Head of School Report

Page 12

New spaces. New equipment. New opportunities. Enhancement of the Lipscomb Academy campus continued at full speed throughout the 2019-20 school year with highly desired projects such as a new air-conditioning system in the auxiliary gymnasium and upgrades to the cafeteria.

Creating an outdoor space for student flex time and lunch, six all-weather tables and umbrellas were placed in the courtyard outside of the upper school library.

A sidewalk was constructed to provide safe pedestrian travel on Caldwell Lane from the upper school weight room to The Highlands. 11

An HVAC unit was purchased and installed in the auxiliary gym to provide additional space for students during lunch.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Head of School Report by Lipscomb Academy - Issuu