IRJET-Statistical Analysis of a Production Line for a Trouser Manufacturing Unit in a Garment Indust

Page 1

International Research Journal of Engineering and Technology (IRJET) Volume: 03 Issue: 07 | July-2016

www.irjet.net

e-ISSN: 2395 -0056 p-ISSN: 2395-0072

STATISTICAL ANALYSIS OF A PRODUCTION LINE FOR A TROUSER MANUFACTURING UNIT IN A GARMENT INDUSTRY USING SIMULATION MODELING Gana Shyam.V1, V.Vivekanand2, Rohit Titus3 , Abhishek Shetty4 1,3,4Bachelor

2Assistant

of Engineering, MSRIT, Banaglore-560054 Professor, Industrial Engineering & Management, MSRIT, Banaglore-560054

---------------------------------------------------------------------***---------------------------------------------------------------------

Abstract -The garment industry consists of series of

arises due to Interarrival and service times. In addition

processing units and a continuous flow of garments. Since it

availability, resource constraints, failures, rejection adds

is a series of processing stages, the variability at one stage

to the decrease in performance measure.

can have an effect on another stage. In a garment industry variability in the system arises due In a trouser manufacturing unit, the back Panel trouser unit

to the processing times of various processes involved in

and front Panel trouser unit are assembled at a particular

stitching the garment. The basic process flow of how a

stage, therefore variability at each one of unit will have an

garment gets processed is shown in Figure 1.

effect on assembly area. Thus the performance outcome such as throughput, WIP, cycle time could be affected. In

Figure 1 provides an outline of the different processes of

order to understand the effects of it would be necessary to

each section. The time required for each sub process in a

study the process time, and hence forth understand the

section is not large enough, however the time required for

effects of its variability at all stages. This can be achieved by

each section for completion of a set of batch is large. For

analyzing the process time and simulating the system. This

example front Panel would take to process a batch of 10

would provide a good insight into the manufacturing

within a particular time, likewise back Panel and

principles of garment industry in reference to performance

assembly. Hence understanding the process time based on

measures such as cycle time.

batches would be a better way to understand the performance measures.

Additionally there would be various situations possible for which simulation can be provide good insight. This paper

Typically in queuing model certain assumptions are taken

focuses on all such aspects.

which include that Inter arrival time should be exponential distributed and model should be Markovian in

Key Words:Simulation, Throughput, T Test, Cycle Time,

nature (Hiller and Liberman[5]). Modeling of such

WIP

situation can be accomplished by using queuing theory models. However it is not necessary that real world

1.INTRODUCTION

scenario need to follow such kind of behavior in process or

There are many factors which affect the throughput and

interarrival times. In such cases simulation would be

waiting time of a manufacturing system. A manufacturing

better option to understand the performance measures.

system can be viewed as queuing system where variability

Š 2016, IRJET

|

Impact Factor value: 4.45

|

ISO 9001:2008 Certified Journal

|

Page 559


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.