About:

Senior architect & project manager with a 10 years experience in design and construction industry.

Designed and managed various projects of different categories; multi-purpose, residential, commercial and industrial.

Capable of providing high-level design skills and technical know how of substantial construction methodologies as well as efficient communication, stakeholders management, BOQ preparation, tendering, material selection, procurement, quality assurance, documentation & overall project construction monitoring & supervision.

Obtained BSc degree in architecture from Faculty of Architecture, Khartoum university in 2010, and received Masters degree in Architecture from Canterbury School of Architecture(CSA), University of the creative Arts (UCA), United Kingdom in 2015.

Joined Real Estate and development department (RED), CTC group ltd. in 2011 and have been working there for 10 years.

Key projects:

_________________(2016
2020) CTC
_____________(2021
Present) CTC
_________(2014
New construction: AAA villa
-
Soba complex
-
Engineering Complex
- 2018)
________________(2020
CTC
________________(2012
CTC
______________________(2011
Rehabilitation: Ref & AC assembly
- 2021) Design:
Headquarters
- 2014)
Farms
- 2013)
Research: Reflective duality (MA Architecture) _______(2014 - 2015)

N E w C O N S T R U C T I O N

AAA Villa Project:

- Category: Residential project

- Project Budget: $ +3M

- Description:

- 2020)

8,000 sq. m residential project, consisting of a Luxury Villa, Pool house, servants quarters, technical area & main gate

_____________(2016
Main villa - Photo Pool house - Photo

- Role:

I have worked on this project in the capacity of Senior Architect, my duties included:

- Preparation of full Design, working drawings & construction sets.

- Tender documents

- Material sourcing & procurement.

- Construction supervision, Site coordination

- Installation details

- Contract management.

- Custom made joinery detailed drawings, production inspection and installation follow up

Interior view - Photo Main villa Skeleton - Photo Cantilevered staircase - Photo

- Key Achievements:

Successfully provided complete architectural design and constructions set for pool house & servants quarters block, Main gate and security office, overall MEP coordination including close follow up on smart system setup with electrical designer and sub-contractor.

Pool house Design

Exterior design - Render Play room - Render Play room - Photo Pool Flowerbed - Photo Concrete skeleton - Photo Outdoor sitting area - Render Pool house - Photo

Landscape Design

- Key Achievements:

Designed and managed project overall landscape design including plants selection, site setting out, infrastructure layout and MEP coordination. Activities included:

- Hardscape materials sourcing and procurement,

- Close on-site follow up

- Plants selection & grouping

- Close follow up with landscape sub-contractor

LandscapeMaster plan
Walkway to gabion terrace - Photo Pool house feature wall - Photo

Interior design

Glass partition - Photo Kids bathroom - Render Cantilevered staircase- Photo Study desk - Render

Furniture design & materials sourcing

Study desk - Render
Banquete area - Render
Main kitchen - Photo

CTC Soba complex:

- Category: Industrial / Multi purpose project

- Estimated Budget: $ +8M

- Description:

12 Acre industrial complex, targeting the establishment of processing plants of multiple edible products. Project includes 23.000 sq.m steel building, 3 level service building, Central lab and 3 level office building.

1 2 3 4 5 6
_____________(2021 - Present))
Overall site plan
Office building - design

- Role:

Lead designer and project manager of the project. Managing project from initiation stage, brief & data collection up to project handover. Responsibilities include: Direct & supervise preparation of design documents & construction sets, BOQ & Tender documents, Material selection, procurement, Contract management and project budget & schedule monitoring.

A 1 2 3 4 5 6 7 8 9 B W W W W W GENTS TOILETS GENTS LOCKERS GENTS PRAY AREA LAUNDRY ROOM CLINIC ROOM ELEC. ROOM DRAWING NAME 09.09.2021 SCALE REVISION DRAWN BY N ALYAA ELIDRISI MAI SAEED SERVICE BUILDING LAYOUT GROUND FLOOR PLAN SERVICE BUILDING A 1 2 3 4 5 6 7 8 9 B DINNING AREA ARCHIVE HAND WASHING AREA CASHIER KITCHEN PROJECT NAME ISSUES REVISIONS NOTES PROJECT LOCATION SOBA WAREHOUSE PHASE 2 immediately brought to the notice the designer prior construction, assembly, fabrication of any works. Unless otherwise noted, ±0.00 aarl 0.45 (adjacent asphalt road level) CTC\EIDCO\11\2019 SOBA INDUSTRIAL BLOCK PLOT 27.04.2021 SCHEMATIC DESIGN N 27.05.2021 SCHEMATIC DESIGN SECOND FLOOR PLAN SERVICE BUILDING
PROCESSING LINE RAW MATERIALS 3,240 SQ. M 10 13 15 16 18 19 20 23 25 26 28 29 30 31 32 33 34 35 36 37 38 39 40 43 45 46 48 49 A B C D G H K M FINISHED GOODS 1,260 SQ. M ROASTING LINE SESAME PASTE COLOR SORTING COLOR SORTING SESAME PASTE 1,032 SQ. M ROASTED SESAME 1,069 SQ. 723 SQ. RAW MATERIAL 1,988 SQ. RAW MATERIAL 864 SQ. M FINISHED GOODS 822 SQ. PRODUCTION HALL 2,860 SQ. M PRODUCTION HALL 3,380 SQ. M 1,690 SQ. M PRODUCTION HALL 1,980 SQ. CLEANING LINE LINE SESAME CLEANING PLANT KEY PLAN DRAWING ISSUES REVISIONS ENGINEER NOTES 1. This cannot without 2. all dimensions otherwise Do not 4. This other MEP 5. Any immediately designer fabrication 6. All works construction. 7. Unless (adjacent DATE SCALE DRAWING REVISION ENGINEER 00 NO. 02 03 OVERALL LAYOUT STEEL WAREHOUSE 4 3 2 1 Main steel building - Plan Service building - Plan Office building - design Office building - design

R E H A B I L I T A T I O N

Ref & AC assembly project:

- Present))

- Category: Industrial project

- Project Budget: $ +1M

- Description:

5,700 sq. m industrial building, main objective is the rehabilitation of a 50 year old steel warehouse in addition to new construction of service building attached to existing building.

- Role:

Lead designer and project manager of the project. Managing project from initiation stage, brief & data collection up to project handover. Responsibilities include: Direct & supervise preparation of design documents & construction sets, BOQ & Tender documents, Material selection, procurement, Contract management and project budget & schedule monitoring.

_____________(2021
Production hall - Photo

- Key achievements:

Due to a pressing business commitment the project started as a crash program and was successfully designed & executed in 6 months after the corona virus lockdown in Khartoum within budget & quality standards.

Production hall during construction - Photo Production hall - Photo Testing rooms - Photo

M A R E S E A R C H

REFLECTIVE DUALITY

- 2015)

- Category: Interactive installation

- Description:

This installation represents a psycho-analytical study that focuses on visual perception and the role of imagination and memory in affecting our perceptual experiences. It explores a *Mind Dependant Reality* in which an embodied spatial experience is introduced where the spectators would view carefully assembled bits and pieces of projected images. Depending on cognitive perception and a bit of imagination the encounter would provide enriching experiences within an empty space.

_____________(2014
Installation setup - Isometric
Installation processing program - Photo
Mirrors prototype 1 - Photo

- Methodologies

1. Static 2D images with defined visual information in relation to perspective points, depth and space/objects coherence.

2. Layering visual information and creating an interactive visual display that engages with the different users occupying the space.

3. Live input of the movements that occurs within the space and merging it with the projected image creating a combination of both outcomes thus increasing interactivity.

4. Programming sketches that enable interplay between live video feed, motion detection and background images

Installation set up - Plan Installation Prototype 1 - Photo 1 2 3 4 5

- Main components:

1. Hidden [projectors (Static 2D images)

2. Mirrors (Reflecting visual information)

3. Hidden Cameras (Live input)

4.Processing Software (Programming sketches for interplay between live video feed, motion detection and background images)

Installation setup - Isometric Installation setup Installation setup - Photo Background image 1 Background image 2

Installation setup - Plan

Installation setup

Mirror base Mirror frame Mirror sheets Concrete frame Mirror panels

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.