1 minute read

Proportional controls indicator light

Authorized workshop

Customer

Every 1500 s/h

Maintenance plan/service hours (s/h) Every 1000s/h once a year

Every 500 s/h

Every 250 s/h

Service 50 s/h

Maintenance work (once a day)

3.3 Maintenance plan (overview)

Work description

t, please refer to the operation and maintenance manual For service and maintenance work on the attachmen of the attachment manufacturer as well. Check the Powertilt for damage (must not be over 0.38 mm.) Check Powertilt for axial play Actuate Powertilt swivel device in final position for 1 minute 13

Lubrication service ( ):

on page 3-4: Maintenance label Lubricate the following assemblies/components – see •Stabilizer blade •Swivelling console •Boom •Stick •Attachments •Hydraulic quickhitch (option) •Powertilt on page 3-46 – see Lubrication strip • Grease strip on chassis

Air conditioning ( ):

Perform the following maintenance and inspection work: •Function of air conditioning 11 Replace cab filter Check dehumidifier for corrosion, condensation and air bubbles Replace dehumidifier and refrigerant 12 Compressor oil 14 Check the refrigerant

Functional check ( ):

mblies/components. Rectify if necessary: Check the function of the following asse •Lights, signalling system, acoustic warning system 15

16 •Heating function

This article is from: