U5PA88E0.book Page 3 Tuesday, June 9, 2009 8:44 AM
FOR YOUR SAFETY – PRE-OPERATION CHECKS ITEM
CHECKS
PAGE
Front fork and rear shock absorber assembly
• Check that they operate smoothly and there is no oil leakage.
4-7, 4-9, 4-9, 7-25
Chassis fasteners
• Make sure that all nuts, bolts and screws are properly tightened. • Tighten if necessary.
—
Moving parts and cables
• Check that the control cables move smoothly. • Check that the control cables are not caught when the handlebars are turned or when the front forks travel up and down. • Lubricate moving parts and cables if necessary.
Exhaust system
• Check that the exhaust pipe is tightly mounted and has no cracks. • Check for leakage.
—
Ignition system
• Check that all leads and cables are properly connected.
7-8
5
5-3
7-23, 7-23, 7-24, 7-25