6 minute read

Two-stage swing-away lattice extension 3.5 Checklists for rigging work

13. Attach the guide rope to the head of the 12.5 m (41 ft) section and raise the lattice extension completely.

14. Swing 12.5 m (41 ft) section onto the main boom; à Swinging the lattice extension when rigging, p.3-61.

15. Raise lattice extension with retaining mandrel in the holder on the main boom; à Lowering/raising retaining mandrel on main boom, p.3-57.

16. Remove the swinging connection between the 12.5 m (41 ft) section and the main boom head; à Connections on main boom head, p.3-48.

17. Swing the 12.5 m (41 ft) section on the run-up rail onto the main boom; à Swinging the lattice extension onto the main boom head , p.3-64.

HIf the 9 m (30 ft) section is not attached to the main boom proceed as from Point 20.

18. Establish connection on the pivot point between the 12.5 m (41 ft) and 9 m (30 ft) sections; à Connections on lattice extension, p.3-50.

Two-stage swing-away lattice extension 3.5 Checklists for rigging work

19. Establish connection between 9 m (30 ft) and 12.5 m (41 ft) sections; à Connection between 9 m (30 ft) section and main boom, p.3-45.

20.If the 9 m (30 ft) section is not attached to the main boom, lock the 12.5m (41 ft) section on the run-up rail; à Connections in the middle area, p. 3-46.

21. Disconnect hydraulic connection between lattice extension and main boom; à Establishing/disconnecting the hydraulic connection , p.3-67.

22. Disconnect electrical connection between lattice extension and main boom; à 13 m (43 ft) swing-away lattice extension , p.3-65.

23. Check whether the lattice extension is in transport position; à Checking the transport condition, p.3-35.

24. Remove hose drum for hydraulic supply (if applicable); à Installing hose drum, p.3-39.

Two-stage swing-away lattice extension 3.5 Checklists for rigging work

3.5.6 CHECK LIST: Rigging 22 m (72 ft) two-stage swing-away lattice extension

HThis checklist is not equivalent to complete operating instructions. There are accompanying instructions which are indicated by cross-references. Observe the warning and safety information given there!

1. Prepare the truck crane for rigging the swing-away lattice extension; à Preparing the truck crane for rigging, p.3-33.

2. Install/connect hose drum for the hydraulic supply of the lattice extension (if applicable); à Installing hose drum, p.3-39.

3. Check that the lattice extension was unrigged properly and is in transport condition; à Transport condition with lattice extension folded at the side, p.3-37.

4. Move run-up rail into rigging position; à Run-up rail, p.3-63.

5. Disconnect connection between 9 m (30 ft) section and main boom; à Connections in the rear area, p.3-47.

6. Establish hydraulic connection between lattice extension and main boom; à Establishing/disconnecting the hydraulic connection, p.3-67.

Two-stage swing-away lattice extension 3.5 Checklists for rigging work

7. Establish electrical connection between lattice extension and main boom; à 13 m (43 ft) swing-away lattice extension , p.3-65.

8. Swing 12.5 m (41 ft) section onto the main boom head; à Swinging the lattice extension onto the main boom head , p.3-64.

9. Establish the swinging connection between the 12.5 m (41 ft) section and the main boom head; à Connections on main boom head, p.3-48.

10. Secure the 12.5 m (41 ft) section with guide rope on the main boom; à Securing lattice extension with cord, p.3-59.

11. Lower lattice extension with retaining mandrel out of the holder on the main boom; à Lowering/raising retaining mandrel on main boom, p.3-57.

12. Swing two-stage swing-away lattice extension in front of the main boom head; à Swinging the lattice extension when rigging, p.3-61.

Two-stage swing-away lattice extension 3.5 Checklists for rigging work

13. Lock 12.5 m (41 ft) section on the left side of the main boom and, if required, lower the lattice extension to the ground to relieve the load on the bearing points; à Connections on the main boom head, p.3-53. à Relieving the load on bearing points, p.3-53.

14. Lock 12.5 m (41 ft) section on the right side of the main boom; à Connections on the main boom head, p.3-53.

15. Attach guide rope to the head of the 9 m (30 ft) section and remove connection between 9 m (30 ft) and 12.5 m (41 ft) sections; à Connection between 9 m (30 ft) section and main boom , p.3-45.

16. Raise lattice extension fully and swing the 9 m (30 ft) section in front of the 12.5 m (41 ft) section; à Swinging the 9 m (30 ft) section in front of the 12.5m (41ft) section, p.3-62.

17. Lock the 9 m (30 ft) section in front of the 12.5 m (41 ft) section; à Connections on lattice extension, p.3-55. à Relieving the load on bearing points, p.3-53.

18. Establish the electrical connection between the 12.5 m (41 ft) and 9 m (30 ft) sections; à 22 m (72 ft) two-stage swing-away lattice extension, p.3-66.

19. Fold out both deflection sheaves on the 12.5 m (41 ft) section and the 9m (30 ft) section; à Folding out/in the deflection sheaves on the 12.5m (41ft) section, p.3-68.

20. Place hoist rope on the 9 m (30 ft) section via all deflection sheaves and the head sheave; à Positioning hoist rope , p.3-70.

21. Move anemometer (additional equipment) from the head of the main boom to the head of the 9 m (30 ft) section; à Anemometer on the lattice extension, p.3-74.

22. Move lifting limit switch from the head of the main boom to the head of the 9 m (30 ft) section; à Lifting limit switch on the lattice extension, p.3-72.

23. Reeve the hoist rope on the hook block; à GMK 5200/6220-L operating instructions, Part 2, Chapter Rigging work, Section Rigging work on the main boom – Reeving and unreeving the hoist rope

24. Attach lifting limit switch weight and guide hoist rope through the weight; à GMK 5200/6220-L operating instructions, Part 2, Chapter Rigging work, Section Rigging work on the main boom – Reeving and unreeving the hoist rope – lifting limit switch weight.

25. Enter SLI code according to the Lifting capacity table for the actual rigging mode of the truck crane with the 22 m (72 ft) two-stage swingaway lattice extension; à GMK 5200/6220-L operating instructions, Part 2, Chapter Crane operation , Section Operation of the safe load indicator – Setting the rigging mode.

Further working steps for raising the boom; à p.3-77. Telescoping with rigged lattice extension; à p.3-78.

3.5.7 CHECK LIST: Unrigging 22 m (72 ft) two-stage swing-away lattice extension

HThis checklist is not equivalent to complete operating instructions. There are accompanying instructions which are indicated by cross-references. Observe the warning and safety information given there!

1. Prepare the truck crane for unrigging; à Preparing the truck crane for rigging, p.3-33.

2. Fully retract and set down main boom.

3. Enter the SLI code according to the Lifting capacity table for the actual rigging mode of the truck crane with the 22 m (72 ft) two-stage swingaway lattice extension; à GMK 5200/6220-L operating instructions, Part 2, Chapter Crane operation , Section Operation of the safe load indicator –Setting the rigging mode.

4. Remove lifting limit switch weight and move lifting limit switch from the head of the 9 m (30 ft) section to the head of the main boom; à GMK 5200/6220-L operating instructions, Part 2, Chapter Rigging work, Section Rigging work on the main boom – Reeving and unreeving the hoist rope lifting limit switch weight

5. Unreeve the hoist rope from the hook block; à GMK 5200/6220-L operating instructions, Part 2, Chapter Rigging work, Section Rigging work on the main boom – Reeving and unreeving the hoist rope.

Two-stage swing-away lattice extension 3.5 Checklists for rigging work

6. Remove anemometer (additional equipment); à Anemometer on the lattice extension, p.3-74.

7. Lower lattice extension until it is on the ground with the supports on the head of the 9 m (30 ft) section, remove hoist rope from head sheave and deflection sheaves and place on the left side of the lattice extension on the ground.

8. Disconnect the electrical connection between the 9 m (30 ft) and 12.5 m (41 ft) sections; à 22 m (72 ft) two-stage swing-away lattice extension, p.3-66.

9. Fold in both deflection sheaves; à Folding out/in the deflection sheaves on the 12.5m (41ft) section, p.3-68.

10. Reel up hoist rope up to the main boom head. H

If the 9 m (30 ft) section needs to be removed and only the 12.5 m (41 ft) section at the side of the main boom needs to be folded, see Point 15.

11. Attach the guide rope to the 9 m (30 ft) section of the lattice extension.

This article is from: