1 minute read

Control and operation

Installation and removal of attachment parts

Turn off the engine and, with the ignition key in the contact position, push the right joystick briefly to the left and then to the right in order to remove the pressure in the hydraulic circuits.

Turn the lever of each valve block 15 in position A (Position A, bucket operation) and push the right joystick briefly to the left and then to the right in order to remove the pressure in the hydraulic circuits.

Push the safety lever up.

Separate hydraulic hose 11, hydraulic hose 12 and, if present, hydraulic hoses 13 and 14 from the pipes on the stick.

Close open lines immediately to prevent any dirt entering. Support the grab so that it is stable.

Remove the plate 6. Drive out the pin 4 and remove the pin bearing sealings 25 If necessary, start the engine and lift the attachment slightly to remove the pin 4

3.7.4Attaching and dismounting the grab on the industrial stanchion

Before attaching a clamshell bucket or grapple, ensure that the required hydraulic lines for operating the grab are attached to the industrial stanchion.

Attaching and dismounting a grab should be carried out by two people.

Danger!

Risk of injury.

moving the equipment.

Attaching the grab

Position the grab with the shell fully open.

Move the equipment until the lower mount of the industrial stanchion is between the bearing points of the grab mounting 1

Guide in bolt 4 and secure using disk 6.

This article is from: