International Research Journal of Engineering and Technology (IRJET)
e-ISSN: 2395-0056
Volume: 08 Issue: 07 | July 2021
p-ISSN: 2395-0072
www.irjet.net
AN EFFICIENT & EFFECTIVE SOLUTION OF CONSTRUCTION WASTE FROM PROJECT MANAGEMENT PERSPECTIVE KARNAVIRSINH V GOHIL1, PROF. JAYRAJ V. SOLANKI2 1M.Tech
Student, Department of Civil Engineering, Ganpat University, Gujarat, India 2PG Head, Ganpat University, Gujarat, India ---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - India is one of the largest developing countries
accounting for more than 50% of the waste from construction and demolition activities, are not being currently recycled in India
with the second largest population in the world Currently there is a huge scope of work related in India due to which a large amount of construction is taking place everywhere in India Over time there have been many new improvements in construction including a lot of software based on which we can schedule the planning and plan this particular construction in a way that makes it easier to know how the construction will work throughout the year and how much work will be done Remain With the increase in construction, the waste of material is also increasing. It accounts for 40 to 50 per cent of the total construction This can reduce construction costs if used with calculation In this this technique , if material is used and ordered by the project management and proper preservation is done, wastage of material can be prevented so that effective and efficient material can be solved by construction management project waste
1.1 Objective Saving Environment Focus on estimations & costs Decelerate resource use Reduce cost over run
1.2 Need To Study This study is necessary to give an estimate of the amount of material consumed by this and to estimate the engineer contractor labor owner material and how much it will cost. How much is the consumption? Estimation of usage will make it easier to order so that material waste is minimized
Key Words: Construction waste, construction waste management, Waste Minimization, Project Management
1.3 Research Methodology Qualitative approach Quantitative approach
1.INTRODUCTION The construction industry is one of the fastest growing industries in India with a lot of money invested and a lot of material wasted. The construction industry involves a large number of laborers and requires a lot of time and cost to work with, so it is very important to have a management that can save money, This construction requires careful management of each of its activities and also its cost analysis, a very large amount of material waste is generated at the time of construction, which is a very high cost if the waste is calculated. The reasons behind the increase in construction work in India are population growth and urbanization due to which the demand for construction has been increasing. Construction waste has been on the rise due to poor construction work at such times. Disposal of construction waste is an important issue At present, where construction is taking place, its waste is dumped in the roadside area near it, which is also causing traffic problems. There is a lot of waste in this construction that we can reuse, reuse reduce recycle and be useful in its cost estimation. Construction waste is generated from construction, renovation, repair, and demolition of houses, large building structures, roads, bridges, piers, and dams waste is made up of wood, steel, concrete, gypsum, masonry, plaster, metal, and asphalt. While retrievable items such as bricks, wood, metal, titles are recycled, the concrete and masonry waste,
© 2021, IRJET
|
Impact Factor value: 7.529
It is imperative to visit the site to get all kinds of information about the site and construction and how the waste is generated Useful for understanding the building with the help of architect by which we can get statistic about the construction so that it is easy to know how much material will be used for work How much will be used for rods and what will be its contingency by drawing of structure and when will it be well used Study all the plans on site with the help of supervisor and study the seat of how much material will be used for each activity Although all types of material are estimated, different types of waste are generated and how much more material is used than the estimated material
2. DATA COLLECTION Project type Plot size Built up area Carpet area Owner Architect Structure engineer Site engineer Height of building Flats of
|
Residential 680 var 27340 sq.ft 16275 sq.ft Neerali Group Hemal bhatt Atul vora Yash bhatt G+5 3 bhk / 2 bhk
ISO 9001:2008 Certified Journal
|
Page 434