Sample of Recent Work (2019-2024)

Page 1


KYLE YAMADA

SAMPLE

LA PAZ GARDENS

ARCHITECTS ORANGE. CALIFORNIA, 2022

Mixed use project on a hillside with three and a half levels of residential.

VIERA CROSSINGS

ARCHITECTS ORANGE. FLORIDA, 2024

Construction documents for two mercantile building shells in Florida.

ORINDA RENOVATION

WILLIAM WOOD ARCHITECTS. CALIFORNIA, 2024

As-built survey, documentation, and proposed design drawings for a 4,000 SF residential renovation in California.

AO ATLANTA OFFICE

ARCHITECTS ORANGE. GEORGIA, 2024

11

This is a 600 SF backyard accessory dwelling unit in California. 12

ALAMO ADU

WILLIAM WOOD ARCHITECTS. CALIFORNIA, 2024

Mixed use project with three levels of residential units on a podium.

CULVER OASIS

ARCHITECTS ORANGE. CALIFORNIA, 2022

Mixed use project with three levels of residential units on a podium.

POWAY SHELL

ARCHITECTS ORANGE. CALIFORNIA, 2024

Mercantile renovation for subdivision.

QUEEN OF THE VALLEY STARBUCKS

ARCHITECTS ORANGE CALIFORNIA, 2023

Tenant improvement build-out for a new coffee shop inside a hospital.

NINGBO MIXED USE

JERDE PARTNERSHIP. CHINA, 2019

Large mixed use project focused on the retail experience.

14

16

17

18

LA PAZ GARDENS

2022 CALIFORNIA

ARCHITECTS ORANGE (AO)

This is a 234-unit mixed use project located in a quiet, suburban Orange County community with no other mixed use projects of this density. Collaboration with the city and client sought to develop a new Residential Mixed Use Zone that would allow for high density housing and commercial uses on the same lot. I was responsible for surveying the site, developing the design model with a teammate, producing exhibits for leasing and entitlements which included several public hearings and meetings with community organizations.

I contribued to this project using SketchUp with Enscape, AutoCAD, InDesign, Excel, Photoshop, and Illustrator.

ELEVATION AT MARGUERITE PKWY..
ELEVATION AT LA PAZ RD.
3D VIEWS AT LA PAZ RD. & MARGUERITE PKWY.

VIERA CROSSINGS

2024

ARCHITECTS ORANGE (AO)

FLORIDA

This is a set of construction documents for two type II-B mercantile building shells in Florida.

This project was mostly developed and managed by twoperson team comprised of a Project Manager and myself. All work was done in Revit, and I was responsible for managing all aspects of the BIM model and all documents in the drawing set. I assisted the Project Manager in tracking budget, schedule, and organizing the project workflow. I supported the Project Manager in the development of the design and detailing. I researched and specified materials, products and systems with consideration for accessibility, design intent, code requirements, the site’s climate, and Florida Product Approvals. I coordinated the evolution of this project with structural and MEP consultants and assisted in coordinating tenant lease requirements.

I developed all of the following views and details in Revit.

BUILDING 500 - 3D
OVERALL

VIERA CROSSINGS

BUILDING 500 - ROOF PLAN

BUILDING 500 - FLOOR PLAN

VIERA CROSSINGS

ORINDA RENOVATION

WILLIAM WOOD ARCHITECTS

2024CALIFORNIA

This is a 4,000 SF residential renovation on a sloped site in California. I worked with a team member to survey the existing building conditions. I recorded as-built drawings and a developed design drawings based on client goals and discussions with the design principal.

The ridge in the photo above occurs at this soffit/floating box in the living room.
The building’s existing conditions at the roof.
This is a photo of the building’s existing conditions at the rear side of the living room.

ORINDA RENOVATION

PROPOSED FRONT ELEVATION

EXISTING FRONT ELEVATION

ORINDA RENOVATION

PROPOSED REAR ELEVATION

EXISTING REAR ELEVATION

AO ATL OFFICE

GEORGIA

ARCHITECTS ORANGE (AO)

This is a tenant improvement project for Architects Orange in Chamblee, Georgia. I was responsible for advancing the design with a 3D model and 2D documents. I reviewed construction documents and shop drawings as the tenant. I also coordinated the conference room curtain walls with the manufacturer and coordinated details with a lighting consultant. I managed aspects of the schedule and budget - this included furniture, fixtures, equipment and their lead times. The Architects Orange team that occupies this new office space was very pleased with the results.

PHOTOS FROM PROJECT SITE
3D VIEWS FROM DESIGN MODEL

ALAMO ADU

2024 CALIFORNIA

This is a 600 SF backyard accessory dwelling unit in California. I was responsible for leading the project effort from initial design to permitting. I worked with a design principal to develop the plan, establish a plate height, and wall thicknesses. The overall appearance of this ADU matched the existing primary residence. All work shown was done with AutoCAD.

SOUTH ELEVATION (FRONT)
NORTH ELEVATION (REAR)
WEST ELEVATION (SIDE)
EAST ELEVATION (SIDE)
FLOOR PLAN

ALAMO ADU

This drawing is not a part of the Alamo ADU project with William Wood Architects. I drew this wall section to explore possibilities at the building envelope.

WALL SECTION

CULVER OASIS

CALIFORNIA

2022

ARCHITECTS ORANGE (AO)

This is a mixed-use development located in a vibrant and dense neighborhood of Culver City, California. It brings together 230 residential units with a 39,000 SF grocery store, 16,500 SF of additional retail, and 11,500 SF of office space. I worked with a teammate to develop the design model and documents for entitlements, leasing packages, schematic design, and design development. I also assisted with exhibits in the construction documents phase. I made contributions to this project using SketchUp, Revit, AutoCAD, Excel, Photoshop, Illustrator, and InDesign.

3D VIEW AT MACHADO RD. & JEFFERSON BLVD.
3D VIEW AT SEPULVEDA BLVD. & MACHADO RD.
3D VIEW AT SEPULVEDA BLVD.
AERIAL VIEW OF PROJECT SITE
MACHADO RD.
JEFFERSON BLVD.
SEPULVEDA BLVD.

CULVER OASIS

SEPULVEDA BLVD. ELEVATION
MACHADO RD. ELEVATION
JEFFERSON BLVD. ELEVATION

NINGBO MIXED USE

JERDE PARTNERSHIP

2019CHINA

This is a large mixed use project with residential and retail components. Construction for a previous design had already started at the start of design. Concrete slabs were cut to transform this project into something completely different from what was previously proposed. The basement was opened up and extend the ground-level with careful design of the retail experience. I was responsible for producing a series of documents that communicated design intent in detail. I also assisted with coordination in construction documents and construction administration. I was honored to attend this project’s grand opening in 2019.

RENDERED VIEW AT BASEMENT LEVEL

STOREFRONT PLAN & ELEVATION

RENDERED VIEW AT GROUND LEVEL

This sheet shows the pavilions in the Ningbo Mixed Use project. I worked with a Design Principal to develop the design of these pavilions. They embrace the idea of extending the ground floor to the basement as these pavilions have two entrances with one at the basement level and the other at ground floor level. I designed and documented these pavilions using AutoCAD, 3D Studio Max, Photoshop, InDesign, and Illustrator.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.