Diploma In Architecture Studies 1002058351 Tan Li Jun
PAGE 04 ABOUT ME
PAGE 05 PAGE 06 PAGE 07 PAGE 08 PAGE 09 PAGE 10
PERSONAL SKILLS
INTRODUCTION OF COMPANY
WORK EXPERIENCE
PROJECT BRIEF: PGA BELURAN & PDC CECIL
PGA BELURAN : NOTES OF DISCUSSION
PGA BELURAN : GENERAL SCHEDULE & ROOM DATA
PAGE 19
PDC CECIL PENANG : SITE ANALYSIS , OBJECTIVE
PAGE 20 PAGE 21 PAGE 22 PAGE 23 PAGE 24
PDC CECIL PENANG : FACADE COLOR SCHEME
PDC CECIL PENANG : BROCHURE
SUBMISSION
PDC CECIL PENANG : CLIENT CONSULTANT AND SITE MEETING
RAMP DETAILS
LOG BOOK OCTOBER 2022 - MARCH 2023
PERSONAL SKILLS
SKILLED COMMUNICATOR COMMUNICATION SKILLS
CREATIVE THINKING SKILLS
BRAINSTORMING EXPERIMENTATION
LANGUAGE SKILLS
ENGLISH
MALAY
HOKKIEN
MANDARIN
CANTONESE
DIGITAL SKILLS
AUTOCAD
WORD EXCEL POWERPOINT
PHOTOSHOP REVIT
INTRODUCTION OF COMPANY
A + I GROUP
A + I WAS FOUNDED IN APRIL 1994.
THE COMPANY IS A 100% BUMIPUTRA MULTIDISCIPLINARY GROUP OF COMPANIES, PROVIDING
PROFESSIONAL CONSULTANCY SERVICES, MAINLY IN THE FIELDS OF :
ARCHITECTURE
INTERIOR DESIGN
QUANTITY SURVEYING
PROJECT MANAGEMENT
PHILOSOPHY
FUNCTION
AESTHETIC
COST
TIME
PHILOSOPHY
IDEAS
EXPERIENCE
EXPERTISE
WORK EXPERIENCE
PGA BELURAN - SIGNAGE DRAWING
PGA BELURAN - NOTES OF DISCUSSION
PGA BELURAN - GENERAL SCHEDULE
PGA BELURAN - ROOM DATA
PDC CECIL - FACADE DESIGN COLOR SCHEME
PDC CECIL -BROCHURE SUBMISSION
PDC CECIL - MINUTES CLIENT CONSULTANT
MEETING
PDC CECIL - MINUTES SITE MEETING
PDC CECIL - DETAILS RAMP
PROJECT BRIEF
PROPOSED CONSTRUCTION OF RESIDENTIAL COMPLEX AND ADMINISTRATIVE BUILDING FOR THE 20TH BATTALION POLIS GERAKAN AM (PGA), ON PART OF LOT 22016, MEASURING 121.21
ACRES (49.05 HECTARES) IN MUKIM LABUK SUGUT, DISTRICT OF BELURAN, SABAH.
PGA BELURAN PDC CECIL -PENANG
FOR THE GOVERNMENT OF MALAYSIA.
PROPOSAL TO BUILD AND COMPLETE 1 BLOCK OF LOW-COST APARTMENTS WITH 24 FLOORS CONSISTING OF:
A. 348 RESIDENTIAL UNITS (700 SQUARE FEET) FROM FLOOR 6 TO 23, B. 9 SHOP UNITS (600 SQUARE FEET) ON THE GROUND FLOOR,
C. PARKING SPACE ON FLOORS 1-4,
D. COMMUNITY FACILITIES SUCH AS A PRAYER ROOM, HALL, MANAGEMENT OFFICE ON FLOOR 5,
E. OPEN SPACE ON FLOORS 5 AND 14,
F. A BOUNDARY AREA (105 SQUARE FEET)
ON GOVERNMENT LAND, PLOT A ADJACENT TO LOT 311 (BETWEEN CECIL EXPRESSWAY AND TUN DR. LIM CHONG EU HIGHWAY), SECTION 11E, GEORGE TOWN, NORTHEAST
DISTRICT, PENANG.
FOR : THE CORPORATION OF PENANG DEVELOPMENT (PENANG DEVELOPMENT CORPORATION)
PGA BELURAN
KEY PLAN
BELURAN IS THE CAPITAL OF THE BELURAN DISTRICT IN THE SANDAKAN, SABAH. ITS POPULATION WAS ESTIMATED TO BE AROUND 3,132 IN 2010. THE POPULATION IS A MIXTURE OF MANY ETHNIC GROUPS, WITH THE KADAZANDUSUN, TIDONG AND ORANG SUNGAI COMMUNITIES BEING THE FOUR LARGEST COMPONENTS. THE TOWN IS LOCATED ABOUT 88 KM FROM SANDAKAN TOWN.
KEY PLAN
THE PROPOSED SITE IS LOCATED AT KG. CAHAYA BARU WHICH IS 4 KM AWAY FROM BELURAN TOWN. IT IS ALSO LOCATED AROUND 80 KM FROM SANDAKAN AND 55 KM FROM KINABATANGAN.
THE SITE IS ACCESSIBLE VIA EXISTING ROAD NETWORK WITH GOOD INFRASTRUCTURES SUCH AS ELECTRICITY, WATER, DRAINAGE SYSTEM AND TELE-COMMUNICATION NETWORK.
PGA BELURAN
LOCATION PLAN
LOCATION : KG CAHAYA BARU, BELURAN, SABAH
LOT NO. : PL 22016
SIZE : 190 ACRES
MUKIM : LABUK SUGUT
DAERAH : BELURAN
Reason why PGA need upgrade?
THE EXISTING BATTALION PGA IS AN EXISTING 3STOREY SHOPLOT DEVELOPMENT, WHICH IS NOT PURPOSE-BUILT FOR A SECURITY-TYPE BUILDING.
PGA BELURAN - SIGNAGE DRAWING
I HAVE DONE RESEARCH ABOUT SIGNAGE OF THE ENTRANCE, SURAU, MAP GUIDANCE AND PYLON THEN , I HAVE DONE THE PYLON SIGNAGE STEP BY STEP ACCORDING TO THE ELEMENTS THAT MY BOSS ASK ME TO USE WHICH IS THE PISAU BAJAU FROM SABAH THUS, I HAVE BEEN APPLYING THE INFORMATION I FOUND DURING MY CASE STUDY OF SIGNAGE TO THE DRAWING WITH FOLLOWING THE MANUF'S DETAIL AND SPECIFICATION
PGA BELURAN - NOTES OF DISCUSSION
ROOM DATA
Room data sheets (RDS) give a detailed description of the finishes, fixtures and fittings, mechanical and electrical requirements that will be required for each room or space in a project, building, complex and so on. Room data sheets can be used to communicate the client's requirements for each room on a project.
NOTES OF DISCUSSION ZONE PERUMAHAN
This zone must change the heights of switch to the dimension that they have discuss during meeting To check M&E drawing and relocate lighting fixture , aircond and fan.
NOTES OF DISCUSSION ZONE LOGISTIC
This zone discuss about to omit some of the lighting fixture due to sufficient light in that space. To check M&E drawing to add power-point socket or omit the socket that has been discuss.
PGA BELURAN - GENERAL SCHEDULE KUARTERS
GENERAL SCHEDULE
TO CALCULATE THE AMOUNT OR QUANTITY OF LIGHTING FIXTURE THAT ARE IN A ROOM AND ADD ALL THE QUANTITY OF LIGHTING FIXTURE , FAN , ELECTRICAL FITTINGS AND WRITE IN THE GENERAL SCHEDULE .
PGA BELURAN - ROOM DATA KUARTERS
ROOM DATA KUARTERS TO AMMEND THE LIGHTING FIXTURE AND DOUBLE CHECK THE LOCATION OF LIGHTING FIXTURE WHETHER IS IN A CORRECT LOCATION AND RELOCATE IF WRONG AND OMIT THE EXTRA LIGHTING FIXTURE OR FAN.
PGA BELURAN - ROOM DATA KUARTERS
ROOM DATA KUARTERS TO AMMEND THE LIGHTING FIXTURE TO CORRECT POSITION AND CHECK THE HEIGHT OF SWITCH ACCORDING TO THE NOTES GIVEN IN THE PAPER AND ADD EXHAUST FAN.
PGA BELURAN - GENERAL SCHEDULE DEWAN
PGA BELURAN - ROOM DATA DEWAN
PGA BELURAN - ROOM DATA DEWAN
SITE PLAN
OBJECTIVE
SITE ANALYSIS
PDC CECIL - FACADE COLOR SCHEME
COLOR SCHEME
I HAVE CHANGE THE COLOR SCHEME AND ADDED ALUMINIUM COPING TO THE FACADE FOR MORE ATTRACTIVE LOOKS. I HAVE CHOOSEN RED COLOR AND YELLOW COLOR FOR THE COLOR SCHEME OPTION FOR THE ALUMIUNIUM COPING ON THE MIDDLE PART BECAUSE IT IS A VIBRANCE COLOR WHICH WILL CATCH PEOPLE ATTENTION. LAST BUT NOT LEAST, I HAVE ADDED THE ALUMINIUM COPING ON THE MIDDLE PART WITH APPLYING THE RYTHM CONCEPT FOR MORE FUN IN TERMS OF DESIGN
PDC CECIL - BROCHURE SUBMISSION
BROCHURE SUBMISSION
I HAVE TO FIND THE IRONMONGERY ON THE CATALOG AND TRACK THE CODE AND LIST DOWN . THEN I NEED TO CHECK BACK THE SPECIFICATION OF THE IRONMONGERYSUCH AS MATERIALS IS STAINLESS STEEL , PLASTIC OR BRASS. LASTLY, I NEED TO SEND A BROCHURE SUBMISSION TO THE CONTRACTOR TO APPROVE THE MATERIALS FOR THEM TO BUY
PDC CECIL - CLIENT CONSULTANT AND SITE MEETINGS
CLIENT CONSULTANT MEETING
I HAVE TO WRITE DOWN WHAT THE THINGS THAT CLIENT MENTION ABOUT THE ONGOING PROJECT BEFORE PROCEED TO SITE MEETING. THIS IS BECAUSE THE PROJECT IS UNDER CONSTRUCTION AND THERE ARE ALWAYS PROBLEM OCCUR DURING SITE EVALUATION OR SITE INSPECTION BY THE PROJECT MANAGER IN ORDER TO SOLVE IT , THEY MUST REPORT TO US AND WE WILL DISCUSS ABOUT WHAT IS THE BEST SOLUTION TO SOLVE IT.
SITE MEETING
AFTER CLIENT CONSULTANT MEETING WE WILL PROCEED TO SITE MEETING WHICH IS MEETING WITH CLIENT,CONTRACTOR M&E AND ALL THE PERSON WHO ARE IN CHARGE FOR THE CONSTRUCTION. THUS, WE WILL QUESTION BACK THE CONTRACTOR ABOUT THE CLIENT NEEDS OR ISSUE THAT ARE DISCUSS DURING CLIENT CONSULTANT MEETING.
PDC CECIL - RAMP DETAILS
RAMP DETAILS
I HAVE LEARN HOW TO DRAW RAMP DETAILS ACCORDING TO ARCHITECTS APPROVAL AND CASE STUDY. THUS, I HAVE AMENDED GAP OF GROVE LINE AND ADDED THE DRAINAGE AT THE SIDE OF GROVE LINE TO REMOVE EXCESS WATER TO PREVENT FLOOD IN THE CAR PARK.