Project Management Sample

Page 1

PROJECT MANAGMENT PORTFOLIO -

FALL 2022

WEEKLY PROJECT SCHEDULE

22/24/26 Aug 2022

COURSE INTRO

Explorations & Research

29/31/2, 5/7/9 Aug-Sep 2022

FIRM RESEARCH

Firm Research, Programing

12/14/16 Sep 2022

PROGRAMING

Concept, Experience, Spatial Use

19/21/23, 26/28/30, 3/5/7

Oct-Sep 2022

SCHEMATIC DESIGN

Furniture Layout, Plan + 3D Modeling

17/19/21 Oct 2022

DESIGN DEVELOPMENT

Color, materials, Way nding & Detailing

14/16/19 Nov 2022

CONSTRUCTION DOCUMENTS

Workshops + Class Wrap Up

14/16/19 Nov 2022

FLEX WEEK & EXAMS

CD workshops, Final Documents & Class Wrap Up

W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16
PHASE PHASE ASSIGNMENT IMPORTANT
22/24/26 29/31/02 05/07/09 12/14/16 19/21/23 26/28/30 3/05/07 10/12/14 17/19/21 24/26/28 31/02/04 07/09/11 14/16/18 21/23/25 28/30/02 05/07/09
NO CLASS CINCY FIELD TRIP MICHIGAN FIELD TRIP AUG SEP OCT NOV DEC NO CLASS 10 HRS 20 HRS 35 HRS 15 HRS 47 HRS 10 HRS NO CLASS 13 HRS TOTAL PROJECT HOUR PROJECTION: 140 HRS

RESOURCE BUDGET SCHEDULE

PHASE

22/24/26 Aug 2022

COURSE INTRO

Explorations & Research

29/31/2, 5/7/9 Aug-Sep 2022

FIRM RESEARCH

Firm Research, Programing

12/14/16 Sep 2022

PROGRAMING

Concept, Experience, Spatial Use

19/21/23, 26/28/30, 3/5/7

Oct-Sep 2022

SCHEMATIC DESIGN

Furniture Layout, Plan + 3D Modeling

17/19/21 Oct 2022

DESIGN DEVELOPMENT

Color, materials, Way nding & Detailing

14/16/19 Nov 2022

CONSTRUCTION DOCUMENTS

Workshops + Class Wrap Up

14/16/19 Nov 2022

FLEX WEEK & EXAMS

CD workshops, Final Documents & Class Wrap Up

W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 22/24/26 29/31/02 05/07/09 12/14/16 19/21/23 26/28/30 03/05/07 10/12/14 17/19/21 24/26/28 31/02/04 07/09/11 14/16/18 21/23/25 28/30/02 05/07/09 AUG SEP OCT NOV DEC 10 HRS 20 HRS 30 HRS 15 HRS 47 HRS 10 HRS 13 HRS TOTAL PROJECT HOUR PROJECTION: 140 HRS PROJ. TOTAL 10 7 3 2 3 6 2 2 4 3 9 4 2 2 4 2 1 9 10 4 4 5 5 6 6 1 6 1 3
2 1 2 1 1 1 1 10

TIMESHEET

WEEK ENDING:

EMPLOYEE NAME:

EMPLOYEE NUMBER:

EMPLOYEE SIGNATURE:

MANAGER SIGNATURE:

PROJECT NUMBER PROJECT NAME PHASE ACTIVITY CODE TOTAL SUN DAY OF THE WEEK WEEKLY HOURS:
MON TUE WED THU FRI SAT NOTES
PHASE ACTIVITY CODES
DESIGN
DEVELOPMENT
DOCUMENTS
ADMINISTRATION RESEARCH + IMAGES MEETINGS AUTOCAD + DRAFTING RENDERING MODELING ADOBE SUITES PRINTING + PRESENTATION P SD DD CD CA 1 2 3 4 5 6 7
PROJECT
PROGRAMMING SCHEMATIC
DESIGN
CONSTRUCTION
CONSTRUCTION

MEETING RECORD

MEETING NAME:

ATTENDEES:

DATE & TIME:

LOCATION:

SUBJECT:

KEY POINTS:

MEETING NOTES:

SUMMARY:

DEADLINES:

UPDATES:

QUESTIONS:

NEXT STEPS:

W8 (ESTIMATED)

W8 (ACTUAL)

At the beginning of the week I had planned to nish up my concept, nalize mood boards and have my plan done. However, I have not had a chance to nalize my plan because it has been very busy to meet and have one-on-ons this week. However, have nalized my concept and feel good about having a clear direction within my design. I would say that overall, this week has been productive and I think I have progessed on drafting and modeling.

WEEKLY REPORT 8
PROJECT NUMBER PROJECT NAME PHASE ACTIVITY CODE TOTAL SUN DAY OF THE WEEK WEEKLY HOURS EMPLOYEE SIGNATURE: MANAGER SIGNATURE: WEEK ENDING: EMPLOYEE NAME: EMPLOYEE NUMBER: MON TUE WED THU FRI SAT NOTES PROJECT PHASE ACTIVITY CODES PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS CONSTRUCTION ADMINISTRATION RESEARCH + MAGES MEETINGS AUTOCAD + DRAFTING RENDERING MODELING ADOBE SUITES PRINTING + PRESENTATION P SD DD CD CA 1 2 3 4 5 6 7 Karol Perez 001 Karol Perez 1 1 1 1 OFFICE WORKPLACE OFFICE WORKPLACE OFFICE WORKPLACE SD SD SD 3 5 2 4 1 0 1 4 0 0 1 in-class meetings 3D modeling 1 6 5 0 9 0 27 oor plan drafting W8 - 10/12/14 Oct 2022 0 0 0 1 0 0 0 0 18 3 1 5 4 1 0 1 6 6 1 1 1 0 0 0 0 adobe suites OFFICE WORKPL ACE SD 6 WEEK 8 - 10/12/14 Oct 2022
TIMESHEET
30 HRS TOTAL PROJECT HOUR PROJECTION: 7 13 10 WEEKLY
REPORT
Furniture Layout Drafting / Floor Plan 3D Modeling Meetings 18 HRS TOTAL PROJECT HOUR PROJECTION: 2 1 3 14 Furniture Layout Drafting / Floor Plan 3D Modeling Meetings 0
REVIEW: MAJOR DEADLINES: IMPORTANT: Schematic design presentation- due MON Schematic Building Code Exercise: Annotated Floor Plan - due MON Interim Plan/Beautiful Plan - due MON
WEEKLY

W9 (ESTIMATED)

W9 (ACTUAL)

This week was very productive in my opinion. I was able to establish the overall layout of what want my oor plan to look like and nalize my concept as well. I also think it is helpful that we are beginning to explore materials and color theories within our design schemes. One thing I hope am able to accomplish within the next week is to nalize furniture pieces and have a better understanding of the overall o ce space I want for my rm.

TIMESHEET

WEEKLY REPORT 9 WEEK 9 - 17/19/21 Oct 2022
12 HRS TOTAL PROJECT HOUR PROJECTION: 3 1 2 WEEKLY REPORT
Furniture Layout Drafting / Floor Plan 3D Modeling Meetings 17 HRS TOTAL PROJECT HOUR PROJECTION: 6 4 2 5 Furniture Layout Drafting / Floor Plan 3D Modeling Meetings 6 WEEKLY REVIEW: MAJOR DEADLINES: IMPORTANT:Color (& Material) Exploration Study - Part 1 - MON Field Trip to Michigan - WED-FRI
PROJECT NUMBER PROJECT NAME PHASE ACTIVITY CODE TOTAL SUN DAY OF THE WEEK WEEKLY HOURS EMPLOYEE SIGNATURE: MANAGER SIGNATURE: WEEK ENDING: EMPLOYEE NAME: EMPLOYEE NUMBER: MON TUE WED THU FRI SAT NOTES PROJECT PHASE ACTIVITY CODES PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS CONSTRUCTION ADMINISTRATION RESEARCH + MAGES MEETINGS AUTOCAD + DRAFTING RENDERING MODELING ADOBE SUITES PRINTING + PRESENTATION P SD DD CD CA 1 2 3 4 5 6 7 Karol Perez 001 Karol Perez 1 1 1 1 1 OFFICE WORKPLACE OFFICE WORKPLACE OFFICE WORKPLACE SD SD SD 3 5 2 3 1 3 1 .5 0 0 3 0 1 in-class meetings 3D modeling 5 8.5 4 1 1 0 19.5 oor plan drafting W9 - 17/19/21 Oct 2022 4 1 0 0 0 1 0 0 0 0 9 2 6 1 1.5 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 adobe suites OFFICE WORKPL ACE SD 6 7 OFFICE WORKPLACE SD presentations

W9 (ESTIMATED)

W9 (ACTUAL)

WEEKLY REVIEW:

I thought that this week was really insightful and I was able to gain a lot of knowledge. The trip to Michigan was so much fun and I really loved getting to have a feel of the di erent o ces spaces from each company. thought it was cool how all of these furniture manfacturers are not only looking at the e ects COVID-19 had but also how they can modernize furniture in a way that ts the fast paced technology advancements we are currently having. They also utilized a variety of furniture spaces within their workplace which is something that I will be incorporating within my design.

MAJOR DEADLINES:

IMPORTANT:

Final Presentation @ Cincy - in TWO weeks

Implement online & living room spaces within o ces (based on research)

Start to nalize drawings + design ideas

TIMESHEET

WEEKLY REPORT 10 WEEK 10 - 24/26/28 Oct 2022
11 HRS TOTAL PROJECT HOUR PROJECTION: 2 4 4 WEEKLY REPORT
Furniture Layout Drafting / Floor Plan
Modeling Meetings Research 27 HRS TOTAL PROJECT HOUR PROJECTION: 0 1 3 0 4 Furniture Layout Drafting / Floor Plan 3D Modeling Meetings Research 0 20
3D
PROJECT NUMBER PROJECT NAME PHASE ACTIVITY CODE TOTAL SUN DAY OF THE WEEK WEEKLY HOURS: EMPLOYEE SIGNATURE: MANAGER SIGNATURE: WEEK ENDING: EMPLOYEE NAME: EMPLOYEE NUMBER: MON TUE WED THU FRI SAT NOTES PROJECT PHASE ACTIVITY CODES PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS CONSTRUCTION ADMINISTRATION RESEARCH + MAGES MEETINGS AUTOCAD + DRAFTING RENDERING MODELING ADOBE SUITES PRINTING + PRESENTATION P SD DD CD CA 1 2 3 4 5 6 7 Karol Perez 001 Karol Perez 1 1 1 1 OFFICE WORKPLACE A OFFICE WORKPL CE SD DD DD DD 3 1 1 1 3 0 0 0 4 3 4 0 7 0 27 Research(Floyd+Cranbrook) W10 - 24/26/28 Oct 2022 4 0 0 0 0 4 0 0 7 4 9 7 0 0 9 0 9 0 0 0 0 0 0 0 7 0 0 0 0 Floor Plan Drafting Research(MillerKnoll+Haworth) Research(Steelcase+MeyerHouse) A OFFICE WORKPL CE A OFFICE WORKPL CE

W11 (ESTIMATED)

W11 (ACTUAL)

I would say that this week was helpful with the feedback I was able to get as we are nalizing our designs. I really thought the 3D iterations as well as the color studies were really helpful as they gave me a better sense of direction for my oor plan and overall design ideas. think that need to continue working on furniture layout as well as material choices in order to nalize my design and be ready to present later this week.

WEEKLY REPORT 11 WEEK 11- 31/02/04 Oct-Nov 2022
6 HRS TOTAL PROJECT HOUR PROJECTION: 2 0 4
WEEKLY REPORT
Furniture Layout Drafting / Floor Plan 3D Modeling Meetings Adobe Suites 19 HRS TOTAL PROJECT HOUR PROJECTION: 0 4 7 5 Furniture Layout Drafting / Floor Plan 3D Modeling Meetings Adobe Suites 0 3 WEEKLY REVIEW: MAJOR DEADLINES: IMPORTANT: Final Presentation - due WED Add architectural elements within design- by WED Finalize design - by WED
0
PROJECT NUMBER PROJECT NAME PHASE ACTIVITY CODE TOTAL SUN DAY OF THE WEEK WEEKLY HOURS: EMPLOYEE SIGNATURE: MANAGER SIGNATURE: WEEK ENDING: EMPLOYEE NAME: EMPLOYEE NUMBER: MON TUE WED THU FRI SAT NOTES PROJECT PHASE ACTIVITY CODES PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS CONSTRUCTION ADMINISTRATION RESEARCH + MAGES MEETINGS AUTOCAD + DRAFTING RENDERING MODELING ADOBE SUITES PRINTING + PRESENTATION P SD DD CD CA 1 2 3 4 5 6 7 Karol Perez 001 Karol Perez 1 1 1 1 OFFICE WORKPLACE A OFFICE WORKPL CE SD DD DD DD 3 4 5 6 3 0 1 0 7 4 4 0 4 0 19 Rendering W11 - 31/02/04 Oct -Nov 2022 4 0 0 3 0 4 0 0 9 5 2 3 0 0 0 0 0 0 0 0 0 2 1 1 0 0 0 0 0 Floor Plan Drafting Modeling Adobe Suites A OFFICE WORKPL CE A OFFICE WORKPL CE
TIMESHEET

W12 (ESTIMATED)

W12 (ACTUAL)

Althought this week was very intense in trying to get everything done before Monday’s deadline, I felt strong about my concept and design ideas. Because of this, felt like I had a clear direction throughout the nal process and overall this week was really productive. The part that I felt had the most trouble with was deciding on architectural elements and also incorporating the “right” colors and materials within my design. However, it was very helpful that the original deadline was changed to

WEEKLY REPORT 12 WEEK 12- 07/09/11 Nov 2022
6 HRS TOTAL PROJECT HOUR PROJECTION: 5 0 1 0
WEEKLY REPORT
Color, materials, way nding & detailing Furniture layout, Plan + 3D modeling 52 HRS TOTAL PROJECT HOUR PROJECTION: WEEKLY REVIEW: MAJOR DEADLINES: IMPORTANT: Final Presentation - due MON Beginning Phase of Constructio Documents - next week ! Make Revisions After Critiques - asap
Meetings Adobe Suites 5 0 34 13 Color, materials, way nding & detailing Furniture layout, Plan + 3D modeling Meetings Adobe Suites
PROJECT NUMBER PROJECT NAME PHASE ACTIVITY CODE TOTAL SUN DAY OF THE WEEK WEEKLY HOURS: EMPLOYEE SIGNATURE: MANAGER SIGNATURE: WEEK ENDING: EMPLOYEE NAME: EMPLOYEE NUMBER: MON TUE WED THU FRI SAT NOTES PROJECT PHASE ACTIVITY CODES PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS CONSTRUCTION ADMINISTRATION RESEARCH + MAGES MEETINGS AUTOCAD + DRAFTING RENDERING MODELING ADOBE SUITES PRINTING + PRESENTATION P SD DD CD CA 1 2 3 4 5 6 7 Karol Perez 001 Karol Perez 1 1 1 1 OFFICE WORKPLACE A OFFICE WORKPL CE DD DD DD DD 3 4 5 6 3 0 1 2 6 5 9 2 7 20 52 Rendering W12 - 07/09/11 Nov 2022 3 0 0 3 6 2 0 1 30 5 4 13 1 0 0 1 2 12 2 2 4 5 1 1 0 0 0 0 2 Floor Plan Drafting Modeling Adobe Suites A OFFICE WORKPL CE A OFFICE WORKPL CE
Monday!
TIMESHEET

W12

WEEKLY

This week was a steady week in wrapping up our nal presentations and beginning the Construction Documents. I think it was really helpful being able to see examples of the the di erent types of construction documents and being able to work on them throughout the week. For this upcoming week, it will be important to focus on working on those and inputting the di erent layers on Autocad.

WEEKLY REPORT 13
PROJECT NUMBER PROJECT NAME PHASE ACTIVITY CODE TOTAL SUN DAY OF THE WEEK WEEKLY HOURS: EMPLOYEE SIGNATURE: MANAGER SIGNATURE: WEEK ENDING: EMPLOYEE NAME: EMPLOYEE NUMBER: MON TUE WED THU FRI SAT NOTES PROJECT PHASE ACTIVITY CODES PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS CONSTRUCTION ADMINISTRATION RESEARCH + MAGES MEETINGS AUTOCAD + DRAFTING RENDERING MODELING ADOBE SUITES PRINTING + PRESENTATION P SD DD CD CA 1 2 3 4 5 6 7 Karol Perez 001 Karol Perez 1 1 1 1 1 OFFICE WORKPLACE A OFFICE WORKPL CE DD DD DD 2 4 5 6 5 0 0 0 3 21 8 9 2 7 20 52 Rendering W13 - 14/16/18 Nov 2023 0 6 4 7 4 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 Presentation @ Cincy Modeling Adobe Suites A OFFICE WORKPL CE A OFFICE WORKPL CE A OFFICE WORKPL CE DD DD Powerpoint Presentation APG CINCINNATI PRESENTATION 7
13- 14/16/18 Nov 2022
TIMESHEET
WEEK
(ESTIMATED) 10 HRS TOTAL PROJECT HOUR PROJECTION: 0 6 0 0 4
(ACTUAL) Presentations AutoCad + Drafting 33 HRS TOTAL PROJECT HOUR PROJECTION:
WEEKLY REPORT W12
REVIEW:
DEADLINES: IMPORTANT:Class Wrap Up - 2 weeks !! -
MAJOR
CD Documents Adobe Suites AutoCad + Drafting CD Documents Adobe Suites Presentations Rendering & Modeling Rendering & Modeling 12 1 1 10 9

This week was a very fast paced week as we are wrapping up the nal semester. It was di cult trying to navigate trying to learn how to make the di erent sections of the construction documents while at the same time doing them correctly. I think one take away is that it was very helpful being able to work together with other peers. Overall, this week was productive and I was able to get a lot done.

Remember to include

WEEKLY REPORT 14-16 WEEK 15- 28/30/2 Nov-Dec 2022
(ESTIMATED) 13 HRS TOTAL PROJECT HOUR PROJECTION: 4 2 6 1
Construction Documents AutoCad + Drafting 28 HRS TOTAL PROJECT HOUR PROJECTION: WEEKLY REVIEW: MAJOR DEADLINES: IMPORTANT: Final CD’s - Due Dec. 9
W15
WEEKLY REPORT W15 (ACTUAL)
Chose
nishes
speci c detailing
materials/
for interior
Adobe Suites Research + Images Construction Documents AutoCad + Drafting Adobe Suites Research + Images 9 7 6 6
PROJECT NUMBER PROJECT NAME PHASE ACTIVITY CODE TOTAL SUN DAY OF THE WEEK WEEKLY HOURS: EMPLOYEE SIGNATURE: MANAGER SIGNATURE: WEEK ENDING: EMPLOYEE NAME: EMPLOYEE NUMBER: MON TUE WED THU FRI SAT NOTES PROJECT PHASE ACTIVITY CODES PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS CONSTRUCTION ADMINISTRATION RESEARCH + MAGES MEETINGS AUTOCAD + DRAFTING RENDERING MODELING ADOBE SUITES PRINTING + PRESENTATION P SD DD CD CA 1 2 3 4 5 6 7 Karol Perez 001 Karol Perez 3 6 1 2 1 1 1 4 4 2 10 3 28 W15 - 28/20/2 Nov- Dec 2022 1 0 0 1 2 1 15 7 6 3 0 1 4 1 1 1 5 3 2 2 0 0 Adobe Suites CD Autocad + Drafting Construction Documents Construction Documents 1 1 1 CD Construction Documents CD Research + Images
TIMESHEET

LETTER OF AGREEMENT

11/21/2022

KP Designs

4567 Madeup St. Cincinnati, OH 45202

Dear Eastlake Studio

It was a pleasure meeting with you last week to finalize the next phase of your new project, Eastlake Studio Satellite Office to be located at The Edge | LEED

Registered Office Space 310 Culvert St, Cincinnati, OH 45202. This letter of agreement outlines the services, fees, and other responsibilities of this firm, beginning December 9, 2022.

Based on our preliminary discussions, it is my understanding that the spaces to be included in the project are A Satellite Workplace Office, including: a lobby, restrooms, private client meeting spaces, team rooms, workstations, private principle offices, break area, kitchen and staff area, mother’s room, materials library, IT service room, workspace, copy and printing, seating areas, conference rooms, mail room, open workstations, reception desk, and outdoor seating/patio area.

It is also my understanding that you wish to purchase the freestanding furnishings directly. To that end, we will provide specification documentation to assist you in making your purchases. While it is not expected that KP Designswill be selling you the materials as part of this agreement, we stand ready to assist you with bid preparation and/or acquisition management as an additional service should you request the services as a later date.

Since the work will include extensive acoustical and audio-visual work, we will coordinate closely with your consultants [insert names here], already under contract to you.

Our scope of basic services on the project will include:

Acquire documentation of the building from the present owner and verify their accuracy.

Based on the programming document prepared by our firm for you last summer, prepare schematic and design development drawings and outline specifications for your review

Based on your approvals of the schematic design direction, prepare construction documents (including drawings and specifications) necessary for interior construction.

• Consult with and coordinate with architects, contractors, engineers, consultants (such as acoustical, kitchen/bar equipment, audio/visual, etc.) and other advisors whose specialized skills may be needed for the project. Assist you with selecting qualified contractors and suppliers needed to complete the remodeling and finishing work.

• During construction review of the work of the project contractors for compliance with the interior design contract documents.]

Compensation for the basic services described above will be calculated at an hourly rate of Two hundred twenty dollars ($220.00) for the work described above completed in association with the project. Additional services, including work required by a change in the project scope, design, or other services requested by Eastlake Studio will be billed at an hourly rate of $220.00 Such services may include but is not limited to preparation of documentation for bidding of furniture, procurement assistance, and preparation of materials for advertising and/or promotional materials. No additional services will be performed without the written consent of Eastlake Studio

Direct costs to the project will be considered Reimbursable Expenses and will be computed as a multiple of 1.15 times the actual expense incurred by KP Designs in the interest of the project. Reimbursable Expenses include but are not limited to the expense of transportation in connection with the project, long distance communication, filing or application fees required by regulatory authorities having jurisdiction over the project site, expense of production, reproduction, postage and handling of documents (including express charges if necessary, expense of renderings, models, and mockup samples. Other expenses may be necessary and will be discussed with you before they are incurred.

The scope of this project may require services of consultants and/or other contractors. While KP Designs is not responsible for such relationships regarding their contracts and compensation, we will endeavor to work with Eastlake Studio to suggest possible sources, probable fees, and other costs to assist with the timely inclusion of these services into the project. All consultant fees will be billed directly to you by the consultant.

Billing and payments will be handled as follows:

1. The client will pay an initial fee of $5,000 upon signing this agreement. This initial fee wil be credited to you on the final project invoice. You will be billed for actual hours worked expended in association with the project.

agreeing to a mediator, prior to either party’s initiation of arbitration or other legal action.

8. The laws of Ohio shall govern this agreement.

9. In recognition of the relative risks, rewards, and benefits of the project to Eastlake Studio and the Design Firm, the risks have been allocated such that Eastlake Studio agrees that, to the fullest extent permitted by law, a total liability to KP Designs for any and all injuries, claims, losses, expenses, damages, or claim expenses arising out of this agreement from cause or causes, shall not exceed $500,000 for any claim arising out of negligence.

10. This agreement represents the entire and integrated agreement between Eastlake Studio and KP Designs and supersedes all prior negotiations, representation or agreements, either written or oral. This agreement may be amended only by written instrument signed both by Eastlake Studio and the Design Firm.

If this agreement is in keeping with your understanding, please sign in the space provided below and return a signed copy to our office along with a check for the $5,000 initial payment. Upon receipt, we’ll begin work on the project. Our first step will be to schedule a meeting with you and the project team to prepare the strategic plan for project implementation.

Thank you for the opportunity to work with you again and to realize the ideas we developed during the programming phase. We look forward to an engaging and productive working relationship.

For KP Designs

Offered by:

Authorized Signatory, Title

Date

For Eastlake Studio

Accepted by:

(Authorized Signature)

(Print name/title)

(Date)

2. Invoices for services and reimbursable expenses will be sent on a regular, periodic basis.

3. Invoices will be sent by emai (with a hardcopy following by standard mail).

4. Invoices are due when rendered and shall be considered past due if not paid within fifteen days after issue date. If the invoice is not paid within thirty days of the issue date, KP Designs may, without waiving claim or right against Eastlake Studio and without liability whatsoever to Eastlake Studio, suspend or terminate the performance of services.

5. Payments to third party consultants are due in accordance to their billing procedures and are to be paid directly to the third party provider.

Other terms applicable to the project

1. All documents prepared for this project by KP Designs under this agreement remain the property of KP Designs and may not be used by Eastlake Studio or any other person or endeavor without consent from the Design Firm. However, Eastlake Studio may use all documents, reports and findings prepared under this agreement for the completion, implementation, and/or execution of recommendations contained therein.

2. Eastlake Studio will provide KP Designs the opportunity to photograph the project and use such images in the promotion of its business endeavors. Photographs will clearly credit the project

3. KP Designs provides good faith in assisting you in obtaining the services of qualified contractors but cannot be held responsible for the performance, quality, or timely completion of work by these third parties. Further, KP Designs is not responsible for changes made by you or your consultants without notification to the designer.

4. KP Designs will provide on site review during the construction, as the firm deems necessary for the sole purpose of establishing compliance with the construction documents. Primary construction supervision remains the responsibility of the contractors hired to the work.

5. KP Designs will have access to the site for activities necessary for the performance of services. Eastlake Studio understands that KP Designs is not responsible, in any way, for the means, methods, sequence, procedures, techniques, scheduling of construction, or jobsite safety, and will not be responsible for any losses or injuries that occur at the Project site.

6. This agreement may be terminated by either party upon 7 days written notice. In the event of termination, Eastlake Studio agrees to compensate KP Designs for all work completed up to the termination.

7. All claims, counterclaims, disputes and other matters in question between the parties hereto arising out of or relating to the Agreement or breach thereof shall be presented to non-binding mediation, subject to the parties

CONTACT

PHONE: (513) 525-2502

EMAIL: perezka3@miamioh.edu

WEBSITE: issuu.com/karolperezportfolio

LINKEDIN: Karol Perez