Nissan Marine NS9.9_NS12_BS15_NS18 Owner's Operating Manual - PDF DOWNLOAD

Page 26

(3) Running-in operation 2) Installation While holding the upper cover with its @Procedure back side raised. insert the front hook 1) It is important to note that the service life of an outboard motor depends mounted on the inner front side of the largely on how it is operated during its cover into the catch of the lower cowr. initial period. Operation under heavily Fit the upper cover onto the ICJWU loaded conditions causes abnormal wear COW by aligning the upper cow on sliding components before proper mountmg bole with the recoil starter contact is achieved. This impairs engine handle. performance for the rest of its hfe. The Next, engage the hook lever located on purpose of running-in the engine is to the back of the lower cover. This will provide proper contact between shdmg lock the upper cover in position. parts by avoiding undue loading during its initial operation period. This will assure high engine performance for an extended period of time. 2) The engine should be rwun for at least ten Lower motor CDVBl hours, using the following procedure: a) For the first 30 minutes, operate the motor at l/4 throttle. After this period, gradually open the throttle to the l/2 position, and continue motor operation for 2.5 hours. During this three-hour runningin period, use fuel with a ?O:I gasoline-oil ratio. b) During the subsequent two hours, continue to run-in the engine by graduFig .?I ally opening the throttle from 112 to 314 position. Every 30 minutes during this period, fully open the throttle once for about 30 seconds (be sure not to

exceed the allowable maximum engine v). During this two-hour period, use the 20: 1 fuel mixture ratio. c) After completing the first five hour period, change the fuel mixture to a 50: 1 ratio, and conduct another fivehour running-in operation at 314 throttle. Every 30 minutes during this period, fully open the throttle once for about one minute @e sure not to exceed the allowable maximum engine rpm). NOTES: a Be sure before

to conduct starting

the

the

A Be sure to warm up starting the running-in A After

starting

the

at high-speed A

under

Avoid

prolonged

during

the

running-in

daily

running-in

inspection operation.

the engine operation.

engine.

before

do riot

no-load full-throttle

operate

conditions. OperatiOn

period.

21


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Nissan Marine NS9.9_NS12_BS15_NS18 Owner's Operating Manual - PDF DOWNLOAD by www.heydownloads.com - Issuu