2 2

4

2012

03 - Floor

B(C)

£1,180

2

0

2 2

4

2012

03 - Floor

B(C)

£5,900

3

0

2 2

4

2013

03 - Floor

B(C)

£1,950

3

0

2 2

4

2013

03 - Floor

B(C)

£1,950

3

0

2 2

4

2013

03 - Floor

B(C)

£11,800

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Circulation Routes: Vinyl sheet requires replacement. A&E Offices: Vinyl sheet needs to be replaced. Calvert: Anti slip vinyl sheet requires replacement to 608, 606, 609, 619, 618, 628, 601, and 627. Theatres: Anti slip vinyl sheet. Theatres: Vinyl tiles. Theatres: Vinyl sheet. Endoscopy Unit: Contract quality carpet. Linoleum. Theatre Sterile Services Dept (TSSU): Anti slip vinyl sheet. General Intensive Care (ITU): Vinyl sheet. Calvert: Vinyl sheet. General Intensive Care (ITU): Laminate flooring. Endoscopy Unit: Vinyl sheet. Endoscopy Unit: Anti slip vinyl sheet. Anti slip vinyl sheet. Vinyl sheet. Theatres: Plastered brickwork to 127 has impact damage to door surround and requires making good. Circulation Routes: Make good plastered brickwork to goods lift area. Theatres: Damaged vents to 131, 134, 142.

03 - Floor

B(C)

£57,230

5

0

2 2

4

2015

03 - Floor

B(C)

£2,950

5

0

2 2

4

2015

03 - Floor

B(C)

£5,900

5

0

2 2

4

2015

03 - Floor 03 - Floor 03 - Floor 03 - Floor

B B B B

£0 £0 £0 £0

10 10 10 10

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2020 2020 2020 2020

03 - Floor 03 - Floor

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

03 - Floor

B

£0

10

0

0 0

0

2020

03 - Floor 03 - Floor

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

03 - Floor 03 - Floor

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

03 - Floor 03 - Floor 05 - Condition of Internal Walls

B B C

£0 £0 £500

15 15 0

0 0 0

0 0 0 0 2 2

0 0 4

2025 2025 2010

05 - Condition of Internal Walls

C

£1,500

0

0

2 2

4

2010

05 - Condition of Internal Walls

C

£500

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Theatres: Plastered Brickwork: Impact damage to walls to 132 and 142 requires making good. Theatres: Plastered Brickwork: Minor damp salt build up to C07. General Intensive Care (ITU): Replace kitchen units to 505. Endoscopy Unit: Kitchen units. Endoscopy Unit: Clinical cupboards. Endoscopy Unit: Sanitary fittings. Theatres: Softwood timber doors: 6No. impact damaged doors to rooms 142, 137 and 147 require replacement. Calvert: Impact damage to door to 615.

05 - Condition of Internal Walls

C

£500

0

0

2 2

4

2010

05 - Condition of Internal Walls

C

£150

0

0

2 2

4

2010

08 - Fixed Units

B(C)

£2,000

5

0

2 2

4

2015

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

10 10

0 0

0 0 0 0

0 0

2020 2020

08 - Fixed Units

B

£0

20

0

0 0

0

2030

09 - Internal Doors

C

£7,200

0

0

2 2

4

2010

09 - Internal Doors

C

£1,200

0

0

2 2

4

2010

01 - Decorations

C

£6,000

0

0

2 2

4

2010

01 - Decorations

B(C)

£31,500

1

0

2 2

4

2011

01 - Decorations

B(C)

£31,500

2

0

2 2

4

2012

B B

£0 £0

15 20

0 0

0 0 0 0

0 0

2025 2030

Remedial Action

Location: 02 - Second Floor C - Building - Internal Fabric

02 - Ceiling 02 - Ceiling Generic Hospital Physical Condition Survey

Wards: Redecoration required within 5 year maintenance schedule - Located to common circulation routes and non ward areas. Wards: Redecoration required within 5 year maintenance schedule - Located to McEntree ward (cost includes decanting of the ward). Wards: Redecoration required within 5 year maintenance schedule - Located to Ruth Myles ward (cost includes decanting of the ward). Wards: Suspended. Wards: Plasterboard. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Wards: Plasterboard. Wards: Concrete soffit. Wards: Vinyl: Need to replace vinyl tile flooring - Located to 2.215. Wards: Vinyl: Need to replace vinyl tile flooring - Located to ward areas and ward circulation routes. Wards: Vinyl: Need to replace vinyl sheet flooring - Located to 2.003, common circulation routes and 2.004. Wards: Vinyl: Need to replace vinyl sheet flooring - Located to 10% of ward areas. Wards: Carpet: Need to replace contract quality carpet 2.008, 2.C14, 2.002 and 2.105. Wards: Vinyl: Need to replace slip resistant vinyl flooring Located to 2.138 and 2.103. Wards: Vinyl: Need to replace vinyl sheet flooring - Located to Ruth Myles circulation routes. Wards: Vinyl sheet. Wards: Slip resistant vinyl sheet. Wards: Concrete. Wards: Brickwork (plastered): Replace blown plaster - Located to 2.003. Wards: Brickwork (plastered): Make good impact damaged plasterwork - Located to 2.C15. Wards: Ceramic tiling: Remove and replace damaged tiling to WC, blown and missing tiles.

02 - Ceiling 02 - Ceiling 03 - Floor

B B C

£0 £0 £400

20 20 0

0 0 0

0 0 0 0 2 3

0 0 6

2030 2030 2010

03 - Floor

C

£58,000

0

0

2 3

6

2010

03 - Floor

C

£5,050

0

0

2 3

6

2010

03 - Floor

B(C)

£5,800

1

0

2 3

6

2011

03 - Floor

B(C)

£2,700

5

0

2 3

6

2015

03 - Floor

B(C)

£700

5

0

2 3

6

2015

03 - Floor

B(C)

£5,600

5

0

2 3

6

2015

03 - Floor 03 - Floor 03 - Floor 05 - Condition of internal walls

B B B C

£0 £0 £0 £300

7 7 20 0

0 0 0 0

0 0 0 2

0 0 0 3

0 0 0 6

2017 2017 2030 2010

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls

C

£325

0

0

2 3

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Wards: Brickwork (plastered): Make good cracking to plastered wall - Located to 2.105. Wards: Ceramic tiling. Wards: Brickwork (plastered). Wards: Fairfaced blockwork. Wards: Sanitary fittings: Shower: Oakleaf informed that the shower gets blocked easily and has poor drainage, suggest further investigation - Located to 2.138. Wards: Kitchen facilities: Replace kitchen units due to age and condition - Located to Ruth Myles ward. Wards: Kitchen facilities: Replace kitchen worktop due to age and condition. Wards: Kitchen facilities: Replace kitchen units due to age and condition - Located to Ruth Myles ward. Wards: Sanitary fittings: Ceramic wash hand basin. Wards: Fitted furniture: Floor units. Wards: Sanitary fittings: Ceramic sink. Wards: Sanitary fittings: Ceramic WC.

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls 05 - Condition of internal walls 05 - Condition of internal walls 08 - Fixed Units

B B B C

£0 £0 £0 £1,500

10 20 20 0

0 0 0 0

0 0 0 3

0 0 0 3

0 0 0 9

2020 2030 2030 2010

08 - Fixed Units

B(C)

£10,000

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£1,000

1

0

3 3

9

2011

08 - Fixed Units

B(C)

£3,000

5

0

3 3

9

2015

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

Remedial Action

Location: 03 - Third Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01 - Decorations

C

£600

0

0

2 2

4

2010

Wards: Redecoration required within 5 year maintenance schedule - Located to 3.222, 3.C25, 3.223 and 3.324.

01 - Decorations

B(C)

£29,000

1

0

2 2

4

2011

01 - Decorations

B(C)

£29,000

1

0

2 2

4

2011

01 - Decorations

B(C)

£32,500

3

0

2 2

4

2013

01 - Decorations

B(C)

£32,500

3

0

2 2

4

2013

02 - Ceiling

C

£500

0

0

2 2

4

2010

02 - Ceiling

C

£500

0

0

2 2

4

2010

02 - Ceiling 02 - Ceiling

B B

£0 £0

10 20

0 0

0 0 0 0

0 0

2020 2030

Wards: Redecoration required within 5 year maintenance schedule - Located to Amyard (90%, cost includes decanting of the ward). Wards: Redecoration required within 5 year maintenance schedule - Located to Marnham (90%, cost includes decanting of the ward). Wards: Redecoration required within 5 year maintenance schedule - Located to Allingham (Cost includes decanting of the ward). Wards: Redecoration required within 5 year maintenance schedule - Located to Rodney Smith (Cost includes decanting of the ward). Wards: Suspended: replace with new (Localised replacement) - Located to Allingham. Wards: Suspended: replace with new (Localised replacement) - Located to Amyard. Wards: Suspended. Wards: Suspended.

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Wards: Vinyl: Need to replace vinyl sheet flooring - Located to 3.417 and 3.312. Wards: Vinyl: Need to replace vinyl tile flooring - Amyard ward, Marnham ward, Rodney Smith Ward, the common circulation routes and 3.425. Wards: Vinyl: Refix slip resistant vinyl sheet - Located to 3.104 and 3.213. Wards: Carpet: Need to replace contract quality carpet - Located to 3.302 and 3.324. Wards: Vinyl: Need to replace vinyl sheet flooring - Located to 3.110. Wards: Vinyl: Need to replace vinyl sheet flooring 3.201/3.323. Wards: Vinyl: Need to replace vinyl sheet flooring - Located to 3.108 and 3.109. Wards: Carpet: Need to replace contract quality carpet - Located to 3.103, 3.403 and 3.303. Wards: Vinyl: Need to replace vinyl sheet flooring - Located to 3.117 and 3.113. Wards: Slip resistant vinyl sheet. Wards: Vinyl sheet. Wards: Concrete. Wards: Vinyl covering: Refix to wall - Located to 3.205 and 3.423.

03 - Floor

C

£800

0

0

2 3

6

2010

03 - Floor

C

£112,000

0

0

2 3

6

2010

03 - Floor

C

£300

0

0

2 3

6

2010

03 - Floor

C

£1,350

0

0

2 3

6

2010

03 - Floor

C

£500

0

0

2 3

6

2010

03 - Floor

B(C)

£1,600

1

0

2 3

6

2011

03 - Floor

B(C)

£1,600

2

0

2 3

6

2012

03 - Floor

B(C)

£2,050

3

0

2 3

6

2013

03 - Floor

B(C)

£600

3

0

2 3

6

2013

03 - Floor 03 - Floor 03 - Floor 05 - Condition of internal walls

B B B C

£0 £0 £0 £500

7 7 10 0

0 0 0 0

0 0 0 2

0 0 0 6

2017 2017 2020 2010

Generic Hospital Physical Condition Survey

0 0 0 3

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Wards: Brickwork (plastered): Make good numerous impact damaged plasterwork - Located to 3.C10, 3.204, 6No. bed spaces (where headboards have been removed) to Marnham Ward. Wards: Brickwork (plastered): Make good impact damaged plasterwork - Located to 3.223. Wards: Brickwork (plastered): Make good numerous impact damaged plasterwork - Located to common circulation routes. Wards: Timber panel. Wards: Ceramic tiling. Wards: Brickwork (plastered). Wards: Sanitary fittings: Replace sink unit due to age and condition - Located to 3.025. Wards: Kitchen facilities: Oakleaf informed of drainage issues - Located to Marnham Ward. Wards: Kitchen facilities: Replace 1No. door - Located to 3.011. Wards: Sanitary fittings: Plastic bath: Replace with new due to age and condition, 1No. Wards: Sanitary fittings: Ceramic wash hand basin. Wards: Sanitary fittings: Ceramic WC. Wards: Kitchen facilities. Wards: Sanitary fittings: Ceramic sink.

05 - Condition of internal walls

C

£900

0

0

2 3

6

2010

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls

C

£600

0

0

2 3

6

2010

05 - Condition of internal walls 05 - Condition of internal walls 05 - Condition of internal walls 08 - Fixed Units

B B B C

£0 £0 £0 £750

10 10 20 0

0 0 0 0

0 0 0 3

0 0 0 3

0 0 0 9

2020 2020 2030 2010

08 - Fixed Units

C

£500

0

0

3 3

9

2010

08 - Fixed Units

C

£200

0

0

3 3

9

2010

08 - Fixed Units

B(C)

£1,000

5

0

3 3

9

2015

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units 08 - Fixed Units

B B

£0 £0

7 10

0 0

0 0 0 0

0 0

2017 2020

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 08 - Fixed Units

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

20

0

0 0

0

2030

Wards: Sanitary fittings: Metal sluice.

01 - Decorations

C

£8,400

0

0

2 2

4

2010

01 - Decorations

B(C)

£151,000

2

0

2 2

4

2012

02 - Ceiling

B(C)

£324,000

5

0

2 2

4

2015

03 - Floor

C

£8,400

0

0

2 3

6

2010

03 - Floor

B(C)

£1,400

2

0

2 3

6

2012

03 - Floor

B(C)

£1,050

5

0

2 3

6

2015

03 - Floor 03 - Floor

B B

£0 £0

7 7

0 0

0 0 0 0

0 0

2017 2017

05 - Condition of internal walls

C

£750

0

0

2 3

6

2010

Ward/Mixed Clinical: Redecoration required within 5 year maintenance schedule common circulation routes (10%). Ward/Mixed Clinical: Redecoration required within 5 year maintenance schedule Located to ward circulation routes and all wards (cost includes decanting). Ward/Mixed Clinical: Suspended: Concealed grid Take down and replace with new - Located to all wards and common circulation routes. Ward/Mixed Clinical: Vinyl: Need to replace vinyl tile flooring - Located to common circulation routes. Ward/Mixed Clinical: Carpet: Need to replace contract quality carpet - Located to 4.011 and 4.012. Ward/Mixed Clinical: Vinyl: Need to replace vinyl sheet flooring - Located to 4.010. Ward/Mixed Clinical: Vinyl sheet. Ward/Mixed Clinical: Slip resistant vinyl sheet. Ward/Mixed Clinical: Brickwork (plastered): Make good impact damaged plasterwork - Located to 4.123, 4.C18 and 4.418.

Location: 04 - Fourth Floor C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Ward/Mixed Clinical: Brickwork (plastered). Ward/Mixed Clinical: Sanitary fittings: Oakleaf informed of drainage issues to Shower Located to 4.305 (cost includes investigation). Ward/Mixed Clinical: Sanitary fittings: Oakleaf informed of drainage issues to metal sluice - Located to 4.208 (cost includes investigation). Ward/Mixed Clinical: Clinical units: Replace units due to age and condition - Located to all wards. Ward/Mixed Clinical: Sanitary fittings: Ceramic bath. Ward/Mixed Clinical: Sanitary fittings: Ceramic sink. Ward/Mixed Clinical: Sanitary fittings: Ceramic WC. Ward/Mixed Clinical: Sanitary fittings: Ceramic wash hand basin. Ward/Mixed Clinical: Sanitary fittings: Metal sluice.

05 - Condition of internal walls

B

£0

20

0

0 0

0

2030

08 - Fixed Units

C

£500

0

0

3 3

9

2010

08 - Fixed Units

C

£500

0

0

3 3

9

2010

08 - Fixed Units

B(C)

£26,000

5

0

3 3

9

2015

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

20

0

0 0

0

2030

C

£5,000

0

0

2 2

4

2010

Remedial Action

Location: 05 - Fifth Floor C - Building - Internal Fabric 01 - Decorations

Generic Hospital Physical Condition Survey

Ward/Mixed Clinical: Redecoration required within 5 year maintenance schedule Located to common circulation routes.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Ward/Mixed Clinical: Redecoration required within 5 year maintenance schedule Located to Holdsworth ward circulation routes and areas (cost includes decanting of the ward). Ward/Mixed Clinical: Redecoration required within 5 year maintenance schedule Located to Keate ward circulation routes and areas (cost includes decanting of the ward). Ward/Mixed Clinical: Redecoration required within 5 year maintenance schedule Located to Gunning ward circulation routes and areas (cost includes decanting of the ward). Ward/Mixed Clinical: Redecoration required within 5 year maintenance schedule Located to Cavell ward circulation routes and areas (cost includes decanting of the ward). Ward/Mixed Clinical: Suspended: Remove tiles and replace with new (Localised replacement). Ward/Mixed Clinical: Suspended. Ward/Mixed Clinical: Suspended.

01 - Decorations

B(C)

£30,000

1

0

2 2

4

2011

01 - Decorations

B(C)

£30,000

1

0

2 2

4

2011

01 - Decorations

B(C)

£30,000

1

0

2 2

4

2011

01 - Decorations

B(C)

£30,000

1

0

2 2

4

2011

02 - Ceiling

C

£1,000

0

0

2 2

4

2010

02 - Ceiling

B

£0

7

0

0 0

0

2017

02 - Ceiling

B

£0

20

0

0 0

0

2030

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Ward/Mixed Clinical: Vinyl: Need to replace vinyl tile flooring common - Located to circulation routes, Cavell ward, 5.325 and 5.326. Ward/Mixed Clinical: Vinyl: Seal vinyl flooring, to prolong useful life of the flooring - Located to Holdsworth Ward (cost includes decanting of the ward). Ward/Mixed Clinical: Vinyl: Need to replace vinyl sheet flooring - Located to 5.304, 5.308, 5.309, 5.317 and 5.313. Ward/Mixed Clinical: Vinyl: Need to replace slip resistant vinyl flooring - Located to 5.311, 5.312 and 5.412. Ward/Mixed Clinical: Vinyl sheet. Ward/Mixed Clinical: Slip resistant vinyl sheet. Ward/Mixed Clinical: Brickwork (plastered): Make good damaged plasterwork - Located to 5.107. Ward/Mixed Clinical: Brickwork (plastered): Make good damaged plasterwork to where headboards have been removed. Ward/Mixed Clinical: Brickwork (plastered): Make good damage adjacent to plug socket Located to 5.110.

03 - Floor

C

£33,350

0

0

2 3

6

2010

03 - Floor

C

£4,800

0

0

2 3

6

2010

03 - Floor

B(C)

£3,900

3

0

2 3

6

2013

03 - Floor

B(C)

£1,200

5

0

2 3

6

2015

03 - Floor 03 - Floor

B B

£0 £0

7 7

0 0

0 0 0 0

0 0

2017 2017

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls

C

£800

0

0

2 3

6

2010

05 - Condition of internal walls

C

£200

0

0

2 3

6

2010

05 - Condition of internal walls

B

£0

10

0

0 0

0

2020

Generic Hospital Physical Condition Survey

Remedial Action

Ward/Mixed Clinical: Ceramic tiling. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Ward/Mixed Clinical: Brickwork (plastered). Ward/Mixed Clinical: Sanitary fittings: Replace broken cistern to ceramic WC and investigate drainage issues - Located to 5.117, 5.106 and 5.123 (cost includes replacement and investigation of cisterns). Ward/Mixed Clinical: Clinical units: Replace units due to age and condition - Located to 5.109. Ward/Mixed Clinical: Clinical units: Replace units due to age and condition - Located to 5.110. Ward/Mixed Clinical: Kitchen facilities: Replace kitchen units due to age and condition 5.102/5.202. Ward/Mixed Clinical: Sanitary fittings: Plastic bath. Ward/Mixed Clinical: Sanitary fittings: Ceramic WC. Ward/Mixed Clinical: Clinical units. Ward/Mixed Clinical: Sanitary fittings: Ceramic wash hand basin. Ward/Mixed Clinical: Sanitary fittings: Metal sluice. Ward/Mixed Clinical: Drainage: Oakleaf informed of drainage issues - Located to 5.112 and 5.212 (cost includes further investigation).

05 - Condition of internal walls

B

£0

20

0

0 0

0

2030

08 - Fixed Units

C

£1,000

0

0

3 3

9

2010

08 - Fixed Units

C

£5,000

0

0

3 3

9

2010

08 - Fixed Units

C

£5,000

0

0

3 3

9

2010

08 - Fixed Units

C

£2,000

0

0

3 3

9

2010

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

7

0

0 0

0

2017

08 - Fixed Units

B

£0

10

0

0 0

0

2020

12 - Comments

C

£1,000

0

0

4 5 20

2010

Remedial Action

Location: Elevation 01 B - Building - External Fabric Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 04 - Windows

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B(C)

£21,000

5

0

4 3 12

2015

Aluminium - Single: Redecorate and make good painted aluminium window frames, overhaul 140 windows Located to elevation 1.

B(C)

£15,300

5

0

4 3 12

2015

Aluminium - Single: Redecorate and make good painted aluminium window frames, overhaul 102 windows Located to elevation 2.

B(C)

£8,100

5

0

4 3 12

2015

Aluminium - Single: Redecorate and make good painted aluminium window frames, overhaul 54 windows - Located to elevation 3.

B(C)

£10,500

5

0

4 3 12

2015

Aluminium - Single: Redecorate and make good painted aluminium window frames, overhaul 70 windows - Located to elevation 4.

Location: Elevation 02 B - Building - External Fabric 04 - Windows

Location: Elevation 03 B - Building - External Fabric 04 - Windows

Location: Elevation 04 B - Building - External Fabric 04 - Windows

Location: Roof 01 D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02a - Flat - Covering

Cost to B Rem Life Priority C L

R

Year

Notes Asphalt: Asphalt roof covering requires renewal inclusive of making good the decking, patch repaired, relay chippings, replace missing drainage caps, (cost allows for 10% replacement over the maintenance period). Reinforced concrete. Aluminium. Brickwork: Rendered. Integrated. Internal (assumed condition, due to no access).

B(C)

£29,000

5

0

4 4 16

2015

B B B B B

£0 £0 £0 £0 £0

10 10 10 6 6

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2020 2020 2020 2016 2016

02a - Flat - Covering

C

£20,000

0

0

4 4 16

2010

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

10 10 20 6 6

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2020 2020 2030 2016 2016

02i - Flat - Skylights

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

0 0 0 0 0

Remedial Action

Location: Roof 02 D - Building - Roof Asphalt: Asphalt roof covering requires renewal inclusive of making good the decking, patch repaired, relay chippings, replace missing drainage caps, (cost allows for 10% replacement over the maintenance period). Reinforced concrete. Aluminium. Brickwork: Rendered. Integrated. Internal (assumed condition, due to no access). Aluminium framed skylight.

Location: Roof 03 D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Asphalt: Asphalt roof covering requires renewal inclusive of making good the decking, patch repaired, relay chippings, replace missing drainage caps, (cost allows for 10% replacement over the maintenance period). Reinforced concrete. Aluminium. Integrated (cost included in covering). Internal (assumed condition, due to no access).

02a - Flat - Covering

B(C)

£8,750

5

0

4 4 16

2015

02b - Flat - Decking 02c - Flat - Flashing 02g - Flat - Guttering

B B B(C)

£0 £0 £0

10 10 5

0 0 0

0 0 0 0 0 0 4 4 16

2020 2020 2015

B

£0

6

0

0 0

0

2016

02a - Flat - Covering

B(C)

£4,000

5

0

4 4 16

2015

02b - Flat - Decking 02c - Flat - Flashing 02g - Flat - Guttering

B B B(C)

£0 £0 £0

10 10 5

0 0 0

0 0 0 0 0 0 4 4 16

2020 2020 2015

B

£0

6

0

0 0

2016

02h - Flat - Down Rainwater pipes

Remedial Action

Location: Roof 04 D - Building - Roof

02h - Flat - Down Rainwater pipes

0

Asphalt: Asphalt roof covering requires renewal inclusive of making good the decking, patch repaired, relay chippings, replace missing drainage caps, (cost allows for 10% replacement over the maintenance period). Reinforced concrete. Aluminium. Integrated (cost included in covering). Internal (assumed condition, due to no access).

Location: Roof 05 D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

02a - Flat - Covering

B(C)

£4,000

5

0

4 4 16

2015

Asphalt: Asphalt roof covering requires renewal inclusive of making good the decking 10% replacement. patch repaired, relay chippings, replace missing drainage caps.

02b - Flat - Decking 02c - Flat - Flashing 02g - Flat - Guttering

B B B(C)

£0 £0 £0

10 10 5

0 0 0

0 0 0 0 0 0 4 4 16

2020 2020 2015

B

£0

6

0

0 0

0

2016

Reinforced concrete. Aluminium. Integrated (cost included in covering). Internal (assumed condition, due to no access).

02a - Flat - Covering

B(C)

£6,000

5

0

4 4 16

2015

02b - Flat - Decking 02c - Flat - Flashing 02g - Flat - Guttering

B B B(C)

£0 £0 £0

10 10 5

0 0 0

0 0 0 0 0 0 4 4 16

2020 2020 2015

B

£0

6

0

0 0

0

2016

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking

B

£0

10

0

0 0

0

2020

02h - Flat - Down Rainwater pipes

Location: Roof 06 D - Building - Roof

02h - Flat - Down Rainwater pipes

Asphalt: Asphalt roof covering requires renewal inclusive of making good the decking, patch repaired, relay chippings, replace missing drainage caps, (cost allows for 10% replacement over the maintenance period). Reinforced concrete. Aluminium. Integrated (cost included in covering). Internal (assumed condition, due to no access).

Location: Roof 07 D - Building - Roof

Generic Hospital Physical Condition Survey

Asphalt: Asphalt roof covering appears in acceptable condition. Reinforced concrete. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02c - Flat - Flashing 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B B

£0 £0 £0

10 6 6

0 0 0

0 0 0 0 0 0

0 0 0

2020 2016 2016

Aluminium. Integrated. Internal (assumed condition, due to no access).

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

10 10 10 6 6

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2020 2020 2020 2016 2016

02i - Flat - Skylights

B

£0

10

0

0 0

0

2020

Asphalt: Asphalt roof covering appears in good condition. Reinforced concrete. Aluminium. Brickwork: Rendered. Integrated. Internal (assumed condition, due to no access). Aluminium framed skylight.

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02c - Flat - Flashing 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B

£0 £0 £0 £0

10 10 6 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2020 2020 2016 2016

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02c - Flat - Flashing 02g - Flat - Guttering

B B B

£0 £0 £0

10 10 6

0 0 0

0 0 0 0 0 0

0 0 0

2020 2020 2016

Location: Roof 08 D - Building - Roof

Location: Roof 09 D - Building - Roof Asphalt: Asphalt roof covering appears in acceptable condition. Reinforced concrete. Aluminium. Integrated. Internal (assumed condition, due to no access).

Location: Roof 10 D - Building - Roof

Generic Hospital Physical Condition Survey

Asphalt: Asphalt roof covering appears in acceptable condition. Reinforced concrete. Aluminium. Integrated. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02h - Flat - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

6

0

0 0

0

2016

Internal (assumed condition, due to no access).

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

10 10 20 6 6

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2020 2020 2030 2016 2016

Asphalt: Asphalt roof covering appears in acceptable condition. Reinforced concrete. Aluminium. Brickwork: Rendered. Integrated. Internal (assumed condition, due to no access).

02a - Flat - Covering

C

£250

0

0

4 4 16

2010

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

10 10 20 6 6

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2020 2020 2030 2016 2016

02a - Flat - Covering

C

£250

0

0

4 4 16

2010

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02d - Flat - Parapets

B B

£0 £0

10 20

0 0

0 0 0 0

0 0

2020 2030

Location: Roof 11 D - Building - Roof

0 0 0 0 0

Location: Roof 12 D - Building - Roof

0 0 0 0 0

Asphalt: Asphalt roof covering requires clearing. Asphalt: Asphalt roof covering appears in acceptable condition. Reinforced concrete. Aluminium. Brickwork: Rendered. Integrated. Internal (assumed condition, due to no access).

Location: Roof 13 D - Building - Roof

Generic Hospital Physical Condition Survey

Asphalt: Asphalt roof covering requires clearing. Asphalt: Asphalt roof covering appears in acceptable condition. Reinforced concrete. Brickwork: Rendered. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B

£0 £0

6 6

0 0

0 0 0 0

0 0

2016 2016

Integrated. Internal (assumed condition, due to no access).

02a - Flat - Covering

C

£250

0

0

4 4 16

2010

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B

£0 £0 £0 £0

10 20 6 6

0 0 0 0

0 0 0 0

0 0 0 0

2020 2030 2016 2016

Asphalt: Asphalt roof covering requires clearing. Asphalt: Asphalt roof covering appears in acceptable condition. Reinforced concrete. Brickwork: Rendered. Integrated. Internal (assumed condition, due to no access).

02a - Flat - Covering

C

£250

0

0

4 4 16

2010

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B

£0 £0 £0 £0

10 20 6 6

0 0 0 0

0 0 0 0

0 0 0 0

2020 2030 2016 2016

02a - Flat - Covering

C

£250

0

0

4 4 16

2010

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking

B

£0

10

0

0 0

0

2020

Location: Roof 14 D - Building - Roof

0 0 0 0

Location: Roof 15 D - Building - Roof

0 0 0 0

Asphalt: Asphalt roof covering requires clearing. Asphalt: Asphalt roof covering appears in acceptable condition. Reinforced concrete. Brickwork: Rendered. Integrated. Internal (assumed condition, due to no access).

Location: Roof 16 D - Building - Roof

Generic Hospital Physical Condition Survey

Asphalt: Asphalt roof covering requires clearing. Asphalt: Asphalt roof covering appears in acceptable condition. Reinforced concrete. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B B

£0 £0 £0

20 6 6

0 0 0

0 0 0 0 0 0

0 0 0

2030 2016 2016

Brickwork: Rendered. Integrated. Internal (assumed condition, due to no access).

02a - Flat - Covering

C

£250

0

0

4 4 16

2010

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B

£0 £0 £0 £0

10 20 6 6

0 0 0 0

0 0 0 0

0 0 0 0

2020 2030 2016 2016

Asphalt: Asphalt roof covering requires clearing. Asphalt: Asphalt roof covering appears in acceptable condition. Reinforced concrete. Brickwork: Rendered. Integrated. Internal (assumed condition, due to no access).

02a - Flat - Covering

C

£250

0

0

4 4 16

2010

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B

£0 £0 £0 £0

10 20 6 6

0 0 0 0

0 0 0 0

0 0 0 0

2020 2030 2016 2016

02a - Flat - Covering

C

£250

0

0

4 4 16

2010

02a - Flat - Covering

B

£0

6

0

0 0

2016

Location: Roof 17 D - Building - Roof

0 0 0 0

Location: Roof 18 D - Building - Roof

0 0 0 0

Asphalt: Asphalt roof covering requires clearing. Asphalt: Asphalt roof covering appears in acceptable condition. Reinforced concrete. Brickwork: Rendered. Integrated. Internal (assumed condition, due to no access).

Location: Roof 19 D - Building - Roof

Generic Hospital Physical Condition Survey

0

Asphalt: Asphalt roof covering requires clearing. Asphalt: Asphalt roof covering appears in acceptable condition. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

Cost to B Rem Life Priority C L 0 0 0 0 0

R

Year

Notes

Remedial Action

B B B B B

£0 £0 £0 £0 £0

10 10 20 6 6

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2020 2020 2030 2016 2016

Reinforced concrete. Aluminium. Brickwork: Rendered. Integrated. Internal (assumed condition, due to no access).

02a - Flat - Covering

C

£250

0

0

4 4 16

2010

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

10 10 10 20 6

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2020 2020 2020 2030 2016

Asphalt: Asphalt roof covering requires clearing. Asphalt: Asphalt roof covering appears in acceptable condition. Reinforced concrete. Aluminium. Brickwork: Rendered. Brickwork: Rendered. Integrated.

02a - Flat - Covering

C

£250

0

0

4 4 16

2010

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

10 10 20 6 6

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2020 2020 2030 2016 2016

Location: Roof 20 D - Building - Roof

0 0 0 0 0

Location: Roof 21 D - Building - Roof

0 0 0 0 0

Asphalt: Asphalt roof covering requires clearing. Asphalt: Asphalt roof covering appears in acceptable condition. Reinforced concrete. Aluminium. Brickwork: Rendered. Integrated. Internal (assumed condition, due to no access).

Location: Roof 22 D - Building - Roof Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Asphalt: Asphalt roof covering appears in acceptable condition (No safe access). Reinforced concrete. Aluminium. Brickwork: Rendered. Integrated. Internal (assumed condition, due to no access).

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

10 10 20 6 6

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2020 2020 2030 2016 2016

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B B

£0 £0 £0 £0 £0

10 10 20 6 6

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2020 2020 2030 2016 2016

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B

£0 £0 £0 £0

10 20 10 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2020 2030 2020 2016

B

£0

10

0

0 0

0

2020

Remedial Action

Location: Roof 23 D - Building - Roof Asphalt: Asphalt roof covering appears in acceptable condition. Reinforced concrete. Aluminium. Brickwork: Rendered. Integrated. Internal (assumed condition, due to no access).

Location: Roof 24 D - Building - Roof Profiled metal sheeting appears in acceptable condition. Aluminium. Brickwork. Integrated. Internal (assumed condition, due to no access).

Location: Roof 25 D - Building - Roof 02a - Flat - Covering Generic Hospital Physical Condition Survey

Profiled metal sheeting appears in acceptable condition. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B B B B

£0 £0 £0 £0

10 20 10 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2020 2030 2020 2016

Aluminium. Brickwork. Integrated. Internal (assumed condition, due to no access).

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

02b - Flat - Decking 02c - Flat - Flashing 02g - Flat - Guttering

B B C

£0 £0 £250

10 10 0

0 0 0

0 0 0 0 0 0 4 4 16

2020 2020 2010

02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B

£0 £0

10 6

0 0

0 0 0 0

0 0

2020 2016

Profiled metal sheeting appears in acceptable condition. Reinforced concrete. Steel. Box gutters: Requires cleaning out. Box Gutters. Internal (assumed condition, due to no access).

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

02c - Flat - Flashing 02g - Flat - Guttering

B C

£0 £250

10 0

0 0

0 0 0 4 4 16

2020 2010

02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B

£0 £0

10 6

0 0

0 0 0 0

0 0

2020 2016

02a - Flat - Covering

B

£0

7

0

0 0

0

2017

02c - Flat - Flashing 02g - Flat - Guttering

B B

£0 £0

7 7

0 0

0 0 0 0

0 0

2017 2017

Location: Roof 26 D - Building - Roof

Location: Roof 27 D - Building - Roof Profiled metal sheeting appears in acceptable condition. Lead. Box gutters: Requires cleaning out. Box gutters. Internal (assumed condition, due to no access).

Location: Roof 28 D - Building - Roof

Generic Hospital Physical Condition Survey

Profiled metal sheeting appears in acceptable condition. Aluminium. Integrated. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 02h - Flat - Down Rainwater pipes

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

6

0

0 0

0

2016

Internal (assumed condition, due to no access).

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

Single ply membrane.

02c - Flat - Flashing 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B

£0 £0 £0

10 10 6

0 0 0

0 0 0 0 0 0

0 0 0

2020 2020 2016

Single ply membrane. Integrated. Internal (assumed condition, due to no access).

B B B B

£0 £0 £0 £0

10 10 10 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2020 2020 2020 2016

Single ply membrane. Reinforced concrete. Integrated. Internal (assumed condition, due to no access).

B B B B B

£0 £0 £0 £0 £0

10 10 10 10 6

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

2020 2020 2020 2020 2016

Single ply membrane. Reinforced concrete. Aluminium. Integrated. Internal (assumed condition, due to no access).

Location: Roof 29 D - Building - Roof

Location: Roof 30 D - Building - Roof 02a - Flat - Covering 02b - Flat - Decking 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

Location: Roof 31 D - Building - Roof 02a - Flat - Covering 02b - Flat - Decking 02c - Flat - Flashing 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

Location: Roof 32 Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Asphalt: Asphalt roof covering appears in acceptable condition. Reinforced concrete. Integrated. Internal (assumed condition, due to no access).

D - Building - Roof 02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B

£0 £0 £0

10 6 6

0 0 0

0 0 0 0 0 0

0 0 0

2020 2016 2016

02a - Flat - Covering

B

£0

6

0

0 0

0

2016

02b - Flat - Decking 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B

£0 £0 £0

10 6 6

0 0 0

0 0 0 0 0 0

0 0 0

2020 2016 2016

02a - Flat - Covering

B

£0

10

0

0 0

0

2020

02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering 02h - Flat - Down Rainwater pipes

B B B B

£0 £0 £0 £0

10 20 10 6

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2020 2030 2020 2016

B

£0

20

0

0 0

0

2030

Location: Roof 33 D - Building - Roof Asphalt: Asphalt roof covering appears in acceptable condition. Reinforced concrete. Integrated. Internal (assumed condition, due to no access).

Location: Roof 34 D - Building - Roof Profiled metal sheeting appears in acceptable condition. Aluminium. Brickwork. Integrated. Internal (assumed condition, due to no access).

Location: Whole Block A - Building - Physical Structure 01 - General Structure

Generic Hospital Physical Condition Survey

Pre-fabricated: Generally sound.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01 - General Structure

B

£0

50

0

0 0

0

2060

Brickwork: Generally sound.

02 - Foundations 02 - Foundations 03 - Ground Stability 04 - Chimneys

B B B B

£0 £0 £0 £0

20 50 50 10

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2030 2060 2060 2020

Generally sound. Generally sound. Generally sound. Steel flue.

B B B B B B B B

£0 £0 £0 £0 £0 £0 £0 £0

50 50 20 50 10 20 10 10

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0

2060 2060 2030 2060 2020 2030 2020 2020

Brickwork. Brickwork. Brickwork. Brickwork. DPC. Aluminium - Double. Aluminium. Aluminium.

01 - Ductwork

B

£0

12

0

0 0

0

2022

04 - Insulation

B

£0

10

0

0 0

0

2020

06 - Pipework

B

£0

10

0

0 0

0

2020

Plant Area: Ductwork in acceptable order. Plant Area: Lagging in acceptable order. Plant Area: Pipework in acceptable order.

B

£0

9

0

0 0

0

2019

B - Building - External Fabric 01b - Masonry - Spalling 01c - Masonry - Pointing 01d - Masonry - Finish 01d - Masonry - Finish 03 - DPC 04 - Windows 06 - Doors 06 - Doors

Facet: 2 - Engineering Location: 0.5 - Mezzanine K - Engineering - Vent & Air Con

P - Engineering - Main Plant 04 - Extract Fans

Plant Area: Extract fans in acceptable order.

R - Engineering - Electrical Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Plant Area: Surface fluorescent lights in acceptable order. Plant Area: Emergency lights in acceptable order.

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

12

0

0 0

0

2022

01 - Sounders

B

£0

10

0

0 0

0

2020

02 - Call Points

B

£0

12

0

0 0

0

2022

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

05 - Fire Main/Zone Panel

B

£0

16

0

0 0

0

2026

01 - Heat Emitters

C

£600

0

0

2 2

4

2010

01 - Heat Emitters

C

£8,400

0

0

2 2

4

2010

01 - Heat Emitters

B

£0

8

0

0 0

0

2018

01 - Heat Emitters

B

£0

12

0

0 0

0

2022

01 - Heat Emitters

B

£0

14

0

0 0

0

2024

01 - Heat Emitters

B

£0

15

0

0 0

0

2025

01 - Heat Emitters

B

£0

15

0

0 0

0

2025

Remedial Action

V - Engineering - Fire Alarms Plant Area: Fire alarm sounders in acceptable order. Plant Area: Fire alarm call points in acceptable order. Plant Area: Smoke detectors in acceptable order. Plant Area: Fire alarm main panel in acceptable order.

Location: 00 - Ground Floor I - Engineering - Heating Systems

Generic Hospital Physical Condition Survey

Orthotics: Cast iron radiator with low surface temperature cover requires replacement. 1513: 14No. cast iron radiators with low surface temperature covers require replacement. 142: Electric heaters in acceptable order. 121: Gas heaters in acceptable order. Clinic 3: Steel panel radiators in acceptable order. Richmond Ward: High efficiency radiators with low surface temperature covers in acceptable order. Clinic 4: High efficiency radiators with low surface temperature covers in acceptable order.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes X-Ray: Steel panel radiators in acceptable order. A&E: Steel panel radiators in acceptable order. Clinic 2: Steel panel radiators in acceptable order. Clinical Decisions Unit: Steel panel radiators in acceptable order. A&E: High efficiency radiators with low surface temperature covers in acceptable order.

01 - Heat Emitters

B

£0

15

0

0 0

0

2025

01 - Heat Emitters

B

£0

15

0

0 0

0

2025

01 - Heat Emitters

B

£0

16

0

0 0

0

2026

01 - Heat Emitters

B

£0

16

0

0 0

0

2026

01 - Heat Emitters

B

£0

16

0

0 0

0

2026

03 - Grilles & Diffusers 03 - Grilles & Diffusers

C C

£150 £150

0 0

0 0

2 2 2 2

4 4

2010 2010

03 - Grilles & Diffusers

C

£150

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£150

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£150

0

0

2 2

4

2010

03 - Grilles & Diffusers

B

£0

9

0

0 0

0

2019

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

03 - Grilles & Diffusers

B

£0

14

0

0 0

0

2024

03 - Grilles & Diffusers

B

£0

14

0

0 0

0

2024

03 - Grilles & Diffusers

B

£0

14

0

0 0

0

2024

03 - Grilles & Diffusers

B

£0

14

0

0 0

0

2024

Remedial Action

K - Engineering - Vent & Air Con

Generic Hospital Physical Condition Survey

A&E: Grille requires cleaning. C38: Grille is missing and requires replacement. 107: Grille/diffuser requires replacement. Store 306: Grille requires cleaning. 682: Grille is missing and requires replacement. Richmond Ward: Grilles/diffusers in acceptable order. Clinic 3: Grilles/diffusers in acceptable order. Stoma Care: Grilles/diffusers in acceptable order. Chapel: Grilles/diffusers in acceptable order. Orthotics: Grilles/diffusers in acceptable order. Pharmacy: Grilles/diffusers in acceptable order. Clinic 4: Grilles/diffusers in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Clinic 1: Grilles/diffusers in acceptable order. X-Ray: Grilles/diffusers in acceptable order. Fracture & Orthopaedic Clinic: Grilles/diffusers in acceptable order. Clinical Decisions Unit: Grilles/diffusers in acceptable order. C41: Grilles/diffusers in acceptable order. 121: Grilles/diffusers in acceptable order. Grilles/diffusers in acceptable order. 122: 2No. fan coil units require upgrading within the maintenance schedule. Clinic 2: Air conditioning in acceptable order. 602A: Air conditioning in acceptable order. Fracture & Orthopaedic Clinic: Air conditioning in acceptable order. Air conditioning in acceptable order. 220: Air conditioning in acceptable order. 232: Air conditioning in acceptable order.

03 - Grilles & Diffusers

B

£0

14

0

0 0

0

2024

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

16

0

0 0

0

2026

03 - Grilles & Diffusers

B

£0

19

0

0 0

0

2029

05 - Cooling Units

B(C)

£600

1

0

3 3

9

2011

05 - Cooling Units

B

£0

8

0

0 0

0

2018

05 - Cooling Units

B

£0

9

0

0 0

0

2019

05 - Cooling Units

B

£0

9

0

0 0

0

2019

05 - Cooling Units

B

£0

9

0

0 0

0

2019

05 - Cooling Units

B

£0

9

0

0 0

0

2019

05 - Cooling Units

B

£0

9

0

0 0

0

2019

01 - Local Water Heaters

B

£0

8

0

0 0

0

2018

01 - Local Water Heaters

B

£0

9

0

0 0

0

2019

Remedial Action

M - Engineering - Hot/Cold Water

Generic Hospital Physical Condition Survey

121: Water heater in acceptable order. Water heater in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Richmond Ward: Water heater in acceptable order. 109a: Water pipes require replacement. 146: Blending valve requires upgrading within the maintenance schedule. Clinic 2: Blending valves in acceptable order. 121: Blending valves in acceptable order. Clinical Decisions Unit: Blending valves in acceptable order. C34: Fire hose reel requires removal as it poses risk of legionella.

01 - Local Water Heaters

B

£0

9

0

0 0

0

2019

02 - Pipework

C

£500

0

0

3 2

6

2010

03 - Blending Valves

B(C)

£750

4

0

3 3

9

2014

03 - Blending Valves

B

£0

6

0

0 0

0

2016

03 - Blending Valves

B

£0

8

0

0 0

0

2018

03 - Blending Valves

B

£0

9

0

0 0

0

2019

06 - Hose Reels

C

£600

0

0

2 3

6

2010

06 - Hose Reels

C

£600

0

0

2 3

6

2010

06 - Hose Reels

C

£600

0

0

2 3

6

2010

B B

£0 £0

15 20

0 0

0 0 0 0

0 0

2025 2030

C04: Lift in acceptable order. Richmond Ward: Lift in acceptable order.

B(C)

£3,000

2

0

2 3

6

2012

111: 2No. pumps require upgrading within the maintenance schedule.

401: Fire hose reel requires removal as it poses risk of legionella. C19: Fire hose reel requires removal as it poses risk of legionella.

N - Engineering - Lifts 01 - Lifts 01 - Lifts O - Engineering - Main Plant 02 - Pumps

P - Engineering - Main Plant Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 111: Control panel is in need of replacement. M05: Control panel in acceptable order. 602A: Control panel in acceptable order.

03 - Controls

C

£20,000

0

0

4 3 12

2010

03 - Controls

B

£0

19

0

0 0

0

2029

03 - Controls

B

£0

20

0

0 0

0

2030

01 - Incoming Cable

B

£0

25

0

0 0

0

2035

02 - Main Switchgear

C

£400

0

0

2 2

4

2010

02 - Main Switchgear

C

£500

0

0

2 2

4

2010

02 - Main Switchgear

C

£400

0

0

2 2

4

2010

02 - Main Switchgear

C

£7,500

0

0

2 2

4

2010

02 - Main Switchgear

C

£600

0

0

2 2

4

2010

02 - Main Switchgear

B

£0

19

0

0 0

0

2029

03 - Distribution Boards

C

£3,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£10,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£10,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£4,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£6,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£3,000

0

0

3 3

9

2010

03 - Distribution Boards

B

£0

18

0

0 0

0

2028

03 - Distribution Boards

B

£0

19

0

0 0

0

2029

Remedial Action

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

PVC incoming cable in acceptable order. M20: 2No. isolators require replacement. M06: 2No. isolators require replacement. M16: 2No. isolators require replacement. M15: 5No. isolators require replacement. M14: 2No. isolators require replacement. M05: 4No. isolators in acceptable order. M20: 2No. distribution boards require replacement. M15: 5No. distribution boards require replacement. M06: 3No. distribution boards require replacement. Orthotics: 2No. distribution boards require replacement. M10: 3No. fuse boards require replacement. M16: 2No. distribution boards require replacement. 602A: Mini circuit breakers in acceptable order. M05: Distribution boards in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Distribution boards in acceptable order. 220: Distribution board in acceptable order. 161: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 333c: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 404: 3No. fluorescent lights over visual display equipment are not suitable and require upgrading. 144: Fluorescent light over visual display equipment is not suitable and requires upgrading. 160: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. Store 306: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 402: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 408: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. C04: 5No. surface fluorescent lights require replacement.

03 - Distribution Boards

B

£0

20

0

0 0

0

2030

03 - Distribution Boards

B

£0

20

0

0 0

0

2030

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£600

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£800

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£1,000

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Pharmacy: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. M15: 2No. surface fluorescent lights require replacement. 129: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 159: 3No. fluorescent lights over visual display equipment are not suitable and require upgrading. C06: 3No. surface fluorescent lights require replacement. 213: Surface fluorescent light requires replacement. 248: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 220: Surface fluorescent light requires replacement. 331: 3No. fluorescent lights over visual display equipment are not suitable and require upgrading. 330: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. C26: 2No. surface fluorescent lights require replacement. 203: 16No. fluorescent lights over visual display equipment are not suitable and require upgrading.

04 - Lighting Installation

C

£800

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£600

0

0

3 2

6

2010

04 - Lighting Installation

C

£600

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£600

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£3,200

0

0

3 2

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes C39: 8No. fluorescent lights over visual display equipment are not suitable and require upgrading. 322: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 343: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 313: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. C24: 2No. surface fluorescent lights require replacement. C38: 2No. surface fluorescent lights require replacement. 346: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 352: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 349: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 134: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. C37: 2No. surface fluorescent lights require replacement.

04 - Lighting Installation

C

£1,600

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 155: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. C41: 3No. surface fluorescent lights require replacement. Stoma Care: 3No. fluorescent lights over visual display equipment are not suitable and require upgrading. 314: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 156: 9No. surface fluorescent lights require replacement. 138: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 158: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 133: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 148: 6No. fluorescent lights over visual display equipment are not suitable and require upgrading. A&E: 2No. surface fluorescent lights require replacement. 647: Surface fluorescent light has no cover and requires replacement.

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£600

0

0

2 2

4

2010

04 - Lighting Installation

C

£600

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£1,800

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£1,200

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 645: Surface fluorescent light has a broken cover and requires replacement. 673: Surface fluorescent light has a broken cover and requires replacement. 603: Surface fluorescent light has a broken cover and requires replacement. C31: Surface fluorescent light requires replacement. 111: 2No. surface fluorescent lights require replacement. 112: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 225: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. C22: Surface fluorescent light requires replacement. 154: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 226: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 685: Fluorescent light over visual display equipment is not suitable and requires upgrading. C31: 4No. tungsten lights require upgrading within the maintenance schedule.

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes C18: 9No. tungsten lights require upgrading within the maintenance schedule. Clinic 2: 30No. tungsten lights require upgrading within the maintenance schedule. 110: 12No. tungsten lights require upgrading within the maintenance schedule. 114: 20No. tungsten lights require upgrading within the maintenance schedule. A&E: 18No. tungsten lights require upgrading within the maintenance schedule. Pharmacy: Surface fluorescent lights in acceptable order. Richmond Ward: Surface fluorescent lights in acceptable order. Clinic 3: Surface fluorescent lights in acceptable order. C01: Surface fluorescent lights in acceptable order. Orthotics: Surface fluorescent lights in acceptable order. Clinic 4: Surface fluorescent lights in acceptable order. Chapel: Surface fluorescent lights in acceptable order. Clinic 1: Surface fluorescent lights in acceptable order. Clinic 2: Surface fluorescent lights in acceptable order. Clinical Decisions Unit: Surface fluorescent lights in acceptable order. Clinic 1: CAT II lights in acceptable order.

04 - Lighting Installation

B(C)

£1,800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£6,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£2,400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£4,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£3,600

3

0

2 2

4

2013

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Chapel: CAT II lights in acceptable order. Richmond Ward: CAT II lights in acceptable order. 121: Surface fluorescent lights in acceptable order. Clinic 3: CAT II lights in acceptable order. X-Ray: Surface fluorescent lights in acceptable order. Clinical Decisions Unit: CAT II lights in acceptable order. Fracture & Orthopaedic Clinic: Surface fluorescent lights in acceptable order. Clinic 4: CAT II lights in acceptable order. Clinic 2: CAT II lights in acceptable order. A&E: CAT II lights in acceptable order. Fracture & Orthopaedic Clinic: CAT II lights in acceptable order. CAT II lights in acceptable order. Surface fluorescent lights in acceptable order. A&E: Surface fluorescent lights in acceptable order. C22: Emergency light requires replacement. A&E: Emergency lights on during survey suggesting there may be a possible fault. C01: Emergency lights in acceptable order. Orthotics: Emergency lights in acceptable order.

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

04 - Lighting Installation 04 - Lighting Installation

B B

£0 £0

12 12

0 0

0 0 0 0

0 0

2022 2022

04 - Lighting Installation

B

£0

12

0

0 0

0

2022

05 - Emergency Lighting

C

£200

0

0

4 2

8

2010

05 - Emergency Lighting

N/A

£0

0

0

0 0

0

2010

05 - Emergency Lighting

B

£0

8

0

0 0

0

2018

05 - Emergency Lighting

B

£0

8

0

0 0

0

2018

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Pharmacy: Emergency lights in acceptable order. Chapel: Emergency lights in acceptable order. Richmond Ward: Emergency lights in acceptable order. Clinic 4: Emergency lights in acceptable order. 121: Emergency lights in acceptable order. Clinic 3: Emergency lights in acceptable order. C41: Emergency lights in acceptable order. Clinic 2: Emergency lights in acceptable order. Clinic 1: Emergency lights in acceptable order. X-Ray: Emergency lights in acceptable order. Clinical Decisions Unit: Emergency lights in acceptable order. A&E: Emergency lights in acceptable order. Emergency lights in acceptable order. Fracture & Orthopaedic Clinic: Sockets and switches in acceptable order. 121: Sockets and switches in acceptable order. Clinic 2: Sockets and switches in acceptable order. Richmond Ward: Sockets and switches in acceptable order. X-Ray: Sockets and switches in acceptable order.

05 - Emergency Lighting

B

£0

8

0

0 0

0

2018

05 - Emergency Lighting

B

£0

8

0

0 0

0

2018

05 - Emergency Lighting

B

£0

8

0

0 0

0

2018

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2020

05 - Emergency Lighting

B

£0

10

0

0 0

0

2020

05 - Emergency Lighting

B

£0

11

0

0 0

0

2021

05 - Emergency Lighting

B

£0

12

0

0 0

0

2022

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes A&E: Sockets and switches in acceptable order. Sockets and switches in acceptable order. Clinical Decisions Unit: Sockets and switches in acceptable order. Clinic 3: Emergency door release in acceptable order. Clinic 2: Emergency door release in acceptable order. Fracture & Orthopaedic Clinic: Emergency door release in acceptable order. Richmond Ward: Emergency door release in acceptable order. A&E: Emergency door release in acceptable order. Emergency door release in acceptable order.

06 - Sockets/Switches

B

£0

12

0

0 0

0

2022

06 - Sockets/Switches

B

£0

12

0

0 0

0

2022

06 - Sockets/Switches

B

£0

12

0

0 0

0

2022

08 - Comments

B

£0

8

0

0 0

0

2018

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

10

0

0 0

0

2020

08 - Comments

B

£0

18

0

0 0

0

2028

01 - Sounders

B

£0

8

0

0 0

0

2018

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

10

0

0 0

0

2020

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

C01: Fire alarm sounders in acceptable order. Clinic 3: Fire alarm sounders in acceptable order. 121: Fire alarm sounders in acceptable order. Richmond Ward: Fire alarm sounders in acceptable order. Orthotics: Fire alarm sounders in acceptable order. Pharmacy: Fire alarm sounders in acceptable order. Chapel: Fire alarm sounders in acceptable order. Clinic 4: Fire alarm sounders in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes A&E: Fire alarm sounders in acceptable order. Fracture & Orthopaedic Clinic: Fire alarm sounders in acceptable order. X-Ray: Fire alarm sounders in acceptable order. Clinic 1: Fire alarm sounders in acceptable order. Clinic 2: Fire alarm sounders in acceptable order. Fire alarm sounders in acceptable order. Clinic 3: Fire alarm call points in acceptable order. Orthotics: Fire alarm call points in acceptable order. Fracture & Orthopaedic Clinic: Fire alarm call points in acceptable order. Clinic 4: Fire alarm call points in acceptable order. Richmond Ward: Fire alarm call points in acceptable order. Chapel: Fire alarm call points in acceptable order. X-Ray: Fire alarm call points in acceptable order. Clinic 2: Fire alarm call points in acceptable order. A&E: Fire alarm call points in acceptable order. 121: Fire alarm call points in acceptable order. Fire alarm call points in acceptable order. C01: Smoke detectors in acceptable order.

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

11

0

0 0

0

2021

01 - Sounders

B

£0

12

0

0 0

0

2022

02 - Call Points

B

£0

8

0

0 0

0

2018

02 - Call Points

B

£0

8

0

0 0

0

2018

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

10

0

0 0

0

2020

02 - Call Points

B

£0

10

0

0 0

0

2020

02 - Call Points

B

£0

11

0

0 0

0

2021

02 - Call Points

B

£0

11

0

0 0

0

2021

02 - Call Points

B

£0

18

0

0 0

0

2028

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Pharmacy: Smoke detectors in acceptable order. Chapel: Smoke detectors in acceptable order. Richmond Ward: Smoke detectors in acceptable order. Clinic 3: Smoke detectors in acceptable order. Clinical Decisions Unit: Smoke detectors in acceptable order. Orthotics: Smoke detectors in acceptable order. X-Ray: Smoke detectors in acceptable order. A&E: Smoke detectors in acceptable order. Fracture & Orthopaedic Clinic: Smoke detectors in acceptable order. Clinic 1: Smoke detectors in acceptable order. Clinic 4: Smoke detectors in acceptable order. Stoma Care: Smoke detectors in acceptable order. Clinic 2: Smoke detectors in acceptable order. Smoke detectors in acceptable order. C41: Smoke detectors in acceptable order. Richmond Ward: Fire alarm main panel in acceptable order. Clinic 3: Fire alarm main panel in acceptable order. C01: Fire alarm main panel in acceptable order.

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

11

0

0 0

0

2021

03 - Smoke Detectors

B

£0

11

0

0 0

0

2021

03 - Smoke Detectors

B

£0

12

0

0 0

0

2022

03 - Smoke Detectors

B

£0

15

0

0 0

0

2025

05 - Fire Main/Zone Panel

B

£0

12

0

0 0

0

2022

05 - Fire Main/Zone Panel

B

£0

14

0

0 0

0

2024

05 - Fire Main/Zone Panel

B

£0

14

0

0 0

0

2024

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Fracture & Orthopaedic Clinic: Fire alarm main panel in acceptable order. A&E: Fire alarm main panel in acceptable order. 121: Fire alarm main panel in acceptable order.

05 - Fire Main/Zone Panel

B

£0

15

0

0 0

0

2025

05 - Fire Main/Zone Panel

B

£0

16

0

0 0

0

2026

05 - Fire Main/Zone Panel

B

£0

16

0

0 0

0

2026

05 - Nurse Call

B

£0

10

0

0 0

0

2020

05 - Nurse Call

B

£0

10

0

0 0

0

2020

05 - Nurse Call

B

£0

11

0

0 0

0

2021

05 - Nurse Call

B

£0

12

0

0 0

0

2022

05 - Nurse Call

B

£0

12

0

0 0

0

2022

05 - Nurse Call

B

£0

12

0

0 0

0

2022

05 - Nurse Call

B

£0

12

0

0 0

0

2022

05 - Nurse Call

B

£0

15

0

0 0

0

2025

05 - Nurse Call

B

£0

15

0

0 0

0

2025

02 - Pipework

C

£10,000

0

2 2

4

2010

09 - Comments

C

£45,000

0

2 2

4

2010

Remedial Action

W - Engineering - Telecoms 121: Nurse call system in acceptable order. Clinic 2: Nurse call system in acceptable order. Richmond Ward: Nurse call system in acceptable order. Clinical Decisions Unit: Nurse call system in acceptable order. Fracture & Orthopaedic Clinic: Nurse call system in acceptable order. X-Ray: Nurse call system in acceptable order. Nurse call system in acceptable order. C41: Nurse call system in acceptable order. A&E: Nurse call system in acceptable order.

Location: -01 - Basement M - Engineering - Hot/Cold Water Chilled Water Room: Associated pipe work for chilled water. Chilled Water Room: 3No. Water chillers require replacement.

O - Engineering - Main Plant Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L 0

R

Year

Notes

3 3

9

2010

Plant Room: Sump pump requires replacement. Generator Room: Brooke and Crompton diesel pump will require replacement during maintenance schedule. Chilled Water Room: Pullen pump for condense water will require replacement during maintenance schedule. 01.M02: 6No. Pullen pumps for secondary chilled water. 01.M02: 4No. Pullen pumps for primary chilled water. 01.M02:2No. Pullen Pumps of condenser water. 01.M02: 2No. Pullen pumps foe condenser water Chilled Water Room: Chilled water buffer tank requires replacement.

02 - Pumps

C

£1,500

0

02 - Pumps

B(C)

£5,000

5

3 3

9

2015

02 - Pumps

B(C)

£5,000

5

2 2

4

2015

02 - Pumps

B

£0

7

0

0 0

0

2017

02 - Pumps

B

£0

7

0

0 0

0

2017

02 - Pumps

B

£0

7

0

0 0

0

2017

02 - Pumps

B

£0

10

0

0 0

0

2020

06 - Comments

C

£30,000

0

2 2

4

2010

01 - Cooling Plant

N/A

£0

0

0 0

0

2010

03 - Controls

C

£10,000

0

2 2

4

2010

03 - Controls

C

£1,000

0

3 3

9

2010

03 - Controls

B(C)

£4,000

2

3 3

9

2012

03 - Controls

B(C)

£150,000

5

3 3

9

2015

03 - Controls

B

£0

8

0 0

0

2018

Remedial Action

P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

0

0

01.M02: Chiller No3 out of action at time of survey. Chilled Water Room: Trane control panel for water chiller. Plant Room: Sump pump controls require replacement. Plant Room: ASA Minerva transformer alert panel. Chilled Water Room: Merlin Gerin chiller control panel requires replacement during maintenance schedule. 01.M01: 3No. Ashland water treatment controller in acceptable condition.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L 0

R

Year

Notes

0 0

0

2025

01.M03: Scada controls in acceptable condition. Lobby: Trane AHU (20) will require replacement during maintenance schedule. Generator Room: 1000 KVA Marcon AC generator with Dorman diesel engine will require replacement during maintenance schedule. 01.M03: Scada UPS in acceptable condition. 01.M03: Diesel tank in acceptable condition.

03 - Controls

B

£0

15

05 - AHUs

B(C)

£50,000

5

3 3

9

2015

08 - Generators

B(C)

£200,000

5

3 3

9

2015

09 - Comments

B

£0

15

0

0 0

0

2025

09 - Comments

B

£0

15

0

0 0

0

2025

02 - Main Switchgear

C

£500

0

3 3

9

2010

02 - Main Switchgear

C

£100,000

0

3 3

9

2010

02 - Main Switchgear

C

£2,000

0

3 3

9

2010

02 - Main Switchgear

B

£0

15

0

0 0

0

2025

02 - Main Switchgear

B

£0

20

0

0 0

0

2030

03 - Distribution Boards

C

£1,000

0

3 3

9

2010

03 - Distribution Boards

B

£0

15

0

0 0

0

2025

03 - Distribution Boards

B

£0

20

0

0 0

0

2030

04 - Lighting Installation

C

£200

0

2 2

4

2010

Remedial Action

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

Generator Room: Crabtree Stop - Start for diesel pump and switchgear requires replacement. Generator Room: Merlin Gerin generator switchgear requires replacement. Generator Room: 2No. Walsall switchgear require replacement. 01.M02: 8No. Isolators in acceptable condition. 01.M01: 1 Moeller Electric isolator in acceptable condition. Generator Room: Ottermill distribution board requires replacement. Lobby: MK distribution board in acceptable condition. 01.M03: MEM distribution board in acceptable condition. Lobby: Surface fluorescent light requires replacement.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Chilled Water Room: 6No. Surface fluorescent lights require replacement. Plant Room: Replace surface fluorescent light. Lobby: 4No. Surface fluorescent lights will require replacement during maintenance schedule. 01.M03: 14No. Surface fluorescent lights in acceptable condition. Plant Room: 3No. Emergency lights will require replacement during maintenance schedule. 01.M03: 6No. emergency lights in acceptable condition. 01.M01: 2No. emergency lights in acceptable condition. 01.M02: Emergency light in acceptable condition. Lobby: Emergency light in acceptable condition. Chilled Water Room: Walsal socket transformer requires replacement.

04 - Lighting Installation

C

£1,200

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

2 2

4

2010

04 - Lighting Installation

B(C)

£800

5

2 2

4

2015

04 - Lighting Installation

B

£0

7

0 0

0

2017

05 - Emergency Lighting

B(C)

£600

5

3 3

9

2015

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

05 - Emergency Lighting

B

£0

10

0

0 0

0

2020

08 - Comments

C

£1,000

0

3 3

9

2010

01 - Sounders

B

£0

15

0

0 0

0

2025

02 - Call Points

B

£0

15

0

0 0

0

2025

02 - Call Points

B

£0

18

0

0 0

0

2028

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

12

0

0 0

0

2022

0

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

01.M01: 2No. Sounders in acceptable condition. 01.M01: 2No. Call points in acceptable condition. Lobby: 2No. Call points in acceptable condition. 01.M03: 4No. Detectors in acceptable condition. Lobby: 2No. Detectors in acceptable condition.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 05 - Fire Main/Zone Panel

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

15

0

0 0

0

2025

Lobby: Vigilant repeater fire alarm panel in acceptable condition.

01 - Heat Emitters

B

£0

14

0

0 0

0

2024

01 - Heat Emitters

B

£0

15

0

0 0

0

2025

01 - Heat Emitters

B

£0

16

0

0 0

0

2026

01 - Heat Emitters

B

£0

16

0

0 0

0

2026

01 - Heat Emitters

B

£0

16

0

0 0

0

2026

01 - Heat Emitters

B

£0

16

0

0 0

0

2026

101: Steel panel radiators in acceptable order. Paul Calvert Recovery: High efficiency radiators with low surface temperature covers in acceptable order. C25: Perimeter heating with low surface temperature covers in acceptable order. Intensive Care Unit: Steel panel radiators in acceptable order. Paul Calvert Theatre 3: High efficiency radiators with low surface temperature covers in acceptable order. Intensive Care Unit: High efficiency radiators with low surface temperature covers in acceptable order.

01 - Ductwork

C

£21,000

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£300

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£150

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£300

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£600

0

0

2 2

4

2010

Location: 01 - First Floor I - Engineering - Heating Systems

K - Engineering - Vent & Air Con

Generic Hospital Physical Condition Survey

Theatres: Broken barometric pressure clamps require replacement. 142: Broken door grille requires replacement. 101: Grille/diffuser is missing and requires upgrading. 137: Door grille requires replacement. 147: 2No. broken door grilles require replacement. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Intensive Care Unit: Grilles/diffusers in acceptable order. Theatre 4: Grilles/diffusers in acceptable order. Theatre 1: Grilles/diffusers in acceptable order. Theatre 3: Grilles/diffusers in acceptable order. Theatre 5: Grilles/diffusers in acceptable order. Theatre 6: Grilles/diffusers in acceptable order. Theatre 7: Grilles/diffusers in acceptable order. Recovery: Grilles/diffusers in acceptable order. 101: Grilles/diffusers in acceptable order. Paul Calvert Theatre 1: Grilles/diffusers in acceptable order. Theatre 2: Grilles/diffusers in acceptable order. Paul Calvert Recovery: Grilles/diffusers in acceptable order. Paul Calvert Theatre 3: Grilles/diffusers in acceptable order. Paul Calvert Theatre 2: Grilles/diffusers in acceptable order. Paul Calvert Theatre 2: Supply grille in acceptable order. Endoscopy Unit: Grilles/diffusers in acceptable order.

03 - Grilles & Diffusers

B

£0

11

0

0 0

0

2021

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

15

0

0 0

0

2025

03 - Grilles & Diffusers

B

£0

16

0

0 0

0

2026

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes C25: Grilles/diffusers in acceptable order. Sterile Services Department: Grilles/diffusers in acceptable order. Sterile Services Department: Air conditioning units require replacement.

03 - Grilles & Diffusers

B

£0

16

0

0 0

0

2026

03 - Grilles & Diffusers

B

£0

20

0

0 0

0

2030

05 - Cooling Units

C

£250

0

0

3 3

9

2010

01 - Local Water Heaters

B

£0

8

0

0 0

0

2018

01 - Local Water Heaters

B

£0

9

0

0 0

0

2019

06 - Hose Reels

C

£600

0

0

2 3

6

2010

06 - Hose Reels

C

£600

0

0

2 3

6

2010

06 - Hose Reels

C

£600

0

0

2 3

6

2010

06 - Hose Reels

C

£600

0

0

2 3

6

2010

03 - Controls

B

£0

25

0

0 0

0

2035

05 - AHUs

B

£0

15

0

0 0

0

2025

02 - Main Switchgear

C

£3,000

0

0

2 2

4

2010

03 - Distribution Boards

C

£3,000

0

0

3 3

9

2010

Remedial Action

M - Engineering - Hot/Cold Water Paul Calvert Recovery: Water heater in acceptable order. Intensive Care Unit: Water heater in acceptable order. Corridor by Reception: Fire hose reel requires removal as it poses risk of legionella. C28: Fire hose reel requires removal as it poses risk of legionella. C20: Fire hose reel requires removal as it poses risk of legionella. C21: Fire hose reel requires removal as it poses risk of legionella.

P - Engineering - Main Plant Sterile Services Department: Control panel in acceptable order. 155: Air handling units in acceptable order.

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

M03: 2No. isolators require replacement. M03: 2No. distribution boards require replacement. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Sterile Services Department: Mini circuit breakers in acceptable order. 101: Distribution board in acceptable order. 507: 5No. surface fluorescent lights require replacement. 308: Surface fluorescent light requires replacement. C25: Surface fluorescent light requires replacement. C20: 8No. surface fluorescent lights require replacement. C07: 4No. surface fluorescent lights require replacement. 155: Surface fluorescent light requires replacement. C21: 5No. surface fluorescent lights require replacement. 104: 6No. fluorescent lights over visual display equipment are not suitable and require upgrading. 414: 14No. tungsten lights require upgrading within the maintenance schedule. C28: 4No. tungsten lights require upgrading within the maintenance schedule. 310: 14No. tungsten lights require upgrading within the maintenance schedule. 101: 18No. tungsten lights require upgrading within the maintenance schedule. 614: 8No. tungsten lights require upgrading within the maintenance schedule.

03 - Distribution Boards

B

£0

15

0

0 0

0

2025

03 - Distribution Boards

B

£0

16

0

0 0

0

2026

04 - Lighting Installation

C

£1,000

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,600

0

0

2 2

4

2010

04 - Lighting Installation

C

£800

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,000

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,200

0

0

3 2

6

2010

04 - Lighting Installation

B(C)

£2,800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£2,800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£3,600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,600

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes C09: 4No. surface fluorescent lights require upgrading within the maintenance schedule. Recovery: 15No. surface fluorescent lights require upgrading within the maintenance schedule. Intensive Care Unit: Surface fluorescent lights in acceptable order. Endoscopy Unit: Surface fluorescent lights in acceptable order. Sterile Services Department: CAT II lights in acceptable order. Paul Calvert Theatre 3: Surface fluorescent lights in acceptable order. Intensive Care Unit: CAT II lights in acceptable order. Sterile Services Department: Surface fluorescent lights in acceptable order. Paul Calvert Recovery: CAT II lights in acceptable order. 101: Surface fluorescent lights in acceptable order. Recovery: Surface fluorescent lights in acceptable order. Theatre 3: Surface fluorescent lights in acceptable order. Paul Calvert Theatre 1: Surface fluorescent lights in acceptable order. Theatre 4: Surface fluorescent lights in acceptable order. Theatre 2: Surface fluorescent lights in acceptable order.

04 - Lighting Installation

B(C)

£800

5

0

2 2

4

2015

04 - Lighting Installation

B(C)

£3,000

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Theatre 5: Surface fluorescent lights in acceptable order. Theatre 6: Surface fluorescent lights in acceptable order. Theatre 7: Surface fluorescent lights in acceptable order. Paul Calvert Theatre 2: Surface fluorescent lights in acceptable order. Theatre 1: Surface fluorescent lights in acceptable order. Paul Calvert Recovery: Surface fluorescent lights in acceptable order. Intensive Care Unit: Emergency lights in acceptable order. Endoscopy Unit: Emergency lights in acceptable order. C25: Emergency lights in acceptable order. Recovery: Emergency lights in acceptable order. Sterile Services Department: Emergency lights in acceptable order. Paul Calvert Recovery: Emergency lights in acceptable order. Theatre 7: Emergency lights in acceptable order. C21: Sockets and switches require replacement. Endoscopy Unit: Sockets and switches in acceptable order. Theatre 6: Sockets and switches in acceptable order. Recovery: Sockets and switches in acceptable order.

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

04 - Lighting Installation

B

£0

11

0

0 0

0

2021

05 - Emergency Lighting

B

£0

8

0

0 0

0

2018

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2020

05 - Emergency Lighting

B

£0

11

0

0 0

0

2021

05 - Emergency Lighting

B

£0

11

0

0 0

0

2021

06 - Sockets/Switches

C

£200

0

0

3 3

9

2010

06 - Sockets/Switches

B

£0

9

0

0 0

0

2019

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Theatre 2: Sockets and switches in acceptable order. Theatre 5: Sockets and switches in acceptable order. Theatre 3: Sockets and switches in acceptable order. Theatre 7: Sockets and switches in acceptable order. Theatre 1: Sockets and switches in acceptable order. 101: Sockets and switches in acceptable order. Paul Calvert Theatre 1: Sockets and switches in acceptable order. Paul Calvert Theatre 2: Sockets and switches in acceptable order. Paul Calvert Theatre 3: Sockets and switches in acceptable order. Intensive Care Unit: Sockets and switches in acceptable order. Theatre 4: Sockets and switches in acceptable order. Intensive Care Unit: Emergency door release in acceptable order. 101: Emergency door release in acceptable order. Endoscopy Unit: Emergency door release in acceptable order. Sterile Services Department: Emergency door release in acceptable order.

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

06 - Sockets/Switches

B

£0

10

0

0 0

0

2020

08 - Comments

B

£0

8

0

0 0

0

2018

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

10

0

0 0

0

2020

08 - Comments

B

£0

10

0

0 0

0

2020

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 08 - Comments

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

11

0

0 0

0

2021

Paul Calvert Recovery: Emergency door release in acceptable order.

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

11

0

0 0

0

2021

02 - Call Points

C

£150

0

0

3 3

9

2010

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

10

0

0 0

0

2020

02 - Call Points

B

£0

10

0

0 0

0

2020

02 - Call Points

B

£0

11

0

0 0

0

2021

02 - Call Points

B

£0

14

0

0 0

0

2024

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

C25: Fire alarm sounders in acceptable order. Endoscopy Unit: Fire alarm sounders in acceptable order. Theatre 7: Fire alarm sounders in acceptable order. Theatre 7: Fire alarm call point requires replacement. 101: Fire alarm call points in acceptable order. Endoscopy Unit: Fire alarm call points in acceptable order. Sterile Services Department: Fire alarm call points in acceptable order. Paul Calvert Recovery: Fire alarm call points in acceptable order. C25: Fire alarm call points in acceptable order. Paul Calvert Theatre 3: Smoke detectors in acceptable order. C25: Smoke detectors in acceptable order. Endoscopy Unit: Smoke detectors in acceptable order. Paul Calvert Recovery: Smoke detectors in acceptable order. Sterile Services Department: Smoke detectors in acceptable order. Recovery: Smoke detectors in acceptable order.

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Theatre 3: Smoke detectors in acceptable order. Theatre 2: Smoke detectors in acceptable order. Theatre 5: Smoke detectors in acceptable order. Theatre 6: Smoke detectors in acceptable order. Theatre 7: Smoke detectors in acceptable order. Theatre 4: Smoke detectors in acceptable order. Theatre 1: Smoke detectors in acceptable order. Paul Calvert Theatre 2: Smoke detectors in acceptable order. Paul Calvert Theatre 1: Smoke detectors in acceptable order. Intensive Care Unit: Fire alarm main panel in acceptable order. Endoscopy Unit: Fire alarm main panel in acceptable order. 101: Fire alarm main panel in acceptable order. 614: Fire alarm main panel in acceptable order.

03 - Smoke Detectors

B

£0

11

0

0 0

0

2021

03 - Smoke Detectors

B

£0

11

0

0 0

0

2021

03 - Smoke Detectors

B

£0

11

0

0 0

0

2021

03 - Smoke Detectors

B

£0

11

0

0 0

0

2021

03 - Smoke Detectors

B

£0

11

0

0 0

0

2021

03 - Smoke Detectors

B

£0

11

0

0 0

0

2021

03 - Smoke Detectors

B

£0

11

0

0 0

0

2021

03 - Smoke Detectors

B

£0

11

0

0 0

0

2021

03 - Smoke Detectors

B

£0

15

0

0 0

0

2025

05 - Fire Main/Zone Panel

B

£0

12

0

0 0

0

2022

05 - Fire Main/Zone Panel

B

£0

14

0

0 0

0

2024

05 - Fire Main/Zone Panel

B

£0

16

0

0 0

0

2026

05 - Fire Main/Zone Panel

B

£0

17

0

0 0

0

2027

B

£0

9

0

0 0

0

2019

Endoscopy Unit: Nurse call system in acceptable order.

B

£0

10

0

0 0

0

2020

Haematology: High efficiency radiators with low surface temperature covers in acceptable order.

W - Engineering - Telecoms 05 - Nurse Call

Location: 02 - Second Floor I - Engineering - Heating Systems 01 - Heat Emitters

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Haematology: Perimeter heating with low surface temperature covers in acceptable order. C05: Steel panel radiators in acceptable order. Ruth Myles Unit: High efficiency radiators with low surface temperature covers in acceptable order. M01: P39 heat recovery requires replacement. M07: P35 heat recovery requires replacement.

01 - Heat Emitters

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

15

0

0 0

0

2025

01 - Heat Emitters

B

£0

20

0

0 0

0

2030

05 - Comments

C

£1,500

0

0

2 2

4

2010

05 - Comments

C

£3,000

0

0

2 2

4

2010

01 - Pipework

C

£16,000

0

0

3 4 12

2010

01 - Pipework

B

£0

7

0

0 0

0

2017

01 - Ductwork

B

£0

7

0

0 0

0

2017

01 - Ductwork

B

£0

10

0

0 0

0

2020

03 - Grilles & Diffusers

B

£0

11

0

0 0

0

2021

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

03 - Grilles & Diffusers

B

£0

21

0

0 0

0

2031

04 - Insulation

B

£0

8

0

0 0

0

2018

06 - Pipework

B

£0

7

0

0 0

0

2017

06 - Pipework

B

£0

15

0

0 0

0

2025

Remedial Action

J - Engineering - Steam Systems M01: Steam pipework requires replacement. M07: Steam pipework in acceptable order.

K - Engineering - Vent & Air Con

Generic Hospital Physical Condition Survey

M01: Ductwork in acceptable order. M07: Ductwork in acceptable order. Haematology: Grilles/diffusers in acceptable order. McEntee Ward: Grilles/diffusers in acceptable order. Ruth Myles Unit: Grilles/diffusers in acceptable order. M07: Lagging in acceptable order. M07: Pipework and lagging in acceptable order. M20: Pipework and lagging in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Haematology: Water heater in acceptable order. M08: Pipework and lagging in acceptable order. M01: Lagging in acceptable order. C05: Fire hose reel requires removal as it poses risk of legionella. M08: Water cylinder in acceptable order.

M - Engineering - Hot/Cold Water 01 - Local Water Heaters

B

£0

9

0

0 0

0

2019

02 - Pipework

B

£0

7

0

0 0

0

2017

04 - Insulation

B

£0

6

0

0 0

0

2016

06 - Hose Reels

C

£600

0

0

2 3

6

2010

09 - Comments

B

£0

14

0

0 0

0

2024

02 - Pumps

C

£5,000

0

0

2 3

6

2010

02 - Pumps

C

£3,000

0

0

2 3

6

2010

02 - Pumps

C

£1,500

0

0

2 3

6

2010

02 - Pumps

C

£16,000

0

0

2 3

6

2010

02 - Pumps

C

£1,500

0

0

2 3

6

2010

02 - Pumps

C

£3,000

0

0

2 3

6

2010

02 - Pumps

C

£15,000

0

0

2 3

6

2010

02 - Pumps

C

£15,000

0

0

2 3

6

2010

02 - Pumps

B(C)

£1,500

3

0

2 3

6

2013

O - Engineering - Main Plant

Generic Hospital Physical Condition Survey

M07: Hot water service cold feed booster pumps (P48 & P49) require replacement. M01: Low temperature hot water pumps require replacement. M01: Heat recovery pumps require replacement. M01: 4No. primary heating pumps require replacement. M01: Heating recovery pump requires replacement. M07: Condenser water booster pump (P19) requires replacement. M07: P20-23 low temperature hot water pumps require replacement. M07: P26 & P27 low temperature hot water pumps require replacement. M01: Hot water service secondary pump requires upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes M08: Cold water booster pump requires upgrading within the maintenance schedule. M07: Medigas pumps require upgrading within the maintenance schedule. M07: Condensate pumps in acceptable order. M05: Medical gas pumps in acceptable order. M08: Cold water booster pumps in acceptable order. M07: CT pumps in acceptable order. M08: Medigas pumps in acceptable order. M08: Pumps in acceptable order. M01: Pumps in acceptable order. M20: Run-around pumps in acceptable order. M01: Hot water service calorifiers in acceptable order.

02 - Pumps

B(C)

£1,500

3

0

2 3

6

2013

02 - Pumps

B(C)

£7,000

3

0

3 3

9

2013

02 - Pumps

B

£0

6

0

0 0

0

2016

02 - Pumps

B

£0

7

0

0 0

0

2017

02 - Pumps

B

£0

7

0

0 0

0

2017

02 - Pumps

B

£0

7

0

0 0

0

2017

02 - Pumps

B

£0

8

0

0 0

0

2018

02 - Pumps

B

£0

8

0

0 0

0

2018

02 - Pumps

B

£0

9

0

0 0

0

2019

02 - Pumps

B

£0

9

0

0 0

0

2019

03 - Calorifiers

B

£0

9

0

0 0

0

2019

01 - Cooling Plant

B

£0

7

0

0 0

0

2017

03 - Controls

C

£200

0

0

2 3

6

2010

03 - Controls

B

£0

7

0

0 0

0

2017

03 - Controls

B

£0

7

0

0 0

0

2017

03 - Controls

B

£0

7

0

0 0

0

2017

03 - Controls

B

£0

14

0

0 0

0

2024

Remedial Action

P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

M07: Air cooling condenser in acceptable order. M07: Panel is missing and requires replacement. M05: Control panel in acceptable order. M07: Incoming panel in acceptable order. M07: Main control panels in acceptable order. M08: Control panel in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes M01: Control panel in acceptable order. M20: Control panels in acceptable order. M01: Extract system in acceptable order. M08: Dirty extract fan in acceptable order. M07: F60 extract fan in acceptable order. M08: Extract fan (clean) in acceptable order. M08: Extract fans in acceptable order. M07: Extract in acceptable order. M07: Air handling unit 3 supply in acceptable order. M07: Air handling unit 2 (A&E) in acceptable order. M07: Air handling unit 9 in acceptable order. M07: Air handling unit 17 in acceptable order. M07: Air handling unit 4 in acceptable order. M07: Air handling unit 1 (South West Wards) in acceptable order. M07: Air handling unit 4 supply in acceptable order. M01: Air handling unit 7 in acceptable order. M01: Air handling unit 10 in acceptable order. M20: Air handling unit (Theatre extract) in acceptable order.

03 - Controls

B

£0

14

0

0 0

0

2024

03 - Controls

B

£0

15

0

0 0

0

2025

04 - Extract Fans

B

£0

6

0

0 0

0

2016

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

8

0

0 0

0

2018

04 - Extract Fans

B

£0

8

0

0 0

0

2018

04 - Extract Fans

B

£0

9

0

0 0

0

2019

05 - AHUs

B

£0

6

0

0 0

0

2016

05 - AHUs

B

£0

6

0

0 0

0

2016

05 - AHUs

B

£0

6

0

0 0

0

2016

05 - AHUs

B

£0

7

0

0 0

0

2017

05 - AHUs

B

£0

7

0

0 0

0

2017

05 - AHUs

B

£0

8

0

0 0

0

2018

05 - AHUs

B

£0

8

0

0 0

0

2018

05 - AHUs

B

£0

8

0

0 0

0

2018

05 - AHUs

B

£0

10

0

0 0

0

2020

05 - AHUs

B

£0

15

0

0 0

0

2025

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes M20: Air handling unit (Theatre supply) in acceptable order. M08: Compressor requires replacement. M08: Compressor requires upgrading within the maintenance schedule. M07: Plate heat exchanger in acceptable order.

05 - AHUs

B

£0

15

0

0 0

0

2025

09 - Comments

C

£1,500

0

0

3 3

9

2010

09 - Comments

B(C)

£1,500

4

0

3 3

9

2014

09 - Comments

B

£0

8

0

0 0

0

2018

02 - Main Switchgear

C

£2,000

0

0

2 2

4

2010

02 - Main Switchgear

B

£0

8

0

0 0

0

2018

02 - Main Switchgear

B

£0

8

0

0 0

0

2018

02 - Main Switchgear

B

£0

10

0

0 0

0

2020

02 - Main Switchgear

B

£0

10

0

0 0

0

2020

03 - Distribution Boards

C

£1,000

0

0

3 3

9

2010

03 - Distribution Boards

B

£0

12

0

0 0

0

2022

03 - Distribution Boards

B

£0

14

0

0 0

0

2024

03 - Distribution Boards

B

£0

15

0

0 0

0

2025

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£600

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

Remedial Action

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

M01: Isolators require replacement. M07: Isolators in acceptable order. M01: Isolators in acceptable order. M07: Isolators in acceptable order. M20: Isolators in acceptable order. M08: Distribution board requires replacement. M05: Distribution board in acceptable order. M07: Hager distribution board in acceptable order. M20: Distribution board in acceptable order. 215: Fluorescent light over visual display equipment is not suitable and requires upgrading. 113: 3No. fluorescent lights over visual display equipment are not suitable and require upgrading. 202: Fluorescent light over visual display equipment is not suitable and requires upgrading. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Corridor by Reception: Fluorescent light over visual display equipment is not suitable and requires upgrading. M05: 2No. surface fluorescent lights require replacement. 216: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 104: 3No. tungsten lights require upgrading within the maintenance schedule. 124: 2No. above bed lights require upgrading within the maintenance schedule. 217: 2No. tungsten lights require upgrading within the maintenance schedule. Corridor by Reception: 2No. tungsten lights require upgrading within the maintenance schedule. 1: 16No. tungsten lights require upgrading within the maintenance schedule. 216: 5No. tungsten downlights require upgrading within the maintenance schedule. C05: 5No. surface fluorescent lights require upgrading within the maintenance schedule. 113: 5No. surface fluorescent downlights require upgrading within the maintenance schedule. M08: 6No. surface fluorescent lights require upgrading within the maintenance schedule.

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

B(C)

£600

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£400

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£3,200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,200

5

0

2 2

4

2015

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Haematology: Surface fluorescent lights in acceptable order. Haematology: CAT II lights in acceptable order. M20: Surface fluorescent lights in acceptable order. M07: Surface fluorescent lights in acceptable order. Ruth Myles Unit: Surface fluorescent lights in acceptable order. McEntee Ward: Surface fluorescent lights in acceptable order. McEntee Ward: CAT II lights in acceptable order. Ruth Myles Unit: CAT II lights in acceptable order. M20: Emergency lights in acceptable order. M07: Emergency lights in acceptable order. M08: Emergency lights in acceptable order. Ruth Myles Unit: Emergency lights in acceptable order. McEntee Ward: Emergency lights in acceptable order. Haematology: Sockets and switches in acceptable order. M07: Emergency door release in acceptable order. M01: Emergency door release in acceptable order. McEntee Ward: Emergency door release in acceptable order.

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2020

05 - Emergency Lighting

B

£0

10

0

0 0

0

2020

06 - Sockets/Switches

B

£0

11

0

0 0

0

2021

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

9

0

0 0

0

2019

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes M08: Emergency door release in acceptable order. Haematology: Emergency door release in acceptable order. Ruth Myles Unit: Emergency door release in acceptable order.

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

8

0

0 0

0

2018

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

10

0

0 0

0

2020

02 - Call Points

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

Haematology: Fire alarm sounders in acceptable order. M08: Fire alarm sounders in acceptable order. M20: Fire alarm sounders in acceptable order. M07: Fire alarm sounders in acceptable order. Ruth Myles Unit: Fire alarm sounders in acceptable order. McEntee Ward: Fire alarm sounders in acceptable order. M20: Fire alarm call points in acceptable order. McEntee Ward: Fire alarm call points in acceptable order. M08: Fire alarm call points in acceptable order. Haematology: Fire alarm call points in acceptable order. M07: Fire alarm call points in acceptable order. Ruth Myles Unit: Fire alarm call points in acceptable order. Haematology: Smoke detectors in acceptable order. M07: Smoke detectors in acceptable order. M20: Smoke detectors in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Ruth Myles Unit: Smoke detectors in acceptable order. McEntee Ward: Smoke detectors in acceptable order. M07: Fire alarm main panel in acceptable order. 1: Fire alarm main panel in acceptable order. Ruth Myles Unit: Fire alarm main panel in acceptable order.

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

05 - Fire Main/Zone Panel

B

£0

14

0

0 0

0

2024

05 - Fire Main/Zone Panel

B

£0

16

0

0 0

0

2026

05 - Fire Main/Zone Panel

B

£0

19

0

0 0

0

2029

05 - Nurse Call

B

£0

9

0

0 0

0

2019

05 - Nurse Call

B

£0

10

0

0 0

0

2020

01 - Heat Emitters

B

£0

12

0

0 0

0

2022

01 - Heat Emitters

B

£0

12

0

0 0

0

2022

01 - Heat Emitters

B

£0

12

0

0 0

0

2022

01 - Heat Emitters

B

£0

14

0

0 0

0

2024

01 - Heat Emitters

B

£0

14

0

0 0

0

2024

Remedial Action

W - Engineering - Telecoms McEntee Ward: Nurse call system in acceptable order. Haematology: Nurse call system in acceptable order.

Location: 03 - Third Floor I - Engineering - Heating Systems

Generic Hospital Physical Condition Survey

Rodney Smith Ward: Steel panel radiators with low surface temperature covers in acceptable order. Allingham Ward: Steel panel radiators with low surface temperature covers in acceptable order. Marnham Ward: Steel panel radiators with low surface temperature covers in acceptable order. C01: Steel panel radiators in acceptable order. Amyand Ward: Steel panel radiators with low surface temperature covers in acceptable order.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 01 - Heat Emitters

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

19

0

0 0

0

2029

Discharge Lounge: High efficiency radiators with low surface temperature covers in acceptable order.

03 - Grilles & Diffusers

B

£0

14

0

0 0

0

2024

03 - Grilles & Diffusers

B

£0

14

0

0 0

0

2024

03 - Grilles & Diffusers

B

£0

14

0

0 0

0

2024

03 - Grilles & Diffusers

B

£0

14

0

0 0

0

2024

03 - Grilles & Diffusers

B

£0

19

0

0 0

0

2029

05 - Cooling Units

B

£0

10

0

0 0

0

2020

Marnham Ward: Grilles/diffusers in acceptable order. Rodney Smith Ward: Grilles/diffusers in acceptable order. Allingham Ward: Grilles/diffusers in acceptable order. Amyand Ward: Grilles/diffusers in acceptable order. Sterile Services Department: Grilles/diffusers in acceptable order. Discharge Lounge: Air conditioning in acceptable order.

06 - Hose Reels

C

£600

0

0

2 3

6

2010

06 - Hose Reels

C

£600

0

0

2 3

6

2010

06 - Hose Reels

C

£600

0

0

2 3

6

2010

02 - Main Switchgear

C

£1,200

0

0

2 2

4

2010

02 - Main Switchgear

C

£1,500

0

0

2 2

4

2010

K - Engineering - Vent & Air Con

M - Engineering - Hot/Cold Water C18: Fire hose reel requires removal as it poses risk of legionella. C17: Fire hose reel requires removal as it poses risk of legionella. Amyand Ward: Fire hose reel requires removal as it poses risk of legionella.

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

M02: 4No. isolators require replacement. M11: 5No. isolators require replacement.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes M11: 5No. fuse boards require replacement. M02: 4No. fuse boards require replacement. M11: Distribution boards in acceptable order. M02: Distribution boards in acceptable order. Sterile Services Department: Distribution board in acceptable order. 12: 3No. fluorescent lights over visual display equipment are not suitable and require upgrading. 310: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 13: Surface fluorescent light is missing light cover and requires replacement. 120: 6No. over bed lights require upgrading within the maintenance schedule. 121: 6No. over bed lights require upgrading within the maintenance schedule. 319: 8No. over bed lights require upgrading within the maintenance schedule. 119: 8No. over bed lights require upgrading within the maintenance schedule. 318: 6No. over bed lights require upgrading within the maintenance schedule. 220: 6No. over bed lights require upgrading within the maintenance schedule.

03 - Distribution Boards

C

£12,500

0

0

3 3

9

2010

03 - Distribution Boards

C

£10,000

0

0

3 3

9

2010

03 - Distribution Boards

B

£0

19

0

0 0

0

2029

03 - Distribution Boards

B

£0

19

0

0 0

0

2029

03 - Distribution Boards

B

£0

25

0

0 0

0

2035

04 - Lighting Installation

C

£600

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,600

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,600

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 219: 8No. over bed lights require upgrading within the maintenance schedule. 218: Over bed light requires upgrading within the maintenance schedule. 216: Over bed light requires upgrading within the maintenance schedule. 214: Over bed light requires upgrading within the maintenance schedule. 114: Over bed light requires upgrading within the maintenance schedule. 116: Over bed light requires upgrading within the maintenance schedule. 320: 6No. over bed lights require upgrading within the maintenance schedule. 118: 6No. over bed lights require upgrading within the maintenance schedule. 221: 6No. over bed lights require upgrading within the maintenance schedule. 419: 8No. over bed lights require upgrading within the maintenance schedule. 414: Over bed light requires upgrading within the maintenance schedule. 420: 6No. over bed lights require upgrading within the maintenance schedule. 421: 6No. over bed lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£1,600

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,600

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 316: Over bed light requires upgrading within the maintenance schedule. 418: 6No. over bed lights require upgrading within the maintenance schedule. 321: 6No. over bed lights require upgrading within the maintenance schedule. 416: Over bed light requires upgrading within the maintenance schedule. 314: Over bed light requires upgrading within the maintenance schedule. 222: 3No. downlights require upgrading within the maintenance schedule. C8: 5No. downlights require upgrading within the maintenance schedule. 210: 4No. downlights require upgrading within the maintenance schedule. 110: 4No. downlights require upgrading within the maintenance schedule. 410: 5No. downlights require upgrading within the maintenance schedule. C18: 4No. downlights require upgrading within the maintenance schedule. 422: 3No. downlights require upgrading within the maintenance schedule. 310: 4No. downlights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes C17: 3No. downlights require upgrading within the maintenance schedule. Rodney Smith Ward: Surface fluorescent lights in acceptable order. Marnham Ward: Surface fluorescent lights in acceptable order. Allingham Ward: Surface fluorescent lights in acceptable order. Amyand Ward: Surface fluorescent lights in acceptable order. C01: Surface fluorescent lights in acceptable order. Allingham Ward: CAT II lights in acceptable order. Rodney Smith Ward: CAT II lights in acceptable order. Sterile Services Department: Surface fluorescent lights in acceptable order. Amyand Ward: CAT II lights in acceptable order. Marnham Ward: CAT II lights in acceptable order. Discharge Lounge: CAT II lights in acceptable order. Rodney Smith Ward: Emergency lights in acceptable order. C01: Emergency lights in acceptable order. Marnham Ward: Emergency lights in acceptable order.

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

14

0

0 0

0

2024

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Allingham Ward: Emergency door release in acceptable order. Amyand Ward: Emergency door release in acceptable order. Marnham Ward: Emergency door release in acceptable order. Discharge Lounge: Emergency door release in acceptable order.

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

14

0

0 0

0

2024

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

14

0

0 0

0

2024

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

9

0

0 0

0

2019

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

C01: Fire alarm sounders in acceptable order. Amyand Ward: Fire alarm sounders in acceptable order. Allingham Ward: Fire alarm sounders in acceptable order. Rodney Smith Ward: Fire alarm sounders in acceptable order. Sterile Services Department: Fire alarm sounders in acceptable order. Marnham Ward: Fire alarm sounders in acceptable order. Discharge Lounge: Fire alarm sounders in acceptable order. Amyand Ward: Fire alarm call points in acceptable order. Allingham Ward: Fire alarm call points in acceptable order. Rodney Smith Ward: Fire alarm call points in acceptable order. Marnham Ward: Fire alarm call points in acceptable order. C01: Fire alarm call points in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes C01: Smoke detectors in acceptable order. Allingham Ward: Smoke detectors in acceptable order. Amyand Ward: Smoke detectors in acceptable order. Marnham Ward: Smoke detectors in acceptable order. Sterile Services Department: Smoke detectors in acceptable order. Rodney Smith Ward: Smoke detectors in acceptable order. Discharge Lounge: Smoke detectors in acceptable order. Marnham Ward: Fire alarm main panel in acceptable order. Rodney Smith Ward: Fire alarm main panel in acceptable order. 310: Fire alarm main panel in acceptable order. Allingham Ward: Fire alarm main panel in acceptable order. Amyand Ward: Fire alarm main panel in acceptable order. 110: Fire alarm main panel in acceptable order.

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

14

0

0 0

0

2024

05 - Fire Main/Zone Panel

B

£0

14

0

0 0

0

2024

05 - Fire Main/Zone Panel

B

£0

15

0

0 0

0

2025

05 - Fire Main/Zone Panel

B

£0

15

0

0 0

0

2025

05 - Fire Main/Zone Panel

B

£0

15

0

0 0

0

2025

05 - Fire Main/Zone Panel

B

£0

15

0

0 0

0

2025

05 - Fire Main/Zone Panel

B

£0

15

0

0 0

0

2025

05 - Nurse Call

B

£0

12

0

0 0

0

2022

05 - Nurse Call

B

£0

12

0

0 0

0

2022

05 - Nurse Call

B

£0

12

0

0 0

0

2022

05 - Nurse Call

B

£0

12

0

0 0

0

2022

Remedial Action

W - Engineering - Telecoms

Generic Hospital Physical Condition Survey

Marnham Ward: Nurse call system in acceptable order. Rodney Smith Ward: Nurse call system in acceptable order. Amyand Ward: Nurse call system in acceptable order. Allingham Ward: Nurse call system in acceptable order.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Cheseldon Ward: Steel panel radiators with low surface temperature covers in acceptable order. Gray Ward: Steel panel radiators with low surface temperature covers in acceptable order. Florence Nightingale Ward: Steel panel radiators with low surface temperature covers in acceptable order.

Location: 04 - Fourth Floor I - Engineering - Heating Systems 01 - Heat Emitters

B

£0

14

0

0 0

0

2024

01 - Heat Emitters

B

£0

14

0

0 0

0

2024

01 - Heat Emitters

B

£0

14

0

0 0

0

2024

03 - Grilles & Diffusers

B

£0

11

0

0 0

0

2021

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

03 - Grilles & Diffusers

B

£0

14

0

0 0

0

2024

03 - Grilles & Diffusers

B

£0

14

0

0 0

0

2024

05 - Cooling Units

B

£0

9

0

0 0

0

2019

C

£600

0

0

2 3

6

2010

K - Engineering - Vent & Air Con Vascular Department: Grilles/diffusers in acceptable order. Vernon Ward: Grilles/diffusers in acceptable order. Surgical Admissions Lounge: Grilles/diffusers in acceptable order. Florence Nightingale Ward: Grilles/diffusers in acceptable order. Cheseldon Ward: Grilles/diffusers in acceptable order. Gray Ward: Grilles/diffusers in acceptable order. Vascular Laboratory: Air conditioning in acceptable order.

M - Engineering - Hot/Cold Water 06 - Hose Reels

Generic Hospital Physical Condition Survey

C18: Fire hose reel requires removal as it poses risk of legionella. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 06 - Hose Reels

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C

£600

0

0

2 3

6

2010

C03: Fire hose reel requires removal as it poses risk of legionella.

02 - Main Switchgear

C

£1,500

0

0

2 2

4

2010

02 - Main Switchgear

C

£1,500

0

0

2 2

4

2010

03 - Distribution Boards

C

£12,500

0

0

3 3

9

2010

03 - Distribution Boards

C

£12,500

0

0

3 3

9

2010

03 - Distribution Boards

B

£0

19

0

0 0

0

2029

03 - Distribution Boards

B

£0

19

0

0 0

0

2029

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£1,000

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

B(C)

£1,600

1

0

2 2

4

2011

M02: 5No. isolators require replacement. M11: 5No. isolators require replacement. M02: 5No. fuse boards require replacement. M11: 5No. fuse boards require replacement. M02: Distribution boards in acceptable order. M11: Distribution boards in acceptable order. 14: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. Vascular Department: 5No. fluorescent lights over visual display equipment are not suitable and require upgrading. 210: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. Vascular Laboratory: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 411: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 319: 8No. over bed lights require upgrading within the maintenance schedule.

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 320: 6No. over bed lights require upgrading within the maintenance schedule. 119: 6No. over bed lights require upgrading within the maintenance schedule. 214: Over bed light requires upgrading within the maintenance schedule. 216: Over bed light requires upgrading within the maintenance schedule. 219: 6No. over bed lights require upgrading within the maintenance schedule. 220: 6No. over bed lights require upgrading within the maintenance schedule. 221: 6No. over bed lights require upgrading within the maintenance schedule. 318: 6No. over bed lights require upgrading within the maintenance schedule. 316: Over bed light requires upgrading within the maintenance schedule. 314: Over bed light requires upgrading within the maintenance schedule. 421: 5No. over bed lights require upgrading within the maintenance schedule. 420: 6No. over bed lights require upgrading within the maintenance schedule. 121: 6No. over bed lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,000

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 419: 8No. over bed lights require upgrading within the maintenance schedule. 118: 2No. over bed lights require upgrading within the maintenance schedule. 120: 6No. over bed lights require upgrading within the maintenance schedule. 418: 6No. over bed lights require upgrading within the maintenance schedule. C11: 3No. downlights require upgrading within the maintenance schedule. 210: 5No. downlights require upgrading within the maintenance schedule. 422: 3No. downlights require upgrading within the maintenance schedule. 410: 5No. downlights require upgrading within the maintenance schedule. 110: 4No. downlights require upgrading within the maintenance schedule. C03: 3No. downlights require upgrading within the maintenance schedule. 122: 4No. downlights require upgrading within the maintenance schedule. 310: 3No. downlights require upgrading within the maintenance schedule. C18: 3No. downlights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£1,600

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£400

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Surgical Admissions Lounge: 24No. downlights require upgrading within the maintenance schedule. Gray Ward: Surface fluorescent lights in acceptable order. M02: Surface fluorescent lights in acceptable order. Florence Nightingale Ward: Surface fluorescent lights in acceptable order. Vernon Ward: Surface fluorescent lights in acceptable order. Cheseldon Ward: Surface fluorescent lights in acceptable order. Florence Nightingale Ward: CAT II lights in acceptable order. Cheseldon Ward: CAT II lights in acceptable order. Vascular Department: CAT II lights in acceptable order. Surgical Admissions Lounge: CAT II lights in acceptable order. Vernon Ward: Emergency lights in acceptable order. Cheseldon Ward: Emergency lights in acceptable order. Surgical Admissions Lounge: Emergency lights in acceptable order. Florence Nightingale Ward: Emergency lights in acceptable order. Cheseldon Ward: Emergency door release in acceptable order.

04 - Lighting Installation

B(C)

£4,800

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

B

£0

12

0

0 0

0

2022

04 - Lighting Installation

B

£0

12

0

0 0

0

2022

05 - Emergency Lighting

B

£0

8

0

0 0

0

2018

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

10

0

0 0

0

2020

05 - Emergency Lighting

B

£0

10

0

0 0

0

2020

08 - Comments

B

£0

9

0

0 0

0

2019

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Gray Ward: Emergency door release in acceptable order. Vernon Ward: Emergency door release in acceptable order. Florence Nightingale Ward: Emergency door release in acceptable order.

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

01 - Sounders

B

£0

10

0

0 0

0

2020

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

Vernon Ward: Fire alarm sounders in acceptable order. Vascular Laboratory: Fire alarm sounders in acceptable order. Vascular Department: Fire alarm sounders in acceptable order. Surgical Admissions Lounge: Fire alarm sounders in acceptable order. Cheseldon Ward: Fire alarm sounders in acceptable order. M02: Fire alarm sounders in acceptable order. Gray Ward: Fire alarm call points in acceptable order. Cheseldon Ward: Fire alarm call points in acceptable order. Vernon Ward: Fire alarm call points in acceptable order. Florence Nightingale Ward: Fire alarm call points in acceptable order. Cheseldon Ward: Smoke detectors in acceptable order. Vernon Ward: Smoke detectors in acceptable order. M02: Smoke detectors in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Vascular Laboratory: Smoke detectors in acceptable order. Vascular Department: Smoke detectors in acceptable order. Surgical Admissions Lounge: Smoke detectors in acceptable order. 410: Fire alarm main panel in acceptable order. Florence Nightingale Ward: Fire alarm main panel in acceptable order. 110: Fire alarm main panel in acceptable order. 210: Fire alarm main panel in acceptable order.

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

03 - Smoke Detectors

B

£0

10

0

0 0

0

2020

05 - Fire Main/Zone Panel

B

£0

14

0

0 0

0

2024

05 - Fire Main/Zone Panel

B

£0

15

0

0 0

0

2025

05 - Fire Main/Zone Panel

B

£0

15

0

0 0

0

2025

05 - Fire Main/Zone Panel

B

£0

15

0

0 0

0

2025

05 - Nurse Call

B

£0

12

0

0 0

0

2022

05 - Nurse Call

B

£0

12

0

0 0

0

2022

05 - Nurse Call

B

£0

12

0

0 0

0

2022

05 - Nurse Call

B

£0

14

0

0 0

0

2024

05 - Nurse Call

B

£0

14

0

0 0

0

2024

B

£0

11

0

0 0

0

2021

Remedial Action

W - Engineering - Telecoms Cheseldon Ward: Nurse call system in acceptable order. Gray Ward: Nurse call system in acceptable order. Florence Nightingale Ward: Nurse call system in acceptable order. Vernon Ward: Nurse call system in acceptable order. Surgical Admissions Lounge: Nurse call system in acceptable order.

Location: 05 - Fifth Floor I - Engineering - Heating Systems 01 - Heat Emitters

Generic Hospital Physical Condition Survey

Gunning Ward: Steel panel radiators with low surface temperature covers in acceptable order.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Cauel Ward: Steel panel radiators with low surface temperature covers in acceptable order. Keate Ward: Steel panel radiators with low surface temperature covers in acceptable order. C08: Steel panel radiators in acceptable order. Holdsworth Ward: Steel panel radiators with low surface temperature covers in acceptable order.

01 - Heat Emitters

B

£0

12

0

0 0

0

2022

01 - Heat Emitters

B

£0

14

0

0 0

0

2024

01 - Heat Emitters

B

£0

14

0

0 0

0

2024

01 - Heat Emitters

B

£0

14

0

0 0

0

2024

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

B

£0

6

0

0 0

0

2016

03 - Grilles & Diffusers

B

£0

10

0

0 0

0

2020

03 - Grilles & Diffusers

B

£0

10

0

0 0

0

2020

03 - Grilles & Diffusers

B

£0

11

0

0 0

0

2021

03 - Grilles & Diffusers

B

£0

12

0

0 0

0

2022

06 - Hose Reels

C

£600

0

0

2 3

6

2010

06 - Hose Reels

C

£600

0

0

2 3

6

2010

06 - Hose Reels

C

£600

0

0

2 3

6

2010

Remedial Action

K - Engineering - Vent & Air Con 104: Grille/diffuser requires cleaning. 104: Grilles/diffusers in acceptable order. Keate Ward: Grilles/diffusers in acceptable order. Cauel Ward: Grilles/diffusers in acceptable order. Holdsworth Ward: Grilles/diffusers in acceptable order. Gunning Ward: Grilles/diffusers in acceptable order.

M - Engineering - Hot/Cold Water

Generic Hospital Physical Condition Survey

C11: Fire hose reel requires removal as it poses risk of legionella. C05: Fire hose reel requires removal as it poses risk of legionella. C25: Fire hose reel requires removal as it poses risk of legionella. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

C08: 5No. isolators require replacement. M11: 4No. isolators require replacement. M11: 4No. Ottermill fuse boards require replacement.

R - Engineering - Electrical 02 - Main Switchgear

C

£1,500

0

0

2 2

4

2010

02 - Main Switchgear

C

£1,200

0

0

2 2

4

2010

03 - Distribution Boards

C

£10,000

0

0

3 3

9

2010

03 - Distribution Boards

C

£12,500

0

0

3 3

9

2010

03 - Distribution Boards

B

£0

19

0

0 0

0

2029

03 - Distribution Boards

B

£0

19

0

0 0

0

2029

04 - Lighting Installation

C

£600

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,000

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,000

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,400

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

Generic Hospital Physical Condition Survey

C08: 5No. fuse boards require replacement. M11: Crabtree distribution boards in acceptable order. C08: Distribution boards in acceptable order. 13: 3No. fluorescent lights over visual display equipment are not suitable and require upgrading. 108: 2No. surface fluorescent lights are missing covers and require replacement. 420: 5No. over bed lights require replacement. 421: 5No. over bed lights require replacement. 321: 6No. over bed lights require replacement. 419: 7No. over bed lights require replacement. 314: Over bed light requires replacement. 316: Over bed light requires replacement.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 318: 6No. over bed lights require replacement. 319: 8No. over bed lights require replacement. 320: 6No. over bed lights require replacement. 120: 6No. over bed lights require upgrading within the maintenance schedule. 118: 6No. over bed lights require upgrading within the maintenance schedule. 119: 8No. over bed lights require upgrading within the maintenance schedule. 219: 8No. over bed lights require upgrading within the maintenance schedule. 221: 6No. over bed lights require upgrading within the maintenance schedule. 220: 6No. over bed lights require upgrading within the maintenance schedule. 121: 6No. over bed lights require upgrading within the maintenance schedule. 216: Over bed light requires upgrading within the maintenance schedule. 214: Over bed light requires upgrading within the maintenance schedule. C07: Downlight requires upgrading within the maintenance schedule. C25: 3No. downlights require upgrading within the maintenance schedule.

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,600

0

0

2 2

4

2010

04 - Lighting Installation

C

£1,200

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,600

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,600

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£1,200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£200

1

0

2 2

4

2011

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes C05: 4No. downlights require upgrading within the maintenance schedule. C05: 4No. surface fluorescent downlights require upgrading within the maintenance schedule. 122: 3No. downlights require upgrading within the maintenance schedule. 424: 3No. tungsten downlights require upgrading within the maintenance schedule. 310: 4No. surface fluorescent downlights require upgrading within the maintenance schedule. 222: 3No. downlights require upgrading within the maintenance schedule. 410: 5No. downlights require upgrading within the maintenance schedule. C11: 3No. downlights require upgrading within the maintenance schedule. C08: Surface fluorescent lights in acceptable order. M11: Surface fluorescent lights in acceptable order. Gunning Ward: Surface fluorescent lights in acceptable order. Holdsworth Ward: Surface fluorescent lights in acceptable order. Holdsworth Ward: CAT II lights in acceptable order.

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£800

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£1,000

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Cauel Ward: Surface fluorescent lights in acceptable order. Keate Ward: Surface fluorescent lights in acceptable order. Holdsworth Ward: Emergency lights in acceptable order. Keate Ward: Emergency lights in acceptable order. C08: Emergency lights in acceptable order. Gunning Ward: Emergency lights in acceptable order. Gunning Ward: Emergency door release in acceptable order. Cauel Ward: Emergency door release in acceptable order. Keate Ward: Emergency door release in acceptable order. Holdsworth Ward: Emergency door release in acceptable order.

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

8

0

0 0

0

2018

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

05 - Emergency Lighting

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

9

0

0 0

0

2019

08 - Comments

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

01 - Sounders

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

8

0

0 0

0

2018

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

Keate Ward: Fire alarm sounders in acceptable order. Gunning Ward: Fire alarm sounders in acceptable order. Cauel Ward: Fire alarm sounders in acceptable order. M11: Fire alarm sounders in acceptable order. Holdsworth Ward: Fire alarm sounders in acceptable order. Gunning Ward: Fire alarm call points in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Cauel Ward: Fire alarm call points in acceptable order. Keate Ward: Fire alarm call points in acceptable order. Holdsworth Ward: Fire alarm call points in acceptable order. M11: Smoke detectors in acceptable order. Gunning Ward: Smoke detectors in acceptable order. Holdsworth Ward: Smoke detectors in acceptable order. Keate Ward: Smoke detectors in acceptable order. Cauel Ward: Smoke detectors in acceptable order. Holdsworth Ward: Fire alarm main panel in acceptable order. Gunning Ward: Fire alarm main panel in acceptable order. Keate Ward: Fire alarm main panel in acceptable order.

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

05 - Fire Main/Zone Panel

B

£0

14

0

0 0

0

2024

05 - Fire Main/Zone Panel

B

£0

15

0

0 0

0

2025

05 - Fire Main/Zone Panel

B

£0

16

0

0 0

0

2026

05 - Nurse Call

B

£0

10

0

0 0

0

2020

05 - Nurse Call

B

£0

10

0

0 0

0

2020

05 - Nurse Call

B

£0

11

0

0 0

0

2021

05 - Nurse Call

B

£0

11

0

0 0

0

2021

B

£0

10

0

0 0

0

2020

Remedial Action

W - Engineering - Telecoms Gunning Ward: Nurse call system in acceptable order. Cauel Ward: Nurse call system in acceptable order. Holdsworth Ward: Nurse call system in acceptable order. Keate Ward: Nurse call system in acceptable order.

Location: Roof J - Engineering - Steam Systems 01 - Pipework

Generic Hospital Physical Condition Survey

Large Plant Room: Steam pipework to chilled fridge in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Large Plant Room: Some ductwork requires replacement. Small Plant Room: Ductwork in acceptable order. Large Plant Room: Ductwork in acceptable order. Large Plant Room: Ductwork in acceptable order. Small Plant Room: Lagging in acceptable order. Large Plant Room: Some pipework has been stood on and requires making good. Small Plant Room: Pipework in acceptable order. Large Plant Room: Pipework in acceptable order.

K - Engineering - Vent & Air Con 01 - Ductwork

C

£300

0

0

3 3

9

2010

01 - Ductwork

B

£0

7

0

0 0

0

2017

01 - Ductwork

B

£0

9

0

0 0

0

2019

01 - Ductwork

B

£0

10

0

0 0

0

2020

04 - Insulation

B

£0

7

0

0 0

0

2017

06 - Pipework

C

£3,000

0

0

3 3

9

2010

06 - Pipework

B

£0

7

0

0 0

0

2017

06 - Pipework

B

£0

8

0

0 0

0

2018

B

£0

10

0

0 0

0

2020

Large Plant Room: Cooling towers make up water storage tank in acceptable order.

02 - Pumps

B

£0

8

0

0 0

0

2018

05 - Pressurisation Units

B

£0

10

0

0 0

0

2020

Large Plant Room: Booster set for cooling tower in acceptable order. Large Plant Room: Pressurisation vessels in acceptable order.

01 - Cooling Plant

B(C)

£75,000

5

0

0 0

0

2015

01 - Cooling Plant

B

£0

12

0

0 0

0

2022

M - Engineering - Hot/Cold Water 08 - Tanks & Bylaws

O - Engineering - Main Plant

P - Engineering - Main Plant

Generic Hospital Physical Condition Survey

Roof Area: Cooling towers will require replacement within the maintenance schedule. Roof Area: Chillers 1 & 2 for Theatres in acceptable order.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Large Plant Room: Main control requires replacement. Large Plant Room: Control panel in acceptable order. Large Plant Room: Hole in duct discharge side of fan into Plant Room requires replacement. Large Plant Room: 2No. access panels are missing and require replacement. Large Plant Room: OPD fracture clean extract (F1) in acceptable order. Large Plant Room: Clean extract (F7) in acceptable order. Large Plant Room: ITU clean extract and inverter (setting 99.1%) in acceptable order. Small Plant Room: Special extract No.2 West F33 in acceptable order. Large Plant Room: Clean extracts (Theatres F16) in acceptable order. Large Plant Room: Dirty extracts (F2) in acceptable order. Large Plant Room: Extract (F3) in acceptable order. Large Plant Room: A&E clean extract (F4) in acceptable order. Large Plant Room: Dirty extracts (F6) in acceptable order. Large Plant Room: South East Ward dirty extracts (F5) in acceptable order.

03 - Controls

C

£50,000

0

0

4 3 12

2010

03 - Controls

B

£0

19

0

0 0

0

2029

04 - Extract Fans

C

£250

0

0

3 3

9

2010

04 - Extract Fans

C

£400

0

0

3 2

6

2010

04 - Extract Fans

B

£0

6

0

0 0

0

2016

04 - Extract Fans

B

£0

6

0

0 0

0

2016

04 - Extract Fans

B

£0

6

0

0 0

0

2016

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

7

0

0 0

0

2017

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Large Plant Room: Adult day ward extract (F10) in acceptable order. Large Plant Room: ITU dirty extracts (F8) in acceptable order. Large Plant Room: Clean extracts (North West Wards F14) in acceptable order. Large Plant Room: Clean extract (F22) in acceptable order. Large Plant Room: Dirty extract (F18 A&E) in acceptable order. Large Plant Room: Clean extracts (Theatres 5&6, F23) in acceptable order. Plant Room A: Extract (F30) in acceptable order. Plant Room A: Extract (F27) in acceptable order. Large Plant Room: Extracts (F20) in acceptable order. Small Plant Room: Special extract No.1 West F32 in acceptable order. Large Plant Room: Clean extract (F13) in acceptable order. Small Plant Room: A&E clean/extract F31 in acceptable order. Plant Room A: Clean extract (F24) in acceptable order. Large Plant Room: Dirty extract (North West Wards F15) in acceptable order.

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

7

0

0 0

0

2017

04 - Extract Fans

B

£0

8

0

0 0

0

2018

04 - Extract Fans

B

£0

8

0

0 0

0

2018

04 - Extract Fans

B

£0

8

0

0 0

0

2018

04 - Extract Fans

B

£0

8

0

0 0

0

2018

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Large Plant Room: Dirty extracts (F19) in acceptable order. Plant Room A: Dirty extract (Outpatients F26) in acceptable order. Plant Room A: Dirty extract (R&R F25) in acceptable order. Large Plant Room: Dirty extracts (Theatres F17) in acceptable order. Large Plant Room: Kitchen supply and extract in acceptable order. Small Plant Room: West anaesthetic gas control unit requires replacement. Large Plant Room: Cold room compressors (Kitchen) in acceptable order. Large Plant Room: Inverters in acceptable order.

04 - Extract Fans

B

£0

8

0

0 0

0

2018

04 - Extract Fans

B

£0

8

0

0 0

0

2018

04 - Extract Fans

B

£0

8

0

0 0

0

2018

04 - Extract Fans

B

£0

8

0

0 0

0

2018

04 - Extract Fans

B

£0

19

0

0 0

0

2029

09 - Comments

C

£500

0

0

3 3

9

2010

09 - Comments

B

£0

8

0

0 0

0

2018

09 - Comments

B

£0

15

0

0 0

0

2025

02 - Main Switchgear

C

£300

0

0

2 2

4

2010

02 - Main Switchgear

C

£300

0

0

2 2

4

2010

02 - Main Switchgear

C

£300

0

0

2 2

4

2010

02 - Main Switchgear

B

£0

6

0

0 0

0

2016

02 - Main Switchgear

B

£0

6

0

0 0

0

2016

02 - Main Switchgear

B

£0

8

0

0 0

0

2018

03 - Distribution Boards

C

£2,000

0

0

3 3

9

2010

Remedial Action

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

Small Plant Room: Isolator requires replacement. Large Plant Room: Isolator requires replacement. Plant Room A: Isolator requires replacement. Large Plant Room: Isolators in acceptable order. Small Plant Room: Isolators in acceptable order. Plant Room A: Isolators in acceptable order. Small Plant Room: Fuse board requires replacement. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Plant Room A: Fuse board requires replacement. Large Plant Room: Fuse board requires replacement. Small Plant Room: Surface fluorescent lights in acceptable order. Plant Room A: Surface fluorescent lights in acceptable order. Small Plant Room: Emergency lights in acceptable order. Plant Room A: Emergency lights in acceptable order.

03 - Distribution Boards

C

£2,500

0

0

3 3

9

2010

03 - Distribution Boards

C

£2,000

0

0

3 3

9

2010

04 - Lighting Installation

B

£0

6

0

0 0

0

2016

04 - Lighting Installation

B

£0

7

0

0 0

0

2017

05 - Emergency Lighting

B

£0

7

0

0 0

0

2017

05 - Emergency Lighting

B

£0

8

0

0 0

0

2018

01 - Sounders

B

£0

6

0

0 0

0

2016

01 - Sounders

B

£0

8

0

0 0

0

2018

01 - Sounders

B

£0

9

0

0 0

0

2019

02 - Call Points

B

£0

7

0

0 0

0

2017

02 - Call Points

B

£0

7

0

0 0

0

2017

02 - Call Points

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B

£0

9

0

0 0

0

2019

Remedial Action

V - Engineering - Fire Alarms Plant Room A: Fire alarm sounders in acceptable order. Small Plant Room: Fire alarm sounders in acceptable order. Large Plant Room: Fire alarm sounders in acceptable order. Small Plant Room: Fire alarm call points in acceptable order. Plant Room A: Fire alarm call points in acceptable order. Large Plant Room: Fire alarm call points in acceptable order. Small Plant Room: Smoke detectors in acceptable order. Large Plant Room: Smoke detectors in acceptable order.

Location: Whole Block N - Engineering - Lifts

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report

01 - Lifts

Block Total

Generic Hospital Physical Condition Survey

Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

B(C)

£1,400,000

9

2015

Although lifts were deemed to be in acceptable condition an allowance should be made for refurbishment works during the maintenance schedule.

5

0

3 3

Remedial Action

£5,107,059.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Redecoration required within 5 year maintenance schedule Located to 30% of the floor. Redecoration required within 5 year maintenance schedule Located to 10% of the floor. Redecoration required within 5 year maintenance schedule Located to 60% of the floor. Plasterboard: Make good water damaged plasterwork - Located to 0.C01. Plasterboard: Make good water damaged plasterwork - Located to 0.047. Plasterboard: Make good minor cracking to plasterwork Located to 0.002. Suspended: Remove tiles and replace with new (30%) Located to 0.030 . Suspended: Remove tiles and replace with new 0.C02 2No. tiles. Suspended. Plasterboard. Carpet: Need to replace contract quality carpet - Located 0.043, 0.043A, 0.043B, 0.042, 0.042A and 0.042B.

Site : Generic Hospital - STG Block : Wolfson Site - WFS Facet: 1 - Building Location: 00 - Ground Floor C - Building - Internal Fabric 01 - Decorations

C

£25,300

0

0

2 2

4

2010

01 - Decorations

B(C)

£8,432

1

0

2 2

4

2011

01 - Decorations

B(C)

£50,600

3

0

2 2

4

2013

02 - Ceiling

C

£400

0

0

2 2

4

2010

02 - Ceiling

C

£400

0

0

2 2

4

2010

02 - Ceiling

C

£300

0

0

2 2

4

2010

02 - Ceiling

C

£600

0

0

2 2

4

2010

02 - Ceiling

C

£250

0

0

2 2

4

2010

02 - Ceiling 02 - Ceiling 03 - Floor

B B C

£0 £0 £4,050

10 20 0

0 0 0

0 0 0 0 2 3

0 0 6

2020 2030 2010

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Vinyl: Need to replace vinyl sheet flooring - Located to 0.028 & 0.028C. Carpet: Need to replace contract quality carpet - Located to 0.052, 0.051, 0.007 and 0.046. Carpet: Need to replace contract quality carpet - Located to 0.035. Vinyl: Need to replace vinyl sheet flooring - Located to 0.026A and 0.015. Vinyl: Need to replace vinyl sheet flooring - Located to 0.040A, 0.034 (50%), 0.010, 0.008, 4No. consulting rooms, 0.047 and 0.026. Carpet: Need to replace contract quality carpet - Located to 0.045, 0.042, 0.042A and 0.002. Parquet: Sand and revarnish Located to 0.038 & 0.036. Vinyl sheet. Slip resistant vinyl sheet. Vinyl sheet flooring. Quarry tiles. Brickwork (plastered): Make good water damaged plasterwork - Located to 0.009. Brickwork (plastered): Make good water damaged plasterwork - Located to 0.047.

03 - Floor

C

£7,000

0

0

2 3

6

2010

03 - Floor

B(C)

£9,600

1

0

2 3

6

2011

03 - Floor

B(C)

£2,900

2

0

2 3

6

2012

03 - Floor

B(C)

£2,000

3

0

2 3

6

2013

03 - Floor

B(C)

£14,000

5

0

2 3

6

2015

03 - Floor

B(C)

£1,200

5

0

2 3

6

2015

03 - Floor

B(C)

£10,500

5

0

2 3

6

2015

03 - Floor 03 - Floor 03 - Floor 03 - Floor 05 - Condition of internal walls

B B B B C

£0 £0 £0 £0 £400

7 7 7 10 0

0 0 0 0 0

0 0 0 0 2

0 0 0 0 3

0 0 0 0 6

2017 2017 2017 2020 2010

05 - Condition of internal walls

C

£400

0

0

2 3

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

05 - Condition of internal walls

C

£800

0

0

2 3

6

2010

Brickwork (plastered): Make good water damaged plasterwork in numerous locations - Located to 0.029.

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

Fairfaced brickwork: Make good cracking - Located to 0.036.

05 - Condition of internal walls 05 - Condition of internal walls 05 - Condition of internal walls 05 - Condition of internal walls 08 - Fixed Units

B B B B C

£0 £0 £0 £0 £3,500

10 20 20 20 0

0 0 0 0 0

0 0 0 0 3

0 0 0 0 3

0 0 0 0 9

2020 2030 2030 2030 2010

08 - Fixed Units

C

£800

0

0

3 3

9

2010

08 - Fixed Units

C

£4,000

0

0

3 3

9

2010

08 - Fixed Units

C

£6,000

0

0

3 3

9

2010

08 - Fixed Units

C

£700

0

0

3 3

9

2010

08 - Fixed Units

C

£1,500

0

0

3 3

9

2010

Ceramic tiling. Fairfaced brickwork. Brickwork (plastered). PVCU panelling. Sanitary fittings: Replace sink unit due to age and condition 7No. - Located to ward. Sanitary fittings: Replace ceramic WC due to age and condition, 1No. Clinical units: Replace units due to age and condition - Located to 0.048. Kitchen facilities: Replace kitchen units due to age and condition - Located to 0.026A. Sanitary fittings: Replace ceramic wash hand basin due to age and condition 1No. Clinical units: Replace units due to age and condition - Located to 0.017.

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Sanitary fittings: Replace ceramic WC due to age and condition, 3No. Sanitary fittings: Replace ceramic wash hand basin due to age and condition 3No. Sanitary fittings: Sink unit. Sanitary fittings: Ceramic WC. Sanitary fittings: Ceramic wash hand basin. Kitchen facilities. Sanitary fittings: Ceramic urinal. Room 0.019 undergoing refurbishment at time of survey and no access was gained.

08 - Fixed Units

B(C)

£2,400

5

0

3 3

9

2015

08 - Fixed Units

B(C)

£2,100

5

0

3 3

9

2015

08 - Fixed Units 08 - Fixed Units 08 - Fixed Units

B B B

£0 £0 £0

7 7 7

0 0 0

0 0 0 0 0 0

0 0 0

2017 2017 2017

08 - Fixed Units 08 - Fixed Units 12 - Comments

B B N/A

£0 £0 £0

7 10 0

0 0 0

0 0 0 0 0 0

0 0 0

2017 2020 2010

01 - Decorations

C

£1,050

0

0

2 2

4

2010

01 - Decorations

B(C)

£1,050

1

0

2 2

4

2011

01 - Decorations

B(C)

£8,400

3

0

2 2

4

2013

02 - Ceiling

C

£400

0

0

2 2

4

2010

02 - Ceiling 02 - Ceiling 02 - Ceiling 03 - Floor

B B B B(C)

£0 £0 £0 £1,250

10 10 20 3

0 0 0 0

0 0 0 2

0 0 0 6

2020 2020 2030 2013

Remedial Action

Location: -01 - Basement C - Building - Internal Fabric

Generic Hospital Physical Condition Survey

0 0 0 3

Redecoration required within 5 year maintenance schedule Located to 10% of the block. Redecoration required within 5 year maintenance schedule Located to 10% of the block. Redecoration required within 5 year maintenance schedule Located to 80% of the block. Plasterboard: Make good water damaged plasterwork - Located to 02.011. Suspended. Fibreboard. Plasterboard. Vinyl: Need to replace slip resistant vinyl flooring - Located to the toilet area of ward area.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Vinyl: Need to replace vinyl sheet flooring - Located to 70% of ward area. Slip resistant vinyl sheet. Ceramic tiling. Brickwork (plastered). Sanitary fittings: Replace sink unit due to age and condition, 4No. Kitchen facilities: : Replace with new due to age and condition, 02.010. Sanitary fittings: Ceramic wash hand basin: Replace with new due to age and condition, 2No. Sanitary fittings: Ceramic WC: Replace with new due to age and condition, 3No. Sanitary fittings: Plastic bath: Replace with new due to age and condition, 1No.

03 - Floor

B(C)

£8,600

5

0

2 3

6

2015

03 - Floor 05 - Condition of internal walls 05 - Condition of internal walls 08 - Fixed Units

B B B C

£0 £0 £0 £3,000

7 10 20 0

0 0 0 0

0 0 0 3

0 0 0 3

0 0 0 9

2017 2020 2030 2010

08 - Fixed Units

C

£3,000

0

0

3 3

9

2010

08 - Fixed Units

B(C)

£1,400

3

0

3 3

9

2013

08 - Fixed Units

B(C)

£2,400

3

0

3 3

9

2013

08 - Fixed Units

B(C)

£1,000

3

0

3 3

9

2013

01 - Decorations

C

£3,100

0

0

2 2

4

2010

01 - Decorations

B(C)

£12,400

1

0

2 2

4

2011

01 - Decorations

B(C)

£15,450

2

0

2 2

4

2012

B B B

£0 £0 £0

10 20 20

0 0 0

0 0 0 0 0 0

0 0 0

2020 2030 2030

Remedial Action

Location: -01 - Lower Ground Floor C - Building - Internal Fabric

02 - Ceiling 02 - Ceiling 02 - Ceiling

Generic Hospital Physical Condition Survey

Redecoration required within 5 year maintenance schedule Located to 10% of the floor. Redecoration required within 5 year maintenance schedule Located to 40% of the floor. Redecoration required within 5 year maintenance schedule Located to 50% of the floor. Suspended. Plasterboard. Concrete soffit.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Carpet: Need to replace contract quality carpet - Located to 0.C03/01.020. Carpet: Need to replace contract quality carpet - Located to 01.019 and 01.027. Vinyl: Need to replace slip resistant vinyl flooring - Located to toilet and shower area to ward. Quarry tiles: Need to replace with new - Located to toilet area of 01.022. Vinyl: Need to replace vinyl sheet flooring - Located to common circulation routes, 01.018, ward areas, male and female toilets. Quarry tiles. Concrete. Fairfaced brickwork: Make good, where alterations took place - Located to Plant Room.

03 - Floor

C

£1,450

0

0

2 3

6

2010

03 - Floor

B(C)

£2,850

2

0

2 3

6

2012

03 - Floor

B(C)

£1,850

5

0

2 3

6

2015

03 - Floor

B(C)

£2,500

5

0

2 3

6

2015

03 - Floor

B(C)

£31,100

5

0

2 3

6

2015

03 - Floor 03 - Floor 05 - Condition of internal walls

B B C

£0 £0 £300

10 10 0

0 0 0

0 0 0 0 2 3

0 0 6

2020 2020 2010

05 - Condition of internal walls

C

£400

0

0

2 3

6

2010

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls

C

£300

0

0

2 3

6

2010

05 - Condition of internal walls 05 - Condition of internal walls

B B

£0 £0

10 20

0 0

0 0 0 0

0 0

2020 2030

Generic Hospital Physical Condition Survey

Remedial Action

Brickwork (plastered): Make good water damaged plasterwork - Located to 01.012. Brickwork (plastered): Make good impact damaged plasterwork - Located to 01.026. Ceramic tiling: Remove and replace damaged tiling Located to 01.014. Ceramic tiling. Fairfaced brickwork. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Brickwork (plastered). Sanitary fittings: Replace ceramic WC due to age and condition, 2No. - Located to 01.022. Clinical units: Replace units due to age and condition - Located to 01.010. Sanitary fittings: Replace Sink units due to age and condition, 6No. Kitchen facilities: Replace kitchen units due to age and condition - Located to 01.020. Kitchen facilities: Replace kitchen units due to age and condition - Located to 01.027. Sanitary fittings: Replace ceramic wash hand basin due to age and condition, 4No. Sanitary fittings: Plastic bath. Sanitary fittings: Ceramic WC. Room 01.021, Ward WC & shower area is undergoing refurbishment.

05 - Condition of internal walls 08 - Fixed Units

B C

£0 £1,600

20 0

0 0

0 0 3 3

0 9

2030 2010

08 - Fixed Units

C

£1,500

0

0

3 3

9

2010

08 - Fixed Units

C

£4,500

0

0

3 3

9

2010

08 - Fixed Units

C

£1,500

0

0

3 3

9

2010

08 - Fixed Units

B(C)

£5,000

3

0

3 3

9

2013

08 - Fixed Units

B(C)

£2,800

3

0

3 3

9

2013

08 - Fixed Units 08 - Fixed Units 12 - Comments

B B N/A

£0 £0 £0

7 7 0

0 0 0

0 0 0 0 0 0

0 0 0

2017 2017 2010

04 - Windows

C

£28,800

0

0

4 3 12

2010

06 - Doors

B(C)

£175

1

0

3 3

2011

Remedial Action

Location: Elevation 01 B - Building - External Fabric

9

Steel - single: Replace crittal steel windows with more suitable alternative, 36m2 elevation 1. Softwood timber: Redecorate and make good 1No. - Located to elevation 1.

Location: Elevation 01 & 06 Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B - Building - External Fabric 01b - Masonry - Spalling

C

£500

0

0

4 3 12

2010

Brickwork: Need to make good spalled brickwork 5No. Located to the corner of elevation 1 & 6.

C

£14,400

0

0

4 3 12

2010

Steel - single: Replace crittal steel windows with more suitable alternative, 18m2 elevation 2.

04 - Windows

C

£120,000

0

0

4 3 12

2010

06 - Doors

B(C)

£1,000

1

0

3 3

9

2011

Steel - single: Replace crittal steel windows with more suitable alternative - Located to elevation 3. Softwood timber: Redecorate and make good 4No. double doors - Located to elevation 3.

04 - Windows

C

£40,000

0

0

4 3 12

2010

06 - Doors

C

£2,400

0

0

3 3

9

2010

06 - Doors

B(C)

£350

1

0

3 3

9

2011

08 - Porches

B

£0

10

0

0 0

0

2020

Location: Elevation 02 B - Building - External Fabric 04 - Windows

Location: Elevation 03 B - Building - External Fabric

Location: Elevation 04 B - Building - External Fabric

Generic Hospital Physical Condition Survey

Steel - single: Replace crittal steel windows with more suitable alternative - Located to elevation 4. Steel: Need to replace 2No. Located to elevation 4. Softwood timber: Redecorate and make good 2No. - Located to elevation 4. Canopy - Located to elevation 4.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Steel - single: Replace crittal steel windows with more suitable alternative - Located to elevation 5. Steel: Need to replace 2No. Located to elevation 5.

Location: Elevation 05 B - Building - External Fabric 04 - Windows

C

£17,600

0

0

4 3 12

2010

06 - Doors

C

£2,400

0

0

3 3

9

2010

04 - Windows

C

£14,400

0

0

4 3 12

2010

06 - Doors

B(C)

£675

1

0

3 3

9

2011

01 - Roads 02 - Car Parks

B C

£0 £400

7 0

0 0

0 0 2 3

0 6

2017 2010

02 - Car Parks 03 - Paths

B C

£0 £200

7 0

0 0

0 0 0 4 4 16

2017 2010

03 - Paths

B(C)

£500

5

0

4 4 16

2015

B(C)

£175

5

0

2 2

2015

Location: Elevation 06 B - Building - External Fabric Steel - single: Replace crittal steel windows with more suitable alternative - Located to Elevation 6. Softwood timber: Redecorate and make good 4No. - Located to elevation 6.

Location: External F - Building - External Works Tarmac. Tarmac: Repair crack with hot bitumen 4No. - Located to elevation 1. Tarmac. Tarmac: Repair crack with hot bitumen - Located to elevation 5. Paving slabs: Relay loose paving blocks as they could represent a potential trip hazard - Located adjacent Elevation 6.

G - Building - Gardens 04 - Other Structure (specify) Generic Hospital Physical Condition Survey

4

Shed: Redecorate and make good. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond. 04 - Other Structure (specify)

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

B

£0

7

0

0 0

0

2017

Greenhouse.

02a - Flat - Covering

B(C)

£320,000

5

0

4 4 16

2015

Asphalt: Asphalt roof covering requires replacement inclusive of making good the decking, relaying stone chippings, this is due to the roof reaching the end of its expected life (patch repairs have been carried out).

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02e - Flat - Verges/Fascias/ Soffits

B B B C

£0 £0 £0 £2,000

10 10 20 0

0 0 0 0

0 0 0 4

0 0 0 0 0 0 4 16

2020 2020 2030 2010

02g - Flat - Guttering

B(C)

£0

5

0

4 4 16

2015

02h - Flat - Down Rainwater pipes 02i - Flat - Skylights

B C

£0 £56,700

7 0

0 0

0 0 0 4 4 16

2017 2010

Reinforced concrete. Mineral felt. Concrete. Concrete: Make good damaged sections of the concrete fascia and soffit - Located to all elevations. Integrated (cost included in covering). PVCU: Internal (assumed). Aluminium skylight Replace all, numerous damaged or patch repaired, ongoing water ingress issues. 60No.

Location: Roof 01 D - Building - Roof

Location: Roof 02 D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Asphalt: Asphalt roof covering requires replacement inclusive of making good the decking, relaying stone chippings, this is due to the roof reaching the end of its expected life. Reinforced concrete. Mineral felt. Concrete. Integrated (cost included in covering). PVCU: Internal (assumed). Aluminium skylights: Replace with new, numerous damaged or patch repaired with temporary tape, 10No. No safe access to roof 2. Assumed condition.

02a - Flat - Covering

B(C)

£50,000

5

0

4 4 16

2015

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering

B B B B(C)

£0 £0 £0 £0

10 10 20 5

0 0 0 0

0 0 0 4

0 0 0 0 0 0 4 16

2020 2020 2030 2015

02h - Flat - Down Rainwater pipes 02i - Flat - Skylights

B C

£0 £9,450

7 0

0 0

0 0 0 4 4 16

2017 2010

02j - Flat - Comments

N/A

£0

0

0

4 4 16

2010

02a - Flat - Covering

B(C)

£35,000

5

0

4 4 16

2015

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering

B B B B(C)

£0 £0 £0 £0

10 10 20 5

0 0 0 0

0 0 0 4

0 0 0 0 0 0 4 16

2020 2020 2030 2015

02h - Flat - Down Rainwater pipes 02j - Flat - Comments

B N/A

£0 £0

7 0

0 0

0 0 0 4 4 16

2017 2010

Remedial Action

Location: Roof 03 D - Building - Roof Asphalt: Asphalt roof covering requires replacement inclusive of making good the decking, relaying stone chippings, this is due to the roof reaching the end of its expected life. Reinforced concrete. Mineral felt. Concrete. Integrated (cost included in covering). PVCU: Internal (assumed). No safe access to roof 3. Assumed condition.

Location: Roof 04 Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

Asphalt: Asphalt roof covering requires replacement inclusive of making good the decking, relaying stone chippings, this is due to the roof reaching the end of its expected life. Reinforced concrete. Mineral felt. Concrete. Integrated (cost included in covering). PVCU: Internal (assumed). No safe access to roof 4. Assumed condition.

D - Building - Roof 02a - Flat - Covering

B(C)

£3,250

5

0

4 4 16

2015

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering

B B B B(C)

£0 £0 £0 £0

10 10 20 5

0 0 0 0

0 0 0 4

0 0 0 0 0 0 4 16

2020 2020 2030 2015

02h - Flat - Down Rainwater pipes 02j - Flat - Comments

B N/A

£0 £0

7 0

0 0

0 0 0 4 4 16

2017 2010

02a - Flat - Covering

B(C)

£2,750

5

0

4 4 16

2015

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering

B B B B(C)

£0 £0 £0 £0

10 10 20 5

0 0 0 0

0 0 0 4

2020 2020 2030 2015

B

£0

7

0

0 0

Location: Roof 05 D - Building - Roof

02h - Flat - Down Rainwater pipes

0 0 0 0 0 0 4 16 0

2017

Asphalt: Asphalt roof covering requires replacement inclusive of making good the decking, relaying stone chippings, this is due to the roof reaching the end of its expected life. Reinforced concrete. Mineral felt. Concrete. Integrated (cost included in covering). PVCU: Internal (assumed).

Location: Roof 06 D - Building - Roof

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes Asphalt: Asphalt roof covering requires replacement inclusive of making good the decking, relaying stone chippings, this is due to the roof reaching the end of its expected life. Reinforced concrete. Mineral felt. Concrete. Integrated (cost included in covering). PVCU: Internal (assumed).

02a - Flat - Covering

B(C)

£27,500

5

0

4 4 16

2015

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering

B B B B(C)

£0 £0 £0 £0

10 10 20 5

0 0 0 0

0 0 0 4

2020 2020 2030 2015

B

£0

7

0

0 0

0

2017

02a - Flat - Covering

B(C)

£3,150

5

0

4 4 16

2015

02b - Flat - Decking 02c - Flat - Flashing 02d - Flat - Parapets 02g - Flat - Guttering

B B B B(C)

£0 £0 £0 £0

10 10 20 5

0 0 0 0

0 0 0 4

2020 2020 2030 2015

B

£0

7

0

0 0

02h - Flat - Down Rainwater pipes

0 0 0 0 0 0 4 16

Remedial Action

Location: Roof 07 D - Building - Roof

02h - Flat - Down Rainwater pipes

0 0 0 0 0 0 4 16 0

2017

Asphalt: Asphalt roof covering requires replacement inclusive of making good the decking, relaying stone chippings, this is due to the roof reaching the end of its expected life. Reinforced concrete. Mineral felt. Concrete. Integrated (cost included in covering). PVCU: Internal (assumed).

Location: Whole Block A - Building - Physical Structure

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01 - General Structure

B

£0

35

0

0 0

0

2045

Concrete frame: Generally sound.

02 - Foundations 03 - Ground Stability 04 - Chimneys 05 - External Fire Escape

B B B B

£0 £0 £0 £0

35 35 20 20

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

2045 2045 2030 2030

Generally sound. Generally sound. Steel flue. Concrete.

01a - Masonry - Cracking 01c - Masonry - Pointing 01d - Masonry - Finish 04 - Windows

B B B C

£0 £0 £0 £21,600

35 35 35 0

0 0 0 0

0 0 0 4

0 0 0 0 0 0 3 12

2045 2045 2045 2010

04 - Windows 06 - Doors

B C

£0 £0

20 0

0 0

0 0 3 3

0 9

2030 2010

06 - Doors

B

£0

10

0

0 0

0

2020

Brickwork. Brickwork. Brickwork. Steel - single: Replace crittal steel windows with more suitable alternative - Located to walkway. Aluminium - Double. Softwood timber: Need to replace 1No. double door to elevation 3 (Oakleaf informed that this is due to be replaced, no cost included). Aluminium.

01 - Heat Emitters

B(C)

£800

2

0

2 2

4

2012

01 - Heat Emitters

B(C)

£400

5

0

3 3

9

2015

B - Building - External Fabric

Facet: 2 - Engineering Location: 00 - Ground Floor I - Engineering - Heating Systems

Generic Hospital Physical Condition Survey

0/028C: 2No. fan convectors require upgrading within the maintenance schedule. Reception Area: Fan convector requires upgrading within the maintenance schedule. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

0/009: 2No. grilles/diffusers require cleaning. 0/009: 2No. grilles/diffusers in acceptable order.

K - Engineering - Vent & Air Con 03 - Grilles & Diffusers

C

£200

0

0

2 2

4

2010

03 - Grilles & Diffusers

B

£0

8

0

0 0

0

2018

C

£250

0

0

2 2

4

2010

0/029: Area is unused, shower requires removing.

B

£0

12

0

0 0

0

2022

Lift in acceptable order.

04 - Extract Fans

B(C)

£400

3

0

3 3

9

2013

09 - Comments

C

£1,200

0

0

2 2

4

2010

0/052: Extract fan requires upgrading within the maintenance schedule. 0/030A: Pool plant all unused requires removing.

03 - Distribution Boards

C

£800

0

0

3 2

6

2010

03 - Distribution Boards

B

£0

10

0

0 0

0

2020

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

M - Engineering - Hot/Cold Water 03 - Blending Valves N - Engineering - Lifts 01 - Lifts P - Engineering - Main Plant

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

0/008: MEM distribution board has rewirable fuses and requires replacement. 0.C01: Merlin Gerin distribution board in acceptable order. 0/010: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0/046: Fluorescent light over visual display equipment is not suitable and requires upgrading.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0/026E: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0/033: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0/004: Medical exam light requires replacement. 0/047: 4No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0/044: Fluorescent light over visual display equipment is not suitable and requires upgrading. 0/004: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0/002: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0/032: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0/027: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0/003: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading. 0/031: 2No. fluorescent lights over visual display equipment are not suitable and require upgrading.

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£150

0

0

2 2

4

2010

04 - Lighting Installation

C

£800

0

0

3 2

6

2010

04 - Lighting Installation

C

£200

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

3 2

6

2010

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0/007A: 4No. CAT II lights require upgrading within the maintenance schedule. 0/035: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 0/038: 3No. surface fluorescent lights require upgrading within the maintenance schedule. 0/045: 2No. surface fluorescent lights require upgrading within the maintenance schedule. Hydro Pool: 12No. surface fluorescent lights require upgrading within the maintenance schedule. 0/036: 12No. surface fluorescent lights require upgrading within the maintenance schedule. 0/008: 3No. surface fluorescent lights require upgrading within the maintenance schedule. Reception Area: 8No. surface fluorescent lights require upgrading within the maintenance schedule. 0/038: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 0/041: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 0/035: 6No. surface fluorescent lights require upgrading within the maintenance schedule. 0/042B: 2No. CAT II lights require upgrading within the maintenance schedule.

04 - Lighting Installation

B(C)

£800

2

0

2 2

4

2012

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£2,400

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£3,600

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,600

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£1,800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

Generic Hospital Physical Condition Survey

Remedial Action

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 0/042A: 2No. CAT II lights require upgrading within the maintenance schedule. 0/042: 2No. CAT II lights require upgrading within the maintenance schedule. 0/043: 2No. CAT II lights require upgrading within the maintenance schedule. 0/033: Surface fluorescent light requires upgrading within the maintenance schedule. 0.C13: Surface fluorescent lights in acceptable order.

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£400

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£200

5

0

2 2

4

2015

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B(C)

£150

3

0

3 2

6

2013

03 - Smoke Detectors

B(C)

£150

3

0

3 2

6

2013

03 - Smoke Detectors

B(C)

£150

3

0

3 2

6

2013

03 - Smoke Detectors

B(C)

£150

3

0

3 2

6

2013

03 - Smoke Detectors

B(C)

£150

3

0

3 2

6

2013

03 - Smoke Detectors

B(C)

£150

3

0

3 2

6

2013

03 - Smoke Detectors

B(C)

£150

3

0

3 3

9

2013

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

0/042A: Smoke detector requires upgrading within the maintenance schedule. 0/042: Smoke detector requires upgrading within the maintenance schedule. 0/042B: Smoke detector requires upgrading within the maintenance schedule. 0/043: Smoke detector requires upgrading within the maintenance schedule. 0/043B: Smoke detector requires upgrading within the maintenance schedule. 0/044: Smoke detector requires upgrading within the maintenance schedule. 0.C02: Smoke detector requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

0/052: Smoke detector requires upgrading within the maintenance schedule. 0/014: Smoke detector requires upgrading within the maintenance schedule. 0/013: Smoke detector requires upgrading within the maintenance schedule. 0/016: Smoke detector requires upgrading within the maintenance schedule. 0/013: Smoke detector requires upgrading within the maintenance schedule. 0/015: Smoke detector requires upgrading within the maintenance schedule. 0.C11: Smoke detector requires upgrading within the maintenance schedule. 0.C01: 3No. smoke detectors require upgrading within the maintenance schedule. Reception Area: Fire alarm main panel in acceptable order.

03 - Smoke Detectors

B(C)

£150

4

0

3 2

6

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 2

6

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 2

6

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 2

6

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 2

6

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 2

6

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£450

4

0

3 3

9

2014

B

£0

10

0

0 0

0

2020

B(C)

£60

5

0

3 2

6

2015

0/005A: Cover on nurse call main panel (mains powered "box") requires refitting.

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

02.015: Tungsten light requires replacement. 02.014: Tungsten light requires replacement.

05 - Fire Main/Zone Panel W - Engineering - Telecoms 05 - Nurse Call

Location: -01 - Basement R - Engineering - Electrical

Generic Hospital Physical Condition Survey

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 02.012: Tungsten light requires replacement. 02/013A: Surface fluorescent light requires upgrading within the maintenance schedule. 02/010: Surface fluorescent light requires upgrading within the maintenance schedule. 02/011: Surface fluorescent light requires upgrading within the maintenance schedule.

04 - Lighting Installation

C

£200

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£200

3

0

2 2

4

2013

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 3

9

2014

03 - Grilles & Diffusers

C

£200

0

0

2 2

4

2010

03 - Grilles & Diffusers

C

£100

0

0

2 2

4

2010

03 - Grilles & Diffusers

B

£0

8

0

0 0

0

2018

03 - Grilles & Diffusers

B

£0

8

0

0 0

0

2018

08 - Tanks & Bylaws

B

£0

20

0

0 0

0

2030

09 - Comments

B

£0

15

0

0 0

0

2025

Remedial Action

V - Engineering - Fire Alarms 02/004: Smoke detector requires upgrading within the maintenance schedule. 02/005: Smoke detector requires upgrading within the maintenance schedule. 02/008: Smoke detector requires upgrading within the maintenance schedule.

Location: -01 - Lower Ground Floor K - Engineering - Vent & Air Con 01/027: 2No. grilles/diffusers require cleaning. 01/022: Grille/diffuser requires cleaning. 01/030: 2No. grilles/diffusers in acceptable order. 01/022: Grilles/diffusers in acceptable order.

M - Engineering - Hot/Cold Water

Generic Hospital Physical Condition Survey

01/036: Cold water storage tank in acceptable order. 01/036: Cold water booster set in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

01/035: 5No. Regency heating boilers in acceptable order. 01/035: Wilo heating pumps in acceptable order. 01/036: MHS Gemini Calorifier in acceptable order. 01/036: Pressurisation unit in acceptable order.

O - Engineering - Main Plant 01 - Heating Boilers

B

£0

15

0

0 0

0

2025

02 - Pumps

B

£0

10

0

0 0

0

2020

03 - Calorifiers

B

£0

15

0

0 0

0

2025

05 - Pressurisation Units

B

£0

15

0

0 0

0

2025

03 - Controls

B

£0

20

0

0 0

0

2030

07 - Flue Gas Termination

B

£0

20

0

0 0

0

2030

08 - Generators

B

£0

20

0

0 0

0

2030

03 - Distribution Boards

C

£700

0

0

3 2

6

2010

04 - Lighting Installation

C

£400

0

0

2 2

4

2010

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B(C)

£800

4

0

2 2

4

2014

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

P - Engineering - Main Plant 01.035: Control panel in acceptable order. 01/035: Forced exhaust flue in acceptable order. 01/035: Diesel generator in acceptable order.

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

01.C03: Wylex distribution board requires replacement. 01/024: 2No. tungsten lights require replacement. 01/022: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 01/020: 4No. surface fluorescent lights require upgrading within the maintenance schedule. 01/007: Surface fluorescent lights in acceptable order. 01/018: Surface fluorescent lights in acceptable order. 01/004: Surface fluorescent lights in acceptable order. 01/005: Surface fluorescent lights in acceptable order. October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes 01/009: Surface fluorescent lights in acceptable order. 01/006: Surface fluorescent lights in acceptable order. 01/008: Surface fluorescent lights in acceptable order.

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

04 - Lighting Installation

B

£0

8

0

0 0

0

2018

03 - Smoke Detectors

B(C)

£600

3

0

3 2

6

2013

03 - Smoke Detectors

B(C)

£600

3

0

3 2

6

2013

03 - Smoke Detectors

B(C)

£150

3

0

3 2

6

2013

03 - Smoke Detectors

B(C)

£150

4

0

3 2

6

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 2

6

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 2

6

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 2

6

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 2

6

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 2

6

2014

03 - Smoke Detectors

B(C)

£150

4

0

3 2

6

2014

Remedial Action

V - Engineering - Fire Alarms

Generic Hospital Physical Condition Survey

01/027: 4No. smoke detectors require upgrading within the maintenance schedule. 01/030: 4No. smoke detectors require upgrading within the maintenance schedule. 01/020: Smoke detector requires upgrading within the maintenance schedule. 01/008: Smoke detector requires upgrading within the maintenance schedule. 01/007: Smoke detector requires upgrading within the maintenance schedule. 01/006: Smoke detector requires upgrading within the maintenance schedule. 01/004: Smoke detector requires upgrading within the maintenance schedule. 01/005: Smoke detector requires upgrading within the maintenance schedule. 01/009: Smoke detector requires upgrading within the maintenance schedule. 01/018: Smoke detector requires upgrading within the maintenance schedule.

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047


EstateManager

Property Appraisal - Detail Report Cond.

Cost to B Rem Life Priority C L

R

Year

Notes

Remedial Action

31No. outside lights require upgrading within the maintenance schedule. 4No. lamp posts require upgrading within the maintenance schedule.

Location: External R - Engineering - Electrical 04 - Lighting Installation

B(C)

£6,200

3

0

2 2

4

2013

04 - Lighting Installation

B(C)

£2,400

5

0

2 2

4

2015

B(C)

£100,000

4

0

3 3

9

2014

Radiators, pipes and controls require upgrading within the maintenance schedule.

04 - Lighting Installation

B

£0

9

0

0 0

0

2019

06 - Sockets/Switches

B(C)

£25,000

4

0

3 3

9

2014

Bedrooms: Lights in bedrooms in acceptable order unless stated. Sockets and switches require rewiring and fitting.

Location: Whole Block I - Engineering - Heating Systems 05 - Comments

R - Engineering - Electrical

Generic Hospital Physical Condition Survey

Block Total

£1,224,717.00

Site Total

£35,112,232.00

Overall Total

£35,112,232.00

October 2010 0000 Issued by Oakleaf Surveying Ltd - 0870 738 6047