Two-stage swing-away lattice extension 3.5 Checklists for rigging work
13. Secure the 12.5 m (41 ft) section with guide rope on the main boom; à Securing lattice extension with cord, p.3-59.
14. Lower lattice extension with retaining mandrel out of the holder on the main boom; à Lowering/raising retaining mandrel on main boom , p.3-57.
15. Swing 12.5 m (41 ft) section in front of the main boom head; à Swinging the lattice extension when rigging, p.3-61.
16. Lock 12.5 m (41 ft) section on the left side of the main boom and, if required, lower the lattice extension to the ground to relieve the load on the bearing points; à Connections on the main boom head, p.3-53. à Relieving the load on bearing points, p.3-53.
17. Lock 12.5 m (41 ft) section on the right side of the main boom; à Connections on the main boom head, p.3-53.
18. Fold out both deflection sheaves on the 12.5 m (41 ft) section; à Folding out/in the deflection sheaves on the 12.5m (41ft) section , p.3-68.
Two-stage swing-away lattice extension 3.5 Checklists for rigging work
19. Place hoist rope above both deflection sheaves and the head sheave on the 12.5 m (41 ft) section; à Positioning hoist rope , p.3-70.
20. Move anemometer (additional equipment) from the head of the main boom to the head of the 12.5 m (41 ft) section; à Anemometer on the lattice extension, p.3-74.
21. Move lifting limit switch from the head of the main boom to the head of the 12.5 m (41 ft) section; à Lifting limit switch on the lattice extension , p.3-72.
22. Reeve the hoist rope on the hook block; à GMK 5200/6220-L operating instructions, Part 2, Chapter Rigging work , Section Rigging work on the main boom – Reeving and unreeving the hoist rope
23. Attach lifting limit switch weight and guiding hoist rope through the weight; à GMK 5200/6220-L operating instructions, Part 2, Chapter Rigging work, Section Rigging work on the main boom – Reeving and unreeving the hoist rope – lifting limit switch weight.
24. Enter the SLI code according to the Lifting capacity table for the actual rigging mode of the truck crane with the 13 m (43 ft) swing-away lattice extension; à GMK 5200/6220-L operating instructions, Part 2, Chapter Crane operation , Section Operation of the safe load indicator – Setting the rigging mode.
Further working steps for raising the boom; à p.3-77. Telescoping with rigged lattice extension; à p.3-78.
Two-stage swing-away lattice extension 3.5 Checklists for rigging work
3.5.5 CHECK LIST: Unrigging 13 m (43 ft) swing-away lattice extension
HThis checklist is not equivalent to complete operating instructions. There are accompanying instructions which are indicated by cross-references. Observe the warning and safety information given there!
1. Prepare the truck crane for unrigging; à Preparing the truck crane for rigging, p.3-33.
2. Fully retract and set down boom.
3. Enter the SLI code according to the Lifting capacity table for the actual rigging mode of the truck crane with the 13 m (43 ft) swing-away lattice extension; à GMK 5200/6220-L operating instructions, Part 2, Chapter Crane operation, Section Operation of the safe load indicator – Setting the rigging mode.
4. Remove lifting limit switch weight and moving lifting limit switch from the head of the 12.5 m (41 ft) section to the head of the main boom; à Lifting limit switch on the lattice extension, p.3-72.
5. Unreeve the hoist rope from the hook block and roll it onto a drum; à GMK 5200/6220-L operating instructions, Part 2, Chapter Rigging work, Section Rigging work on the main boom – Reeving and unreeving the hoist rope.
6. Remove anemometer (additional equipment); à Anemometer on the lattice extension, p.3-74.
Two-stage swing-away lattice extension 3.5 Checklists for rigging work
7. Lower lattice extension until it is on the ground with the supports on the head of the 12.5 m (41 ft) section, remove hoist rope from head sheave and deflection sheaves and place on the left side of the lattice extension on the ground.
8. Fold in both deflection sheaves; à Folding out/in the deflection sheaves on the 12.5m (41ft) section, p.3-68.
9. Reel up hoist rope up to the main boom head.
10. Move run-up rail into the Unrigging position; à Run-up rail , p.3-63.
11. Remove locking pin between 12.5 m (41 ft) section and main boom head on the left side of the main boom; à Connections on the main boom head, p.3-53. à Relieving the load on bearing points, p.3-53.
12. Remove locking pin between 12.5 m (41 ft) section and main boom head on the right side of the main boom; à Connections on the main boom head, p.3-53.