Operation

Next Article
Operation

Operation

Digging tips

When completing digging work, we recommend the following:

• Exit the pit, as level as possible, from outside the digging line.

• Dig by removing adjacent strips.

• Drive in forward when transporting a full bucket out of the digging area.

• Drive in reverse when transporting a full bucket down a steep slope.

Loading trucks

When loading trucks, we recommend the following:

• The truck and loader working direction should form an angle of 45°.

• Only raise a full bucket to the dump height when you are driving in a straight line toward the truck.

• Dump with the wind behind you to keep the dust away from your eyes, air filters, and fans.

Freeing the machine

If your machine gets stuck in soft ground:

☞ Dump out the bucket until the blade is vertical above the ground.

☞ Completely lower the loader unit.

☞ Gradually tilt back the bucket

➥ The machine is pushed rearward.

☞ Reverse slowly.

☞ Repeat this procedure until the wheels reach firm ground.

☞ Reverse the machine away.

Workingwiththepalletforks

• Before working, be sure that the fork arms on the fork frame are safely locked.

• Maintain a minimum distance of 19’7” (6 m) between loader unit/load and overhead lines.

• Always approach the material with the machine wheels in straight-ahead position.

• Always tilt the forks slightly back (toward the machine) for transport.

• Always transport the load close to the ground.

• Always load on firm and level ground with sufficient load-bearing capacity (for a fully loaded machine).

• Only set loads onto designated areas, with a stable base, that have load-bearing capacity.

• Only stack loads up to the authorized maximum pallet height.

• Only place loads in designated areas within the construction site.

• Move the fork arms all the way under a pallet, as far as they will go, so that the load is picked up as closely as possible to the fork frame.

• Move under the load with the straight fork arms as far apart as possible and at an equal distance to the left and right side of the load (figure b)

• Lock the adjustable fork arms with the locking lever before moving the machine (with loaded or unloaded pallet forks).

• Lower the forks as closely as possible to the ground for transport. Follow minimum ground clearance.

• Drive slowly with a raised load, especially in off-road applications, to avoid swinging movements of the load.

• When driving or working across a slope, the load must be on the uphill side of the machine/attachment.

• On sloping terrain, drive the machine rearward to prevent the load from falling off and the machine from tilting forward when braking.

• When transporting large bulk loads, drive the machine rearward for improved visibility.

• Learn the load bearing capacity of bridges, basement ceilings, vaults, and similar structures before moving the machine onto them.

• Learn the clearances of underpasses, tunnels, gates, and similar structures before driving through or under them.

• Follow the load bearing capacity of the set-down area (e.g., truck platforms, storage area in high-bay warehouses).

• Load the vehicles or trailers evenly.

• Position and distribute the load evenly on the front tires.

• Never raise a load with only one fork arm.

• Never operate the machine and loaded attachment at high speeds.

• Never leave the machine with the load raised.

• Never use the controls, movable lines, or cables as handles.

• Never use bent, cracked or damaged fork arms/pallet forks.

• Never work or stand under raised or suspended loads (figure a )

• DO NOT transport people in the attachment.

• DO NOT stack or set down loads that are not properly packaged, have shifted in higher places, or have damaged pallets/stacking containers.

• DO NOT overload the attachment or the machine - follow the load diagram.

• DO NOT exceed the authorized maximum pallet height.

This article is from: